YOUR REF: OUR REF: DA-2007-515/B
31 August 2011 The Geocal Group Pty Ltd C/- I-Plan Town Planning Pty Ltd PO Box 687 STONES CORNER QLD 4120 Dear Sir/Madam COMPILED DECISION NOTICE Applicant: The Geocal Group Pty Ltd Proposal: Request to Change Approval - FROM: Motel (173
Rooms and Ancillary Caretaker's Residence, Conference / Meeting Facilities, Bar, Reception Area and Recreation Facilities), Catering Shop and Shop TO: Motel (144 Rooms and Caretaker's/Managers Residence, Function Room and Restaurant) AND Catering Shop/Shop/Commercial Premises
Application Number: DA-2007-515/B Address: 48, 50 and 52 Carlyle Street, MACKAY QLD 4740 Property Description: Lot 1 on RP700909, Lot 1 on RP700910 and Lot 2 on
RP700909 Please find enclosed the above Decision Notice with the relevant attachments: Compiled Decision Notice Assessment Manager’s Conditions Approved Plans Appeal Rights Notice to commence Use Adopted Infrastructure Charges Notice If you require any further information please contact Shane Kleve
This is a Mackay Regional Council digitally signed document.
COMPILED DECISION NOTICE Sustainable Planning Act
Application Number: DA-2007-515/B
Date of Decision: 25 August 2011
1. APPLICANT/S DETAILS
Name: The Geocal Group Pty Ltd
Postal Address: C/- I-Plan Town Planning Pty Ltd
PO Box 687
STONES CORNER QLD 4120
2. PROPERTY DETAILS
Property Address: 48, 50 and 52 Carlyle Street, MACKAY QLD 4740
Property Description: Lot 1 on RP700909, Lot 1 on RP700910 and Lot 2 on RP700909
3. OWNER’S DETAILS
Carlyle Street Mackay Pty Ltd
GPO Box 694, BRISBANE QLD 4001
4. PROPOSAL
Request to Change Approval - FROM: Motel (173 Rooms and Ancillary Caretaker's Residence, Conference / Meeting Facilities, Bar, Reception Area and Recreation Facilities), Catering Shop and Shop
TO: Motel (144 Rooms and Caretaker's/Managers Residence, Function Room and Restaurant) AND Catering Shop/Shop/Commercial Premises
5. DECISION TYPE
DEVELOPMENT DECISION
Material Change of Use Development Permit
Pursuant to the Mackay City Planning Scheme
Approved in Full subject to Conditions
This is a Mackay Regional Council digitally signed document.
COMPILED DECISION NOTICE Sustainable Planning Act
6. ASSESSMENT MANAGER’S CONDITIONS
The following conditions have been changed: Conditions Number 1, 2, 8, 15, 17, 21, 22, 32, 34, 35, 41, 42 and Assessment Managers
Advice Number 7 have been amended. Conditions Number 9, 10, 11, 29, 36 and Assessment Manager Advice 8 have been
deleted. Conditions Number 21A and Assessment Manager Advice 9 have been added. All remaining conditions remain unchanged as per original Decision Notice. The conditions for this Compiled Decision Notice are attached.
7. IDAS REFERRAL AGENCIES
It is advised that there are no Referral Agencies for this Application.
8. SUBMISSIONS
There were no properly made submissions received on this application.
9. PLANNING SCHEME
This approval is issued under the Mackay City Planning Scheme.
10. SUPERSEDED PLANNING SCHEME
Not Applicable
11. FURTHER DEVELOPMENT PERMITS REQUIRED
Operational Works - Development Permit (Civil Works) Building Works - Development Permit Plumbing and Drainage Works - Compliance Permit
12. PRELIMINARY APPROVAL OVERRIDING THE PLANNING SCHEME
Not Applicable
13. CURRENCY PERIOD Council has agreed to extend the Currency Period for an additional two (2) years, meaning the approval will expire on 6th August 2014.
14. APPEALS Attached is an extract from the Sustainable Planning Act which details your appeal rights and
the appeal rights of any submitters regarding this decision. 15. ASSESSMENT MANAGER SIGNATURE
Name Shane Kleve
Position Principal Planner
Signature Date
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 1 of 10
1. Plan of Development
The approved Motel (144 rooms and Caretaker's/Managers Residence, Restaurant and Function Room), Catering Shop/Shop/Commercial Premises development must be completed and maintained generally in accordance with the Plan of Development (identified in the Table below) and supporting documentation which forms part of this application, except as otherwise specified by any condition of this approval.
Drawing Number Issue Drawing Title Date SK09 P7 DA Cover Sheet 14/07/11 SK10 P7 Basement 2 Plan 14/07/11 SK11 P7 Basement 1 Plan 14/07/11 SK12 P7 Ground/Site Plan 14/07/11 SK13 P7 Level 1 to 9 Typical Floor Plan 14/07/11 SK14 P7 Roof Plan 14/07/11 SK15 P7 East and West Elevations 14/07/11 SK16 P7 South Elevation 14/07/11 SK17 P7 North Elevation 14/07/11 SK18 P7 Section A 14/07/11 SK19 P7 Section B 14/07/11
2. Amended Plans Required
Prior to the lodgement of the application for Operational Works – Development Permit, the approved plans of development must be amended to comply with the following matters, and submitted to Council:
a) screening on the balconies of the western elevation that has a maximum area of 25% openings, is permanently fixed to the building and is made of durable materials;
3. Compliance with conditions
All conditions must be complied with prior to the commencement of the use on the subject site, unless specified in an individual condition.
4. Maintenance of Development
Maintain the approved development (including landscaping, carparking, driveways and other external spaces) in accordance with the approved drawings(s) and/or documents, and any relevant Council engineering or other approval required by the conditions.
5. Compliance with Council Standards All design and construction for the development must be in accordance with
Council’s Policies, Engineering Design Guidelines, Standard drawings and standard specifications.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 2 of 10
6. Conflict between plans and written conditions
Where a discrepancy or conflict exists between the written conditions(s) of the approval and the approved plans, the requirements of the written condition(s) will prevail.
7. Notice of Intention to Commence the Use
Prior to the commencement of the use on the site, written notice must be given to Council that the use (development and / or works) fully complies with the decision notice issued in respect of the use (please see attached notice for your completion).
8. Potential Infrastructure Charges Offset
The contribution may be reduced in light of the works required by Condition 21 subject to Mackay Water reviewing a full Hydraulic Assessment (prepared by the applicant / developer) and agreeing to a lesser contribution in writing. The Hydraulic Assessment must recommend cost sharing, if any, for the difference in the main needed to service the proposed development compared to the main size required by Condition 21. The agreement or otherwise to vary the contribution must be in place prior to the commencement of building works on the site.
9. Deleted 10. Deleted 11. Deleted 12. Amalgamation of Allotments Lots 1 and 2 on RP700909 and Lot 1 on RP700910 must be amalgamated into
one allotment prior to lodgement of application for Building Works Development Permit.
13. Damage Any damage which is caused to Council’s infrastructure as a result of the
proposed development must be repaired immediately. 14. Concrete Footpath A full width concrete footpath must be constructed for the full frontage of the
site in Carlyle Street, in accordance with Council Standard Plan A3-989 (Amend B).
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 3 of 10
15. Invert Crossing An invert crossing must be constructed in accordance with Council’s Standard
Drawing No. PA3-773 and Council Policy 024 for access to Carlyle Street. 16. Electricity and Telecommunications Services The approved development must be provided with electricity and
telecommunications infrastructure. 17. Stormwater Drainage Stormwater from the site (including roofwater) shall be collected within the
property boundaries and discharged via an underground system to Council’s stormwater system in Carlyle Street. The legal point of discharge is the Alfred Street Trunk Drainage System.
