project planning scheduling

Post on 03-Nov-2014

96 Views

Category:

Business

11 Downloads

Preview:

Click to see full reader

DESCRIPTION

 

TRANSCRIPT

4251

0011 0010 1010 1101 0001 0100 1011

Project Management Orientation Program Project Planning & Scheduling Basics

Sadhanandavel R

Dheenadayalan S

4251

0011 0010 1010 1101 0001 0100 1011

Projects happen in two ways:

a)Planned and then executed or b) Executed, stopped, planned

and then executed.

4251

0011 0010 1010 1101 0001 0100 1011• Develop Project Management Plan

• Define the Scope and Create the WBS

• Sequence the activities, Estimate the duration and Create the

Schedule

• Identify the Risks and Plan the Responses

• Estimate the Costs

• Plan the Human Resources, Purchases

• Plan the Communication

Planning

4251

0011 0010 1010 1101 0001 0100 1011• Describes the Project Management Processes used by the Project

Team

• If the processes differ from Organization’s standards, the details of

Project Specific Processes

• Project Team Structure

• Roles and Responsibilities of Project Team

• Communication needs – Status Reports, Review Meetings,

Escalation Matrix

PLANNING > Project Management Plan

4251

0011 0010 1010 1101 0001 0100 1011• Defines the Project Life Cycle

• Describes management of:

• Risk – Risk Dimensions, Approach to Risk Management

• Change Control – Change Control Process

• Configuration – Details of version control mechanisms

• Quality – Project Metrics; Quality Audits

PLANNING > Project Management Plan

4251

0011 0010 1010 1101 0001 0100 1011• Integrates all the plans in one place

• Subsidiary plans are developed separately also

• PMP is different from Schedule

• Some plans include Earned Value Management

PLANNING > Project Management Plan

4251

0011 0010 1010 1101 0001 0100 1011• Product Scope – The functions and features of the product

• Project Scope – The work associated in the delivery of the product

of the project with specified

• Methods for defining scope vary from industry to industry

• In Software, product scope is defined in SRS and Project Scope is

defined in Project Plan, WBS

• Document Assumptions/Constraints

Planning > Scope Definition

4251

0011 0010 1010 1101 0001 0100 1011• Define the Deliverables of the Project – SRS, Project Plan, Design

Specs, Test Plans, Test Cases, User Documents, Tested Product

etc.

• Define the related work - Deployment on Client Servers, User

Training, Online Support etc.

• Document the Assumptions/Constraints

Planning > Scope Definition > Project Scope

4251

0011 0010 1010 1101 0001 0100 1011• Define the Functional and Non-functional requirements – Use

Cases, Screen Shots, Process Flow Charts etc

• Define the Technical Requirements – Deployment Architecture,

Technology used, License, Bandwidth requirements, Disaster

Recovery Plan etc.

• A separate Technical Requirements Document may be prepared

• Document the assumptions, constraints

Planning > Scope Definition > Product Scope

4251

0011 0010 1010 1101 0001 0100 1011

“Assumptions are important sources for Risk Identification!”

4251

0011 0010 1010 1101 0001 0100 1011• Represents the scope of the project into smaller, manageable

hierarchy of components

• Enables allocation of resources and assignment of responsibilities at

granular levels

• Improves the accuracy of Cost Estimation

• Improves the Cost, Performance Measurement & Control

Planning > Work Breakdown Structure

4251

0011 0010 1010 1101 0001 0100 1011

Planning > Work Breakdown Structure

4251

0011 0010 1010 1101 0001 0100 1011• Start at the project goal, and keep breaking down activities until you

get to the smallest task

• Involve the team for identifying the tasks or

• The Sub team approach (agree on level 1 activities, then have sub

teams tackle each activity in detail; then check for duplication and

missed tasks)

Planning > WBS > Top-down Approach

4251

0011 0010 1010 1101 0001 0100 1011• Agree on the top level activities using the top-down approach

• Then break into teams and brainstorm all the activities you think are

within that overall activity

• Organize the activities, and check for missed tasks and

redundancies

Planning > WBS > Bottom-up Approach

4251

0011 0010 1010 1101 0001 0100 1011

The top-down approach is more effective for generating a detailed WBS

4251

0011 0010 1010 1101 0001 0100 1011• The levels of hierarchy varies from project to project

• The division of levels can be based on Product Features (e.g. User

Module), Process (e.g. Requirements)

• The lowest level of the WBS contains items for which the cost can

be tracked

• The items at the lowest level are called Work Packages or Terminal

Elements

Planning > WBS > Levels of Hierarchy

4251

0011 0010 1010 1101 0001 0100 1011• Do not make it too detailed – Results Micro-Management

