a d d e n d u m n o . 3 - windsor, connecticut · the following changes to the project manual shall...
TRANSCRIPT
-
A D D E N D U M N O . 3
WINSOR POLICE FACILITY
ADDITIONS AND RENOVATIONS –
110 ADDISON ROAD
WINDSOR, CT 06095
KBA #18009.00
Date: July 31, 2019
Page: 1 of 3
CONNECTICUT OFFICE 416 Slater Road, P.O. Box 2590, New Britain, CT 06050-2590
V: (860) 229-0361 | F: (860) 229-5303
MASSACHUSETTS OFFICE
16 Chestnut Street, Suite 301, Foxborough, MA 02035V: (508) 549-9906 | F: (508) 549-9907
The following changes to the Project Manual shall become a part of the Drawings, Specifications, Bidding Requirements and Contract
Documents; superseding previously issued Drawings, Specifications, Bidding Requirements, Contract Documents and Addenda, to the extent
modified by this Addendum.
CLARIFICATION
Invitation to Bid
Sealed bids for the General Contract will be received until 2:00 p.m. on MONDAY, AUGUST 5, 2019.
All “L” Series drawings and specifications related to planting beds (stone and wood mulch) and decorative crushed stone
surfacing:
-Weed fabric shall provide full coverage over topsoil throughout planting beds. Overlap all individual pieces of fabric. Wrap fabric a
minimum of 2” up sides of abutting edging, site amenities (bollards, lights, walls, etc.) and concrete walks. There shall be no gaps in
fabric. Fabric shall not be visible at grade or above the mulch surfacing.
-Decorative Crushed Stone and River Stone Surfacing as specific and detailed shall be free of soils, fines, organic or deleterious
materials. Wash stones as required to remove any sediment, soil, sand from the stones prior to placing. The material above
the weed fabric shall not promote weed growth.
CHANGES TO SPECIFICATIONS
TABLE OF CONTENTS Add the following: Section 12 21 16 – Vertical Louver Blinds
DIVISION 8 – OPENINGS
At Section 08 06 00 – Openings Schedule: Change Door A207A from 1-3/4” thick to 2” thick door.
DIVISION 10 – SPECIALTIES
At Section 10 51 13.13 – Specialty Lockers: Change 2.4, B. Locker Construction: “All welded construction, fabricated from
16 gauge cold-rolled steel sheet, with sliding drawer base”.
ADD SPECIFICATION SECTIONS
DIVISION 12 – FURNISHINGS
Add the following Section 12 21 16 – Vertical Louver Blinds
CHANGES TO DRAWINGS
L6.01 – SITE DETAILS
Detail #1:
-
A D D E N D U M N O . 3
WINSOR POLICE FACILITY
ADDITIONS AND RENOVATIONS –
110 ADDISON ROAD
WINDSOR, CT 06095
KBA #18009.00
Date: July 31, 2019
Page: 2 of 3
CONNECTICUT OFFICE 416 Slater Road, P.O. Box 2590, New Britain, CT 06050-2590
V: (860) 229-0361 | F: (860) 229-5303
MASSACHUSETTS OFFICE
16 Chestnut Street, Suite 301, Foxborough, MA 02035V: (508) 549-9906 | F: (508) 549-9907
Install geotextile drainage fabric under granular fill layer at subgrade in new asphalt pavement areas at the southern access
drive. This proposed access driveway is between the existing parking on the east side of the building and Addison Road
connection and runs parallel to the south side of the building. Continue fabric under and wrap around edge drain as indicated
on civil drawings. Overlap seams min. 12”.
L6.04 – SITE DETAILS
Detail # 5:
Revise dimension: Increase seat wall height to minimum 24” above finished grade to top of cap in lieu of 22” ht.
L6.04 – SITE DETAILS
Detail # 5:
Add the following notes:
Contractor shall provide architectural quality craftsmanship to produce a product that represents the intended wood grained
plank appearance. Finish all exposed sides and ends. No air pockets or voids are permitted. Provide a (full size) minimum
of one 6’ long mockup, including cap and flashing for review and approval by Architect and Owner. Maintain consistency in
concrete color and appearance.
Seal all joints in bluestone cap with two-part Sika flex or equal. Color match required.
Refer to structural specifications for additional information regarding concrete walls.
Seal concrete with salt guard.
L6.07 – SITE DETAILS
Detail #1:
Revise dimension: Increase depth of all stone mulch surfacing to a minimum of 4” depth in lieu of 3” depth. Maintain
dimensioned topsoil depth.
L6.07 – SITE DETAILS
Detail #4:
Revise dimension: Increase depth of all crushed stone surfacing to a minimum of 6” depth in lieu of 4” depth.
S2.01 – ROOF FRAMING PLAN
Add new roof opening frames to the framing plan in locations as follows:
• Eight frames for all roof drains located as shown on drawing “A3.01”
S4.02 – STRUCTURAL SECTIONS
Section R2/S4.02 is MODIFIED as shown on Sketch “SSK-9”
A13.01 - MAIN LEVEL FURNITURE PLAN
Room A224 – Detective Sgt.: remove note “SAFES??” from drawings.