18. Ponding and Diversion of Stormwater Ponding of stormwater resulting from the development must not occur on
adjacent sites and stormwater formerly flowing onto the site must not be diverted onto other sites. The site shall be graded so that it is free draining.
The applicant is to demonstrate compliance with this condition in the application
for Operational Works approval. 19. Underground Car parking – drainage A pump system must be installed in the basement to pump all collected water to
the Council Stormwater system. 20. Direct Pumping from Mackay Water’s Reticulation System Pumping direct from Council water mains for potable or fire fighting supply is
not permitted and break tanks shall be installed in accordance with Mackay Water and Fire Authority requirements.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 4 of 10
21. Connect to water services The developer is to upgrade existing 100mm dia main located on the eastern
side of Carlyle Street to a 150mm dia main from the existing 375mm dia water main located in Gordon Street, to the southern boundary of subject site.
Alternatively, a new 150mm dia main may be constructed on the western side of Carlyle Street, with a connection to the existing 100mm dia main on the eastern side of Carlyle Street.
Separate water meters required for potable water and fire fighting supply.
Two new 150mm dia water services are required for the development. 21A. Water Sub Metering
Queensland State Legislation (the ‘Standard Plumbing and Drainage Regulation 2003’, Section 8B) requires compliance with the Queensland Plumbing and Wastewater Code. In particular, the QPW Code requires that ‘The water supply to a meterable premises must be fitted with a device (water meter) to measure the amount of water supplied to the premises’. ‘Meterable premises’ means (amongst other definitions) each lot within a community title scheme, including the common property, in a water service provider’s area. a) Individual meters (Sub-meters) must be installed to each meterable
premises (ie. each lot including common property areas). b) A Master Meter must be installed to the development. c) Sub-meters and Master Meter must be fitted with Automatic Meter
Reading (AMR) technology. AMR technology consists of a Meter Interface Unit (MIU) fitted to each meter (including the master meter), a Data Concentration Unit (DCU) and the equipment necessary to provide connectivity between the MIU’s and the DCU.
d) The Master Meter and the DCU must be located together in a lockable Cupboard (termed ‘Meter Cupboard’) located at the front of the development such that accessibility to the meter cupboard from outside the development is maintained at all times.
The developer is responsible for the installation of sub-meters, master meter, AMR technology hardware, meter cupboards and the supply of all equipment and materials to the satisfaction of Mackay Regional Council. Meters are to be supplied by Mackay Regional Council.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 5 of 10
22. Sewer Main Plans The development is to connect to the existing sewer line in accordance with the
requirements of Mackay Water & Waste. The development is not permitted to be built over the existing sewer main
running along the western boundary of the site. The sewer main must be replaced for the length of the site, the detailed design and construction requirements of Mackay Water & Waste are attached. The applicant is to demonstrate compliance with these requirements at the time of lodgement of Operational Works application.
23. Sewer Disconnection The existing house drain must be disconnected. A Sewer Disconnection form is
to be submitted to Mackay Water with the appropriate fees for approval. 24. Sewers Policy All building work is to comply with Council’s Policy MW02 – “Building Over and
Adjacent to Sewers”. 25. Landscape Plan Required
A detailed site and footpath landscaping plan must be prepared by a qualified Landscape Designer and must be submitted with Operational Works Approval application. The plan must show for all areas identified on the approved plan of development the following:
Landscape specification of sufficient detail so that landscape works are to be carried out;
Plant schedule detailing number of plants, species, pot size and height at planting;
Details of soil and mulch types, including depths, areas or turf, garden edges and paving finishes;
the details of the irrigation system; and details of the footpath materials, street furniture and street trees (should
be generally in accordance with Council’s Standards for CBD Footpath Treatment and Tree Planting (copies attached)).
Any proposed landscaped works within Council’s Road Reserve must comply with Planning Scheme Policy No.11 – Landscaping.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 6 of 10
26. Maintenance for Landscaping within Road Reserve
All landscaping works undertaken within Council’s Road Reserve must be maintained for a 12 month period. An inspection of the landscaping works will be undertaken at this time to determine if landscaping works are acceptable to Council. If the works are acceptable then the landscaping works are to handed over to Council. If the landscape works completed is unsatisfactory then the maintenance period will be extended.
27. Completion of Landscaping
All of the landscaping works shown on the approved plan must be completed before the commencement of the use on the site.
28. Waste Storage Area
The waste storage area must be provided in the location shown on the approved plan and must comply with the following;
a) contain an impervious surface a) contain sufficient storage space for the storage of four 1,100 litre flat lid
commercial bins; and b) be screened from view from Carlyle Street.
29. Deleted 30. No Nuisance to adjoining properties
All service equipment, lightning and air-conditioning units shall be located so as not to cause a nuisance to neighbouring properties.
31. Screening of Storage / Service Area
The storage of any equipment or material and any service area shall be aesthetically screened so as not to be visible from Carlyle Street.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 7 of 10
32. Awning Required
An awning must be provided in Carlyle Street for the full frontage of the subject site (excluding driveway). The awning must comply with the following: continuous weather protection for pedestrians (continuos lining or soffit); is setback at least 300mm from the kerb at a minimum height of 3 metres
above the kerb but not higher than the floor level of the first floor; is constructed of non-combustible materials (except timber battens for
fixing linings); is impervious to water and drained to avoid water dropping onto the
footpath; has a fascia depth of not more than 600mm; and is of a cantilever design or has non-load bearing ornamental posts or
columns. 33. Screening
Screening must be provided on the balconies on the western elevation. The design of the screening must be approved by the Manager, Development Assessment – Planning prior to the issuing of the Building Approval.
34. Minimum Car Parking Spaces
The car parking area must be constructed, sealed, linemarked and drained for a minimum of 80 car parking spaces in accordance with the approved plan and maintained thereafter. The carparking is to be designed in accordance with Australian Standard AS/NZS2890.1 : 2004 and 2890.6 : 2009. Grade transitions along the ramp are to be verified using ground clearance templates (refer Section 2.5.3 (e) and Appendix C of AS/NZS 2890.1). Vehicle turn path diagrams are to be provided to verify compliance with Section 2.5.2 (c) of AS/NZS 2890.1 (Intersection Areas). Particular attention is to be paid to the entry/exit from the entry ramp to the first aisle of the basement carparks.
35. On-Street Car Parking
Redundant driveways must be removed and kerb and channel reinstated to match adjoining sections. A plan detailing new on-street car park linemarking which details the amendments to the existing car parking arrangement is to be submitted with the Operational Works application.
36. Deleted
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 8 of 10
37. Parking Signs
A sign/s to the satisfaction of the Council must be provided directing drivers to the area(s) set aside for car parking and must be located and maintained to the satisfaction of the Council. The area of each sign must not exceed 0.3 m².
38. Loading / unloading
The loading and unloading of vehicles and the delivery of goods to and from the premises must at all times be undertaken entirely within the site and be so conducted as to cause minimum interference with other vehicular traffic.
39. Use of Carparking areas
The areas set aside for parking, vehicle manoeuvring and loading and unloading, must not be used for the storage or placement of goods or materials.
40. Lighting of Carpark areas
Install and maintain a suitable system of lighting to illuminate car parking areas. The car park lighting system and any other outdoor lighting, must comply with Australian Standard no. AS4282 – Control of the obtrusive Effects of Outdoor lighting.
41. Building Height
The ceiling of the uppermost habitable level must not exceed a height of 33.25m AHD.
42. Floor Level
The minimum habitable floor level of the proposed development must be RL 5.95m AHD as shown on the approved Ground/Site Plan (Drawing No. SK12, Issue P7) prepared by Loucas Zahos Architects (attached).