• Do not make it less detailed too – Tasks too large to manage

• 8/80 Rule – Thumb Rule says Work Package should be more than 8

and less than 80 hours in duration

• Consider appropriate milestones as Control points as well as for

Status Reporting

• Maintain Standard WBS for the organization based on project types

Planning > WBS > Points To Ponder

4251

0011 0010 1010 1101 0001 0100 1011• Decomposition – The process of arriving at components for WBS;

Division of project scope into manageable components/activities to

the level of work packages

• Rolling Wave Planning – The process of defining the tasks at a

higher level (due to lack of information) and elaborating them later

based on the clarification of details

Planning > WBS > Terminology

4251

0011 0010 1010 1101 0001 0100 1011• Develop the list of project activities (WBS/Activity List)

• Sequence the list of project activities

• Determine the relationships between activities

• Estimate the resource requirements for each activity

• Estimate the duration for each activity

• Determine the project duration (start and completion dates)

Scheduling > Steps Involved

4251

0011 0010 1010 1101 0001 0100 1011

Scheduling > Activity Sequencing

4251

0011 0010 1010 1101 0001 0100 1011

The resource related dependencies and constraints should not be considered for sequencing the activities

4251

0011 0010 1010 1101 0001 0100 1011• Identifying the relationships between activities involves the

sequencing plus dependencies between tasks

• There are 4 types of scheduling dependencies

Scheduling > Activity Relationships

Finish to Start

Start to Start Finish to Finish

Start to Finish

4251

0011 0010 1010 1101 0001 0100 1011• Two widely used diagramming techniques

• Bar / Gantt Charts

• Schedule and progress graphically depicted on a single chart

• Simple and most used scheduling diagram

• Good for Status Reporting

• Network Diagrams

• Identifies activities that control the project length

• Clearly shows the task dependencies

• Shows available float for non-critical activities

Scheduling > Schedule Diagrams

4251

0011 0010 1010 1101 0001 0100 1011

Scheduling > Gantt Charts

Status Date

Tasks

Plan

Progress

4251

0011 0010 1010 1101 0001 0100 1011• Two types of network diagramming techniques

• Arrow Diagramming Method

• Precedence Diagramming Method

Scheduling > Network Diagrams

AB

C

D

EF

C E

FA

B D

4251

0011 0010 1010 1101 0001 0100 1011• Precedence Diagramming Method (PDM)

• Boxes/Nodes represent the activities

• Arrows connect the boxes, show the dependencies

• Also called Activity On Node (AON) method

• PDM uses all the four dependencies (F-S,F-F,S-S,S-F)

• The dependency – Start to Finish – is seldom used

Scheduling > Network Diagrams

C E

FA

B D

4251

0011 0010 1010 1101 0001 0100 1011• Arrow Diagramming Method (ADM)

• Arrows represent activities

• Arrows connect the nodes for showing dependencies

• Also called Activity on Arrow (AOA) method

• Uses only Finish to Start dependency

• Uses Dummy activities to show logical relationships

Scheduling > Network Diagrams

AB

C

D

EF

4251

0011 0010 1010 1101 0001 0100 1011• Estimate the resource requirement for each activity

• The information from previous projects will be helpful

• The dependency between tasks should be considered for estimating

the resources

Scheduling > Resource Estimation

4251

0011 0010 1010 1101 0001 0100 1011• People who are familiar with the work can estimate better

• Organizational Process Assets (Historical Info, Productivity Data etc.)

will be helpful as a reference

• Estimation will be more accurate if it is obtained from more than one

source and averaged

• Consider the availability of a resource for a task. If the resource is

available only 50%, the task will take twice the duration

Scheduling > Duration Estimation

4251

0011 0010 1010 1101 0001 0100 1011• Two estimating methods : PERT and CPM

• Three time estimates

• Optimistic (O) No risk impacts considered

• Pessimistic (P) Some amount of risk impacts considered

• Most Likely (M) All risk impacts considered

• PERT uses the distribution’s mean to determine individual activity

duration (P + 4M + O) / 6

• CPM uses only one time estimate – Most Likely estimate

Scheduling > Duration Estimation

4251

0011 0010 1010 1101 0001 0100 1011• A Milestone is an event specifically designated to represent

some meaningful or specified goal that shows progress

• Good Reference for Management Reporting

• Types of Milestones

• Key Milestones – Phase Gates

• Schedule Milestones – Any significant event in the schedule

Scheduling > Milestones

4251

0011 0010 1010 1101 0001 0100 1011• Lead – A lead in dependency that allows acceleration of successor

activity

• Lag – A lag in dependency directs a delay in the successor activity

Scheduling > Leads & Lags

-5

B

Lag – 3 days delay after A Lead – D accelerated for 5 days

+3

A

C

4251

0011 0010 1010 1101 0001 0100 1011• The path in a project with the longest duration. The duration of the

