Project Next Steps. Cybion Srl. Workpackage flow. WP1 Methodology definition. WP5 Awareness Raising/workshops. WP2 Data Collection. WP3 Mapping implementation. WP4 Database and on-line tools. WP5 Awareness Raising/dissemination. Workpackage flow. WP1 Methodology - PowerPoint PPT Presentation

TRANSCRIPT

Presentazione di PowerPointProject Next Steps
T1.1 Methodology definition
T1.2 Target profile, data set definition, IT excellence criteria and guidelines
T1.3 Methodology sharing
WP2 Data collection
T2.3 Questionnaires mailing
WP3 Knowledge Mapping
T3.1 Environmental scanning
T3.2 Mapping excellence
WP4 Database creation
T4.1 Database implementation
T5.2 Newsletter edition and mailing list
T5.3 Results Showcase at Workshops
T5.4 Dialogue launch through blog
T5.5 Final event organisation
WP6 Management and co-ordination
5th March 2008 - Brussels
T0+13
Ongoing
D2.1
Set of raw data to be analysed by the working groups
T0+15
T0+24
Task 2.3 Questionnaires distribution
Quest. distribution (started in January )
Errors analysis and questionnaires redistribution
Follow up actions on target players: phone calls, visits, events participation, etc.
Database population
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
Task 3.2 Mapping Excellence
Planning and organisation of subsequent meetings with detailed agenda definition
Organisation of the 2nd meeting of the two working groups: first analysis of questionnaires; definition of research target areas according to environmental analysis
Distribution of working group meetings minutes
Organisation of the 2nd meeting of the expert panels: analysis of first results from questionnaire, analysis of results from environmental analysis, first identification of potential common convergent priority areas
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
Task 3.2 Mapping Excellence cont’d
Organisation of 3rd Expert panels meeting : final definition of target research areas and analysis of 50 ICT excellent players
Distribution of expert panels meetings minutes
Input structuring to national mapping reports
Task 3.2/3.3 Mapping reports
Draft national mapping reports
Results consolidation and validation
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
Task 4.1 a Database technical implementation
- Geographic visualisation access to data
Task 4.1 b Database population
Database on-line access to the public
Task 4.3 Blog creation and launch
- Technical implementation of blog platform
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
Task 5.2 Newsletter - Ongoing
Task 5.3 Workshops – Completed
Task 5.4 Dialogue Launch
Dialogue launch through the blog section of the portal in june
Dialogue refreshing and moderation on blog.
Dissemination and
awareness
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
Task 5.5 Final event
Continue dissemination actions through website, newsletter, database and other communication tools/channels implemented
Fidelise target MED ICT players to monitor and update mapping till the end of the project
Dissemination and
awareness
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
MAP-IT! – MED IST Clustering
Plan strategy for single access to database
Reciprocal invitation/participation in workshops
Contribution to newsletter
WP1 = fare riferimento al change nel PP che ha posticipato il T 1.4
WP2: specoificare quanto manca, cosa mnaca per il completamento del design
WP3 = cosa è stato fatto di svilkuppo? L’interfaccia?
WP4 = spiegare le attività svolte di dissemination
5th March 2008 - Brussels
2) Postponement of mapping results
5th March 2008 - Brussels
5th March 2008 - Brussels
5th March 2008 - Brussels
MAP-IT! Changes in planning
Task 2.4 Questionnaire distribution to end at month 15 instead of month 10
Task 3.2 Mapping excellence to end at month 16 instead of month 13
Task 3.3 Drafting of mapping reports to end at month 17 instead of month13
Task 4.3 Blog platform creation to end at month 16
Task 5.4 Dialogue launch through blog to start at month17 instead of month 13
Tasks / Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
WP1 Methodology
T1.2 Target profile, data set definition, IT excellence criteria and
guidelines
WP2 Data collection
T2.3 Questionnaires mailing
WP3 Knowledge Mapping
T3.1 Environmental scanning
T3.2 Mapping excellence
WP4 Database creation
T4.1 Database implementation
T5.2 Newsletter edition and mailing list
T5.3 Results Showcase at Workshops
T5.4 Dialogue launch through blog
T5.5 Final event organisation
WP6 Management and co-ordination