-
A D D E N D U M N O . 3
WINSOR POLICE FACILITY
ADDITIONS AND RENOVATIONS –
110 ADDISON ROAD
WINDSOR, CT 06095
KBA #18009.00
Date: July 31, 2019
Page: 3 of 3
CONNECTICUT OFFICE 416 Slater Road, P.O. Box 2590, New Britain, CT 06050-2590
V: (860) 229-0361 | F: (860) 229-5303
MASSACHUSETTS OFFICE
16 Chestnut Street, Suite 301, Foxborough, MA 02035V: (508) 549-9906 | F: (508) 549-9907
P1.01 – Underground Plumbing Plan
Add: Add one SS countertop sink, Type D1 in Evidence Receiving Room A160, including all hot & cold water supplies,
drainage and vent piping, fixtures and trim. Coordinate sink location with Architectural Plans. (Applies to Drawings P1.02
and P1.03 also.)
P1.03 – Plumbing Water & Gas Piping
At Room A137 “Compressor” change note “80 GALLON, 2 STAGE VERTICAL AIR COMPRESSOR SEE DETAIL #3,
DWG P2.10” to read “60 GALLON, SINGLE STAGE VERTICAL AIR COMPRESSOR SEE DETAIL #5, DWG P2.01”.
M4.01 – Mechanical Schedules
Add: Add “Hot Water Reheat Coil Schedule” to the drawing. Refers to all duct mounted hot water reheat coils indicated on
the Mechanical Plan. Attached is pdf file “HW Reheat Coil Schedule.pdf”.
E3.02 - SCHEDULES:
Add: Add to responsibility matrix at bottom of sheet: Furnish and install all Information Technology (IT), Telephone,
Audio Visual and all other Communications devices, head end equipment, racks, and all cabling and jacks, including tagging
and testing and all finish faceplates shall be by Town of Windsor and/or their appointed vendor/subcontractor.
ATTACHMENTS
Sketches:
SSK-9 – Revised Section “R2/S4.02”
Schedule Attached:
Horizontal Blind Location Schedule
Vertical Blind Location Schedule
Hot Water Heating Coil Schedule
Bid Questions and Responses:
RFI #018, RFI #019, RFI #020, RFI #021, RFI #022, RFI #023, RFI #024.
Specifications:
Division 12 21 16 – “Vertical Louver Blinds”
-
ED.9
SHORE EXIST'G JOISTS AS REQ'D TO
INSTALL FIELD WELDED
REINFORCING TYP.
FIELD WELD NEW L1 1/4x1 1/4x1/4
CONT. UPLIFT BRIDGING AT ENDS
OF ALL EXIST'G ROOF JOISTS TYP.
CONT. HSS 4x2 1/2x1/4 FIELD
WELDED TO TOP OF EXIST'G
STEEL BEAM AT BRACED BAY
BETWEEN EXIST'G ROOF
JOISTS TYP.
FIELD WELD EXIST'G
ROOF DECK @ 6" O.C.
TO TOP OF TUBE PC'S
TYP.
PROVIDE PL 3/8"x12"x1'-2"
@ 2'-8" O.C. FIELD WELDED TO L5 &
BOLTED TO BOND BEAM W/
(3)-1/2"∅ ANCHOR RODS W/ MIN.
6" EMBEDMENT USING HILTI
"HY-70" ADHESIVE TYP.
#5 VERTICALS @ 4'-0" O.C.
GROUTED SOLID W/ MATCHING
DOWELS EPOXIED INTO EXIST'G
FNDN WALL TYP.
PROVIDE CONT. GROUTED
BOND BEAM AT SHEAR
WALLS REINF. W/ (2)-#5 AT
TOPS OF WALL TYPICAL
CONT. HSS 4x2 1/2x1/4 FIELD WELDED
TO TOP OF EXIST'G STEEL BEAM AT
BRACED BAY BETWEEN EXIST'G ROOF
JOISTS TYP.
EXISTING BEAM
TO REMAIN TYP.
NEW STEEL BEAM - FOR
SIZE SEE PLAN TYP.
SAWCUT & REMOVE
EXISTING END DIAGONAL &
SEAT AT EXIST'G JOISTS TYP.
NEW L1 1/2"x1 1/2"x1/4 DIAGONALS
B/S TYP.
V.I.F.
1' - 0" ±
FIELD WELD NEW 3/4" FILLER
PLATE AS REQUIRED BETWEEN
BOTTOM CHORD ANGLES TYP.
NEW L2"x2"x5/16" SEAT ANGLE B/S
W/ 3/4" FILLER PL BETWEEN CHORD
ANGLES TYP.
PROJECT NO.:
DRAWN BY:DRAWING NO.:
TITLE:
DATE:
THIS SKETCH TOBE READ INCONJUNCTIONWITH THECONTRACTDOCUMENTS
SKETCH GENERATED FOR:
ADDENDUM R.R.F.I. A.S.I. P.R. C.C.D.
REFERENCE DETAIL/SHEET:
SCALE:
CONSULTANT: PROJECT:
2018 ©
C
OP
YR
IGH
T K
AE
ST
LE
BO
OS
AS
SO
C.,
IN
C.
