Page 1: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

1

Please press the F5 key to begin.

(Then, press the Page Up or Page Down keys to move through the following slides.)

Page 2: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

Integrating the Audit Leverage workflow into your audit process

Page 3: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

AUDIT LEVERAGE IS DESIGNED IN SEPARATE, BUT INTEGRATED MODULES

Module A is an optional module – allows the “scoring” of projects for placement on the Annual Audit Plan based on the risk criteria.

Module B has a required component for establishing projects, and an optional components for time tracking and scheduling.

Module C collects the Audit Programs, Findings, Attachments, and Review Notes

Mod A is optional – represented by the “dashed line”

Page 4: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

Module D contains the reporting tools - “Search Your Data Base” and Audit Director’s Summary Report

Module E contains one of the reporting tools – Outstanding Findings Report

Module F contains the files for your Audit Staff

Module G is the initial point of entry to establish the tables required to run Audit Leverage: Project Types, Finding Severity Codes, etc.

Page 5: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

Module G and F contain table data that feed all the other modules (A-E)

Page 6: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

6

Within each of these Main Menu Options, there are sub-menu options:

Module B contains the Main Project Setup screen and the Time Entry Screen.

In addition, several reporting features are also contained through Module B

Page 7: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

7

Module C – Sub Menus

Audit Programs are entered

Review of attachments

Entry of Findings and Management Responses, and Follow-up

Internal “post it” notes from reviewers to preparers

“To Do” List

Page 8: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

8

TABLE OF CONTENTS (page 1 of 2)

Set up a new project Module B – Project Set up Main Tab

Enter audit program steps Module C – Step Execution

Record documentation of work performed. Attach work papers.

Module C –Step Execution Tab, “work performed” area

Record time Module B – Time Keeping

2

3

4

5

TASK Navigational Path *

1 Risk Assessment Module A – Risk Assessment

Page # (click on

hyperlink)

10

11

16

20

23

Page 9: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

9

Record findings & management’s responses

Module C – Findings

Create an audit report Module C – Findings

6

8

TASK Navigational Path *

7 Monitor outstanding items Module C – Project Status

Module D – SYDB

Module B – Report Engine

Page # (click on

hyperlink)

TABLE OF CONTENTS (page 2 of 2)

34

28

43

Page 10: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

10

Because the modules “feed” each other, there are often different ways to “get to” a particular part of the program. You might think of the Modules within Audit Leverage as connecting doors in a house.

For example: to create or view Findings, you can get to the Findings screen in any of these 3 ways:

Module C, then Click on Findings.

Module B, then through Project Setup, enter the Audit Program, then, from a particular audit step, you can select Findings.

Module C, Step Execution, then from a particular audit step, you can select Findings.

* Navigational Path

Page 11: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

11

1 Risk Assessment

Page 12: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

12

Set up a Project -------------------- Module B. Project Setup-Main Tab

2A

Page 13: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

13

Assign Staffing to a Project ------ Module B. Project Setup – Staffing Tab

2B

Page 14: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

14

Assign Staffing to a Project

WHY DO I …

1. Staffing assignments feed the…

• Visual Scheduler

• Provide a source for outstanding tasks on the Project Status Summary (from Module B – Project Status Summary)

3. The “role” determines….

• If the report will appear on the Project Status Summary Report (Module B Tab) Only Projects with a “manager” assigned will appear.

5. The “assigned” field determines…

• what color and bar style are represented on the Visual Scheduler

4. The “begin date” and “end date” affect …

• the length of the bar on the visual scheduler

2. The “name” must be already established on Module F

2B

Page 15: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

15

Create Milestones for a Project ------ Module B. Project Setup – Milestones Tab

2C

Page 16: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

16

Create Milestone Dates

WHY DO I …

1. To manage the progress of the audit. Milestone dates are reflected on the following reports:

• Milestone Report (from Module B – Report Engine)

• Project Status Summary (from Module B – Project Status Summary)