The minimum level at the crest of the carpark entry ramp is to be RL 5.4m AHD.
43. Demolish Remove Existing Structure(s)
All existing building/s currently situated on the subject site must be demolished or removed from the subject site prior to the commencement of the use. A Building approval is required for demolition and should be issued by a Private Building Certifier.
44. Waste Storage Area
The location and design of the waste storage area must be located so as not to cause a nuisance to neighbouring properties in accordance with the relevant provisions of the Environmental Protection Act and Regulations.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 9 of 10
45. General Amenity Provision
The use and or development must be managed so that the amenity of the area is not detrimentally affected, through the:
a) Transport of materials, goods or commodities to or from the subject site; b) Appearance of any building, works or materials; b) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour,
steam, soot, ash, dust, waste water, waste products, grit or oil; and c) Presence of vermin.
46. Acid Sulphate Soils
The proposed works and development trigger the application and implementation of SPP 2/02 Planning and Managing Development in Acid Sulphate Soils. A site Based Acid Sulphate Soil Management Plan must be prepared by a suitably qualified professional and submitted to Council for approval at the time of submission of the Operational Works application.
ASSESSMENT MANAGER’S ADVICE 1. Local laws
The approved development must also comply with Council’s Local Laws under the Local Government Act 1993 from time and other controls.
2. Hours of Work
It is the applicant/owner’s responsibility to ensure compliance with Section 6W of the Environmental Protection Regulation 1998, which prohibits any construction, building and earthworks activities likely to cause nuisance noise (including the entry and departure of heavy vehicles) between the hours of 6:30pm and 6:30am from Monday to Saturday and at all times on Sundays or Public Holidays.
3. Dust Control
It is the applicant/owner’s responsibility to ensure compliance with Part 2A – Environmental Nuisance of the Environmental Protection Regulation 1998 which prohibits unlawful environmental nuisance caused by dust, ash, fumes, light, odour or smoke beyond the boundaries of the property during all stages of the development including earthworks and construction.
4. Sedimentation Control
It is the applicant/owner’s responsibility to ensure compliance with Section 32 of the Environmental Protection (Water) Policy 1997 to prevent soil erosion and contamination of the stormwater drainage system and waterways.
This is a Mackay Regional Council digitally signed document.
ASSESSMENT MANAGER CONDITIONS Application Number: DA-2007-515/B Applicant’s Name: The Geocal Group Decision Date: 25 August 2011
Page 10 of 10
5. Noise during Construction and Noise in General It is the applicant/owner’s responsibility to ensure compliance with Section 6S
General Emission Criteria and Section 6T Noise Emission Criteria of the Environmental Protection Regulation 1998.
6. General Safety of Public during Construction It is the principal contractor’s responsibility to ensure compliance with Section
31 of the Workplace Health and Safety Act 1995. Section 31(1)(c) states that the principal contractor is obliged on a construction workplace to ensure that work activities at the workplace are safe and without risk of injury or illness to members of the public at or near the workplace.
It is the responsibility of the person in control of the workplace to ensure
compliance with Section 30 of the Workplace Health and Safety Act 1995. Section 31(1) (c) states that the person in control of the workplace is obliged to ensure there is appropriate, safe access to and from the workplace for persons other than the person’s workers.
7. Contaminated Land
It is strictly the applicant/owner’s responsibility to source information regarding contaminated land from the Department of Environment and Resource Management, Contaminated Land Section as Council has not conducted detailed studies and does not hold detailed information pertaining to contaminated land.
8. Deleted 9. Adopted Infrastructure Charges Notice
Pursuant to the Sustainable Planning Act 2009 and the Draft State Planning Regulatory Provision (adopted charges) an Adopted Infrastructure Charges Notice relates to this Development Permit, and is attached. Prior to making payment please contact Mackay Regional Council, Development Services, Business Support Unit to establish if any Development Incentive Policies apply to the development at the time of the payment will be made.
This is a Mackay Regional Council digitally signed document.
Mackay Water requirements for construction adjacent to sewer main – DA-2007-515/B Prior to approval, Mackay Water and Waste require proof that the following conditions have been met, both physically and materially. 1) A CCTV condition report of sewer line 25 from MH 1/12 to MH 2/12 (undertaken at the developers expense) is to be conducted at the completion of piling to confirm the condition of the new sewer main after piling works. 2) A new manhole is to be constructed 2.0m from the southern boundary of the development. Between this new manhole and the existing downstream manhole a new 225mm dia main is to be 3) The existing rear allotment property connections are to connect to the new main with uPVC pipe and fittings at the developers’ expense. Reconnection of the 100mm dia house drains to the new sewer points must be undertaken at the developers’ expense. The existing sewer and property house drains are to remain operational at all times during construction, provide a method statement detailing how this will be achieved to Mackay Water and Waste. 4) The dwelling house at 54 Carlyle Street is to have the existing house drain diverted and connected to the new manhole at developers expense. 5) Show the connection point for the approved development. 6) Any DICL pipe penetrating the building walls for any reason shall have a flexible fitting placed inside and outside the penetration. 7) The developer is responsible for the sealing of all the penetrations into the building. 8) Show in detail all penetrations in “for approval and construction drawings”. 9) All waste fittings below the invert of the main are to be DICL or suitably protected to ensure damage cannot occur. 10) The developer is required to obtain written permission to enter other properties to undertake any construction work. 11) Civil construction works carried out within the building site that may affect the integrity of the sewer shall include a method statement showing how this will be mitigated. 12) A Building Over and Adjacent to Sewer indemnity form signed and supplied to Council at the completion of the sewer main construction. 13) Indemnify Council with respect to all damage claims resulting from failure of the works. Note. The developer is to be aware that the sewer main can operate in a surcharged condition during wet weather and failure to maintain the integrity of the line will result in a spill. Direct connection to the sewer main of fixtures below RL 3.000 is not permitted. This is to protect against backup during surcharge conditions.
This is a Mackay Regional Council digitally signed document.
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
A. C. N. 0 0 8 1 6 7 4 0 4
48 - 52 Carlyle St, Mackay Qld 4740
Geocal Group Pty Ltd
Quest Serviced Apartments, Mackay
DA - ARCHITECTURAL DRAWING LISTDrawing No Sheet Name Date Issue
SK09 DA COVER SHEET 14/07/11 P7SK10 BASEMENT 2 PLAN 14/07/11 P7SK11 BASEMENT 1 PLAN 14/07/11 P7SK12 GROUND / SITE PLAN 14/07/11 P7SK13 LEVEL 1 TO 9 TYPICAL FLOOR PLAN 14/07/11 P7SK14 ROOF PLAN 14/07/11 P7SK15 EAST AND WEST ELEVATIONS 14/07/11 P7SK16 SOUTH ELEVATION 14/07/11 P7SK17 NORTH ELEVATION 14/07/11 P7SK18 SECTION A 14/07/11 P7SK19 SECTION B 14/07/11 P7
CURRENT APPROVED DEVELOPMENT:SITE AREA:
SITE COVER:
BASEMENTS
GROUND LEVEL: GENERAL : 2046msq
LEVEL 2 TO 9: 174 ROOMS (sqm x 8 Levels) 12937 msq
TOTAL GFA:
CAR PARK REQUIRED:
TOTAL CARPARKS PROVIDED:
LEVEL 1: PARKING AND COMMON FACILITY: 2046msq
13951 msq
2046msq
100%
2046msq
MOTEL 174 ROOMS
119 CARS
BASEMENTS B1 1597.5 + B2 1552.5
GROUND LEVEL COMMERCIAL AREA: 400msq
LEVEL 1 TO 9: 144 ROOMS (830msq X 9 Levels) 6640msq
TOTAL GFA:
CAR PARK REQUIRED:
OTHER AREAS:
10795msq
2046msq
44%
3150msq
80 CARS
MOTEL 144 ROOMS
MOTEL / RESTAURANTCOMMERCIAL OFFICE 8 CARS
98 CARS
MOTEL / RESTAURANT
TOTAL CARPARKS REQUIRED: 119 CARS
515msq
PROPOSED DEVELOPMENT:
1 x CARETAKER UNIT 90msq
DEVELOPMENT SUMMARY
106 CARS11 STAFF 3 STAFF
87 CARS
SHOP 2 CARS
TOTAL CARPARKS PROVIDED:
TOTAL CARPARKS REQUIRED:
REAL PROPERTY DESCRIPTION
LOT 1 on RP 700909LOT 2 on RP 700909LOT 3 on RP 700910This is a Mackay Regional Council digitally signed document.
