project portfolio planning & scheduling masterclass
TRANSCRIPT
©2018RealizationTechnologies,Inc.AllRightsReserved.
MASTERCLASS: Project Portfolio Planning and SchedulingHOW TO ACHIEVE A STEP JUMP IN PERFORMANCESANJEEV GUPTA
©2018RealizationTechnologies,Inc.AllRightsReserved.
2
PROJECT MANAGEMENT, WE HAVE A PROBLEM
PROJECTSARETHELIFEBLOODOFDEVELOPMENTANDGROWTHo $10Tspentoninfrastructureprojectseveryyearo Weareenteringtheageofhypercompetitiono DigitalTransformationisonthetopofCEO’sagenda
PROJECTMANAGEMENTISINCREASINGINIMPORTANCEo $500milliononthebalancesheetofPMI(purveyorofcertifications)o $8-10billion/yr.spentonprojectmanagementsoftwareandserviceso $208billionGDPimpactof2017-2027TalentGap
PROJECTSAREOVERDUEANDOVERBUDGET,OVERANDOVERAGAINo Noneedtoquotestatistics,youalreadyknowwhattheywouldbeo Theimpactcanbemeasuredindollarsandcents,orinhumanmisery
©2018RealizationTechnologies,Inc.AllRightsReserved.
3
THE PROMISE OF PROJECT PLANS
OPTIMIZATION OF TIME & RESOURCES
RELIABLEPROMISES
SYNCHRONIZED EXECUTION FULL
CONTROL
©2018RealizationTechnologies,Inc.AllRightsReserved.
4
THE HARSH REALITY
Worktooklongerthanestimated
Supplierswerelate
Approvalsdidn’thappenontime
Scopeandspecswerechanged
Encounteredtechnicalproblems
Tasksequencehadtochange
Plannedresourcesnotavailable
©2018RealizationTechnologies,Inc.AllRightsReserved.
6
BACKPOCKETSCHEDULES
5d
5d5d
5d
5d5d
5d
5d5d
5d
5d5d
ONEPLAN
o Projectplanningisresistedasanexerciseinfutilityo Peopleprefertheirown“backpocket”scheduleso Localoptimizationbecomesthemainmode*o Everyoneisfirefightingandwaitingonsomeoneelseo It’sdifficulttoholdpeopleaccountableo Youhavefrequentmeetingstoresolvescheduleconflictso Taskupdatesarejustabunchofrandomnumberso Statusreportsareunreliable(projectskeepslipping)o Highpriorityprojectscangetdoneinhalfthetime
CT 17.5è 10TP 2è 3
IS PLANNING & SCHEDULING THE PRIMARY PROBLEM?
If you have a planning & scheduling problem, improving processes or soft skills won’t improve
project delivery and resource efficiency.PLEASE FIX THE PLANNING & SCHEDULING PROBLEM.
©2018RealizationTechnologies,Inc.AllRightsReserved.
7
THE CCPM BREAKTHROUGH• The fundamental limitation it overcomes• How to make the breakthrough complete• ***Focus & Finish***• Value of Agile
“FOCUS & FINISH” TECHNIQUES FORLEVERAGING THE CCPM BREAKTHROUGH• Project planning• Pipeline planning• Resource planning• Execution practices
IMPLEMENTATION• Exactly what buy-in’s are required• When and why you need software
MASTERCLASS AGENDA
©2018RealizationTechnologies,Inc.AllRightsReserved.
8
CCPM IS A MAJOR BREAKTHROUGH…
5 5 5
DATE DATE DATE DATE
+/- +/- +/-
DATE DATEq PRIORITIZINGTASKS(WITHIN
ANDACROSSPROJECTS)q KNOWINGPROJECTSTATUSq ESTIMATINGCOMPLETIONDATESq USINGMANAGEMENTRESERVESq MANAGINGBOTTLENECKS
HOWTOUSEFLEXIBLETASKSCHEDULES
©2018RealizationTechnologies,Inc.AllRightsReserved.
9
…ALBEIT INCOMPLETE
TaskDurationvariabilityisnottheonlychangethatafflictsprojects.Howtomanagechangesinprojectnetworks(tasks anddependencies)?
©2018RealizationTechnologies,Inc.AllRightsReserved.
10
2-TIERED TASKS COMPLETE THE BREAKTHROUGH
TASK TASK TASK
TASK
Checklistsþ
þ
SUBTASKS
TIER1(TASKS)• Projectnetworksarestable(taskschangeveryinfrequently)
TIER2(SUBTASKS)• Givesflexibilitytothefrontline
§ TraditionalPERTnetworkisalwaysatthelowestleveloftasks§ CriticalPath/CriticalChain/BufferManagementrunatthelowestlevel§ Causesfrequentchangesinpriorities
§ 2-TieredPERTisonelevelabovethelowestleveloftasks(Tier1)§ Itisnotthesameasdefiningsummarytasks§ CriticalPath/CriticalChain/BufferManagementrunsatTier1§ Tier2schedulesaresubordinatedtoTier1priorities§ Takes“Focus&Finish”evendeeper
©2018RealizationTechnologies,Inc.AllRightsReserved.
11
WebinarbySiemensGamesahttps://youtu.be/4l3o9cp1u5k
©2018RealizationTechnologies,Inc.AllRightsReserved.
12
6w 10w 4w
6w 10w 4w
6w 10w 4w
6w 10w 4w
6w 10w 4w
6w 10w 4w
GLOBALOPTIMIZATIONMODE:FOCUS&FINISH
40weeks
Durationsincludeinterruptions
6w 10w 4w33%morethroughput
(1) (3) (3)
15w 25w 10w
15w 25w 10w
15w 25w 10w
50weeks
LOCALOPTIMIZATIONMODE:KEEPBUSY,SHOWPROGRESSEVERYWHERE(SPREADTHIN)
LOCAL VS. GLOBAL OPTIMIZATION
©2018RealizationTechnologies,Inc.AllRightsReserved.
13
• Thelongeratasktakes,thelongerthedownstreamwaitingtime(ratioof“TouchTime”to“LeadTime”isveryhighinprojects).
• Whenresourcesarespreadthin,workfinishesinbowwaves.
WHY NOT SPREAD RESOURCES THIN?
©2018RealizationTechnologies,Inc.AllRightsReserved.
14
BEFORE AFTER
ABBAG,PowerTechnologiesDivisionElectricalPowerTransmission,Engineer-to-Order
Throughputwas300baysperyear. Throughputincreasedto430baysperyear.