3. The dates will allow for filtering parameters in SYDB

4. The start/end field work dates are displayed on the Visual Scheduler

2. The actual engagement letter date permits an engagement letter to be generated.

2C

Page 17: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

17

3 Entering an Audit Program in Audit Leverage

Audit Programs can be created either:

a)“on the fly,” or

b) stored in a “template” to store programs for reuse on other projects,

There are 2 navigational paths, “doorways”, to enter audit programs on the fly:

1) Module B – Project Set Up, Program Set-up Tab, then click the Audit Step Execution Button

2) Module C – Audit Step Execution

Page 18: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

18

3A Navigating to Audit Step Execution through Module B

Page 19: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

19

3B Creating Audit Program Templates

Program Templates can be created by selecting the Template Library button in Module C. Select the “Create a New Template” button, and a submenu will allow entry of a template name.

Page 20: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

20

3B Creating Audit Program Templates

Program Templates can also be entered “after the fact.” If you have entered the program “on the fly” for a particular project, and decide that this program should be saved for further use, you can select the “Create Template button from the Step Execution Screen.

Page 21: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

21

4 Entering Work Performed

A description of the actions performed in completed the audit step can be recorded in the “Work Performed” area for each audit step within Audit Step Execution.

Page 22: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

22

4 Entering file attachments for Audit Steps

From the audit step, click on the Attachments tab, then enter and a file attachment reference number and attach the file in the Doclink field.

Page 23: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

23

Entering file attachments for Audit Steps4

To insert a file attachment, position your mouse in the doclink field, right click, select Create from File, click the Browse button, and navigate to the appropriate file.

The label for the file can be changed by selecting the Change Icon Button

Page 24: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

24

5 Recording time in Audit Leverage

Time is Entered through Module B

Page 25: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

25

5 Recording time in Audit Leverage

The screen that is presented after selecting the Auditor Timesheets button is the filter (top section) and display (bottom section) of time that has already been entered.

To enter time, select the Enter Time button in the lower right hand corner

Filter selections

Time entry display

Page 26: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

26

5 Time Entry Screen – Comments:

Charged By: You can enter time only for yourself. (you can view anyone’s time, but enter time only for your own log-in.)

Project Number: The drop-down list will only display those projects for which you are assigned (on the Staffing tab of the Project Setup Screen),, or for which you have previously charged time. Even if a project number does not display in the drop-down, you can manually enter it.

Hours: There is no edit for hours in excess of 24/day. This enables your department to choose to enter time on a weekly basis rather than a daily basis (e.g., 32 hours spent this week on project 9901, and 8 hours on vacation).

If you want to have a warning message displayed for hours exceeding the budget, then select the “budget check” box on the previous screen.

Page 27: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

27

5 HOW DO I …

Get a summary time report by project, person, etc.

From the Module B menu, select the Time Summaries option, and select the desired report grouping5A

Page 28: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

28

5 HOW DO I …

Get a summary time report by project, person, etc

5B Additional reporting options are available through:

Module B - Budget vs Actual Audit Hours

Module B – Report Engine

Page 29: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

29

6 Record findings

Findings are typically associated with a particular Audit Step. Findings can be entered by:

by clicking on the findings shortcut key from the audit step itself.

navigating through Module C, Findings or

Page 30: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

30

6 Record findings

There are no “required” fields in entering findings. However, since the findings, recommendations, and management responses serve as the basis for the Audit Report generated, the clarity and extent of detail is obviously critical.

Page 31: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

31

6 Record findings

The other use of the findings data is in the ability to utilize the Search Your Database (SYDB) screen to query for particular frequencies of data. For example, the Control Issue selection and the Financial Impact parameter are often used to filter for finding data. As an example, you could filter for a control issue of “Bank Authorizations” with a financial impact > $10,000

Page 32: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

32

6 Record Management Responses

The Management Response is stored on a separate tab within the Findings screen. Again, as with findings, no fields are required; however, the management response can be included on the audit report, thus clarity and extent of detail are important considerations.

