Page 1: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Tribal Transportation Program Questions &

Answers

22nd Annual BIA Providers ConferenceAnchorage, AK

11/27/12

Page 2: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Questions, Answers, and Information on the Tribal Transportation Program (TTP) found in MAP-21:◦ General;◦ Funding; and◦ Other Programs and Activities

Information is posted at: http://www.fhwa.dot.gov/map21/qandas/index.cfm

Content

Page 3: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Where can I get access to the final legislation?◦ Answer: The legislation is known as the Moving Ahead for

Progress in the 21st Century Act, Public Law 112-141. The acronym is MAP-21. The legislation, along with additional information, can be found on FHWA's website at: http://www.fhwa.dot.gov/map21/.

Is the Indian Reservation Roads (IRR) Program included in MAP-21?◦ Answer: The IRR program is not provided new funding under

MAP-21. However, the newly established Tribal Transportation Program (TTP) contains similar provisions and eligibility requirements as the IRR program.

GENERAL

Page 4: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

What is the authorized funding level for the Tribal Transportation Program?◦ Answer: The TTP is authorized at $450 million/year, which is

subject to the overall Federal-aid obligation limitation.

How will the TTP funds be administered and distributed?◦ Answer: The TTP funds made available will be administered

in accordance with Chapter 2 of Title 23. MAP-21 contains a statutory formula which replaces the Relative Need Distribution Factor (RNDF) formula included in Subpart C of 25 CFR Part 170.

Funding

Page 5: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Are there any funding set-asides?◦ Answer: Yes. MAP-21 includes set-asides for the following

programs: 2% for Transportation Planning 2% for Tribal Bridge Program 2% for Tribal Safety Projects and Activities 6% for Program Management and Oversight (PM&O)

The PM&O is used by BIA and FHWA to carry out stewardship and oversight of the program, including those functions that are deemed as being "not otherwise contractible" per Appendix A to Subpart E of 25 CFR Part 170.

Tribal Supplemental Allocation – To be covered

Funding

Page 6: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Formula: The new formula will calculate tribal shares using three different factors (as percentages of national or regional totals):

27% of funding based on the Tribe's approved road mileage (national percentage)

39% of funding based on the Tribe's most recent Native American Housing Assistance and Self Determination Act (NAHASDA) population (national percentage)

34% of funding based on the Tribe's RNDF and Population Adjustment Factor (PAF) amounts from FY05 to FY11 (regional percentage)

TTP Funding Formula

Page 7: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

What inventory is used for determining a Tribe's road mileage?◦ Answer: The mileage used to generate a Tribe's share of

funding includes the following: Any BIA owned road included in the FY12 Inventory; Any tribal owned road included in the FY12 Inventory; and Any road owned by another entity that was included in the BIA

System of Roads utilized to generate funding prior to October 1, 2004. These are generally known as the “BGE roads."

Funding

Page 8: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Tribal Supplemental Allocation:◦ MAP-21 contains a set-aside for another factor which will be

included in a Tribe's share of TTP funds. The Tribal Supplemental Allocation, which totals approximately $104 million, will be utilized initially within each Bureau of Indian Affairs (BIA) Region to supplement those Tribes that experience a negative impact from the new statutory formula in any year when compared to the funding a Tribe received under the old formula in Fiscal Year 2011.

◦ TTP funds are 100% Federal share, and like IRR funds, can be used to satisfy local match requirements on construction projects.

Funding

Page 9: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Question 7: Is there a transition in implementing the new formula?◦ Answer 7: Yes. In FY13, tribal shares will be determined by

adding the Tribe’s: A) Share percentage from FY11’s (RNDF plus PAF) from

25CFR170 and applying it to an amount of funding equal to 80% of the FY11 total (RNDF plus PAF) funding that was provided; and

B) Share percentage utilizing the new MAP-21 formula applied to the remaining funds.

◦ In FY14, the FY11 percentage in A) above is 60%.◦ In FY15, the FY11 percentage in A) above is 40%. ◦ In FY16 and thereafter, the FY11 percentage in A) above is

20%.

Funding

Page 10: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

$0

$350

$300

$200

$100

What is 80% of FY11 Shares?

DRAFT

$ 27

7.4

Mill

ions

$ 69

.3

Not Used in MAP-21

80% of FY2011 Tot $

80%

• FY2011 Allocation: $346 M• The FY2011 Relative Need

Distribution Factor share plus the Population Adjustment Factor share make up the “FY2011 Allocation”.

• 80 % of $346 M:• $277.4 M

• 23 USC (b)(3)(A)(i)(I)(bb) amount is identified as the “remainder” after the available funds less set asides have been taken off then less the 80% amt identified above.

