Brent R. Koch, P.E.Brent R. Koch, P.E.ConCon‐‐Fab California CorporationFab California Corporation
HAZEL AVENUE IMPROVEMENT PROJECTHAZEL AVENUE IMPROVEMENT PROJECTPHASE 1PHASE 1PHASE 1PHASE 1
US 50 to US 50 to CurraghCurragh Downs DriveDowns Drive
Project Length 0.9 MilesProject Length 0.9 Milesj gj g
Owner County of Sacramento
Engineering Design Parsons Brinkerhoff – Sacramento, CA
General Contractor Flatiron West ‐ Benicia, CA
Precast Subcontractor Con‐Fab California Corp ‐ Lathrop, CA
2
Project DescriptionPhase 1 of the Hazel Avenue Projects includes improvements from U.S. Highway 50 to Curragh Downs Drive. Roadway system benefits include:
Improved roadway safety.Increased traffic capacity to ease congestion and delays.Improved bicycle and pedestrian facilities.
3
Meet Americans with Disability Act requirements.Beautification of the project area.
Roadway improvements include:
Widening Hazel Avenue from four to six lanes over the AmericanWidening Hazel Avenue from four to six lanes over the American River Bridge from U.S. 50 to Curragh Downs Drive.
Construction of new bicycle and pedestrian facilities including bike lanes and a barrier separating bicycle/pedestrian/equestrian modes from vehicle traffic on the bridge over the American River.
Improved connections to Folsom Lake bike trail.
Architectural treatments on the bridge structure and decorative street lightingstreet lighting.
Traffic signal modifications at Curragh Downs Drive, Gold Country Boulevard and Tributary Point.Boulevard and Tributary Point.
4
Contract Details:
$20M contract awarded to Flatiron West in March 2009$20M contract awarded to Flatiron West in March 2009
(16) PCPS Bulb Tee Girders Furished and Installed ‐ $652K
Credit For Modifications to Architectural Treatment $150KCredit For Modifications to Architectural Treatment ‐ $150K
Groundbreaking – April 2009
T tl I t ll ti J 2009Trestle Installation ‐ June 2009
Girder Fabrication ‐ October 2009
dGirder Erection ‐ June 2010
Estimated Projected Completion – January 2011
5
6
7
8
9
10
Tuesday, November 16, 2010 11
Tuesday, November 16, 2010 12
Tuesday, November 16, 2010 13
Tuesday, November 16, 2010 14
Tuesday, November 16, 2010 15
16
17
18
Tuesday, November 16, 2010 19
Tuesday, November 16, 2010 20
21
22
Tuesday, November 16, 2010 23
Tuesday, November 16, 2010 24
Tuesday, November 16, 2010 25
26
Tuesday, November 16, 2010 27
Tuesday, November 16, 2010 28
29
30
31
Tuesday, November 16, 2010 32
Tuesday, November 16, 2010 33
34
35
Tuesday, November 16, 2010 36
Tuesday, November 16, 2010 37
Tuesday, November 16, 2010 38
Tuesday, November 16, 2010 39
Tuesday, November 16, 2010 40
Tuesday, November 16, 2010 41
Tuesday, November 16, 2010 42
Tuesday, November 16, 2010 43
Tuesday, November 16, 2010 44
45
46
47
48
Tuesday, November 16, 2010 49
Tuesday, November 16, 2010 50
51
Tuesday, November 16, 2010 52
Tuesday, November 16, 2010 53
Tuesday, November 16, 2010 54
Tuesday, November 16, 2010 55
Tuesday, November 16, 2010 56
Tuesday, November 16, 2010 57
Tuesday, November 16, 2010 58
Tuesday, November 16, 2010 59
Tuesday, November 16, 2010 60
Tuesday, November 16, 2010 61
Tuesday, November 16, 2010 62
Tuesday, November 16, 2010 63
Tuesday, November 16, 2010 64
Tuesday, November 16, 2010 65
Tuesday, November 16, 2010 66
Tuesday, November 16, 2010 67
Tuesday, November 16, 2010 68
Tuesday, November 16, 2010 69
70
71
72
Tuesday, November 16, 2010 73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89