  • 8/11/2019 38 Introduction to UBD

    1/50

  • 8/11/2019 38 Introduction to UBD

    2/50

  • 8/11/2019 38 Introduction to UBD

    3/50

    UB DRILLING - JOBS

    1997 Underbalanced Drilling Jobs

    Geographic Distribution

    Canada

    US Europe

    South America

    Middle East

    Far East

    1998 Spears & Assoc.

  • 8/11/2019 38 Introduction to UBD

    4/50

    Underbalanced Drilling in the United StatesUnderbalanced Drilling in the United States

    YEAR

    95 96 97 98 99 00 01 02 03 04 05

    0

    2,000

    4,000

    6,000

    8,000

    10,000

    12,000

    14,000

    16,000

    TOTA L

    UNBDE

    RBALA

    NC

    EDWELL

    S

    LOW

    HIGH

  • 8/11/2019 38 Introduction to UBD

    5/50

    UBD Definition

    Formation Pressure isequal to or greater than

    Circulating Pressure

  • 8/11/2019 38 Introduction to UBD

    6/50

  • 8/11/2019 38 Introduction to UBD

    7/50

    Barriers to UB Drilling

  • 8/11/2019 38 Introduction to UBD

    8/50

    REGULATORY BARRIERSto

    UnderBalance Drilling

    The regulatorsneed assuranceand details

  • 8/11/2019 38 Introduction to UBD

    9/50

    BARRIERS TO UB D&C

    RegulatoryLack of Standards

    Lack of knowledgeLittle statistical history

    Concern about well control

    Environmental questions

  • 8/11/2019 38 Introduction to UBD

    10/50

    OPERATORS BARRIERS

    The Operatorneedsexperience and

    confidence.

  • 8/11/2019 38 Introduction to UBD

    11/50

    OPERATORS PROBLEMS

    Unfamiliar with the systemrisk of the new

    Lack of experienced peopleEconomics - Too expensive

    Concern- liabilityConcern- well bore stability

  • 8/11/2019 38 Introduction to UBD

    12/50

    REASONS FOR UB GROWTH

    There aredriving

    economicreasons

  • 8/11/2019 38 Introduction to UBD

    13/50

    UBD Forecast by Region

    UBD Forecast by Region

    -

    200

    400

    600

    800

    1,000

    1,200

    1996 1997 1998 1999 2000 2001 2002

    Wells

    US

    Can

    Eur

    SoAm

    ME/Afr

    FE

    1998 Spears & Assoc.

  • 8/11/2019 38 Introduction to UBD

    14/50

    REASONS FOR UB GROWTH

    Depleted reservoirs

    Awareness of skin damageLimits of lost circulation matl.

    Cost of differential sticking

  • 8/11/2019 38 Introduction to UBD

    15/50

    REASONS FOR UB GROWTH

    Service co. competition

    Trade journal publications

    Horizontal drilling

    Consultants available

  • 8/11/2019 38 Introduction to UBD

    16/50

    TECHNICAL IMPROVEMENTS

    We were notready to put all

    of this togetheruntil the 1990s

  • 8/11/2019 38 Introduction to UBD

    17/50

    TECHNICAL IMPROVEMENTS

    Compressor EvolutionHammer drills

    NitrogenIncreased availability

    Reduced costOn site generation

  • 8/11/2019 38 Introduction to UBD

    18/50

    TECHNICAL IMPROVEMENTS

    Recyclable foam systemsBetter gas separators

    Closed loop circulationHydraulics models

    Improved rotating headsWire line wet connect

  • 8/11/2019 38 Introduction to UBD

    19/50

    TECHNICAL IMPROVEMENTS

    Improved MWDRig assist snubbing units

    Coiled tubing equipmentNon-damaging drilling fluids

    Top drive

  • 8/11/2019 38 Introduction to UBD

    20/50

  • 8/11/2019 38 Introduction to UBD

    21/50

    Reasons for UB drilling

    Lost circulation Faster Drilling

  • 8/11/2019 38 Introduction to UBD

    22/50

    Reasons for UB drilling

    Lost circulation Faster Drilling

    No DifferentialSticking

  • 8/11/2019 38 Introduction to UBD

    23/50

    Reasons for UB drilling

    ... Reduce

    Reservoir

    Damage

  • 8/11/2019 38 Introduction to UBD

    24/50

    Reasons for UB drilling

    ... Reduce

    Reservoir

    Damage

    Improve Prod.

    Evaluation

  • 8/11/2019 38 Introduction to UBD

    25/50

    Effect of Skin on Production Rates

    0

    200

    400

    600

    800

    1,000

    SKIN

    BOPD

    5 10-2 0 15-3 -1

  • 8/11/2019 38 Introduction to UBD

    26/50

    UBD is another tool in the toolbox,

    not a Panacea.