416 Slater Road, P.O. Box 2590New Britain, CT 06050-2590
Additional offices located in Massachusetts and Rhode Island
Email: [email protected] Web: www.kba-architects.com
Ph: 860-229-0361 F: 860-229-5303
3/4" = 1'-0" SSK-9Author
18009.01
ADDITIONS &RENOVATIONS
WINDSOR POLICEFACILITY
REVISED SECTION "R2/S4.02"
110 ADDISON ROADWINDSOR, CT 06095
07/31/19
R2
S4.02
SECTIONSCALE: 3/4" = 1'-0"
S4.02
-
WINDSOR POLICE FACILITY
110 ADDISON ROAD
WINDSOR, CT
ADDITIONS RENOVATIONS
KBA#18009.01
Room No. Rm Name Location Qty. Remarks
A121 TRAINING/EOC MTG. side light in door A121A 1Provide horizontal blinds and hold down clips
at bottom.
A129 CONFERENCE hollow metal frame A129B 3Provide horizontal blinds and hold down clips
at bottom.
Horizontal Blind Location Schedule
SECTION 12 21 13 - Page 1 of 1
HORIZONTAL LOUVER BLINDSJuly 2, 2015 – BID
-
WINDSOR POLICE FACILITY
110 ADDISON ROAD
WINDSOR, CT
ADDITIONS RENOVATIONS
KBA#18009.01
Room No. Rm Name Location Qty. Remarks
A154 REPORT WRITING hollow metal frame A154 1Provide vertical blinds and hold down clips at
bottom.
A182 ROLL CALL hollow metal frame A182A/B 1Provide vertical blinds and hold down clips at
bottom.
A182 ROLL CALL hollow metal frame A182C 1Provide vertical blinds and hold down clips at
bottom.
A182 ROLL CALL hollow metal frame A182D 1Provide vertical blinds and hold down clips at
bottom.
Vertical Blind Location Schedule
SECTION 12 21 16 - Page 1 of 1
VERTICAL LOUVER BLINDSJuly 2, 2015 – BID
-
HOT WATER HEATING COIL SCHEDULEPerformance based on 140F Entering Water Temperature.All coils duct mounted.Based on Temptrol, Model 5WC water coils with 5/8" OD 0.02" copper tubes and 1-1/2" duct mounting flanges.
TAG MANUFACTURER AND MODEL SERVESNOM. SIZE (FW x FH) CFM EAT LAT BTU/HR
MAX APD (IN. WC) GPM
NOM. LWT REMARKS
HC-1-1 Temptrol Coils Model 5WC 5/8" tubes. RTU-1 Main Supply Air 60" x 24" 13,000 50F 65F 210,000 0.25" 20.0 120FHC-2-1 Temptrol Coils Model 5WC 5/8" tubes. RTU-2 - Zone 1 22" x 14" 1,300 54F 85F 33,400 0.25" 3.0 120FHC-2-2 Temptrol Coils Model 5WC 5/8" tubes. RTU-2 - Zone 2 12" x 10" 400 54F 85F 13,400 0.25" 1.2 120FHC-2-3 Temptrol Coils Model 5WC 5/8" tubes. RTU-2 - Zone 3 12" x 10" 500 54F 85F 13,600 0.25" 1.2 120FHC-2-4 Temptrol Coils Model 5WC 5/8" tubes. RTU-2 - Zone 4 12" x 9" 300 54F 88F 10,200 0.25" 1.0 120FHC-2-5 Temptrol Coils Model 5WC 5/8" tubes. RTU-2 - Zone 5 12" x 10" 400 54F 90F 13,400 0.25" 1.2 120FHC-3-1 Temptrol Coils Model 5WC 5/8" tubes. RTU-3 - Zone 1 12" x 9" 300 54F 80F 8,400 0.25" 1.0 120FHC-3-2 Temptrol Coils Model 5WC 5/8" tubes. RTU-3 - Zone 2 12" x 9" 300 54F 80F 8,400 0.25" 1.0 122FHC-3-3 Temptrol Coils Model 5WC 5/8" tubes. RTU-3 - Zone 3 9" x 9" 210 54F 85F 7,000 0.25" 0.8 120FHC-3-4 Temptrol Coils Model 5WC 5/8" tubes. RTU-3 - Zone 4 12" x 9" 250 54F 90F 9,700 0.25" 1.0 120FHC-3-5 Temptrol Coils Model 5WC 5/8" tubes. RTU-3 - Zone 5 20" x 12" 990 54F 85F 33,000 0.25" 3.0 120F
HC-4-1 Temptrol Coils Model 5WC 5/8" tubes. RTU-4 Main Supply Air 22" x 14" 1,200 60F 75F 19,400 0.25" 2.0 120FHC-ERV-1 Temptrol Coils Model 5WC 5/8" tubes. ERV-1 Supply Air 30" x 18" 2,200 54F 90F 35,600 0.25" 3.5 120FHC-ERV-2 Temptrol Coils Model 5WC 5/8" tubes. ERV-2 Supply Air 20" x 15" 850 54F 90F 13,800 0.25" 1.5 120F
-
RFI 018 Maximum Security Products Corp (MSP)
3 Schoolhouse Lane
Waterford, NY 12188
518-233-1800
(F)518-233-8088
REQUEST FOR INFORMATION #4: VISUAL DISPLAY SURFACES CLARIFICATION To: Nicholas Semyanko: [email protected] FROM: Thomas Townson
DATE: July 26, 2019 PROJECT: Additions & Renovations, Windsor Police Facility Question:
Please clarify the following concerning door control:
• Section 280000 includes an Electronic Access Control System • Drawing SE402 shows security electronics to control detention doors • Section 087163 paragraph 2.13.E. Control Station specifies an electronic control station for the
operation of doors.