ABBCórdobaPowerTransformers,Engineer-to-Order
Engineeringcycletimewas8months.On-timedeliverywas85%.
Engineeringcycletimereducedto3months.On-timedeliveryimprovedto95%.16%increaseinmanufacturingthroughput(revenues).
ABB,HalleTransformerRepairandOverhaul
42projectscompletedin2007.On-timedeliverywas68%.
54projectscompletedin2008.On-timedeliveryimprovedto83%.
ActionParkMultiformaGrupoThemeParkDesign,Install&Commissioning
121projectscompletedin2004. 142projectscompletedin2005.153projectscompletedin2006.
AirgoNetworks(Qualcomm)NextGenerationWirelessTechnologyProductDevelopment
Cycletimefromfirstsilicontoproductionfor1stgenerationwas19months.
Cycletimefromfirstsilicontoproductionfor2ndgenerationwas8months.
AlcanAlesaTechnologiesMaterialHandlingSolutions,Engineer-to-Order
Completedanaverageof6.9projectsperyear. Completed10projectsinfirst8monthsof2009.31%increaseinthroughput-dollars.
Alcatel-LucentTelecommunicationSwitchesDesign,Development&Upgrades
Leadtimeswerelong.On-timedeliverywaspoor.
Leadtimesshortenedby10-25%.On-timedeliveryimprovedto90+%.Throughputincreasedby45%perperson.
Alna SoftwareCustomizedSoftwareDevelopment
Growthwasstagnating,becominginsufficienttosecuremarketposition.
Throughputincreasedby14%inthefirst6months.Cycletimereducedby25%andprojectcompletionsincreased17%withover90%on-timedelivery.
AmdocsCustomerExperienceSystemsCustomizedSWDevelopmentforTelecommunications
Marketpressuretoreducecostandcycletime.
8projectsincrisisrequiringCEOlevelattentionin2007.
14%increaseinrevenue/man-month.20%reductionincycletime.0projectsincrisisin2008.
ArmyFleetSupportHelicopterMaintenance,RepairandOverhaul(ForFlightSchools)
Maintenanceworkloadincreasedby37%andturnaroundtimeswerelong,leadingtohelicoptershortages.
32%reductioninCH-47turnaroundtime.52%reductioninUH-60turnaroundtime.8aircraftreturnedtocustomer($90Mincostavoidance).18,000sqftofhangarspacefreedup($2Mincostsavings).
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
15
BEFORE AFTER
AsahiSeisakushoInc.GlassManufacturing
Completed13projectspermonth. Completed16projectspermonth(23%increase).Reducedovertimerateby35%.Revenuegrewfrom¥280Mto¥420M(50%increase)with¥50Minprofits.
BHPBillitonIronOreAssetDevelopmentProjects
25,800man-hoursofengineeringdesignworkhadtobecompletedin8months.Historicaldelaysof2weeksandman-houroverrunsof20%.
Productivityincreasedby25%withonly19,500man-hoursneeded.Projectfinished3weeksearly.
BoeingSpace&IntelligenceSystemsSatelliteDesignandAssembly
ReflectorsweretheconstraintinAntennaandSatellitedelivery.
Electronicunitswerelate,delayingSatellitesubsystems.ClassifiedGovernmentprogramwasbehindscheduleandlosingmoney.
Operationwaslosing$200Maquarter.
DoubledReflectorsthroughputandreducedcycletimeby28%,alleviatingdeliveryconstraint.IncreasedproductivityinAntennaAssemblyandTestby64%andsubsequentlyanother26%.ReducedcycletimeforElectronicunits,allowingsubsystemstofinish30%faster.StabilizedscheduleandreturnedmoneytoGovernment4quartersinarow.Operationturnedprofitable.
BoeingT45TrainingSystemUndergraduateMilitaryFlightOfficersGroundBasedTrainingSystems
Projectswerelateandoverbudget.
Unhappycustomerslosingfaith.
Projectsfinished1.5monthsaheadofschedule.Hardware/Softwareintegrationfinished32daysaheadofschedule.20%costsavingsindesigndevelopmentphase.Realizedadditional$12MinECPwork.Restoredcustomerconfidence.
C.N.Cofrentes(Iberdrola)NuclearPowerEngineering
Due-dateperformancewas60%. Due-dateperformanceincreasedto95%.Throughputincreasedby30%.
CelsaGroupITProjects
15SAPfunctionalityprojectswerecompletedpermonth. SAPfunctionalityprojectcompletionsincreasedby30%to20projectsamonth.
CentralNuclearAlmaraz TrilloNuclearPowerEngineering
19designevaluationandmodificationprojectswerebeingcompletedpermonth.
Throughputincreasedby25%to24-30projectspermonth.
ChryslerAutomotiveProductDevelopment
Cycletimeforprototypebuildswas10weeks. Cycletimeforprototypebuildsreducedto8weeks.
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
16
BEFORE AFTER
CIBAVisionEye-caresolutions
Nopredictabilityintowhenthissinglemega,multi-countryprogramwillfinishcausingbigcostandtimeoverrun.
Projectexecutionsynchronizedacrossmultiplecountriestogetitincontrolandontracktodeliveron-time.
DaiwaHouseSAPImplementation
CycletimeforFinancialModuleprojectswas234days.
CycletimeforHRModuleprojectswas288days.
CycletimeforFinancialModuleprojectsreducedto172days(26%reduction).CycletimeforHRModuleprojectsreducedto213days(26%reduction).
Danisco(GenencorInternational)BiotechnologyPlantEngineering
20%projectsontime. 87%projectsontime.15%immediateincreaseinthroughput.
DeltaAirLines,Inc.AircraftEngineRepairandOverhaul
476enginesproducedperyear.
4-8weekspiece-partcycletime.
60dayslandinggearturnaroundtime.
586enginesproducedperyear(23%increase).30%reductioninengineturnaroundtime.15dayspiece-partcycletime(70%reduction).25%increaseinthroughput.30dayslandinggearturnaroundtime(50%reduction).$60Mmonetizedinassetsfromreducedturnaroundtime.Ongoingimprovement:10dayspiece-partturnaroundtime(30%furtherreduction).
DeltaAirLines,Inc.AircraftBaseMaintenance
24,799hoursproducedpermonthin2010.
On-timedeliverywas14.3%in2010.
