    CASE HISTORY| bakerhughes .com

    Results Enabled successful CT fishingreturning well to production aftertwo-year shut-in

    Cleaned debris from producing interval

    Facilitated decision making byproviding real-time data and imagesto onshore staff

    Challenges Well located on offshore Norwegiancontinental shelf

    High-production well shut in for twoyears because of lost fish across theperforated interval

    Perform operation as perNORSOK requirements

    Kill well, recover fish, and clean outdebris in one run

    Baker Hughes solution Implemented TeleCoil intelligent

    coiled tubing services with cameraand fishing tools

    Followed up with Tornado cleanouttool with motor and mill

    Provided real-time camera servicesand differential pressure, temperature,and depth correlations

    Transmitted live data to customer

    operation center and theBaker Hughes BEACON Center fordata analysis and operational support

    A high-producing oil well on the offshore

    Norwegian continental shelf (NCS) had been

    shut in for two years because deposits and

    sand in the wellbore had caused a failed

    intervention and temporary abandonment of the

    well. Seventy-two ft (22 m) of the tool string,

    consisting of a production logging tool (PLT) a

    dual e-line tractor, and approximately 1,148 ft

    (350 m) of seven conductor cable, was left in

    the well.

    The length of the fish and lubricator height

    precluded live well operations or any

    hydrocarbon returns to surface. After multiple

    attempts to retrieve the string had failed, the

    operator asked Baker Hughes for a solution

    that would return the well to production.

    Baker Hughes recommended the TeleCoil

    intelligent coiled tubing (CT) services.

    TeleCoil services provide an advanced andreliable approach to complex offshore

    interventions by acquiring accurate downhole

    informationdepth correlation as well as

    pressure and temperature measurementsthat

    eliminate the guesswork and assumptions

    associated with traditional CT operations. In

    addition, a video camera can be attached to

    a standard TeleCoil BHA. The camera captures

    real-time, high-definition images of downhole

    conditions to facilitate planning and operations.

    The TeleCoil service included a camera and

    normal fishing tools run on a 2 3/8-in. (60-mm)

    CT string. Debris was removed and a clear

    image was established for further evaluation.This prevented time-consuming and expensive

    well fluid displacement. The quality of the image

    was controlled from the surface and provided a

    greater insight into downhole conditions.

    Live downhole data and video was transmitted

    to both the operators onshore operation center

    and the Baker Hughes BEACONCenter for

    analysis and operational planning. The data and

    images were used to facilitate decision making

    in an extensive and meticulous planning sessionthat refined the fishing strategy.

    Using the strategy, the TeleCoil service assisted

    in retrieving the entire BHA fish in one run after

    the cable was out.

    TeleCoil Intelligent CT Services Used to Clean Debrisand Diagnose and Remove Complex FishLocation: Offshore Norway

  • 8/11/2019 39261.SnA.P41.TeleCoil Case.history HiRes

    2/2

    CASE HISTORY

    2013 Baker Hughes Incorporated. All rights reserved.

    Telecoil, BEACON, and Tornado are trademarks of Baker Hughes Incorporated.

    Disclaimer of Liabili ty: This inf ormation is provided for general information purposes only and is bel ieved to be accurate as of the date hereof; however, Baker Hughes Incorporated and its affiliates do not make any warranties or representations of any kind regarding theinformation and disclaim all express and implied warranties or representations to the fullest extent permissible by law, including those of merchantability, fitness for a particular purpose or use, title, non-infringement, accuracy, correctness or completeness of the informationprovided herein. All information is furnished as is and without any license to distribute. The user agrees to assume all liabilities related to the use of or reliance on such information. BAKER HUGHES INCORPORATED AND ITS AFFILIATES SHALL NOT BE LIABLE FOR ANY DIRECT,INDIRECT, SPECIAL, PUNITIVE, EXEMPLARY OR CONSEQUENTIAL DAMAGES FROM ANY CAUSE WHATSOEVER INCLUDING BUT NOT LIMITED TO ITS NEGLIGENCE.

    39261 12/2013

    Baker Hughes then used the Tornadocleanout

    tool with motor and mill to return the treated

    well to its previous production rate. Returning

    this well to production also helped the field to

    achieve its target of greater production efficiency.

    Based on a significant collaborative effort

    between Baker Hughes and the operators staff,

    the operation was completed without any HSE

    incidents. Baker Hughes provided a technically

    and commercially suitable solution to meet the

    operators needs.