• Is Section 087163 to provide door control stations/control panels for the detention doors with electric locks and electric sliding door devices.
Thanks
Thomas Townson
Response:
• Correct • Typical 403D for door A207B only. All cell sliding doors are controlled by a key only. These
doors are not electronically controlled. Refer to Section 08 34 63.
• All doors are to be controlled by Dispatch. By: Matt Alain Date: July 29, 2019
-
RFI 019
147 Hale Road P.O. Box 610 Manchester, CT 06045-0610 Telephone 860.644.2427 Facsimile 860.644.6505
AA/EOE
Orlando Annulliand Sons, Inc.
REQUEST FOR INFORMATION #4: VISUAL DISPLAY SURFACES CLARIFICATION To: Nicholas Semyanko: [email protected] FROM: Jonathan Adams, Chief Estimator DATE: July 29, 2019 PROJECT: Additions & Renovations, Windsor Police Facility Question:
Specification Section: 10 10 00 Drawing(s): Varies
1. Please clarify the types, locations and sizes of the required visual display surfaces. In addition, please provide a specification for the Glass Markerboard as shown in Room A165.
Jonathan W. Adams Chief Estimator Orlando Annulli and Sons, Inc. 147 Hale Road Manchester, CT 06045 P: 860.644.2427 F: 860.644.6505 E: [email protected] www.annulli.com
Response: 1). Tack boards in the following rooms A163, A166, A167, A168, A169, A172, and A173 will be provided in the F.F.&E. package and are not included in this Contract. Room A165 does not have a tack board. A glass marker board in Room A165 will be provided in the F.F. & E. package and is not included in this Contract. By: Nicholas Semyanko Date: July 30, 2019
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 1FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Horizontal Louver Blinds
Response
By: Dominique Canestri Date: 7/24/2019
Proposed Solution
122113
SentenceSpec Section
Request for Information
Information Requested
1.) Under spec section 122113 Horizontal Louver Blinds, it lists a schedule labeled vertical Louver Blinds. Please confirm if these blinds are
to be vertical or horizontal.
2.) On the schedule labeled vertical blinds under spec section 122113 it lists a side light in door A129. There is no door, only a window.
Please confirm if there are shades in that window.
Submittal #Schedule #Sub-Section
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText Box1). Specification Section 12 21 13 Horizontal Louver Blinds to remain. Specification Section 12 21 16 Vertical Louver Blinds added. See attached Horizontal Blind Location Schedule and Vertical Blind Location Schedule
2). At Door A129A there is no side light. At Door A129B there is a door and window frame HMF-15.
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 2FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Visual Display Boards
Response
By: Dominique Canestri Date: 7/24/2019
Proposed Solution
101100
SentenceSpec Section
Request for Information
Information Requested
1.) On page A13.01 there are several tack boards listed without sizes. Please confirm sizes for tack boards in the rooms listed below. A163,
A165, A166, A167, A168, A169, A172, A173.
2.) On page A13.01 there is a glass marker board listed in room A165. There is no subsection in spec section 101100 calling out for glass
marker boards. Please confirm size of board and type; if glass please provide specification.
Submittal #Schedule #Sub-Section
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText Box1). Tack boards in the following rooms A163, A166, A167, A168, A169, A172, and A173 will be provided in the F.F.&E. package and are not included in this Contract. Room A165 does not have a tack board.2). A glass marker board in Room A165 will be provided in the F.F. & E. package and is not included in this Contract.
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 3FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Emergency Key Cabinets
Response
By: Dominique Canestri Date: 7/24/2019
Proposed Solution
104116
SentenceSpec Section
Request for Information
Information Requested
1.) Spec Section 104116 Emegency Key Cabinets calls for exterior Knox Boxes. There are no boxes listed on the plans. Please confirm
quantities and locations.
Submittal #Schedule #Sub-Section
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText BoxThe Knox Box (quantity one) shall be installed on the prominent elevation of the building as directed by the Windsor Fire Department.
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 4FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Residential Appliances
Response
By: Dominique Canestri Date: 7/24/2019
Request for Information
Information Requested
1.) Spec Section 113100 lists an appliance schedule showing an icemaker with only a model number. Please review attached cutsheet and
confirm manufacturer of product, finish, placement / quantity, bin size and cube size.
Submittal #Schedule #Sub-Section Sentence
1.) Manufacturer is Scottsman. Finish is stainless steel. Bin Size is B530P. Cube size is medium.
