0 intro uph(new)
TRANSCRIPT
-
8/6/2019 0 Intro Uph(New)
1/27
1
Tema:PROFESIONALISME & SERTIFIKASI
UNTUK MANAJER PROYEK
KERJA SAMAUNIVERSITAS PELITA HARAPAN
&
IKATAN AHLI MANAJEMEN PROYEK
INDONESIA
INTRODUKSI ATAS IMPLEMENTASI METODE
PROJECT MANAGEMENTPADA BANGUNAN GEDUNG.
-
8/6/2019 0 Intro Uph(New)
2/27
2
Tom Peters dalam bukunya, Liberation Management (1992):
"Almost all of tomorrow's work will be done inproject configurations...the professionalservice firm is the best possible model forfuture survival."
Mungkin beliau terlalu membesarkan hal ini, namun
terdapat cukup banyak bukti nyata bahwa manajemen
proyek makin diakui sebagai suatu disiplin yang
sangat penting, yang akan berkontribusi terhadapkesuksesan suatu organisasi baik dalam sektor
pemerintah ataupun swasta.
-
8/6/2019 0 Intro Uph(New)
3/27
3
Advertisement inKOMPASJanuary 2006.
PT Siemens Indonesia is looking for bright talented individuals to fill the following positions:PROCESS MANAGEMENT (Code: 205/0601)
Responsibilities:
Responsible for Siemens Process Framework, Process Management strategy, methodology,
implementation, optimization and reporting
Project management & controlling Supporting compliance and governance issues (ISO, SOA, Occupational, H&S, etc)
Supporting Company initiative/program/special projects
Roadmap & Communication plan
Candidates should fulfill the following requirements:
S1 degree majoring in IT related field 3 5 years working experience, handling similar function
Good project management skills
Sound knowledge of Business Process (CRM/SCM/PLM)
Etc.
-
8/6/2019 0 Intro Uph(New)
4/27
4
3 PIHAK UTAMA DALAM INDUSTRI JASA KONSTRUKSI
ISTILAH DALAM UNDANG2
JASA KONSTRUKSI No 18/ 1999.
PENGGUNA JASA
PENYEDIA JASA
PEMILIK:PEMBERI TUGAS
EMPLOYER (Ing.)
BOUWHEER (Bel.)
KONTRAKTOR:PEMBORONG
SELLER/ PENJUAL
KONSULTAN:PERENCANA (Arsitek, Struktur, MEP)
BIAYA (Quantity Surveyor)
PENGAWASAN (CM, MK)
INDUSTRI
KONSTRUKSI
-
8/6/2019 0 Intro Uph(New)
5/27
5
HIGH SELLING PRICE
PROFIT
LOW PRODUCTION COST
OWNERS MOTTO: BUY LOW SELL HIGH
-
8/6/2019 0 Intro Uph(New)
6/27
6
MASA PELAKSANAAN PROYEK
TAHAPPRA KONSTRUKSITAHAP KONSTRUKSI
1. AKTIVITAS DESIGN
2. AKTIVITAS TENDER
3. AKTIVITAS PELAKSANAAN
4. AKTIVITAS SERAH TERIMA
PROJECT LIFE CYCLE
CM / MK
PM
-
8/6/2019 0 Intro Uph(New)
7/27
7
-
8/6/2019 0 Intro Uph(New)
8/27
8
ORGANISASI PROYEK (MULTI KONTRAKTOR)
PEMILIK/ OWNER
KONSULTAN QS KONSULTAN PM/ CM KONSULTAN A/E
GENERAL CONTRACTOR( MAIN CONTRACTOR )SPECIALIST
SUPPLIERS
NOMINATEDSUB CONTRACTORS
SANITAIR
FURNITURE
dsbDOMESTIC
SUB CONTRACTORS
SPECIALIST
CONTRACTORS
LIFTGENSET
dsb
INSTALASI MEP
dsbCOMMAND
CONTRACT
-
8/6/2019 0 Intro Uph(New)
9/27
9
C M
BERARTI
CONSTRUCTION MANAGEMENT
. CONSTR SUPERVISION
. QUALITY ASSURANCE
MANAGEMENT OF
- SCOPE CHANGES
- DESIGN CHANGES
- TIME CHANGES
- VALUE ENGINEERING
Bukan semata- mata Problem Solving saja, tetapi yangLebih penting adalah Problem Prevention, Pro-Active.