Page 11: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Funding Charts

Page 12: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

MAP-21, Sec. 1101(a)(3)(A)• Authorized Amt: $450,000,000

DRAFT

Page 13: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

23 USC 202(a)(6)• Authorized Amt: $450,000,000• Less BIA/FHWA Admin.:

– $27,000,000 or 6%

DRAFT

Page 14: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

23 USC 202 (c)(1)• Authorized Amt: $450,000,000• Less BIA/FHWA Admin.:

– $27,000,000 or 6%

• Less Tribal Trans Planning– $9,000,000 or 2%

DRAFT

Page 15: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

23 USC 202 (d)(2)• Authorized Amt: $450,000,000• Less BIA/FHWA Admin.:

– $27,000,000 or 6%

• Less Tribal Trans Planning– $9,000,000 or 2%

• Less Bridge Program– $9,000,000 or 2%

DRAFT

Page 16: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

23 USC 202 (e)(1)• Authorized Amt: $450,000,000• Less BIA/FHWA Admin.:

– $27,000,000 or 6%

• Less Tribal Trans Planning– $9,000,000 or 2%

• Less Bridge Program– $9,000,000 or 2%

• Less Tribal Safety Funding– $9,000,000 or 2%

DRAFT

Page 17: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

23 USC (b)(3)C)(i)• Authorized Amt: $450,000,000• Less BIA/FHWA Admin.:

– $27,000,000 or 6%

• Less Tribal Trans Planning– $9,000,000 or 2%

• Less Bridge Program– $9,000,000 or 2%

• Less Tribal Safety Funding– $9,000,000 or 2%

• Less Tribal Supplemental Fund– $104,375,000 or 30% of $275 M plus

12.5% of amount over $275 M

DRAFT

Page 18: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

6.0%2.0% 2.0%

2.0%

23.2%

64.8%

• The amount available for the Tribal Transportation Program.

DRAFT

$291.6 million

Page 19: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

MAP-21 FY13 Distribution PercentagesPercent

PM&OPlanningBridgeSafetySupplementalAvailable for Distribution with new formula"80%" of FY11

6%

2%

61.6%

3.2%

DRAFT

23.2%

Page 20: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Regional TTP Authority

2012 2013 2014 2015 20160

10

20

30

40

50

60

70

Great PlainsSouthern PlainsRocky MountainAlaskaMidwestE. OKWesternPacificSouthwestNavajoNorthwestEastern

Page 21: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

How will funding get to the Tribes?◦ Answer: The funds will be apportioned to FHWA. FHWA will

withhold the funding amount associated with the Tribes operating under FHWA/Tribal TTP Program Agreements and will then re-allocate the remainder to the BIA

Does the IRR High Priority Program (IRRHPP) continue?◦ Answer: MAP-21 includes a new Tribal High Priority Projects

Program (THPPP). The IRRHPP under 25 CFR Part 170 does not. However, the THPPP and the IRRHPP are very similar. The THPPP is not funded through the Highway Trust Fund. An appropriation is needed from the General Fund before the THPPP can proceed.

Other Programs and Activities

Page 22: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Side by Side comparison to old IRRHPP $30 million from General Fund Dates do not apply

◦ Will be a call for projects Evaluation with same criteria $1,000,000 limit on project but not tribal

share

Tribal High Priority Projects Program

Page 23: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Will the IRR Bridge Program Continue to operate under its current regulations?◦ Answer: Yes, the TTP Bridge Program will function in the same

manner as the IRR Bridge Program established in SAFETEA-LU. Can Tribes use TTP funds for maintenance?

◦ Answer: Yes, in accordance with 25 CFR Part 170 and MAP-21, Tribes may use up to 25% of their TTP funds or $500,000, whichever is greater, for eligible and approved maintenance activities. These activities must be included on the Tribe's TIP approved by FHWA.

How will the new Tribal Safety Funding function?◦ Answer: Two percent of the authorized funding will be made

available to tribes to carry out safety specific activities and projects. The Draft Guidance has been developed in coordination with the TTP Coordinating Committee. (Other session)

Other Programs and Activities

Page 24: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Projects can be submitted that improve safety in one or all of the following categories:◦ planning activities;◦ enforcement;◦ education and outreach; and◦ engineering projects

Each category of projects/activities will be ranked separately. Individual funding goals have been established for each category.

Tribal Safety Funding

Page 25: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

January 4◦ Issue Call for Projects in the Federal Register

March 1◦ Tribe submits application to the FLH TTPSF Coordinator

March 31◦ Review Committee completes review and ranks

applications April 15 *

◦ Successful applicants will be notified of funds to be received, unsuccessful applicants notified and fund distribution process initiated.

* funding distribution may depend upon receipt of TTP funds by FHWA, all funds will be made available that are appropriated.