Spec Section
Proposed Solution
113100
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText BoxThe ice maker is specified in Section 11 90 00 Misc Equipment, as referenced in Section 11 31 00, paragraph 1.2B.1.
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 5FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Specialty Lockers
Response
By: Dominique Canestri Date: 7/24/2019
Request for Information
Information Requested
1.) Under spec section 101513.13 subsection 2.4 Wardrobe lockers, it lists the lockers as sloped top, however the corresponding detail
listed on page A9.03 #1 and #2 show the lockers with a flat top. Please advise as to what top is required, sloped or flat. If flat top is
required, will plenum pieces be needed to connect lockers to gypsum soffits / ceilings?
2.) Under the same spec section it lists the basis of the lockers to be Tiffin Infinity lockers, however the construction is for the Tiffin Airflow
lockers. The Infinity series comes as a standard 18 or 16 gauge construction, not 14. What locker is being requested?
Submittal #Schedule #Sub-Section Sentence
1.) Use sloped top lockers.
2.) Use Infinity Lockers in standard 18 gauge.
Spec Section
Proposed Solution
101513.13
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText Box1). Wardrobe Lockers, Section 10 51 13.13, 2.4 shall have a flat top with a ducted connection at the gypsum wall enclosure as show on details 1 & 2 / A9.03. 2). Tiffin Infinity Lockers shall be 16 gauge. Sidearm Tiffin Lockers shall be 14 gauge as specified.
-
ELITE CONSTRUCTION RENTALS LLC5 Alexander Drive
Wallingford, CT 06492
Phone 860-290-9421
Fax 860-290-9467
www.elitecr.com
To: Chris Nanci # 6FIP Construction
860-641-4483 Job Name Windsor Police Facility Renovation and Addition
Address 110 Addison Road, Windsor, CT 06095
From : Date 7/24/2019
Elite Construction Rentals Response Required by 7/26/2019
Dominique Canestri Status Open
860-290-9421 Subject Metal Lockers
Response
By: Dominique Canestri Date: 7/24/2019
Request for Information
Information Requested
1.) Spec section 105113 Metal Lockers lists Lyons, Penco and Republic Storage as acceptable manufacturers. Can we submit a quote for
List Lockers as an equivalent substitution?
Submittal #Schedule #Sub-Section SentenceSpec Section
Proposed Solution
105113
http://www.elitecr.com/mailto:[email protected]:[email protected] BoxRFI 020
nsemyankoText Box1). Provide Metal Lockers Section 105113; 2.3 Wardrobe Lockers shall be one of the listed manufacturers.
nsemyankoText BoxResponse: Nicholas Semyanko Date: July 30, 2019
-
RFI 021
SARAZIN GENERAL CONTRACTORS, INC. Jonathan Sygrove, Estimator / PM 6 Commerce Drive North Windham, CT 06256 T-(860)456-4576 F-(860)456-8937 AA/EOE
REQUEST FOR INFORMATION #6: Bullet Resistance Door
To: Nicholas Semyanko: [email protected] FROM: Jonathan Sygrove, Estimator DATE: July 30, 2019 PROJECT: Additions & Renovations, Windsor Police Facility Question:
Please see the RFIs below regarding the Windsor PD project:
• Opening A119 & A120 is showing a bullet resistance door ( BRWD-1 ) with hardware set #703. Hardware set #703 is for push pull hardware with no locking devise. Please advise if this is the
correct hardware set.
Thank You, Jonathan Sygrove, Estimator / PM Response: Hardware set #703 is the required hardware set at opening A119 & A120.
By: Nicholas Semyanko Date: July 30, 2019
-
20 1st Ave. Chicopee, MA 01020-4619
www.valleycommunications.com Toll Free 800-522-4136
Phone: 413-592-4136 Fax: 413-592-4682
SME: Jim Page Date: 07/30/2019 Institution: Valley Communications Systems, Inc.
Section: RFI Submitting To: Nicholas Semyanko RFI Submitting Method: Email
Specs
Section Specs Page Drawing Question
28 50 00 3 1. Please provide specifications or make and model number for desired speakers
28 50 00 3 2. Please provide specifications or make and model of desired audio source/amplifier
SE-100 3. Are all gate contacts provided and installed by gate manufacturer, or only those specifically called out?
28 50 00 2 4. Please provide locations for intercom amplifiers and volume controls
28 23 00 3 5. 11.a.iv As specified, recording in interview sooms will cease if inhabitants stop moving for an extended period of time. Is this feature intentional?
28 23 00 3 6. 11.b.i, 11.b.ii Are cell cameras intended to record video on motion or just audio? Should they be recording continuously? As specified, cell recording is audio only and stops if no motion is detected. Is this correct?
28 23 00 8 7. Specified NVR in specified quantity will not meet record storage requirements with specified cameras. Please advise.
28 23 00 35 8. How many Owner Furnished systems we will need to install and configure?
9.
10.
11.
