FAMPO RESOLUTION 14-01
A RESOLUTION OF THE FREDERICKSBURG AREA METROPOLITAN
PLANNING ORGANIZATION (FAMPO) POLICY COMMITTEE TO REQUEST
THAT VDOT AND THE COMMONWEALTH TRANSPORTATION BOARD
(CTB) IMMEDIATELY MOVE FORWARD TO CONSTRUCT A PROJECT TO
REDUCE I-95 AND OTHER TRAFFIC CONGESTION IN THE FAMPO REGION
AND TO IMPROVE REGIONAL SAFETY, ECONOMIC VITALITY AND
QUALITY OF LIFE AND ALSO TO AMEND THE FY12-FY15
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TO TRANSFER
$250,000 OF PREVIOUS FUNDS FROM UPC # 13558 (RELOCATION OF
INTERCHANGE ON I-95 AT RTE 630/EXIT 140, STAFFORD COUNTY ) TO
UPC # 104928 (I-95 REST AREA ACCESS AND RTE. 3 CONNECTOR ROAD)
WHEREAS, in 2010, after years of analysis, FAMPO submitted an Interchange Justification Report
(IJR) to VDOT and the Federal Highway Administration (FHWA), and
WHEREAS, this IJR showed that a series of improvements would alleviate congestion on I-95 and on
Route 17 in Stafford County and Route 3 in the City of Fredericksburg and Spotsylvania County, as well
as improving safety, economic vitality and quality of life in the FAMPO Region, and
WHEREAS, the improvements recommended in the IJR included an upgrade to the I-95 interchange at
Exit 133, expansion of I-95 capacity between Exits 133 and 130 (including new capacity across the
Rappahannock River), a new I-95 interchange just north of the I-95 Welcome Center at Fredericksburg
and a new parkway, extending from the new I-95 interchange and connecting with Route 3 at Gordon
Road in Spotsylvania County, and
WHEREAS, in 2010 VDOT and FHWA gave approval for the improvements recommended in the IJR to
proceed to environmental review and design, and
WHEREAS, in September 2013 the Commonwealth Transportation Secretary noted delays in solving I-
95 congestion in the FAMPO Region and the negative impacts this congestion was having on the
Commonwealth and the American Eastern Seaboard, and directed VDOT to report back to the CTB with
its recommendations for solving I-95-related congestion in the FAMPO Region at the December 2013
CTB meeting, and
WHEREAS, having been asked by the Fredericksburg District CTB Member for a recommendation,
FAMPO voted to endorse a combined project which included construction of all of the improvements
contained in the 2010 IJR, as well as improvements to Exit 133 and construction of the “Berea Parkway,”
extending from I-95 Exit 136 to Route 17 in Stafford County, and
FREDERICKSBURG AREA METROPOLITAN
PLANNING ORGANIZATION (FAMPO) Matt Kelly
Fredericksburg City Chairman
Spotsylvania County
Stafford County Lloyd Robinson
FAMPO Administrator
2
WHEREAS, on December 4, 2013 the Commonwealth Transportation Board met and reviewed a report
by VDOT on alternatives for reducing traffic congestion on I-95 and elsewhere in the FAMPO Region,
and
WHEREAS, VDOT’s recommendation to the CTB was identical to the FAMPO recommendation, and
WHEREAS, after reviewing the VDOT presentation, the CTB acted to immediately move forward to
transfer $250,000 in FY13 funds within the current Six Year Improvement Program from UPC 13558 to
UPC 104928 to expedite development of VDOT’s recommended project, and
WHEREAS, as shown in the attached maps and described above, the overall project the CTB selected to
expedite consists of three smaller projects, namely: 1) the Berea Parkway in Stafford County; 2) the
Rappahannock River Crossing in Stafford County and the City of Fredericksburg, and 3) the
Rappahannock Parkway in the City of Fredericksburg and Spotsylvania County, and
WHEREAS, each of the three smaller projects listed above are included in the FAMPO 2040
Constrained Transportation Plan, and
NOW, THEREFORE BE IT RESOLVED BY THE FREDERICKSBURG METROPOLITAN
PLANNING ORGANIZATION (FAMPO) POLICY COMMITTEE THAT IT HEREBY AMENDS
THE FY12-FY15 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TO TRANSFER
$250,000 OF PREVIOUS FUNDS FROM UPC # 13558 (RELOCATION OF INTERCHANGE ON
I-95 AT RTE 630/EXIT 140, STAFFORD COUNTY ) TO UPC # 104928 (I-95 REST AREA
ACCESS AND RTE. 3 CONNECTOR ROAD), AND HEREBY URGES THE CTB AND VDOT
TO EXPEDITE DEVELOPMENT AND IMPLEMENTATION OF A PROJECT CONSISTING
OF THE BEREA PARKWAY, THE RAPPAHANNOCK RIVER CROSSING AND THE
RAPPAHANNOCK PARKWAY, IN ORDER TO REDUCE REGIONAL TRAFFIC
CONGESTION AND TO IMPROVE SAFETY, ECONOMIC VITALITY AND THE QUALITY
OF LIFE.