    Physical Limitation to UBD

    Borehole Instability

    Unconsolidated Sands Weak Formations

    Geopressured Shales

    Salt Beds

    Inadequate Casing

  • 8/11/2019 38 Introduction to UBD

    27/50

    Production Limits to UBD

    Permeability isso low the zoneneeds to be

    fracked

    Zones must beisolated

  • 8/11/2019 38 Introduction to UBD

    28/50

    MISTFOAMLIQUID GASAERATED

    LIQUID

    Types of Flow Regimes

  • 8/11/2019 38 Introduction to UBD

    29/50

    GeneralizedFluid Systems

  • 8/11/2019 38 Introduction to UBD

    30/50

    Shaffer Rotating Blow-Out Preventor

    2,500 psi rotating - 5,000 psi static

    Equipment - Rotating Head

  • 8/11/2019 38 Introduction to UBD

    31/50

    Closed Loop Circulation

    System

    Closed Loop Circulation

    System

    SEPARATOR

    OILTANKS

    WATER

    TANKS

    NITROGENPUMPERS

    MUDTANKS

    RIG

    RIG

    PUMPS

    R-BOP

    TOPDRIVE

    SYSTEM

    CATCHERS

    SAMPLE

    CHOKEMANIFOLD

    FLARESTACK

    N2 / FLUID

    MIX

    CUTTINGRETURN

  • 8/11/2019 38 Introduction to UBD

    32/50

    Stainless Steel

    Liquid Nitrogen(-320OF)

    Carbon Steel

    Gaseous nitrogento well

    80O

    F, 0-10,000psi

    Pump

    Vaporizer

    6.11.3

    Equipment - Gas Source

  • 8/11/2019 38 Introduction to UBD

    33/50

    AIR DRILLING

    A brief summary

  • 8/11/2019 38 Introduction to UBD

    34/50

    Air Drilling

    Air/Gas drilling (dust) is a technique used inareas where the formations are Dry i.e., thereis no influx of water or liquid hydrocarbons.

    This medium requires significant compressedgas volumes to clean the well with average

    velocities of over 3,000 ft per minute.

  • 8/11/2019 38 Introduction to UBD

    35/50

    Air Drilling Dusting

  • 8/11/2019 38 Introduction to UBD

    36/50

    Air Drilling Benefits

    Increased Rate of PenetrationReduced Formation DamageImproved Bit Performance

    Lost Circulation ControlContinuous Drill Stem Test

  • 8/11/2019 38 Introduction to UBD

    37/50

    Air/Dust Drilling Layout

  • 8/11/2019 38 Introduction to UBD

    38/50

    Misting

    Addition of 6 to 30 bbl/hr offluid to the air stream.

    Cleans and lubricates the bit

    Carries the cuttings to thesurface as a mist or more

    normally in a modified twophase flow.

  • 8/11/2019 38 Introduction to UBD

    39/50

    TT96-86 39

    FOAM DRILLINGFOAM DRILLING

    Basic Comments

  • 8/11/2019 38 Introduction to UBD

    40/50

    Foam Drilling

    The most versatile of the gas-generatedsystems.

    Effective operating range from 0.2 to 0.6 s.g. Mixture of gas phase and foaming solution.

    Foam flow varies with depth in the hole.

    Adjustable effective BHP.

    Enhanced lifting and well bore cleaning.

    A displacing medium, not a propellingmedium.

  • 8/11/2019 38 Introduction to UBD

    41/50

    Foam (Heading)

  • 8/11/2019 38 Introduction to UBD

    42/50

    Improved Hole Cleaning

  • 8/11/2019 38 Introduction to UBD

    43/50

    Foam Drilling Benefits

    Faster Penetration rate Low Air requirements

    Low fluid requirements

    Low Hydrostatic head No damage to formation

    Continuous Drill Stem test

    Best for large holes

  • 8/11/2019 38 Introduction to UBD

    44/50

    Mist or Foam Drilling Layout

  • 8/11/2019 38 Introduction to UBD

    45/50

    GASEATED

    OR

    AERATED

    DRILLING

  • 8/11/2019 38 Introduction to UBD

    46/50

    Gaseated

    Mist

    TransitionWater

    Gas

  • 8/11/2019 38 Introduction to UBD

    47/50

    Aerated Fluid

    Gasification of Primary Drilling Fluid.

    Initially designed as a technique to lightenmud to reduce lost circulation.

    Methods

    Standpipe injection Jet Sub

    Parasite String

    Dual Casing String

    As an UB fluid, it is easiest to control in smallholes.

  • 8/11/2019 38 Introduction to UBD

    48/50

    Small injection string run simultaneously

    with intermediate casing. Injected gas does not affectbit hydraulics.

    Injected gas does not effectMWD

    Parasite String

  • 8/11/2019 38 Introduction to UBD

    49/50

    Aerated Fluid Layout

  • 8/11/2019 38 Introduction to UBD

    50/50

    Compressor/N2Cost

    Rotating BOPs

    Solid/Liquid/GasSeparation

    Corrosion

    Vibration

    High Torque/Drag

    Borehole StabilityMWD Transmission

    Hydraulic Calculations

    Cuttings Lifting

    Fluid Influx

    Fire/Explosions

    UnderbalancedCompletion