some developments (projects) · hybrid prototyping / dlp-printing 2013 pre-serial product for...

Post on 22-Aug-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

High-Speed-Inline-Galvanic Ultra-Sonic-Device

Some Developments (Projects)

Cable Storage

Chip Fixing

for Soccer Ball Planned for Soccer-World

Championship 2006

US-Shuttle

2004

REORGANISATION OF ASSEMBLY ITW-

CRONES Ansbach

2-LAYER-KANBAN-STOCK

80/20

Compact and flexible

JUST IN TIME Assembling

2005

MRD- induced supply chain management for KANBAN -Production

-200

0

200

400

600

800

1000

1200

1400

1600

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77

day

am

ou

nt

(pie

ce

s)

Produktion

STOCK JK!

CC!

induced KANBAN

STOCK-SG!

20 Per. Gleitender

Durchschnitt (STOCK-SG!)20 Per. Gleitender

Durchschnitt (STOCK JK!)

possible workload scenario in 2005 quartal outlook

• Evaluating a Support Construction together with external Engineers

• Projectmanagement together with the Unit-Manager

• Responsible for electrical Energy Supply (Planning, Installation, Controlling)

Management Task „Renovation“

2006-2007

Development of Electro Power Tools

2008/2012

Designing the plastic Parts of a a new

8kg Hammer and 5 kg Hammer

SRC-Electronic Feature to

improve the Safety

Concept - scalable Assembly Line

Target: minimum Production Costs according to

Sales Forcast

2013

Hybrid Prototyping / DLP-Printing

2013

Pre-Serial Product for Cosmetic Industry

First Prototype of a new HH-Generator 3D Printing

Hybrid-Prototype (with 3D printed parts)

top related