X5
X4
Y1 Y2 Y3 Y4
X1
Y5
BSK19
BSK19
CSK18
CSK18
X3
BASEMENT LEVEL 2
LIFT LIFT
PARKING FOR 40 CARSFL 0.550
EX
IST
ING
SE
WE
R (
app
rox)
FRESHAIRINTAKE
ROLLER DOOR
50 292
50 292
40 3
14
40 3
14
UP
FIRESTAIR 1
LINEN
FIRESTAIR
UPAIREXHAUST
17
15
27
40
26
1
WATER PUMPROOM
RAIN WATER TANK
B
EXHAUST PLENUM
RAMP 1:12
STORE
500 2500 2500 300 2500 2500 2500 300 2500 2500 2500 300 2500 2500 2500 300 2500 2500 2500 300 2500 1250 2800 2250
1496 2218 290 5500 300 2500 2500 2500 300 2500 2500 2500 2800 2500 2500 300 2500 2500 2500 300 2500 2500 300 2500 1000
5400
5800
5400
5400
5800
1705
5800
750
RAMP 1:12 RAMP 1:4.5
FL 0.
550
FL 0.
716
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK10
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
BASEMENT 2PLAN
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
DA BASEMENT 2
N
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A1@A31 : 200
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
UPUP
ASK18
ASK18
X5
X4
Y1 Y2 Y3 Y4
X1
Y5
BSK19
BSK19
CSK18
CSK18
300
X2
1455 2549 5500 300 2500 2500 2500 300 2500 2500 2500 300 2500 2500 2500 300 2500 2500 2500 300 2500 2800 2500 1000
5400
1705
5800
5400
5400
5800
6100
X3
500 2500 2500
300
2500 2500 2500
300
2500 2500 2500
300
2500 2500 2500
300
2500 2500 2500
150 150
2500 1250 2500
300
ChuteOutlet
16
15
27 40
26
BASEMENT LEVEL 1 PARKINGFOR 40 CARSFL 3.100
PARKING ACCESS
OUTLINE OF BUILDINGABOVE
POOL ABOVE
PARKING ACCESS
BIN AREA
EX
IST
ING
SE
WE
R (
app
rox)
FIRESTAIR 1
ROLLER DOOR
50 292
50 292
40 3
14
40 3
14
FIRE PUMP ROOMFL 2.360
TRANSFORMEROVER
FIRE TANK144,000 LTRS17x2.52x3.4
FL 2.360
227,000 LTRRAIN WATER TANK
8x7x4.1FL 0.550
LINEN
LIFT LIFT
FIRESTAIR
FRESHAIRINTAKE
AIREXHAUST
UP
1
BIKE RACKS
B
MARKING LINESFIRE SHUTTER
STAFF
STAFF
UP UP
OPEN TO BASEMENT 2BELOW UP
FL 3.300
RAMP 1:12 RAMP 1:4.5
FL 0.
550
FL 0.
716
FL 3.
145
FL 3.
311
FL 3.
477
RAMP 1:12 RAMP 1:12 RAMP 1:4
FL 3.
311
FL 3.100
RA
MP
1:1
2
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK11
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
BASEMENT 1PLAN
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
DA BASEMENT 1
N
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
ASK18
ASK18
X5
X4
Y1 Y2 Y3 Y4
X1
Y5
BSK19
BSK19
CSK18
CSK18
X2
FFL RL 5.950
FFL RL 5.950
X3
FFL RL 5.200
OUTDOORAREA
RAMP TO BASEMENT PARKING
RECEPTION
RESTAURANT
MAIN ACCESS
EN
TR
Y
OUTLINE OF BUILDING OVER
VEHICLE ENTRY
LIFT
LOBBY
LIFT
ENTRY FOYER
TERRACE
HALL
BOUNDARY
BOUNDARY (timber fence)
BO
UN
DA
RY
(ti
mb
er f
ence
)
400 sqm OFFICE TENANCY
CA
RLY
LE S
TR
EE
T
BO
UN
DA
RY
CROSS OVER
KITCHEN
OFFICE
DECKING
STEPPING STONES
POOL
NEW AWNING OVER
GATE
POOL FENCE
SEAT
SEATSEAT
TURF
LOUV
ERED
SCR
EEN
PO
OL
/GY
M A
CC
ES
S
GYM
MANAGER'SAPARTMENT
STORE
ONE WAYMIRROR
OUTLINE OF BUILDING OVER
Female
FEMALE
MALE
PWD
WATER METERS / VALVES M.S.B ELECTRICAL METERS
AIREXHAUST
KITCHEN EXHAUSTDUCT
EXHAUST CANOPY
DWPREP
HB
PWD
MALE
CHUTE
ENTRY
BIN COLLECTION AREA
LET
TE
R B
OX
ES
A/C UNITS
SCREEN
BBQ AREA
1:14
RA
MP
KIT/BAR
DEMOLISH EXISTINGCROSS OVERS SHOWNDASHED
DEMOLISH EXISTINGCROSS OVERS SHOWNDASHED
AWNING OVER
1:14
RA
MP
50 292
50 292
40 3
14
40 3
14
FIRESTAIR 2
FIRESTAIR 1
FIRESTAIR
UP
TR
AN
SF
OR
ME
R
L'DRY
PLANTER
OUTDOORAREA
UP
PLANTER PLANTER PLANTER
UP
BO
OS
TE
RC
UP
BO
AR
D
PLANTER
PWD WC M/F WC
FUNCTION ROOM
LA
ND
SC
AP
ING
LANDSCAPING
PLANTER
CO
NC
LID
CO
NC
LID
TA
XI
- L
OA
DIN
G B
AY
EX
IST
ING
ST
RE
ET
PA
RK
ING
FRESHAIRINTAKE
ELEC
DATA
EXISTING PARKINGSPACES
UP UPOPEN TO BASEMENT 2
BELOWOPEN TO BASEMENT 1
BELOW
ROLLER SHUTTER
RAMP 1:12 RAMP 1:4.5
FL 0.
550
FL 0.
716
FL 3.
145
FL 3.
311
FL 3.
477
RAMP 1:12 RAMP 1:12 RAMP 1:12RAMP 1:4
FL 5.
100 +
FL 5.
325
FL 5.
159
RAMP 1:33
FL 3.