SALES · INSTALLATIONS · DESIGN · ENGINEERING · SERVICE · TRAINING Affirmative Action/Equal Opportunity Employer | MA Lic.# 7159-C | CT Lic.# CT-C5-192407 | RI Lic.# RI-TSC-464
http://www.valleycommunications.com/nsemyankoText BoxRFI 022
-
nsemyankoText BoxRFI 022
nsemyankoSnapshot
nsemyankoSnapshot
nsemyankoText BoxRESPONSE:
1. The basis of design for the speakers is the all-in-one Axis C2005 Network Speaker or an approved equal network based speaker system. 2. The basis of design for the speakers is an all-in-one solution including the speaker, amplifier, mixer, processor, edge storage and microphone. If the integrators solution requires an amplifier, as well as any other component for a complete system, this should be included with the solution.3. See specification section 282000 section 1.5.G.1.A. The security integrator will be responsible for installing the gate door position switch provided by the gate manufacturer.4. If physical volume controls and amplifiers are required of the integrators solution, the volume controls and amplifiers should be installed inside the Communication Equipment Servers Room A152. The system is intended to be all-in-one such that the volume control, speaker zoning and all other programming is controlled through the software or web application.5. Audio and video shall be continuously recorded based on the requirements stated in 2.3.B.2.b.6. Cell cameras are intended to record both audio and video continuously based on the requirements stated in 2.3.B.2.b.7. It is the responsibility of the integrator to verify the recording storage requirements for the project provided by Avigilon. If the integrators storage calculations differ from the storage calculations in the specification, either higher or lower, the integrator shall provide the proper server and storage to meet the requirements stated in the specification. 8. There are no owner furnished systems to install or configure however, the integrator shall conform to the requirements stated in specification section 281000 section 1.9 Scope of Work.
BY: DATE: July 30, 2019Matthew Allain, AIA, NCARB, CSL Director, Design and EngineeringGood Harbor Techmark, LLC17 Accord Park Drive, Suite 201Norwell, MA 02061 Tel: (781) 871-6555 x 510Cell: (508) 667-8799
-
RFI 023
118 Quinnipiac Avenue
North Haven, CT 06473
www.RedHawkUS.com
Main Office: 203-672-9699 | Direct: 203-672-9654
Cell: 203-233-0755 | Fax: 203-891-8858 Opportunity
You are the artist and life is the canvas: add all the color you can to it
REQUEST FOR INFORMATION #1: Sprinkler Systems
To: Nicholas Semyanko: [email protected] FROM: Daniel C. Hardy/ Estimator
DATE: July 30, 2019 PROJECT: Additions & Renovations, Windsor Police Facility Question:
Couple of Clarifications needed on the fire protection side of the project.
• Fill and Drain fire sprinkler systems daily? • Temporary Upright Sprinklers during demo? • System to remain active during working hours or is this a cut, cap, make safe demo? IF
it is a make safe, we will leave the demoed items on the floor and exclude the cleanup. Thank you for any information you can provide. Daniel C. Hardy | Red Hawk Fire and Security Estimator
Response:
1. The Area B (DPW Side) of the building shall be maintained live, in service at the end of each workday to afford sprinkler protection to that side of the building. This should be the duration it takes to make the piping modifications to separate the two sprinkler risers, one for each side of the building. A temporary one hour rated construction barrier will be provided by GC to compartmentalize.
2. The new Police Side will not require temporary sprinklers during construction. 3. The sprinkler system on the Area A (Police) side can be taken out of service
during demolition and construction, provided the temporary barrier wall is in place.
By: John Pouliot - RZDA Date: 7/30/2019
-
RFI 024
339 Washington Avenue North Haven, CT 06473 [email protected] • www.bantonconstruction.com Affirmative Action / Equal Opportunity Employer
Sumi Oldman T: 203.234.2353 • F: 203.234.0010 • C: 617.932.9265
REQUEST FOR INFORMATION #1: Sprinkler Systems
To: Nicholas Semyanko: [email protected] FROM: Sumi Oldman
DATE: July 30, 2019 PROJECT: Additions & Renovations, Windsor Police Facility Question:
• On drawing E2.01 one of the general notes calls for the use of illuminated red receptacles for C.O.P.S outlets. On drawing E3.01 the riser shows multiple C.O.P.S panels in different locations. The legend does not provide any detailed markings, symbols, or notes clarifying which outlets are C.O.P.S receptacles or what areas they are required in. These receptacles have a big difference in cost compared to standard receptacles. Please provide clarification. RZDA Response: Circuits, receptacles and other loads connected to COPS power are identified on the circuit tags indicating what panel and circuit number to connect to. The COPS panels are CL-1, CL-2A, CL-2B and CL-3 which indicates C=“COPS” and L=”Low” (120/208) voltage. Thus is a receptacle is identified as connected to panel CL-2A, 25 it means COPS Low Voltage Panel 2A, circuit 25.
• Regarding the structural steel: Can we access both top and bottom of the steel in the addition and in the renovation for the lightning protection?
KBA Response:
Contractor to visit the job site and familiarize themselves with existing field conditions.
• We do not know what vendors provide the EM Radio System or the 9-1-1 System and the specs don’t provide this information either. Please advise on what vendors provide these systems?
RZDA Response:
These work scopes are identified in the responsibility matrix on drawing E3.02. The Town of Windsor and their vendor, Motorola, will provide the Emergency Radio system and equipment and the Town of Windsor and the approved 911 vendor (AT&T) will provide the 911 system and equipment.