30,840hoursproducedpermonthwith8%fewerresourcesin2011.On-timedeliveryimprovedto66.7%in2011.
DeltaAirLines,Inc.AircraftLineMaintenance
29.3cancellationsperdayduetomaintenanceinSummer2010.
11.2cancellationsperdayduetomaintenanceinSummer2011.
Dr.Reddy’sLaboratoriesPharmaceuticalNewProductDevelopment
6projectscompleted.20%projectsontimein12weeks.85globalgenericsandPSAIfilingsin2009.85productlaunchesin2009.915dayscycletimeforfulldevelopmentin2008.
11projectscompleted(83%increase).80%projectsontime(60%increase).110filingsin2010(30%increase).149launchesin2010(75%increase).563dayscycletimefordevelopmentin2010(40%faster).
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
17
BEFORE AFTER
e2vSemiconductorsSemiconductorDesignandManufacturing
Actualcycletimeofprojectswas38months;25%ofprojectswereontime.
Actualcycletimereducedto23months;almostallprojectswerewithinthecommittedcycletimeof24months.
eircomTelecommunicationsNetworkDesign&Installation
On-timedeliverywaslessthan75%.Averagecycletimewas70days.
Increasedon-timedeliveryto98+%.Averagecycletimedroppedto30days.
EmbracoRefrigeratorCompressorDesignandManufacturing
Completed5projectsperyearin2006,2007and2008. Completed7projectsin2009(40%throughputincrease)and9projectsin2010(100%throughputincrease).11%reductioninleadtimes.
EmcocablesManufacturingPlantConstruction
11monthsindustrystandardprojectduration. 7monthstoprojectcompletion.(55%additionalrevenue4monthsearlier).
EmesaTGVStationConstruction
6monthslefttodeliver,andprojectwas5monthslate. Completed11monthsofworkin6months.Projectontime(€5Mpenaltyavoided).
EricksonAir-CraneHelicopterManufacturingandMaintenance
Only33%projectscompletedontime. On-timedeliveryincreasedto83%.
FrenchAirForce,SIAéClermontFerrandTransallProductionLineAircraftUpgradeandRepair
5aircraftonstation.
Cycletimeof165days.
3aircraftonstation,2aircraftreturnedtoAirForce,areplacementvalueof€300M.15%cycletimereduction,15%increaseinoutputwith13%fewerresources;22%reductioninsupportshops’cycletime.
GenecorBiotechnologyPlantEngineering
20%projectsontime. 87%projectsontime.15%immediateincreaseinthroughput.
HamiltonBeachBrands,Inc.NewProductDevelopmentHomeAppliances
34newproductsperyear.
74%projectsontime.
Increasedthroughputto52newproductsinthe1styear,andto70+inthe2ndyear,withnoincreaseinheadcount.88%projectsontime.
Heineken,SpainCPGNewProductDevelopment
90%on-timedelivery. 98%on-timedelivery.20%fastertime-to-market.10%ofprojectsfinishedaheadofschedule.
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
18
BEFORE AFTER
HPDigitalCameraGroupDigitalCameraProductDevelopment
6cameraslaunchedin2004.1cameralaunchedinspringwindow.1outof6cameraslaunchedontime.
15cameraslaunchedin2005.7cameraslaunchedinspringwindow.All15cameraslaunchedontime.
Ismeca SemiconductorEngineer-to-Order
84daysoverallcycletime.24daysproductioncycletime.15machinesin8monthswashighestthroughputever.
64daysoverallcycletime(25%reduction).10daysproductioncycletime(60%reduction).22machinesin5months(47%higherthroughput).22%improvementinEBIT.
LeTourneauTechnologies,Inc.Oil&GasPlatformDesign&Manufacturing
DesignEngineeringtook15months.ProductionEngineeringtook9months.FabricationandAssemblytook8months.
DesignEngineeringtakes9months.ProductionEngineeringtakes5months.FabricationandAssemblytakes5monthswith22%improvementinlaborproductivity.
LSILogicASICDesignTechnologyDevelopment
74%projectsontimeforsmallprojects.Majortoolreleaseswerealwayslate.
85%ofsmallprojectsontime.Majortoolsreleasedontimeforthreeyearsinarow.
LufthansaTechnikAircraftMaintenance,RepairandOverhaul
CompletedC-Checkin14days. CompletedC-Checkin11.5days,18%cycletimereduction.
MarketingArchitectsAdvertisingProductDevelopment
Completed7projectsin2006. Completed7projectsinthefirst8monthsof2007.
MedtronicHighTechMedicalProductDevelopment
1softwarereleaseevery6-9months.Predictabilitywaspoorondeviceprograms.
1softwarereleaseevery2months.Scheduleslipsondeviceprogramscutby50%.
Medtronic,EuropeHighTechMedicalProductDevelopment
Deviceprojectstook18monthsonaverageandwereunpredictable.
Developmentcycletimereducedto9months.On-timedeliveryincreasedto90%.
OregonFreezeDryFoodPreparation&Packaging
72salesprojectscompletedperyear. 171salesprojectscompletedperyear.52%increaseinthroughput-dollars.
Owens-IllinoisProcessManufacturingPlantEngineering
6monthscycletimeforfurnacedesign.45projects/yearengineeringthroughput.
2.5monthscycletime(58%faster).60projects/yearthroughput(33%increase).
Procter&GamblePharmaceuticalsPharmaceuticalProductDevelopment
In2005,completionratewas5projects/quarter.55%ofprojectsdeliveredontime.
In2008,completed12projects/quarter.90%ontime,withsamenumberofresources.
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
19
BEFORE AFTER
Railcare Wolverton,UKTrainMaintenance,RepairandOverhaulEngineering
16monthsdelayindeliveryoflastorder.1orderexecutedatatime.
100%on-timedeliveryonallorders.3ordersexecutedinthesametimeframe.
RapidSolutionsGroupMarketing/PublishingSupport
Projectswerealwayslate.Leadtimeswerenotacceptable.
On-timedeliveryimprovedby30%.Leadtimesreducedby25%.
SiemensGeneratorEngineeringElectricGeneratorEngineering
2.4projectsproducedperweekin2008.
Projecton-timedeliverywas38%inQ3FY10.94non-projectsproducedperweekin2008.
2.9projectsproducedperweekin2009(38%increase).3.8projectsproducedperweekin2010(61%increase).Projecton-timedeliveryincreasedto85%inQ4FY11.128non-projectsproducedperweekin2010(36%increase).