311
FL 3.300
DEMOLISH EXISTINGCROSS OVERS SHOWNDASHED
ENTRY HEIGHT TO BASEMENT 225 mmABOVE NATURAL GROUND LEVEL
REMOVE EXISTING CARPARK
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK12
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
GROUND / SITEPLAN
Checker Approver
B1277
14/07/11SK01
P7
N
Scale 1 : 100
DA GROUND/SITE PLAN
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
P3 31.03.11 DESIGN PROGRESS-INFO PS
P4 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
REAL PROPERTY DESCRIPTION
LOT 1 on RP 700909LOT 2 on RP 700909LOT 3 on RP 700910
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
ASK18
ASK18
X5
X4
Y1 Y2 Y3 Y4
X1
Y5
BSK19
BSK19
BOUNDARY
BOUNDARY
BO
UN
DA
RY
BO
UN
DA
RY
50 292
3000 SET BACK LINE
4500
SE
T B
AC
K L
INE
3000 SET BACK LINE
3000
SE
T B
AC
K L
INE
X2
UNIT 1STUDIO
UNIT 21 BED
UNIT 3STUDIO
UNIT 41 BED
UNIT 6STUDIO
UNIT 51 BED
UNIT 71 BED
UNIT 8STUDIO
UNIT 9STUDIO
UNIT 101 BED
SCREEN
UNIT 121 BEDUNIT 11
STUDIO
UNIT 131 BED
UNIT 14STUDIO
UNIT 15STUDIO
UNIT 161 BED
LOBBY
FIRE STAIR
FIRE STAIR
SCREEN
LINEN
50 292
40 3
14
40 3
14
X3LOBBY F.A.400x300min
DATA
ELEC
LINEN
LIFT LIFT
STREETAWNING
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK13
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
LEVEL 1 TO 9TYPICAL FLOORPLAN
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
DA LEVEL 1 TO 9 TYPICAL FLOOR PLAN
N
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
- 8 DUAL KEY APARTMENTS- PWD UNITS TO LEVELS 1-4. TYPICAL TO UNIT 6.@A31 : 200
@A1
P3 31.03.11 DESIGN PROGRESS-INFO PS
P4 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
ASK18
ASK18
X5
X4
Y1 Y2 Y3 Y4
X1
Y5
BSK19
BSK19
CO
NC
RE
TE
RO
OF
ME
TA
L R
OO
F @
5 D
EG
FA
LL
DP1DP1
DP1
DP1
RS1
RS1
CR
MF
DP1
DP1
ME
TA
L R
OO
F @
5 D
EG
FA
LL
BG1
MF
EG
1
METAL ROOF @12 DEG FALL
METAL ROOF @12 DEG FALL
3000 BOUNDARY SET BACK LINE
BC
BC
BC
BC
BC
BC
BC BC
EG1
EG
1
EG1CRCR
CR
X2
RS1RS1
KITCHEN EXHAUST
3000
BO
UN
DA
RY
SE
T B
AC
K L
INE
4500
BO
UN
DA
RY
SE
T B
AC
K L
INE
3000 BOUNDARY SET BACK LINE
EG1
CR
50 292
50 292
40 3
14
40 3
14
DP1 DP1
X3
LOBBY F.A.
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK14
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
ROOF PLAN
Checker Approver
B1277
14/07/11SK01
P7
N
Scale 1 : 100
DA ROOF PLAN
P1 31.03.11 FOR INFORMATION PS
@A31 : 200@A1
P2 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
ROOF LEGEND
R1ROOF 1CONCRETE ROOF OVER LIFT CORETO LIFT ENGINEERS SPECIFICATION
ROOF SHEETING 2
BG1 BOX GUTTER 1600mm WIDE X 200mm DEEP X 1.0mm THICKCOLORBOND BOX GUTTER SUPPORTED ON GUTTERBOARD AT 900mm CTRS.
EG1 EAVES GUTTER 1COLORBOND 100mm WIDE HALF ROUND EAVESGUTTER AND BRACKETS BY STRATCO.
EJ EXPANSION JOINTFOLDED COLORBOND EXPANSION JOINT IN BOX GUTTER.
DP1 DOWN PIPE 1100mm DIA COLORBOND DOWN PIPE.
NOTES-PROVIDE ALL CAPPINGS AND FLASHINGS REQUIRED TO ENSUREROOF IS WATERPROOF.-REFER TO HYDRAULIC AND MECHANICAL DRAWINGS FOR LOCATIONSOF DOWNPIPES AND CONNECTION TO STORMWATER SYSTEM.
RS2
FLASHINGS
MF METAL FLASHINGTWO PIECE FLASHING
PC PARAPET CAPPINGCOLORBOND PARAPET CAPPING
BC BARGE CAPPINGCOLORBOND BARGE CAPPING
RC RIDGE CAPPINGCOLORBOND ROOF RIDGE FLASHING CAP
BHP TRIM-DEK 0.48mm THICK METAL ROOF SHEETINGWITH R2.5 INSULATION BLANKET AND FOIL BACKEDSISILATION (0.55mm) ON METAL PURLINS.-COLORBOND FINISH.
XXXX
BOX GUTTER DEPTH
DIRECTION OF GUTTER FALL
This is a Mackay Regional Council digitally signed document.
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
A1
B1A2 B1B1 A2
B1A2 B1B1 A2
B1A2 B1B1 A2A2
B1A2 B1B1 A2A2
B1A2 B1B1 A2A2
B1A2 B1B1 A2A2
B1A2 B1B1 A2A2
B1A2
B1B1 A2A2
B1A2
B1B1 A2A2
DA 2007-515APROVED TOP OF
STAIRWELL
39550
SC1
SC1
A2
A2
PEDESTRIAN RAMP
STREET AWNING
B1
STEP ENTRY
MC MCROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
LETTER BOXES BOOSTER SCREEN
4200
3450DRIVEWAY
STREET AWNING
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
A1
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1 A2B1 B1A2
B1A2
B1 B1A2
A2
SC1
SC1
SC3
SC3
MCMC
A2
A2
ROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK15
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
EAST AND WESTELEVATIONS
Checker Approver
B1277
14/07/11SK01
P7
P1 23.02.11 INITIAL ISSUE PS
Scale 1 : 100
DA EAST ELEVATIONScale 1 : 100
DA WEST ELEVATION
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
@A31 : 200@A1
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
SC3 SCREEN TYPE 3FIXED ALUMINIUM LOUVRES TO SPECIFICATION
B3 BALUSTRADE TYPE 3POWDERCOATED STEEL BALUSTRADE TO DETAIL.
MC METAL CLADDING
ELEVATION LEGENDA1 ACRATEX ON BLOCK (1 )
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE BLOCK EXTERIOR WALLS.ACRATEX ON CONCRETE (2 )
B1 BALUSTRADE TYPE 1CLEAR GLASS PANEL BALUSTRADE (TYPE 1) TO DETAIL.
A2
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE PANEL EXTERIOR WALLS.
B2 BALUSTRADE TYPE 2CLEAR GLASS 650mm HIGH PANEL ON TOP OFCONCRETE 400mm UPSTAND WALL BALUSTRADE(TYPE 2) TO DETAIL.
R1 CONCRETE ROOF TYPE 1CONCRETE ROOF, REFER ROOF PLAN.
ACRATEX ON COMTEX (3 )A3
ACRATEX PAINT FINISH TO SPECIFICATION ON JAMESHARDIE D3 COMTEX OR SIMMILAR EXTERIOR WALLS.
RS1 ROOF SHEETING TYPE 1ROOF SHEETING TYPE 1, REFER ROOF PLAN.
SC1 SCREEN TYPE 1CUSTOM MADE HORIZONTAL ALUMINIUM BATTENSIN ORDER AND LENGTH AS SHOWN ON VERTICALALUMINIUM SUPPORTS. REFER EAST AND WESTELEVATIONS.
SC2 SCREEN TYPE 2PERFORATED ALUMINIUM PANELSFIXED TOALUMINIUM FRAMING BEHIND - REFER NORTH ANDSOUTH ELEVATIONS ALSO SEPARATE DETAILS.