Adopted by the FAMPO Policy Committee at its meeting on January 27, 2014.
FAMPO Resolution 14-01
____________________________________________________
Chairman
Fredericksburg Area Metropolitan Planning Organization
Date:___________________
(540) 373-2890
406 Princess Anne St. FAX: (540) 899-4808
Fredericksburg, Virginia 22401 www.fampo.gwregion.org
(3) Rappah an n o c k Par kw a y
Æþ1
Exit 130
!"#$95
Æþ17
ÉÊ3
Exit 133
Exit 136
ÉÊ3
Æþ17
Æþ1
!"#$95
ÉÊ2
ÉÊ3
ÉÊ218
620
627
610
652
656
670
616
621
610
612
639
613
Copyright:© 2009 ESRI
I Recommended CTB Projects to Reduce I-95 and Other Tra�c Congestion in the FAMPO Region
0 1 20 . 5M i l e s
S p o t s y l va n i a C o u n t yS p o t s y l va n i a C o u n t y
C i t yC i t yC i t yo fo f
Fr e d e r i c k s b u r gFr e d e r i c k s b u r gFr e d e r i c k s b u r gFr e d e r i c k s b u r g
ivvee rr
Fr e d e r i c k s b u r g a n d S p o t s y l va n i aFr e d e r i c k s b u r g a n d S p o t s y l va n i aFr e d e r i c k s b u r g a n d S p o t s y l va n i aN a t i o n a l M i l i t a r y Pa r kN a t i o n a l M i l i t a r y Pa r k
B a t t l e o f C h a n ce l l o r s v i l l e
Fr e d e r i c k s b u r g a n d S p o t s y l va n i aN a t i o n a l M i l i t a r y Pa r k
P ra t t P ra t t Pa r kPa r k
Berea Parkway(1)(2)(3)
Rappahannock River Crossing Improvements
Rappahannock Parkway
Highlighted Projects
þþþÆþÆÆþÆÆþÆÆþÆ17ÆþÆÆþÆ17ÆþÆÆþÆ17ÆþÆ
656656
S t a � o r d C o u n t yS t a � o r d C o u n t yS t a � o r d C o u n t y
RRaapppppp aa hhh aa nn nnn oockkk
RRiivv
(1) Berea Parkway
ar kkww aa yy
( 2 ) Ra p p a h a n n o c kR i ve r C r o s s i n gI m p r ove m e n t s
670670
( 2 ) Ra p p a h a n n o c k
Fredericksburg MPO
MPO TIP Report Interstate
UPC 104928 SCOPE New Construction Roadway
SYSTEM Interstate JURISDICTION District-Wide OVERSIGHT FO
PROJECT I-95 Rest Area Access and Rte 3 Connector Road ADMIN BY VDOT
DESCRIPTION From: I-95 (Virginia Welcome Center) To: Intersection of Rte 3 and Rte 627
ROUTE/STREET Interstate 95 TOTAL COST $150,000,000
FUND SOURCE Prev Alloc. FY12 FY13 FY14 FY15
Residue Parcel – Interstate $0 $0 $250,000 $0 $0
TOTAL $0 $0 $250,000 $0 $0
MPO NOTE $250,000 was transferred in the SYIP from UPC 13558 (Interchange Relocation at Exit 140/Rte 630 in Stafford County) per CTB action; $2,000,000 in NHPP: Interstate funds programmed in SYIP for FY2016