ŠkodaPowerEngineered-to-OrderSteamGenerators
20casingsperyear.60%on-timedelivery.
27casingsperyear(30%increase).90%on-timedelivery.20-30%fastercycletime.
SkyeGroupGarmentDesign
Productrangeswerelatetomarket. 100%due-dateperformance.30%reductioninleadtimesandsamplingcosts.
SpiritAerosystemsAircraftEngineering
Pastpylonproductioncycletimewas21months. Actualcycletimeofpylonproductionis14months(33%reduction).25,000hoursofcostavoidance.
TATASteelPlantMaintenanceandUpgrade
300-500daysforboilerconversion.Routinemaintenancetooktoolong.
11daysplannedforshutdown.$2Mrevenuegeneratedperday.
120-160dayscompletiontime(68%faster).10-33%reductionin2007cycletime.5-33%additionalreductionin2008cycletime.8.8daysshutdownachieved.$4Mrevenuegained.Setnetoperatinghoursindustryrecord(6690hoursperyear).
TECNOBITDefenseProductsDesignandManufacturing
Longprojectcycletimeswithfrequentdelays. Projectcycletimesreducedby20%.
TerumoHeartInc.MedicalDeviceDevelopment
LaserCoverWeldingQualificationprojectranfor2years. Similarprojectranforonly6months.90%on-timedelivery(withinoneweek).
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
20
BEFORE AFTER
ThyssenKrupp(JohannA.Krause,Inc.)AutomotiveAssemblySystems,Engineer-to-Order
70%ofprojectswerelate.Highovertimeandoutsourcing.
Latenessreducedby50%.63%gainsinproductivity.15%moreprojectscompleted.
USAirForceOperationalTest&EvaluationCenterWarfighter SystemsTesting
Longcycletimes.Lowutilizationofresources.Poorvisibilityofprojectslips.
30%reductionincycletimemeasuredover900projects.30%improvementinresourceutilization.88%on-timedeliveryperformance.
USAirForce,OgdenAirLogisticsCenter572ndAMXG,C130ProductionLineAircraftMaintenance,RepairandOverhaul
Aircraftthroughputwas33inFY09.
36aircraftonstation.OngoingImprovement:2.58aircraftproducedpermonthin2010.On-timedeliverywas45%inQ42010.
Aircraftthroughputincreasedto44inFY10(33%increase).24aircraftonstation,12aircraftreturnedtoAirForce.OngoingImprovement:3.42aircraftproducedpermonthin2011(32%increase).On-timedeliveryincreasedto85%inQ42011.
USAirForce,OklahomaCityAirLogisticsCenterB-1ProductionLineAircraftRepairandOverhaul
Turnaroundtime162days.7aircraftinrepaircycle.
Turnaroundtimereducedto115days.4aircraftinrepaircycle(3returnedtocustomer).Productionoutputincreasedfrom185hours/dayto273.1½dockspacesfreedup(additionalrevenuepotential$35M).
USAirForce,OklahomaCityAirLogisticsCenterB-52ProductionLineAircraftUpgradeandRepair
Produced11aircraftayear.Cycletimeof225days.
Produced17aircraftayear.Cycletimeof195days.
USAirForce,OklahomaCityAirLogisticsCenterE-3ProductionLineAircraftUpgradeandRepair
4aircraftonbase.Cycletimeof183days.
Averageof2.6aircraftonbase.Cycletimeof155days.11%capacityreleasedforadditionalworkload.
USAirForce,OklahomaCityAirLogisticsCenterKC-135ProductionLineAircraftMaintenance,RepairandOverhaul
Averageturnaroundtimewas327days. Averageturnaroundtimereducedto146days.44%increaseinthroughputfromQ42008toQ42009.
USAirForce,TinkerAirForceBase76thPMXGAircraftEngineRepairandOverhaul
EnginePiece-PartRepair:137daysbackshopcycletime.260parts/monthbackshopthroughput.EnginesandModules:45modules/monththroughput.18dayscycletime.
EnginePiece-PartRepair:42daysbackshop cycletime(69%reduction).434parts/monththroughput(67%increase).EnginesandModules:50modules/monththroughput(10%increase).8dayscycletime(55%reduction).
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
21
BEFORE AFTER
USAirForce,WarnerRobinsAirLogisticsCenterC-17ProductionLineAircraftUpgradeandRepair
Throughputof178hoursperaircraftperday.Turnaroundtime46-180days.Mechanicoutputwas3.6hoursperday.
25%increaseinthroughput.Turnaroundtimereducedto37-121days.Mechanicoutputincreasedto4.75hoursperday.40%reductioninovertime.
USAirForce,WarnerRobinsAirLogisticsCenterC-5ProductionLineAircraftRepairandOverhaul
Turnaroundtime240days.13aircraftinrepaircycle.
Turnaroundtime160days.7aircraftinrepaircycle.75%fewerdefects.
USArmy,CorpusChristiArmyDepotHelicopterMaintenance,RepairandOverhaul
Throughputof5.4aircraftpermonth.ThroughputforBlackHawkwasmuchlowerthanrequired.Turnaroundtimeswereunacceptable.
Workscopeperaircraftwasincreasing.
Throughputincreasedto6.3aircraftpermonth.BlackHawkthroughputincreasedby40%injust6months.50%reductioninApacheturnaroundtime.15%reductioninCH47turnaroundtime.15%reductioninPaveHawkturnaroundtimedespiteincreasedscope.
USDepartmentofDefenseProcurementOrganizationProcessingofPurchaseRequests
Longdelaysinprocessingrequests.Longcycletimes.
Delaysreducedby40%.76%reductionincycletime.29%increaseinthroughput.
USMarineCorpsLogisticsBase,BarstowArmyVehiclesMaintenanceandRepair
RepaircycletimeforMK48was168days.RepaircycletimeforLAV25was180days.RepaircycletimeforMK14was152days.RepaircycletimeforLAVATwas182days.
RepaircycletimeforMK48reducedto82days.RepaircycletimeforLAV25reducedto124days.RepaircycletimeforMK14reducedto59days.RepaircycletimeforLAVATreducedto122days.
USNavalAviationDepot,CherryPointAircraft,Engines&ComponentsRepairandOverhaul
160,500hourspermonthproducedin2010.
Laborratenotcompetitivein2010.
178,750hourspermonthproducedin2011(11%increase).$18/hrlaborratereductionin2011.