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
B1 B1
B1 B1
B1 B1
B1 B1
B1 B1
B1 B1
B1 B1
B1B1 B1 B1
B1B1 B1 B1
A2 A2
A2 A2
A2 A2
A2
A1
A2
DA 2007-515APROVED TOP OF
STAIRWELL
39550
SC3
SC3
SC3
SC3
SC3
SC3
SC3
SC3
B2
B2
B2
B2
B2
B2
B2
B2B2
B2
B2
B2
B2
B2
B2
B2
B2
SC2
SC2
B1
B1 B1
B1 B1
B1 B1
B1
B1B1
B1B1
B1B1
MC MC ROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
B2
CARLYLESTREET
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK16
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
SOUTHELEVATION
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
DA SOUTH ELEVATION
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
SC3 SCREEN TYPE 3FIXED ALUMINIUM LOUVRES TO SPECIFICATION
B3 BALUSTRADE TYPE 3POWDERCOATED STEEL BALUSTRADE TO DETAIL.
MC METAL CLADDING
ELEVATION LEGENDA1 ACRATEX ON BLOCK (1 )
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE BLOCK EXTERIOR WALLS.ACRATEX ON CONCRETE (2 )
B1 BALUSTRADE TYPE 1CLEAR GLASS PANEL BALUSTRADE (TYPE 1) TO DETAIL.
A2
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE PANEL EXTERIOR WALLS.
B2 BALUSTRADE TYPE 2CLEAR GLASS 650mm HIGH PANEL ON TOP OFCONCRETE 400mm UPSTAND WALL BALUSTRADE(TYPE 2) TO DETAIL.
R1 CONCRETE ROOF TYPE 1CONCRETE ROOF, REFER ROOF PLAN.
ACRATEX ON COMTEX (3 )A3
ACRATEX PAINT FINISH TO SPECIFICATION ON JAMESHARDIE D3 COMTEX OR SIMMILAR EXTERIOR WALLS.
RS1 ROOF SHEETING TYPE 1ROOF SHEETING TYPE 1, REFER ROOF PLAN.
SC1 SCREEN TYPE 1CUSTOM MADE HORIZONTAL ALUMINIUM BATTENSIN ORDER AND LENGTH AS SHOWN ON VERTICALALUMINIUM SUPPORTS. REFER EAST AND WESTELEVATIONS.
SC2 SCREEN TYPE 2PERFORATED ALUMINIUM PANELSFIXED TOALUMINIUM FRAMING BEHIND - REFER NORTH ANDSOUTH ELEVATIONS ALSO SEPARATE DETAILS.
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
B1B1 B1 B1
B1B1 B1 B1
B1B1 B1 B1
B1B1 B1 B1
B1B1 B1 B1
B1B1 B1 B1
B1B1B1 B1
B1B1 B1 B1
B1B2B1 B1 B1
A2 A2
A2 A2
A2 A2
A2
A2
DA 2007-515APROVED TOP OF
STAIRWELL
39550
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
B2
SC2SC3
SC3
EG1EG1
EG1
RS1 RS1
SC2
STREETAWNINGS
SCREENS TODETAIL
MCMC MC
MC
SC3
ROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
CARLYLESTREET
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK17
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
NORTHELEVATION
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
DA NORTH ELEVATION
P1 23.02.11 INITIAL ISSUE PS
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
SC3 SCREEN TYPE 3FIXED ALUMINIUM LOUVRES TO SPECIFICATION
B3 BALUSTRADE TYPE 3POWDERCOATED STEEL BALUSTRADE TO DETAIL.
MC METAL CLADDING
ELEVATION LEGENDA1 ACRATEX ON BLOCK (1 )
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE BLOCK EXTERIOR WALLS.ACRATEX ON CONCRETE (2 )
B1 BALUSTRADE TYPE 1CLEAR GLASS PANEL BALUSTRADE (TYPE 1) TO DETAIL.
A2
ACRATEX PAINT FINISH TO SPECIFICATION ONCONCRETE PANEL EXTERIOR WALLS.
B2 BALUSTRADE TYPE 2CLEAR GLASS 650mm HIGH PANEL ON TOP OFCONCRETE 400mm UPSTAND WALL BALUSTRADE(TYPE 2) TO DETAIL.
R1 CONCRETE ROOF TYPE 1CONCRETE ROOF, REFER ROOF PLAN.
ACRATEX ON COMTEX (3 )A3
ACRATEX PAINT FINISH TO SPECIFICATION ON JAMESHARDIE D3 COMTEX OR SIMMILAR EXTERIOR WALLS.
RS1 ROOF SHEETING TYPE 1ROOF SHEETING TYPE 1, REFER ROOF PLAN.
SC1 SCREEN TYPE 1CUSTOM MADE HORIZONTAL ALUMINIUM BATTENSIN ORDER AND LENGTH AS SHOWN ON VERTICALALUMINIUM SUPPORTS. REFER EAST AND WESTELEVATIONS.
SC2 SCREEN TYPE 2PERFORATED ALUMINIUM PANELSFIXED TOALUMINIUM FRAMING BEHIND - REFER NORTH ANDSOUTH ELEVATIONS ALSO SEPARATE DETAILS.
This is a Mackay Regional Council digitally signed document.
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
BASEMENT 1
3100
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
Y1 Y2 Y3 Y4 Y5
BASEMENT 1 BASEMENT 1LIFT 1 LIFT 2
OFFICE / COMMERCIAL TENANCY
Apt 7Apt 4
DA 2007-515APROVED TOP OF
STAIRWELL
39550
BASEMENT 2 BASEMENT 2BASEMENT 2
550
STREETAWNING
MANAGERSAPARTMENT
FUNCTION ROOM OFFICE
Apt 11 Apt 16
3100
2700
2700
2700
2700
2700
2700
2700
2700
3400
2850
2550
Apt 8 Apt 12
Apt 23Apt 20 Apt 27 Apt 32Apt 24 Apt 28
Apt 39Apt 36 Apt 43 Apt 48Apt 40 Apt 44
Apt 55Apt 52 Apt 59 Apt 64Apt 56 Apt 60
Apt 71Apt 68 Apt 75 Apt 80Apt 72 Apt 76
Apt 87Apt 84 Apt 91 Apt 96Apt 88 Apt 92
Apt 103Apt 100 Apt 107 Apt 112Apt 104 Apt 108
Apt 119Apt 116 Apt 123 Apt 126Apt 120 Apt 124
Apt 135Apt 132 Apt 139 Apt 144Apt 136 Apt 140
750
3059
0
EXISTING SEWERBEHIND WALL
ROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
GROUND
5950
BASEMENT 1
3100
Y1 Y2 Y3 Y4 Y5
BASEMENT 2
550
ROLLERSHUTTER
227,000 LTRRAINWATER TANK
ROLLERSHUTTER
FL 0.550FL 0.716
FL 3.311
FL 3.145 FL 3.311FL 3.477
FL 5.100FL 5.325FL 5.159
RAMP 1:12
2000
RAMP 1:5.3
11080
RAMP 1:12
2000 6199
RAMP 1:12
2000
RAMP 1:4
6729
RAMP 1:12
2001
ALI
GN
ME
NT ALI
GN
ME
NT
FL 5.080
CARLYLESTREET
2850
2550
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK18
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
SECTION A
Checker Approver
B1277
14/07/11SK01
P7
P1 23.02.11 INITIAL ISSUE PS
Scale 1 : 100
SECTION A
P2 15.03.11 DESIGN PROGRESS- INFO PS
@A31 : 200@A1
P3 31.03.11 DESIGN PROGRESS-INFO PS
P4 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
Scale 1 : 100
RAMP SECTION - C
@A31 : 200@A1
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
GROUND
5950
LEVEL 1
9350
LEVEL 2
12050
BASEMENT 1
3100
LEVEL 3
14750
LEVEL 4
17450
LEVEL 5
20150
LEVEL 6
22850
LEVEL 7
25550
LEVEL 8
28250
LEVEL 9
30950
X5X4X1
LIFT PIT
LIFTSHAFT
BASEMENT 1 CAR PARK BASEMENT 1 CAR PARK
POOLBEHIND
DA 2007-515APROVED TOP OF
STAIRWELL
39550
3100
2700
2700
2700
2700
2700
2700
2700
2700
3400
B3 B3
BASEMENT 2
550
BASEMENT 2 CAR PARK
X2
CARRAMP
SC3
2924
2
2904
9
X3
ROOF LEVEL.