-
RFI 024
• Our A/V system vendors have determined that they are unable to quote the A/V system on this job. Please advise on what A/V vendor(s) are providing a quote for this project?
RZDA Response:
The Town of Windsor will engage A/V Vendors for the project directly. Refer to Security System drawings and specifications for which TV’s/Monitors are to be provided under the construction contract.
Goodharbor Tech Response:
The security specification section 285000, Security Communication System, and section 286000, Security Rack, Console and Equipment, outline the systems included for the audio and video scope of work associated with the electronic security system. These sections include the audio and video intercom system, and the workstations and monitors associated with the access control and video management system.
• The plans and specs show the existing simplex fire alarm system to be replaced with a new Siemens fire alarm system. Looking at drawing E1.06 it shows new fire alarm devices including the new FACP located in the Area B portion of the building. Based upon multiple architectural and some electrical drawings they state that the interior work in area B besides the two bathrooms is NOT IN CONTRACT. Please advise on whether this work will be included in the base bid or whether this work will be given as a complete alternate price? RZDA Response: All of the fire alarm work and all electrical work indicated on drawing E1.06 is to be included in the base bid. The fire alarm system is to be complete throughout the entire building. E1.06 also identifies other work scopes that are included in the base bid, such as, exterior wall pack lighting, security camera rough-ins, communications conduits, emergency lighting at FACP, etc. KBA Response: The Bathrooms and Temporary Walls at the DPW area are part of the Architectural Base Bid.
Thank you for your assistance, Sumi Oldman
Response: See responses above. By: John Pouliot, Matt Alain, Nick Semyanko Date: 7/30/2019
-
WINDSOR POLICE FACILITY ADDITIONS AND RENOVATIONS
110 ADDISON ROAD KBA #18009.01
WINDSOR, CT
SECTION 12 21 16 - Page 1 of 5
VERTICAL LOUVER BLINDS July 2, 2019 - BID
SECTION 12 21 16 – VERTICAL LOUVER BLINDS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. The Contractor, Subcontractors, and/or suppliers providing goods and services referenced in or
related to this Section shall also be bound by the Related Documents identified in Division 01
Section “Summary.”
1.2 SUMMARY
A. This Section includes the following:
1. Vertical louver blinds, aluminum vanes.
B. Related Sections include the following:
1. Division 06 Section "Miscellaneous Rough Carpentry" for wood blocking and grounds
for mounting vertical louver blinds and accessories.
1.3 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings: Show fabrication and installation details for vertical louver blinds.
C. Samples for Initial Selection: For each type of vertical louver blind indicated.
1. Include similar Samples of accessories involving color selection.
D. Samples for Verification: For each type of vertical louver blind indicated.
1. Vane: Not less than 12 inches long.
2. Valance: Full-size unit, not less than 12 inches wide.
E. Window Treatment Schedule: For vertical louver blinds. Use same designations indicated on
Drawings.
F. Product Certificates: For each type of vertical louver blind, signed by product manufacturer.
G. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified
testing agency, for each type of vertical louver blind.
H. Maintenance Data: For vertical louver blinds to include in maintenance manuals.
-
WINDSOR POLICE FACILITY ADDITIONS AND RENOVATIONS
110 ADDISON ROAD KBA #18009.01
WINDSOR, CT
SECTION 12 21 16 - Page 2 of 5
VERTICAL LOUVER BLINDS July 2, 2019 - BID
1.4 QUALITY ASSURANCE
A. Source Limitations: Obtain vertical louver blinds through one source from a single
manufacturer.
B. Fire-Test-Response Characteristics: Provide vertical louver blinds with the fire-test-response
characteristics indicated, as determined by testing identical products per test method indicated
below by UL or another testing and inspecting agency acceptable to authorities having
jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting
agency.
1. Flame-Resistance Ratings: Passes NFPA 701.
C. Product Standard: Provide vertical louver blinds complying with WCSC A 100.1.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver vertical louver blinds in factory packages, marked with manufacturer and product name,
fire-test-response characteristics, and location of installation using same designations indicated
on Drawings and in a window treatment schedule.
1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not install vertical louver blinds until construction and wet and
dirty finish work in spaces, including painting, is complete and dry and ambient temperature
and humidity conditions are maintained at the levels indicated for Project when occupied for its
intended use.
B. Field Measurements: Where vertical louver blinds are indicated to fit to other construction,
verify dimensions of other construction by field measurements before fabrication and indicate
measurements on Shop Drawings. Allow clearances for operable glazed units' operation
hardware throughout the entire operating range. Notify Architect of discrepancies. Coordinate
fabrication schedule with construction progress to avoid delaying the Work.
1.7 EXTRA MATERIALS
A. Furnish extra materials described below that match products installed and that are packaged
with protective covering for storage and identified with labels describing contents.
1. Vanes: Before installation begins, furnish quantity of full-size units equal to 5 percent of
amount of each type, color, and size installed.