USNavalShipyard,PearlHarborSubmarineMaintenanceandRepair
Jobcompletionratewas94%.On-timedeliverywaslessthan60%.Costperjobwas$5,043.
Jobcompletionrateincreasedto98%.Increasedon-timedeliveryto95+%.Reducedcostperjobto$3,355,a33%reduction.Overtimedroppedby49%,a$9Msavinginthefirstyear.
USNavy,FleetReadinessCenterSoutheast,P-3AircraftMaintenanceandUpgrades
Produced6aircraftin2008. Produced9aircraftinthefirst9monthsof2009.
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
22
BEFORE AFTER
ValleyCabinetWorksCustomFurnitureDesign&Manufacturing
Struggledtocomplete200projectsperyear.Revenueswereflat,businesswasjustbreakingeven.
Completed334projectsinthefirst9months.Revenuesincreasedby88%andprofitsby300%.
VerintCustomizedSoftwareDevelopment
Completedlargeprojectsin298days.Completedsmallprojectsin226days.Throughputwas20projectsperquarter.
Completedlargeprojectsin189days(37%reduction).Completedsmallprojectsin151days(33%reduction).Throughputincreasedto30projectsperquarter.
VonArdenneEquipmentforManufacturingSolarPanels,Engineer-to-Order
Revenuesof€130M.Profitsof€13M.Cycletimewas17weeks.On-timedeliverywas80%.
Revenuesof€170M.Profitsof€22M.Cycletimereducedto14weeks.On-timedeliveryimprovedto90%.
VotorantimProcessPlantTurnaround(NickelSmelting)
Projectswerelateandoverbudget. Project1deliveredontime.Project2delivered1dayearlier(with10%extrascope).Actualcostwas96%ofplannedbudget.
Ø Shingo GoldØ Franz Edelman (a.k.a Super Bowl of Operations Research)ØAir Force Chief of Staff Excellence
350Customers
including Airbus, Delta Air Lines, Medtronic, Siemens and Terumo
Medical Systems
10%-30%Productivity Gain
20%-50% Faster Cycle Time
$6+BBottom Line Impact
Awards
REAL RESULTS FROM “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
23
VALUE OF AGILE: RISK REDUCTION
SPRINT1
SPRINT2
SPRINT3
RISK
PROJECTPROGRESS
©2018RealizationTechnologies,Inc.AllRightsReserved.
24
BENEFITSOF“FOCUSANDFINISH”FAROUTWEIGHTHEBENEFITSOFBUFFEROPTIMIZATION
NOTENOUGHTASKSINACHAINTOTAKEADVANTAGEOFAGGREGATION;“HIDDEN”SAFETIESSOUNDSACCUSATORY
CCPMAND2-TIEREDTASKSENABLEREAL-TIMESCHEDULING
BUFFER OPTIMIZATION OR “FOCUS & FINISH”?
©2018RealizationTechnologies,Inc.AllRightsReserved.
25
THE CCPM BREAKTHROUGH• The fundamental limitation it overcomes• How to make the breakthrough complete• Focus & Finish• Value of Agile
“FOCUS & FINISH” TECHNIQUES FORLEVERAGING THE BREAKTHROUGH• Project planning• Pipeline planning• Resource planning• Execution practices
IMPLEMENTATION• Exactly what buy-in’s are required• When and why you need software
MASTERCLASS AGENDA
©2018RealizationTechnologies,Inc.AllRightsReserved.
26
RESOURCEDENSITY
THRO
UGHPU
T
RESOURCEDENSITY
MoreResourcesperTask⇒ FasterCycleTime
RESOURCEDENSITY
#OFWORK
STRE
AMS
MoreResourcesperTask⇒ FewerActiveWork-Streams
Throughput=NumberofActiveWork-Streams÷ CycleTimeofEachWork-Stream
ESTIMATING THE IMPACT OF FOCUS & FINISH
©2018RealizationTechnologies,Inc.AllRightsReserved.
27
SO, HOW MUCH IMPROVEMENT CAN YOU EXPECT?
RESOURCEDENSITY
THRO
UGHPU
TWheremost
organizationsareWherethey
canbe
DOYOUHAVEA. Moreworkthanpeople?B. Morepeoplethanwork?
©2018RealizationTechnologies,Inc.AllRightsReserved.
28
FOCUS & FINISH EXAMPLE: ENGINEERING
§ All 6 sections of the fuselage were being developed simultaneously§ Projected engineering lead time was 9 months§ 60 engineering resources were split among all 6 sections for the entire project§ 20 management and support resources were shared by all sections§ Wanted to achieve the same lead time, but with lower engineering cost
SectionsofaBoeing737fuselageAn aircraft systems supplier with full engineering responsibility for the 737 fuselage.
©2018RealizationTechnologies,Inc.AllRightsReserved.
29
10engineersx9months
10engineersx9months
10engineersx9months
10engineersx9months
10engineersx9months
10engineersx9months
20engineersx3months 20engineersx3months20engineersx3months
20engineersx3months 20engineersx3months20engineersx3months
20overheadx9months
20overheadx9months
FOCUS & FINISH EXAMPLE, CONTINUED
EngineersReducedfrom90to60!
©2018RealizationTechnologies,Inc.AllRightsReserved.
30
5d
5d5d
9d
9d9d
5d 5d
9d
9d9d
SYNCHRONIZATIONTASKSWITCHING TEAMSIZING INTERACTIVEWORK MANAGEMENT
12d 5d
12d 5d
5d 5d
5d 5d
5d
5d5d
8 8 8
5d
5d5d
12d
12d5d
12d
12d5d
5d5d
5d
5d5d
5d
5d
5d5d
5d
5d5d
5d
5d5d
5d
5d5d
5d
5d5d
5d
5d5d
4
WaitQueue
LOCALSTAYBUSY
SHOWPROGRESS
GLOBALFOCUS&FINISH
IMPACTTASKSIP 2è 1
CT 17.5è 12.5
TP 2è 3
TASKSIP 2è 1CT 17è 10TP 2è 2.4
TASKSIP 2è 1CT 18è 10TP 2è 2.6
TASKSIP 2è 1CT 17è 10TP 2è 3
TASKSIP 4è 2CT 18è 7TP 4è 5.1
2 11 1
FORMS OF “SPREADING THIN” VS. “FOCUS & FINISH”
©2018RealizationTechnologies,Inc.AllRightsReserved.