34050
ALIG
NMEN
T
ALIG
NMEN
T
POOL FENCE
WATERTANK
BASEMENT 2 CAR PARK
2850
2550
2 7 0 F L I N D E R S S TA D E L A I D E S A 5 0 0 0
P h [ 0 8 ] 8 2 9 0 3 2 0 0 F a x [ 0 8 ] 8 2 2 3 2 2 6 5
L E V E L 3 4 C E N T R A L P L A Z A 1 3 4 5 Q U E E N S TB R I S B A N E Q L D 4 0 0 0
P h [ 0 7 ] 3 0 0 2 3 4 4 4 F a x [ 0 7 ] 3 8 3 2 2 2 6 6
DO NOT SCALE USE FIGURED DIMENSIONS ONLYALL LEVELS AND DIMENSIONS MUST BE VERIFIED ON SITE BEFORECOMMENCING CONSTRUCTION, FABRICATION OR SHOP DRAWINGS. COPYRIGHT LOUCAS ZAHOS PTY LTD. ALL RIGHTS RESERVED
PR
OJE
CT
CLI
EN
TD
RA
WIN
G T
ITLE
DRAWING NO. ISSUE.
A. C. N. 0 0 8 1 6 7 4 0 4
ISSUE DATE AMENDMENT NOTES BY
CHECKED [PQA]
CAD FILE NAME
APPROVED [PD]
PLOT DATE
PROJECT NO. SCALE
c
QualityEndorsedCompany
QEC 7228ISO 9001 LICENCE
48 - 52 Carlyle St, Mackay Qld4740
1 : 100
SK19
Geocal Group Pty Ltd
Quest ServicedApartments, Mackay
SECTION B
Checker Approver
B1277
14/07/11SK01
P7
Scale 1 : 100
SECTION B
P2 15.03.11 DESIGN PROGRESS- INFO PS
P1 23.02.11 INITIAL ISSUE PS
@A31 : 200@A1
P3 20.05.11 CONSULTANT ISSUE MD
P5 01.06.11 DA SET MD
P6 20.06.11 CONSULTANT ISSUE MD
P7 14.07.11 D.A. REVISIONS MD
This is a Mackay Regional Council digitally signed document.
Decision Notice Sustainable Planning Act
Civic Precinct, Gordon Street Telephone 1300 622 529 Email [email protected] PO Box 41 │Mackay │QLD 4740 │ Australia Facsimile 07 4944 2400 www.mackay.qld.gov.au
Sustainable Planning Act Appeals Chapter 7 Part 1 Planning and Environment Court:
Division 8 – Appeals to court relating to development applications 1) An applicant for a development application may appeal to the court against any of the following - (a) the refusal, or the refusal in part, of the development application; (b) any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242; (c) the decision to give a preliminary approval when a development permit was applied for; (d) the length of a period mentioned in section 341; (e) a deemed refusal of the development application. (2) An appeal under subsection (1)(a), (b), (c), or (d) must be started within 20 business days (the applicant’s appeal period) after- (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision notice is given to the applicant; or (b) otherwise-the day a decision notice was required to be given to the applicant.
462 Appeals by submitters - General (1) A submitter for a development application may appeal to the court only against- (a) the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) the part of the approval relating to the assessment manager’s decision under section 327 (2) To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following- (a) the giving of a development approval; (b) any provision of the approval including- (i) a condition of, or lack of condition for, the approval; or (ii)the length of a period mentioned in section 341 for the approval. (3) However, a submitter may not appeal if the submitter- (a) withdraws the submission before the application is decided; or (b) has given the assessment manager a notice under section 339(1)(b)(ii) (4) The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.
463 Additional and extended appeal rights for submitters for particular development applications (1) This section applies to a development application to which chapter 9, part 7 applies. (2) A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application. (3) However, the submitter may only appeal against a referral agency’s response to the extent it relates to- (a) if the prescribed concurrence agency is the chief executive (fisheries)-development that is- (i)a material change of use of premises for aquaculture; or (ii)operational work that is the removal, damage or destruction of a marine plant. (4) Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment- (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries); (b) a referral agency’s response mentioned in subsection (2)
464 Appeals by advice agency submitters (1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission. (2) The advice agency may, within the limits of its jurisdiction, appeal to the court about- (a) any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or (b) any part of the approval relating to the assessment manager’s decision under section 327. (3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter. (4) However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.
This is a Mackay Regional Council digitally signed document.
COMPILED DECISION NOTICE Integrated Planning Act
NOTICE OF INTENTION TO COMMENCE USE
Planning Approval DA-2007-515/B
Date of Approval 25-Aug-2011
Approved Request to Change Approval - FROM: Motel (173 Rooms and Ancillary Caretaker's Residence, Conference / Meeting Facilities, Bar, Reception Area and Recreation Facilities), Catering Shop and Shop
TO: Motel (144 Rooms and Caretaker's/Managers Residence, Function Room and Restaurant) AND Catering Shop/Shop/Commercial Premises
Location 48, 50 and 52 Carlyle Street, MACKAY QLD 4740
Property Description Lot 1 on RP700909, Lot 1 on RP700910 and Lot 2 on RP700909
I am hereby notifying you of my intention to commence the approved use on ______________________________ (insert date). I have read the conditions of the above Decision Notice and believe that all the applicable conditions have been complied with. Applicant: The Geocal Group Pty Ltd Address: C/- I-Plan Town Planning Pty Ltd PO Box 687 STONES CORNER QLD 4120 _________________________________________ Signature of Applicant Date: ______________
This is a Mackay Regional Council digitally signed document.
ADOPTED INFRASTRUCTURE CHARGES NOTICE Sustainable Planning Act 2009 and Local Government Act 2009
To: The Geocal Group Pty Ltd C/- I-Plan Town Planning Pty Ltd
PO Box 687 STONES CORNER QLD 4120
Date of issue: 25th August 2011 Ref Number DA-2007-515/B
LAND TO WHICH THE INFRASTRUCTURE CHARGE APPLIES Planning Scheme: Mackay City Planning Scheme Lot & Plan Number: Lots 1 & 2 on RP700909 and Lot 1 on RP700910 Property Address: 50 Carlyle Street, MACKAY QLD 4740 DEVELOPMENT TO WHICH THE ADOPTED INFRASTRUCTURE CHARGE APPLIES The adopted infrastructure charge applies to the following development type: Motel (144 Rooms and Caretaker's/Managers Residence, Function Room and Restaurant) AND Catering Shop/Shop/Commercial Premises AMOUNT OF THE ADOPTED INFRASTRUCTURE CHARGE The adopted infrastructure charge has been calculated in accordance with an adopted infrastructure charges resolution under the Sustainable Planning Act 2009.