-
WINDSOR POLICE FACILITY ADDITIONS AND RENOVATIONS
110 ADDISON ROAD KBA #18009.01
WINDSOR, CT
SECTION 12 21 16 - Page 3 of 5
VERTICAL LOUVER BLINDS July 2, 2019 - BID
PART 2 - PRODUCTS
2.1 VERTICAL LOUVER BLINDS, ALUMINUM VANES
A. Basis of Design Product: Subject to compliance with requirements, provide the following, or
equal:
1. Hunter Douglas Architectural; Contract Vertical Blinds.
B. Vanes: Aluminum, alloy, and temper recommended by producer for type of use and finish
indicated, not less than .008” gauge; with crowned profile and not less than 3/8-inch overlap
when vanes are rotated fully closed.
1. Nominal Vane Width: 3-1/2 inches wide.
C. Headrail: Channel, extruded aluminum with long edges returned or rolled and ends capped.
Headrail encloses operating mechanisms including carrier-spacing mechanism that provides
uniform vane spacing when blinds are traversed fully across headrail (closed).
1. Manual Traverse Control: Wand.
2. Manual Rotation Control: Wand.
3. Manual Control Locations: Right.
4. Draw and Stack: One way, stack right.
D. Carriers: Engineered plastic with gears to align and synchronize vane rotation and stems that
allow vane removal and replacement. Lead carriers have self-lubricating wheels or elongated
bearing surfaces; following carriers have self-lubricating wheels.
1. Spacer Links: Stainless steel, 5/16” x .008” spacer links smoothly space and stabilize
carrier trucks.
E. Valance: One vane insert.
F. Louver Bottom: Connecting or spacing chains.
G. Mounting: Wall mounting, permitting easy removal and replacement without damaging blind
or adjacent surfaces and finishes; with spacers and shims required for blind placement and
alignment indicated.
1. Provide intermediate support brackets if end support spacing exceeds spacing
recommended by manufacturer for weight and size of blind.
H. Stack Release: Permitting stacked vanes to be moved away from stacking position for total
access to glazed opening.
I. Colors:
1. Vanes: As selected by Architect from manufacturer’s full range.
-
WINDSOR POLICE FACILITY ADDITIONS AND RENOVATIONS
110 ADDISON ROAD KBA #18009.01
WINDSOR, CT
SECTION 12 21 16 - Page 4 of 5
VERTICAL LOUVER BLINDS July 2, 2019 - BID
2. Components: Provide materials exposed to view matching or coordinating with vanes
unless otherwise indicated.
2.2 VERTICAL LOUVER BLIND FABRICATION
A. Product Description: Vertical louver blind consisting of equally spaced, synchronized vanes
and rail system with self-aligning carrier mechanisms, carriers, traverse and vane directional
mechanisms and controls, and installation hardware.
B. Concealed Components: Noncorrodible or corrosion-resistant-coated materials.
1. Louver Directional and Traversing Control Mechanisms: With permanently lubricated
moving parts.
C. Unit Sizes: Obtain units fabricated in sizes to fill window and other openings as follows,
measured at 74 deg F:
1. Blind Units Installed outside Jambs: Width and length as indicated, with terminations
between blinds of end-to-end installations at centerlines of mullion or other defined
vertical separations between openings.
D. Installation Brackets: Designed for easy removal and reinstallation of blind, for supporting
headrail, valance, wand operating hardware, and for hardware position and blind mounting
method indicated.
E. Installation Fasteners: No fewer than two fasteners per bracket, fabricated from metal
noncorrosive to blind hardware and adjoining construction; type designed for securing to
supporting substrate; and supporting blinds and accessories under conditions of normal use.
F. Color-Coated Finish: For metal components exposed to view, unless anodized or plated finish
is indicated. Apply manufacturer's standard baked finish complying with manufacturer's written
instructions for surface preparation including pretreatment, application, baking, and minimum
dry film thickness.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with
requirements for installation tolerances, operational clearances, and other conditions affecting
performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
-
WINDSOR POLICE FACILITY ADDITIONS AND RENOVATIONS
110 ADDISON ROAD KBA #18009.01
WINDSOR, CT
SECTION 12 21 16 - Page 5 of 5
VERTICAL LOUVER BLINDS July 2, 2019 - BID
3.2 INSTALLATION
A. Install vertical louver blinds level and plumb and aligned with adjacent units according to
manufacturer's written instructions, and located so exterior vane edges in any position are not
closer than 2 inches to interior face of glass. Install intermediate support as required to prevent
deflection in headrail. Allow clearances between adjacent blinds and for operating glazed
opening's operation hardware, if any.
B. Head Mounted: Install headrail on face of opening head.
3.3 ADJUSTING
A. Adjust vertical louver blinds to operate smoothly, easily, safely and free of binding or
malfunction throughout entire operational range.
3.4 CLEANING AND PROTECTION
A. Clean vertical louver blind surfaces after installation, according to manufacturer's written
instructions.
B. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and
Installer, that ensure that vertical louver blinds are without damage or deterioration at time of
Substantial Completion.
C. Replace damaged vertical louver blinds that cannot be repaired, in a manner approved by
Architect, before time of Substantial Completion.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to
adjust, operate, and maintain systems. Refer to Division 01 Section "Demonstration and
Training."
END OF SECTION 12 21 16