31
PROJECTPLANNING
2-TIEREDTASKS
FULLKITTING
COMPLETIONMILESTONES
PIPELINEPLANNING
PHASEBASEDPIPELINING
RESOURCEVS.WIP
CONSTRAINTS
RESOURCEPLANNING
SHAREDCAPACITY
LOGICALRESOURCEHIERARCHY
RESERVECAPACITY
EXECUTIONPRACTICES
FASTISSUERESOLUTION
BUFFERRECOVERY
FOCUS & FINISH TECHNIQUES
©2018RealizationTechnologies,Inc.AllRightsReserved.
32
USE CASES FOR 2-TIERED TASKS
USECASE DESCRIPTION1.INTERACTIVEWORK Continual flowof informationbetweendifferenttasks
2.INTERACTINGRESOURCES Back-and-forthhandoffs atahighfrequency
3.MINI-ASSEMBLIES Manyintegration pointsalongtheflowofwork
4.BATCHINGTOSAVESETUPS Avoid frequentsetup-up,teardown
5.ENFORCEANEXECUTIONSEQUENCE AnyofthemanytaskscanbedoneinparallelbutonlyacertainsequenceisbestforFOCUS&FINISH
6.FLEXIBLEEXECUTIONSEQUENCE Allowflexibilityin whattasktopickupnext
7.ROLLING-WAVE(AGILE)PLANNING Avalidend-to-endplanpossible at theprojectlevel,butdetailsareavailableonlyafewdaysorweeksout
©2018RealizationTechnologies,Inc.AllRightsReserved.
33
1. INTERACTIVE WORK EXAMPLE: TURBINE DESIGN
SITUATION• Continual flow of information between TURBINE, COMPRESSOR and CASING Designs
PROBLEM• Ensuring synchronized execution of parallel designs requires complex dependencies• Complex dependencies make the plan highly error-prone and impossible to keep up-to-date
SOLUTION• Group TURBINE, COMPRESSOR and CASING designs as subtasks under a BLADE task• Exercise “Release Control” for Tier-1 Tasks
BLADE2BLADE1
BLADE2BLADE1
BLADE2BLADE1
Subtasks
TURBINE
COMPRESSOR
CASING
TASK=BLADE1
Subtasks
TASK=BLADE2
• Projectisaboutimprovingturbinepowerandefficiency• Ideally,Turbine,CompressorandCasingshouldworktogether• However,ifCompressordesignisdelayed,TurbineandCasingtendtomoveforward
©2018RealizationTechnologies,Inc.AllRightsReserved.
34
1. INTERACTIVE WORK: ANOTHER EXAMPLE
SITUATION• Continual flow of information between design of CASTINGS and FABRICATED PARTS• CASTINGS are long lead time item whereas FABRICATED PARTS are short lead items
PROBLEM• Traditional PERT + “Silo Approach” attempts synchronization according to lead time
SOLUTION• Group a CASTING and its associated FABRICATED PARTS subtasks under one task• Even if it means that FABRICATED PARTS have slack in their execution flow
LONGLEAD
SHORTLEAD
CASTINGS1-3
CLIPS/MOUNTS/FASTNERS
CASTING1CLIPS
CASTING2MOUNTS
CASTING3FASTENERS
AssemblyStart
CASTINGLEADTIMEAssemblyFullKit
AllDesignsDoneMilestone
DesignGroup1
DesignGroup2
DesignGroup3
©2018RealizationTechnologies,Inc.AllRightsReserved.
35
2. INTERACTING RESOURCES
SITUATION• Work flows as shown above• PURPLE, RED and BLUE resource groups are supporting multiple streams of work
PROBLEM• Traditional PERT can cause different resource groups prioritize their work differently
SOLUTION• Group all steps as subtasks under one work-stream task• Assign PURLE, RED and BLUE resources to the work-stream task
REVIEWDRAWINGS REWORK REVIEW APPROVAL#1priorityforPURPLEResource
#4priorityforREDResource
#8priorityforBLUEResource
WORK-STREAM 1
WORK-STREAM 2
WORK-STREAM ..
REVIEWDRAWINGS REWORK REVIEW APPROVAL
REVIEWDRAWINGS REWORK REVIEW APPROVAL
WORK-STREAM1• Drawing• Review• Rework• Approval
©2018RealizationTechnologies,Inc.AllRightsReserved.
36
3. MINI ASSEMBLIES
SITUATION• Work flows as shown above, with hundreds to a few thousand PLATES per SHIP• All 3 PLATES “must-have” for fabricating SUB-SECTION 1, all 3 SUB-SECTIONS for SECTION 1 …
PROBLEM• Traditional PERT, even if accurately and perfectly planned, gets de-synchronized during execution
SOLUTION• Group all plates for a major assembly (a SECTION) as subtasks under one task• Group all subsections for a SECTION as subtasks under another task
CUTPLATE1FABRICATE
SUB-SECTIONACUTPLATE2CUTPLATE3
ListofallplatesFABRICATE
SUB-SECTIONB
FABRICATESUB-SECTIONC
FABRICATESECTION1
ASSEMBLESHIP
CUTALLPLATESFORSECTION1
FABRICATESECTION1
Listofallsub-sections
©2018RealizationTechnologies,Inc.AllRightsReserved.
37
4. BATCHING TO SAVE SETUPS
PUMPSAREA1
PUMPSAREA2
PUMPSAREA3
VALVESAREA1
VALVESAREA2
VALVESAREA3
PANELSAREA1
PANELSAREA2
PANELSAREA3
PIPINGAREA1
PIPINGAREA2
PIPINGAREA3
GEARSAREA1
GEARSAREA2
GEARSAREA3
SITUATION• A crane is required to stage heavy items; actual time to stage an item is not too long• However, setting up and tearing down a crane takes significant effort and time
PROBLEM• Traditional PERT +”Silo Thinking” causes the crane operator to setup and tear down the crane
multiple times within an area
SOLUTION• Group all individual items for an AREA as subtasks under one AREA task
STAGEAREA1
STAGEAREA2
STAGEAREA3
• Pumps• Valves• Panels• Piping• Gears
©2018RealizationTechnologies,Inc.AllRightsReserved.