• Proposed 2nd round of projects call in April

Safety Funding Proposed Dates

Page 26: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Are there additional transportation planning requirements in MAP-21?◦ Answer: The transportation planning requirements of the IRR

Program continue in the TTP. Funds must only be expended on projects and activities identified on an FHWA approved Transportation Improvement Program (TIP). Road Inventory data will continue to be a major part of transportation planning. However, MAP-21 will now require the inspection of all public bridges, including tribal bridges, and the reporting of data into FHWA's National Bridge Inspection System (NBIS), which will be another planning effort.

Other Programs and Activities

Page 27: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Is Question 10 (25 C.F.R. 170, Appendix C to Subpart C) still a factor in the TTP funding formula?◦ Answer: Factor in the formula - No. The tribal shares

generated by the TTP funding formula are not influenced by Question 10.

◦ However, the corrected functional classification of roads is critical for properly reporting TTP Inventory and the work to correct them will continue.

◦ In addition, roads unable to be located will be turned off before the FY12 inventory becomes final so as to not generated funding.

◦ See following slides

Other Programs and Activities

Page 28: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

What was found (nationally) Routes themselves

◦ Reviewed 45,246 routes/sections◦ Missing Data on 3961 routes/sections (8.7%)

Functional Classifications◦ Reviewed 45,246 Routes/sections◦ Classified 41,226 Routes/sections (91.1%)◦ Need to change 11,212 Routes/sections (27.2%)

Page 29: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Regional Inventory Report5/14/2012

Data Classification

Region Total RoutesRoutes

Missing Data% Missing

DataTotal

RoutesTotal

Classified % ClassifiedRoutes changing

classification% changing

Classification

Great Plains 2758 141 5.1% 2758 2617 94.9% 550 21.0%

Southern Plains 2602 220 8.5% 2602 2372 91.2% 765 32.3%

Rocky Mountain 2230 88 3.9% 2230 2142 96.1% 1047 48.9%

Alaska 8164 1044 12.8% 8164 7100 87.0% 1548 21.8%

Midwest 7395 296 4.0% 7395 7104 96.1% 2695 37.9%

Eastern Oklahoma 5015 166 3.3% 5015 4852 96.7% 926 19.1%

Western 2596 220 8.5% 2596 2376 91.5% 310 13.0%

Pacific 1815 334 18.4% 1815 1484 81.8% 339 22.8%

Southwest 2146 213 9.9% 2146 1889 88.0% 802 42.5%

Navajo 4179 33 0.7% 4179 4146 99.2% 547 13.2%

Northwest 3593 834 23.2% 3593 2762 76.9% 1092 39.5%

Eastern 2753 372 13.5% 2753 2382 86.5% 591 24.8%

TOTALS 45246 3961 8.7% 45246 41226 91.1% 11212 27.2%

Page 30: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

What is the status of Proposed and Access Roads?◦ Answer: These too will not impact the funding formula.

However, the final recommendations concerning the necessary data and information required to be submitted in order to keep these roads in the inventory will still be requested and the inventory updated over the course of next two years.

Does FTA provide public transit assistance to Indian tribes?◦ Answer: Yes. MAP-21 continues the Public Transportation on

Indian Reservations Program, also referred to as "TTP," under Chapter 53 of title 49, funded at $30 million.

◦ FTA's Tribal website: http://fta.dot.gov/grants/13094_3553.html

Other Programs and Activities

Page 31: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Regulation Update◦ 25 CFR 170 (IRR Regulations)

Draft by mid-January Outreach meetings NPRM Additional Outreach meetings Updated Final Rule by October 1

◦ 23 CFR 661 (IRR Bridge Regulations) Will be updated to reflect new program eligibilities

Guidance◦ Safety Funding

In final draft form, developed through TTPCC Presented at NTTC

◦ High Priority Projects Program Being drafted

Regulations

Page 32: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Fund Distribution◦ Operating under MAP-21 and a 6-mos Continuing Resolution

The formula run has been made based on a full year of authority and the current FY12 Inventory

Estimated obligation limitation/lop off and ½ year CR was applied to these numbers in order to determine the tribal share funding available.

Funding distribution to the Tribes and the BIA Regions has begun. FY12 Inventory

◦ 99% final. A few submittals are in an appeal process. Review of routes not found is being carried out. Initial focus is on BIA and tribal roads due to MAP-21 formula. Work will be completed before availability/distribution of the next round

of funding.

Where are we now?

Page 33: 22nd Annual BIA Providers Conference Anchorage, AK 11/27/12

Mr. LeRoy Gishi – Chief BIA Division of Transportation◦ [email protected]

Mr. Bob Sparrow – FHWA’s Tribal Transportation Program Manager◦ [email protected]

Contacts