Please check out the latest slideshare of the 1st floor renovation project at TechTown - Detroit. This slideshare marks month no. 4 of the construction progress on this project designed by Centric Design Studio. You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.

TRANSCRIPT

Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Rear Accent Wall At Conference Room 4TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Painted Entry Wall At Conference Room 4TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Ceiling Cloud Framing At Future Copy CenterTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Ceiling Cloud Framing At Future Copy Center

Ceiling Cloud Grid + Lighting At Conference Room 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Exterior View Of Conference Room 2 ProgressTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Retrofitting Of Existing Light Fixtures (Recycling)TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Installation Of Retrofitted Light Fixtures (Reuse)TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Aluminum Storefront System Ready For InstallationTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Storefront System Installed At Future Video Conf. RoomTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Storefront System Installed At Conf. Rooms 1 + 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Storefront Glazing Ready For InstallationTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Storefront Glazing Installed At Conf. Rooms 1 + 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Storefront Glazing Installed Inside Conf. Room 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At Corridor 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Ceiling + Lighting Installation At Future Video Conf. RoomTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At Event Spaces 1 + 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At Event Spaces 1 + 2

Construction Progress At Event Spaces 1 + 2TechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At Event Spaces 1 + 2

Wall Panel Finish Mock-Up Outside Of Event + Conf. Room AreaTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At TechTown Management SuiteTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Construction Progress At TechTown Management SuiteTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

More Construction Progress Photos Will Be Posted Next MonthTechTown 1st Floor Renovation

Aug. 1 - Aug. 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com