Page 33: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

33

6 Findings – The Synopsis Tab

The synopsis tab is designed to store a summarized upper management level synopsis of the finding. Information entered on this tab will be presented on the Audit Director’s Summary Report (in Module D) and on other custom reports that you may create.

Page 34: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

34

Sign-off on Findings and Management Responses

The Sign-Off tab on findings will protect from inadvertent (or deliberate) alteration of data.

6

Page 35: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

35

7HOW DO I …

Manage Outstanding Tasks in Audit LeverageWhat is outstanding for me to do? Where do I look in AL?

There are several tools to assist you in monitoring the progress of your work in Audit Leverage:

Project Status screenSYDB (Search Your Database) screenOutstanding Findings ReportProject Status SummaryReport Engine

Page 36: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

36

HOW DO I ...

Manage Outstanding Tasks in Audit LeverageWhat is outstanding for me to do? Where do I look in AL?

Use Project Status screen (Module C) and filter for:

1. Audit Steps

Where you are the preparer and the status is something less than “ready for review,” or

Where you are the reviewer and the status is “ready for review”

7

7A

Page 37: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

37

HOW DO I …

Manage Outstanding Tasks in Audit LeverageWhat is outstanding for me to do? Where do I look in AL?

(cont.)

Use Project Status (Module C) and filter for:

2. Attachments:

Where you are the preparer and the status is something less than “ready for review,” or

Where you are the reviewer and the status is “ready for review.”

7A

Page 38: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

38

3. Review notes:

Where you are the recipient and the status is “awaiting recipient’s response,” or

Where you are the reviewer and the status is “cleared by recipient.”

7A Use Project Status (Module C) and filter for (cont.):

Page 39: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

39

4. Findings

Where you are the author and the status is prior to “pending approval”

7A

Page 40: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

40

HOW DO I …

Manage Outstanding Tasks in Audit Leverage

Follow-up Entries

The Search Your Database screen (Module D) can be used to monitor follow-up entries. Click on the last tab, “Follow-up Entries,” entering the desired parameters (follow-up date)

7B

Page 41: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

41

The Report Engine is a powerful tool that allows the user to specify the exact parameters of interest. The example below is set to look at projects with a status code of “fieldwork in process.”

7C

Page 42: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

42

7C

Page 43: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

43

The Report Engine can be used in a variety of report options, such as Hours by Project and Employee

Page 44: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

44

8Creating an Audit Report

Audit Leverage currently has over 50 different audit report formats available. You may find that one of these reports suits your needs exactly. More likely, though, you already have a unique format that your readers are comfortable with.

To have our software produce a Microsoft Word audit report that looks exactly like your existing one, you have the following 4 options. (Options #1-2 are more efficient than options #3-4.)

1. Have someone from your firm (with some knowledge of MS Access report design) develop the report in-house. You can browse through the 55 available report formats, find one that you want, and customize it for your needs. All the designs and source code for all of our forms and reports are already included with your license fee.

2. Hire us to create a customized audit report format that looks exactly like your existing one. The cost is usually around US$600, depending on the complexity.

3. Use one of our existing report formats that is close to what you want. Export it to Word, and make minor modifications in Word. However, this would have to be done again for the next audit.

4. Copy and paste one finding at a time from Audit Leverage into Word. (This option is the least efficient one.)

Page 45: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

45

8

Page 46: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

46

8 Report Format #8 – Operational Style Audit Report

Page 47: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

47

8 Creating an Audit Report

In addition to the formal audit report, informal reports can be printed from Audit Leverage by selecting the Search Your Database option from Module D, then clicking on the Findings Tab and the Search button. You can then scroll down to find the project number of interest, click on the “See Detail” arrow. This will put you into the detail of the finding. Click the “View Search Reports” button.

Page 48: 1 Please press the F5 key to begin. (Then, press the Page Up or Page Down keys to move through the following slides.)

48

This is the report created from the “Search Your Database” option called “View the Results Report.”

8