High-Speed-Inline-Galvanic Ultra-Sonic-Device
Some Developments (Projects)
Cable Storage
Chip Fixing
for Soccer Ball Planned for Soccer-World
Championship 2006
US-Shuttle
2004
REORGANISATION OF ASSEMBLY ITW-
CRONES Ansbach
2-LAYER-KANBAN-STOCK
80/20
Compact and flexible
JUST IN TIME Assembling
2005
MRD- induced supply chain management for KANBAN -Production
-200
0
200
400
600
800
1000
1200
1400
1600
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 61 63 65 67 69 71 73 75 77
day
am
ou
nt
(pie
ce
s)
Produktion
STOCK JK!
CC!
induced KANBAN
STOCK-SG!
20 Per. Gleitender
Durchschnitt (STOCK-SG!)20 Per. Gleitender
Durchschnitt (STOCK JK!)
possible workload scenario in 2005 quartal outlook
• Evaluating a Support Construction together with external Engineers
• Projectmanagement together with the Unit-Manager
• Responsible for electrical Energy Supply (Planning, Installation, Controlling)
Management Task „Renovation“
2006-2007
Development of Electro Power Tools
2008/2012
Designing the plastic Parts of a a new
8kg Hammer and 5 kg Hammer
SRC-Electronic Feature to
improve the Safety
Concept - scalable Assembly Line
Target: minimum Production Costs according to
Sales Forcast
2013
Hybrid Prototyping / DLP-Printing
2013
Pre-Serial Product for Cosmetic Industry
First Prototype of a new HH-Generator 3D Printing
Hybrid-Prototype (with 3D printed parts)