construction progress for techtown 1st floor renovation | aug 1 - aug 31
DESCRIPTION
Please check out the latest slideshare of the 1st floor renovation project at TechTown - Detroit. This slideshare marks month no. 4 of the construction progress on this project designed by Centric Design Studio. You can view the previous three slide share months of progress (starting in May 2013) to see how far we have come. Come back next month and see the progress. Thanks for viewing.TRANSCRIPT
Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Rear Accent Wall At Conference Room 4TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Painted Entry Wall At Conference Room 4TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Ceiling Cloud Framing At Future Copy CenterTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Ceiling Cloud Framing At Future Copy Center
Ceiling Cloud Grid + Lighting At Conference Room 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Exterior View Of Conference Room 2 ProgressTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Retrofitting Of Existing Light Fixtures (Recycling)TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Installation Of Retrofitted Light Fixtures (Reuse)TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Aluminum Storefront System Ready For InstallationTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Storefront System Installed At Future Video Conf. RoomTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Storefront System Installed At Conf. Rooms 1 + 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Storefront Glazing Ready For InstallationTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Storefront Glazing Installed At Conf. Rooms 1 + 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Storefront Glazing Installed Inside Conf. Room 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Corridor 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Ceiling + Lighting Installation At Future Video Conf. RoomTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Event Spaces 1 + 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Event Spaces 1 + 2
Construction Progress At Event Spaces 1 + 2TechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At Event Spaces 1 + 2
Wall Panel Finish Mock-Up Outside Of Event + Conf. Room AreaTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Co-Working Kitchen Construction ProgressTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At TechTown Management SuiteTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
Construction Progress At TechTown Management SuiteTechTown 1st Floor Renovation
Aug. 1 - Aug. 31 Construction 2013
CentricdesignStudio | www.centricdesignstudio.com
More Construction Progress Photos Will Be Posted Next MonthTechTown 1st Floor Renovation