LOI – Next Steps?

John Thomason

ISIS Schedule

Possible Workplan (1)

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling tosynchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6

First experiments with beam in synchrotron

January experiments go well 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam

Assumes:

May/June 2008

Possible Workplan (2)

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling tosynchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6

First experiments with beam in synchrotron

January experiments go well 4 x ISIS 2RF systems not fully commissioned No ISIS management approval to operate so close to first real TS-2 beam

Assumes:

August/September 2008

Possible Workplan (3)

More experiments in R5.4 needed 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam

Assumes:

Experiments in R5.4 to showfull operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc.

ISIS staff complete break-out box and cabling toSynchrotron SP6

First experiments with beam in synchrotron (to be decided after June experiments)

Further experiments in R5.4