NET CHARGE AMOUNT – $1,432,000 + annual adjustments and/or reviews
CHARGE CALCULATION
Charge Category
Adopted Infrastructure
Charge Demand Units
No. of Demand
Units
Charge Amount
Accommodation (Short Term) - 1 or 2 bedroom dwelling
$10,000 units 144 $1,440,000
Commercial (Retail) $180
M2 Gross Floor Area (GFA)
400 $72,000
$10 M2 Impervious Area 400 $4,000
Gross Charge Amount Total $1,516,000
APPLIED CREDIT CALCULATION
Charge Category
Credit Unit Value of Credit Unit No of Credit Units
Applied Credit
Amount 3 or more bedroom dwelling
Lots $28,000 3 84,000
Applied Credit Amount Total $84,000
NET CHARGE SUMMARY Gross Charge Amount Applied Credit Amount Net Charge Amount
$1,516,000 $84,000 $1,432,000
ADJUSTMENTS TO THE CHARGE The amount of the adopted infrastructure charge is subject to escalation in accordance with relevant legislation from the date of the notice to the date of payment. DUE DATE FOR PAYMENT Payment of the total charge must be made before the change happens if the charge applies to a Material Change of Use.
This is a Mackay Regional Council digitally signed document.
PAYMENT DETAILS Payment of the Adopted Infrastructure Charges must be made to Mackay Regional Council via the Development Services, Business Support Unit. Please contact Mackay Regional Council, prior to making payment to confirm details. Phone: (07) 4961 9098 or e-mail [email protected] Payment can be made at:
42 Wellington Street, Mackay cheque to PO Box 41. Mackay, QLD 4740
or credit card
GOODS AND SERVICES TAX The federal government has determined that rates and utility charges levied by local government will be GST free. Accordingly, no GST is included in this infrastructure charges notice. FAILURE TO PAY CHARGE An adopted infrastructure charge levied by a local government is, for the purposes of recovery, taken to be a rate within the meaning of the Local Government Act 2009. Compound annual interest at 11% calculated daily is to be applied on an overdue charge. This notice will lapse if the development approval stops having effect APPEAL RIGHTS Attached is an extract from the Sustainable Planning Act 2009 which details the appeal rights in relation to this notice (sections 478, 535 and 675 to 680). ENQUIRIES Enquiries regarding this Adopted Infrastructure Charge Notice should be directed to the Development Services, Business Support Unit on phone: (07) 4961 9098 or e-mail [email protected] John Caldwell Manager Development Assessment
This is a Mackay Regional Council digitally signed document.
Chapter 7 Appeals, offences and enforcement – Part 1 Planning and Environment Court – Division 10 Appeals to court about other matters Section 478 Appeals about particular charges for infrastructure (1) This section applies to a person who has been given, and is dissatisfied with—
(a) an infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges notice or regulated State infrastructure charges notice; or
(a) a negotiated infrastructure charges notice, negotiated regulated infrastructure charges notice, negotiated adopted infrastructure charges notice or negotiated regulated State infrastructure charges notice
(2) The person may appeal to the court against the notice. (3) An appeal against a notice mentioned in subsection (1) must be started within 20 business days after the day the notice is given
to the person. (4) An appeal under this section may only be about—
(a) whether a charge in the notice is so unreasonable that no reasonable relevant local government, State infrastructure provider or coordinating agency could have imposed it; or
(b) an error in the calculation of the charge. (5) To remove any doubt, it is declared that an appeal under this section can not be about the methodology used to establish an
adopted infrastructure charge or the charge in a relevant infrastructure charges schedule, regulated infrastructure charges schedule or regulated State infrastructure charges schedule.
Chapter 7 Appeals, offences and enforcement – Part 2 Building & development dispute resolution committees - Division 7 Appeals about particular charges 535 Appeals about charges for infrastructure (1) This section applies to a person who—
(a) has been given— (i) an infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges notice or
regulated State infrastructure charges notice; or (ii) a negotiated infrastructure charges notice, negotiated regulated infrastructure charges notice, negotiated adopted
infrastructure charges notice or negotiated regulated State infrastructure charges notice; and (b) is dissatisfied with the calculation of a charge in the notice.
(2) The person may appeal to a building and development committee about an error in the calculation of the charge. (3) An appeal about a notice mentioned in subsection (1)(a) must be started within 20 business days after the day the notice is given
to the person. (4) To remove any doubt, it is declared that an appeal under this section can not be about the methodology used to establish an
adopted infrastructure charge or the charge in a relevant infrastructure charges schedule, regulated infrastructure charges schedule or regulated State infrastructure charges schedule.
Chapter 8 Infrastructure – Part 4 Changing notices 675 Definition for pt 4 In this part – relevant appeal period, for a person who has been given an infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges notice or regulated State infrastructure charges notice, means the period within which the person may appeal against the notice to the court or a building and development committee under section 478 or 535. 676 Application of pt 4 This part applies to a person who has been given an infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges notice or regulated State infrastructure charges notice only during the person’s relevant appeal period. 677 Representations about notice The person may make representations about the notice to the entity that gave the notice. 678 Consideration of representations The entity that gave the infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges notice or regulated State infrastructure charges notice must consider any representations made to the entity under section 677. 679 Decision about representations (1) If the entity agrees with any of the representations, the entity must give to the person—
(a) for representations about an infrastructure charges notice—a new infrastructure charges notice (the negotiated infrastructure charges notice); or
(b) for representations about a regulated infrastructure charges notice—a new regulated infrastructure charges notice (the negotiated regulated infrastructure charges notice); or
(c) for representations about an adopted infrastructure charges notice—a new adopted infrastructure charges notice (the negotiated adopted infrastructure charges notice); or
(d) for representations about a regulated State infrastructure charges notice—a new regulated State infrastructure charges notice (the negotiated regulated State infrastructure charges notice).
(2) The entity may give only 1 negotiated infrastructure charges notice, negotiated regulated infrastructure charges notice, negotiated adopted infrastructure charges notice or negotiated regulated State infrastructure charges notice.
(3) The negotiated infrastructure charges notice, negotiated regulated infrastructure charges notice, negotiated adopted infrastructure charges notice or negotiated regulated State infrastructure charges notice— (a) must be given within 5 business days after the day the entity agrees with the representations; and (b) must be in the same form as the notice previously given; and (c) must state the nature of the changes; and (d) replaces the notice previously given.
(4) If the entity does not agree with any of the representations, the entity must, within 5 business days after the day the entity decides not to agree with any of the representations, give a written notice to the person stating the decision about the representations.
680 Suspension of relevant appeal period (1) If the person given the infrastructure charges notice, regulated infrastructure charges notice, adopted infrastructure charges
notice or regulated State infrastructure charges notice needs more time to make the written representations, the person may, by written notice given to the entity that gave the notice, suspend the person’s relevant appeal period.
(2) The person may act under subsection (1) only once. (3) If the written representations are not made within 20 business days after the day written notice was given to the entity, the
balance of the person’s relevant appeal period restarts. (4) If the written representations are made within 20 business days after the day written notice was given to the entity—
(a) if the person gives the entity a notice withdrawing the notice under subsection (1)—the balance of the person’s relevant appeal period restarts the day after the entity receives the notice of withdrawal; or
(b) if the entity gives the person a notice under section 679(4)—the balance of the person’s relevant appeal period restarts the day after the person receives the notice; or
(c) if the entity gives the person a negotiated infrastructure charges notice, negotiated regulated infrastructure charges notice, negotiated adopted infrastructure charges notice or negotiated regulated State infrastructure charges notice (the negotiated notice)—the person’s relevant appeal period starts again the day after the person receives the negotiated notice.
This is a Mackay Regional Council digitally signed document.