CASE HISTORY| bakerhughes .com
Results Enabled successful CT fishingreturning well to production aftertwo-year shut-in
Cleaned debris from producing interval
Facilitated decision making byproviding real-time data and imagesto onshore staff
Challenges Well located on offshore Norwegiancontinental shelf
High-production well shut in for twoyears because of lost fish across theperforated interval
Perform operation as perNORSOK requirements
Kill well, recover fish, and clean outdebris in one run
Baker Hughes solution Implemented TeleCoil intelligent
coiled tubing services with cameraand fishing tools
Followed up with Tornado cleanouttool with motor and mill
Provided real-time camera servicesand differential pressure, temperature,and depth correlations
Transmitted live data to customer
operation center and theBaker Hughes BEACON Center fordata analysis and operational support
A high-producing oil well on the offshore
Norwegian continental shelf (NCS) had been
shut in for two years because deposits and
sand in the wellbore had caused a failed
intervention and temporary abandonment of the
well. Seventy-two ft (22 m) of the tool string,
consisting of a production logging tool (PLT) a
dual e-line tractor, and approximately 1,148 ft
(350 m) of seven conductor cable, was left in
the well.
The length of the fish and lubricator height
precluded live well operations or any
hydrocarbon returns to surface. After multiple
attempts to retrieve the string had failed, the
operator asked Baker Hughes for a solution
that would return the well to production.
Baker Hughes recommended the TeleCoil
intelligent coiled tubing (CT) services.
TeleCoil services provide an advanced andreliable approach to complex offshore
interventions by acquiring accurate downhole
informationdepth correlation as well as
pressure and temperature measurementsthat
eliminate the guesswork and assumptions
associated with traditional CT operations. In
addition, a video camera can be attached to
a standard TeleCoil BHA. The camera captures
real-time, high-definition images of downhole
conditions to facilitate planning and operations.
The TeleCoil service included a camera and
normal fishing tools run on a 2 3/8-in. (60-mm)
CT string. Debris was removed and a clear
image was established for further evaluation.This prevented time-consuming and expensive
well fluid displacement. The quality of the image
was controlled from the surface and provided a
greater insight into downhole conditions.
Live downhole data and video was transmitted
to both the operators onshore operation center
and the Baker Hughes BEACONCenter for
analysis and operational planning. The data and
images were used to facilitate decision making
in an extensive and meticulous planning sessionthat refined the fishing strategy.
Using the strategy, the TeleCoil service assisted
in retrieving the entire BHA fish in one run after
the cable was out.
TeleCoil Intelligent CT Services Used to Clean Debrisand Diagnose and Remove Complex FishLocation: Offshore Norway
-
8/11/2019 39261.SnA.P41.TeleCoil Case.history HiRes
2/2
CASE HISTORY
2013 Baker Hughes Incorporated. All rights reserved.
Telecoil, BEACON, and Tornado are trademarks of Baker Hughes Incorporated.
Disclaimer of Liabili ty: This inf ormation is provided for general information purposes only and is bel ieved to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affiliates do not make any warranties or representations of any kind regarding theinformation and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the informationprovided herein. All information is furnished as is and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE LIABLE FOR ANY DIRECT,INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.
39261 12/2013
Baker Hughes then used the Tornadocleanout
tool with motor and mill to return the treated
well to its previous production rate. Returning
this well to production also helped the field to
achieve its target of greater production efficiency.
Based on a significant collaborative effort
between Baker Hughes and the operators staff,
the operation was completed without any HSE
incidents. Baker Hughes provided a technically
and commercially suitable solution to meet the
operators needs.