Critical Path is earliest completion date for the project

• Critical Path Method (CPM)

• Forward Pass calculates Early Start and Early Finish dates

• Backward Pass calculates Late Start and Late Finish dates

Scheduling > Critical Path

4251

0011 0010 1010 1101 0001 0100 1011• Early Start (ES)- The earliest date a task can start

• Early Finish (EF)- The earliest date a task can be completed

• Late Start (LS)- The latest date a task can start without delaying the

projects end date

• Late Finish (LF)- The latest date a task can finish without delaying

the projects end date

Scheduling > Early & Late Dates

A 2ES EF

ES EF

LS LF

LS LF

4251

0011 0010 1010 1101 0001 0100 1011Calculation of Early & Late Dates

•Early Start = EF predecessor + 1

•Early Finish = ES + duration - 1

•Late Start = LF - duration + 1

•Late Finish = LS successor - 1

Scheduling > Early & Late Dates

4251

0011 0010 1010 1101 0001 0100 1011Forward pass calculates an activity’s early dates

•ES start + duration – 1 = EF

•Purpose of forward pass is to find the Critical Path

Backward pass calculates an activity’s late dates

•LF – duration + 1 = LS

•Purpose of the Backward Pass is to find the slack/float

Scheduling > Forward/Backward Pass

10 A 14

15 5 19

ES EF

LS LF

4251

0011 0010 1010 1101 0001 0100 1011The amount of time an activity can be delayed or lengthened. Also

called slack.

•Total float - The amount of time an activity can be delayed without

extending the overall project completion time. TF = LS – ES or TF = LF –

EF

•Free Float - The amount of time that an activity can be delayed without

delaying the start or occurrence of any other activity in the schedule

Scheduling > Float

4251

0011 0010 1010 1101 0001 0100 1011

My Sample Project

Scheduling > Sample Project

Tasks  Duration Start End Predecessor

12 days 6-Oct-08 21-Oct-08  

Task A 1 day 6-Oct-08 6-Oct-08  

Task B 3 days 7-Oct-08 9-Oct-08 A

Task C 2 days 7-Oct-08 8-Oct-08 A

Task D 5 days 10-Oct-08 16-Oct-08 B,C

Task E 3 days 9-Oct-08 13-Oct-08 C

Task F 3 days 17-Oct-08 21-Oct-08 D,E

4251

0011 0010 1010 1101 0001 0100 1011

My Sample Project

Method

ES of task with no predecessor = 1

EF of task with one predecessor = EF of predecessor + 1

EF of task with multiple predecessors = Max (EF of predecessors) +

1

EF = ES + Task Duration – 1

Critical Path = A-B-D-F

Scheduling > Forward Pass

2 3

C 2

4 6

E 3

10 12

F 3

1 1

A 1

2 4

B 3

5 9

D 5

4251

0011 0010 1010 1101 0001 0100 1011

My Sample Project

•LF of the last task = EF of the last task

•LS = LF - Duration +1

Scheduling > Backward Pass

2 3

C 2

4 6

E 3

10 12

F 3

1 1

A 1

2 4

B 3

5 9

D 5

LS

1210

LF

ES EF

4251

0011 0010 1010 1101 0001 0100 1011

My Sample Project

LF of a predecessor = Min (LS of all successors) - 1

Scheduling > Backward Pass

9743

1 1

A 1

2 4

B 3

5 9

D 5

2 3

C 2

4 6

E 3

10 12

F 310 12

9542

11

4251

0011 0010 1010 1101 0001 0100 1011

Scheduling > Calculating Float

A

B

C D

E F

  Early StartEarly

Finish Late Start Late Finish Free Slack Total Slack

Task A 1 1 1 1 0 0

Task B 2 4 2 4 0 0

Task C 2 3 3 4 0 1

Task D 5 9 5 9 0 0

Task E 4 6 7 9 3 3

Task F 10 12 10 12 0 0

Total Float = LS – ES or LF – EF

Free float = ES (Earliest successor) - EF – 1

or

Free float = Min (ES of successors) – ES - Duration

My Sample Project

4251

0011 0010 1010 1101 0001 0100 1011

Questions…?

4251

0011 0010 1010 1101 0001 0100 1011

Thank You