38
5. ENFORCE AN EXECUTION SEQUENCE
SITUATION• The 9 flooring tasks shown above can be done in any sequence (parallel tasks)
PROBLEM• If an APARTMENT is not completely floored, it stops follow-on work in that apartment• As a result, you have 9 ROOMS stuck in execution
SOLUTION• Group all 3 ROOMS in an Apartment as subtasks under one task
APT1ROOMAAPT1
ROOMBAPT1
ROOMCAPT2
ROOMAAPT2
ROOMBAPT2
ROOMCAPT3
ROOMAAPT3
ROOMBAPT3
ROOMC
APT1
• ROOMA• ROOMB• ROOMC
APT2
• ROOMA• ROOMB• ROOMC
APT3
• ROOMA• ROOMB• ROOMC
©2018RealizationTechnologies,Inc.AllRightsReserved.
39
6. LEAVE EXECUTION SEQUENCE FLEXIBLE
SITUATION• The ideal sequence for designs is CIVIL -> MECH -> ELEC
PROBLEM• Actual sequence can change in execution depending on resourcing, technical and other factors• Keeping this sequence up-to-date is cumbersome if not impossible
SOLUTION• Group all 3 (CIVIL, MECH, ELEC) designs as subtasks under one DESIGN task
CIVILDESIGN
MECHDESIGN
ELECDESIGN DESIGN
• CIVIL• MECH• ELEC
©2018RealizationTechnologies,Inc.AllRightsReserved.
40
7. ROLLING-WAVE (AGILE) PLANNING
SITUATION• A software upgrade project has 8 months to get done; on-time completion is critical
PROBLEM• High level requirements known, but not the exact features (resources, task durations also unknown) • However, we still need a project and resource plan to ensure timely completion
SOLUTION• Create a project plan with tasks and resources at the functionality level• Fill in the features as they become known after design or customer feedback• Also adjust duration and resource estimates after the exact work is understood
DESIGN
• Logic• UI
DEVELOP
• FEATUREA• FEATUREB• FEATUREC
TEST
• SystemTest• UserAcceptance
DESIGN DEVELOP TEST
DESIGN DEVELOP TEST
MODULE1
MODULE2
MODULE3
©2018RealizationTechnologies,Inc.AllRightsReserved.
41
FULL KITTING
StopStopStopStopStop
InputsInputsInputsInputsInputs
CONCEPTPrepareallinputsbeforestartingaproject,sub-projectoraphase.
InputsInputsInputsInputsInputs
©2018RealizationTechnologies,Inc.AllRightsReserved.
42
T0 T3 T9T6 T12 T18 T20T15
Customization
PrepforAssemblyandTest
Pre-CouplingWork
DetailedEngineering
LongLeadEquipment
Post-Coupling,Testing,andWrap-up
WIP = 2
WIP = 3
WIP = 2
WIP = 1-3
WIP = 1-2
Customization DetailEngr.
Assembly,Testing,andWrap-up
PrepforAssy andTest
Full Kit Point
HoldforEquipment
Full Kit Point20w 10w 30w 10w 20w
WIP = 2 WIP = 1 WIP = 1 WIP = 2WIP = 3
• Up to 10 [Communication Satellites] Projects active at a time• Traveled Work (starting a phase without completing the previous phase)• Managers and Technical Experts spread too thin to answer problems
• Active WIP reduced to no more than 6 projects• FK ensure a phase starts only once all predecessor work is complete• Active CT reduced from 20 to 14 months (30%)
Full Kit Point Full Kit Point
BEFORE
AFTER
FULL KITTING + COMPLETION MILESTONES EXAMPLE
©2018RealizationTechnologies,Inc.AllRightsReserved.
43
EXERCISES FOR FOCUS & FINISH PROJECT PLANNING
©2018RealizationTechnologies,Inc.AllRightsReserved.
44
Approach1:WIP=6IndividualCycleTime=9daysTotalDuration=30days
DesignerCheckerDesignHeadFocus-and-finishwithCheckerandDesignHead
Legend:
Approach2:WIP=2IndividualCycleTime=3 daysTotalDuration=24days
EXERCISE 1
©2018RealizationTechnologies,Inc.AllRightsReserved.
45
OrderingofA;receiptofloaddata30days
OrderingofB;receiptofloaddata30days
OrderingofC;receiptofloaddata30days
OrderingofD;receiptofloaddata30days
OrderingofE;receiptofloaddata30days
OrderingofF;receiptofloaddata30days
OrderingofG;receiptofloaddata30days
OrderingofH;receiptofloaddata30days
PileLayout
5daysExcavationdrawings5days
Foundationdrawings5days
ColumnDrawings
5days Elevationdrawings
5daysPlinthbeamdrawings5days
Foundationdrawings:A5days
Foundationdrawings:B5days
Foundationdrawings:C5days
Foundationdrawings:D5days
Foundationdrawings:E5days
Foundationdrawings:F5days
Foundationdrawings:G5days
Foundationdrawings:H5days
SlabDrawings
5days
Flooringdrawings
5days
Excavation
15days
Piling,Columns
45days
Foundations:GrFloor
30days
Slabcasting
30days
Walls,plastering,painting30days
10days
Foundations:Roof
30days
Flooring
30days
20days
EXERCISE 2: ORIGINAL PLAN
©2018RealizationTechnologies,Inc.AllRightsReserved.
46
Orderingandreceiptofloaddata:Set1
Orderingandreceiptofloaddata:Set2
DrawingsuptoColumns
DrawingsforRooffoundations
DrawingsforGr.Floorfoundations
Slab,Elevation,Flooringdrawings
Completionuptoallcolumns
60days
60days
15days 10days 10days 10days
SlabCasting
FoundationsonRoof
FoundationsinthegroundFloor
Walls,plastering,Painting
Flooring
• PileLayout• Excavation
drawings• Foundation
drawings• Columndrawings• PlinthBeam
drawings
• EquipmentE• EquipmentF• EquipmentG• EquipmentH
• EquipmentA• EquipmentB• EquipmentC• EquipmentD
• FoundationE• FoundationF• FoundationG• FoundationH
• SlabDrawings• Elevation
Drawings• Flooring
Drawings
55days 30days
• FoundationA• FoundationB• FoundationC• FoundationD
30days
30days
30days
30days
TotalDuration:170days
EXERCISE 2: TWO-TIERED TASKS
©2018RealizationTechnologies,Inc.AllRightsReserved.
47
Execution Full Kit Manager: PM• Contractor finalization• Identification of camp locations• Camp set-up• Stocking of tower material• Pick-up trucks, 4-wheel drive vehicles• Procurement of concreting material
FullKitting
Foundations
Towererection
Stringing
Survey
Foundationdrawings
BOQ
Materialprocurement
Manufacturing
Shipping
Ordering
TaskTypes
ProjectFK
100d 100d 20d45d
100d 100d 20d45d
100d 100d 20d45d
100d 100d 20d45d
Sequence:Zone1toZone4
Projectduration:520days
EXERCISE 3
©2018RealizationTechnologies,Inc.AllRightsReserved.
48
PROJECTPLANNING
2-TIEREDTASKS
FULLKITTING
COMPLETIONMILESTONES
PIPELINEPLANNING
PHASEBASEDPIPELINING
RESOURCEVS.WIP
CONSTRAINTS
RESOURCEPLANNING
SHAREDCAPACITY
LOGICALRESOURCEHIERARCHY
RESERVECAPACITY
EXECUTIONPRACTICES
FASTISSUERESOLUTION
BUFFERRECOVERY
FOCUS & FINISH TECHNIQUES
©2018RealizationTechnologies,Inc.AllRightsReserved.
49
MULTI-PROJECT PIPELINE MUST RETAIN FOCUS & FINISH
REDRESOURCE
BLUERESOURCE
GOLDRESOURCE100%LOADING
1. Projectscanslideinandoutbuttheirtasksmuststaytogether
2. Pipelineplancan’tbejittery;naturaldelaysandchangesinexecutionmustnotaffectplannedprojectdates
3. Amechanismisalsoneededtoaccountformanagementcapacity
BEFOREPIPELINING
AFTERPIPELINING
©2018RealizationTechnologies,Inc.AllRightsReserved.
50
TIMELINE
NUMBEROFRESOURCES
• TheTetrisproblemo Exactfittingisimpossibleo Timelinesstretcho Stillleavescapacitygaps
• Executionwillbedifferentanyway• Timelineandcapacitygapswill
increaseinexecution
ProjectResourceType
MULTI-PROJECT PLANNING:PERILS OF TASK-BY-TASK SCHEDULING
©2018RealizationTechnologies,Inc.AllRightsReserved.
51
MULTI-PROJECT PLANNING: STAGGERING PHASES
I II III
I II III
I II III
REDRESOURCE
BLUERESOURCE
GOLDRESOURCE100%LOADING
1. Identifythephasethatconsumesredresourcesthemost
2. Staggerthecorrespondingphase
©2018RealizationTechnologies,Inc.AllRightsReserved.
52
MANAGEMENT
4
WaitQueue
TASKSIP 4è 2CT 18è 7TP 4è 5.1
1
IMPORTANCE OF MODELING MANAGEMENT CAPACITY
Solution:SpecifyWIPlimitsbyphases
©2018RealizationTechnologies,Inc.AllRightsReserved.
53
PROJECTPLANNING
2-TIEREDTASKS
FULLKITTING
COMPLETIONMILESTONES
PIPELINEPLANNING
PHASEBASEDPIPELINING
RESOURCEVS.WIP
CONSTRAINTS
RESOURCEPLANNING
SHAREDCAPACITY
LOGICALRESOURCEHIERARCHY
RESERVECAPACITY
EXECUTIONPRACTICES
FASTISSUERESOLUTION
BUFFERRECOVERY
FOCUS & FINISH TECHNIQUES
©2018RealizationTechnologies,Inc.AllRightsReserved.
54
RM2
PM5PM4PM3PM2
§ There are two types of resources: Red and Blue § 21 Beads in the Red Bowl = 21 Red Resource Units§ 21 Beads in the Blue Bowl = 21 Blue Resource Units§ There are 5 projects§ Every project needs both the Blue and Red resources§ Actual resource requirement depends on dice rolls
21RedResources
21BlueResources
PM1
RM1
ILLUSTRATING THE NEED FOR RESOURCE FLEXIBILITY
©2018RealizationTechnologies,Inc.AllRightsReserved.
55
PM5PM4PM3PM2
§ Each PM gets 9 Resource Units (any combination of Red and Blue)§ PM’s roll the dice two times to find out actual resource requirements§ Projects that run short of either resource are late§ All PM’s are measured on On-Time Delivery
PM1
SIMULATION 1: RESOURCES ARE PRE-ASSIGNED
RM2
21RedResources
21BlueResources
RM1
©2018RealizationTechnologies,Inc.AllRightsReserved.
56
PM5PM4PM3PM2PM1
§ Use the dice roll from SIMULATION 1§ Resources are assigned after the dice rolls§ If enough resources are not available, projects are late§ All PM’s are measured on On-Time Delivery
SIMULATION 2: RESOURCES ARE FLEXIBILE
RM2
21RedResources
21BlueResources
RM1
©2018RealizationTechnologies,Inc.AllRightsReserved.
57
RESOURCE PLANNING: ASSIGN SPECIFIC RESOURCES AS LATE AS POSSIBLE
GENERICRESOURCES
PLANNING
CORETEAM
PROJECT/PHASESTART
SHAREDRESOURCES
TASKEXECUTION
©2018RealizationTechnologies,Inc.AllRightsReserved.
58
Backenddevelopers
(5)
StackA(3)
StackB(4)
TomAshokChen
TomAshokMonicaBob
LOGICAL RESOURCE HIERARCHY
©2018RealizationTechnologies,Inc.AllRightsReserved.
59
RESOURCE1
RESOURCE2
RESOURCE3
100%
RESERVE CAPACITYUSES• ProtectiveCapacity• Non-ProjectWork• Drop-inProjectsCANBERECLAIMEDIFNOTUSED
©2018RealizationTechnologies,Inc.AllRightsReserved.
60
PROJECTPLANNING
2-TIEREDTASKS
FULLKITTING
COMPLETIONMILESTONES
PIPELINEPLANNING
PHASEBASEDPIPELINING
RESOURCEVS.WIP
CONSTRAINTS
RESOURCEPLANNING
SHAREDCAPACITY
LOGICALRESOURCEHIERARCHY
RESERVECAPACITY
EXECUTIONPRACTICES
FASTISSUERESOLUTION
BUFFERRECOVERY
FOCUS & FINISH TECHNIQUES
©2018RealizationTechnologies,Inc.AllRightsReserved.
61
FAST ISSUE RESOLUTION TECHNIQUES
• WORKSHOPMODE• HELPDESK• SETCALENDARFORREVIEWS,
BUTFLEXIBLECONTENT
©2018RealizationTechnologies,Inc.AllRightsReserved.
62
BUFFER RECOVERY
Don’tparallelize!Infact,serializemore.