-
8/6/2019 0 Intro Uph(New)
10/27
10
Definisikan Proyek.
Uraikan dalam elemen yg lebih kecil yg mudah di kontrol.
Dapatkan sumberdaya yang tepat dan memadai.
Susunlah tim proyek untuk melaksanakan pekerjaan.
Rencanakan pelaksanaan pekerjaan dan alokasikan
sumberdaya.
Monitor dan kontrol pekerjaan.
Laporkan kemajuan pekerjaan kepada
pemilik (sponsor) proyek.
Tutup proyek setelah rampung.
Review untuk mendapatkan pelajaran
(lesson learned).
Tugas Seorang Manajer Proyek
-
8/6/2019 0 Intro Uph(New)
11/27
11
FAKTOR-FAKTOR PENUNJANG PROFESIONALISME
SEORANG (PM) PROFESIONAL:
1. MENGUASAI ILMU/ KOMPETENSI YANG UP-TO-DATE.
2. BERTINDAK SESUAI KODE ETIK DARI ASOSIASINYA.
(PERILAKU INDEPENDEN & BERINTEGRITAS TINGGI).
3. MENDAPAT IMBALAN JASA YANG LAYAK SESUAI
DENGAN TINGKATAN KOMPETENSINYA.
4. MENDAPAT PENGAKUAN RESMI ATAS PROFESINYA.5. MENDAPAT PERLINDUNGAN TERHADAP TUNTUTAN
ATAS HASIL KARYANYA.
-
8/6/2019 0 Intro Uph(New)
12/27
12
CERTIFICATION
OF THE
PROJECT MANAGEMENT
PROFESSION IN INDONESIA
-
8/6/2019 0 Intro Uph(New)
13/27
13
What is CERTIFICATION?
Certification is the assessment process to acquire
recognition for the competence and skill classification and
qualification in the relevant field .
-
8/6/2019 0 Intro Uph(New)
14/27
14
WORKPLACE COMPETENCY BASED
ASSESSMENT.
Emphasizing on what people need to do and to know
in their jobs
Indicating the standard of performance required in
the job by industry or enterprise.
ASSESSMENT PERFORMED BY PEERS (IAMPI).
-
8/6/2019 0 Intro Uph(New)
15/27
15
WHAT ARE THE BENEFITS OF
CERTIFICATION?
Monetary Reward?
More and More Work?
-
8/6/2019 0 Intro Uph(New)
16/27
16
1. Expansion and improvement of PM knowledge, experience
and personal attitude in managing projects.
2. Better control on project objectives.
3. Distinction of having a nationally acknowledged IAMPI
certificate of their qualification.
4. Impetus in moving ahead in their career path.
5. Increased networking with other PM professionals.
BENEFITS FOR PROJECT MANAGERS and
MEMBERS of the PROJECT MANAGEMENT TEAM.
(YOU & THE GANG . . .)
-
8/6/2019 0 Intro Uph(New)
17/27
17
BENEFITS FOR EMPLOYERS (YOUR BOSS . . . )
1. Improvement of personnels performance, guaranteeing
a competitive edge in the global market place.
2. Enhanced professionalism.
3. Assuring that project management competence andcompetitiveness is upgraded.
4. Better equipped to control and monitor all their projects
BIG or small.
5. Use of a common language.
-
8/6/2019 0 Intro Uph(New)
18/27
18
BENEFITS FOR EMPLOYERS (YOUR BOSS . . . )
1. Improvement of personnels performance, guaranteeing
a competitive edge in the global market place.
2. Enhanced professionalism.
3. Assuring that project management competence andcompetitiveness is upgraded.
4. Better equipped to control and monitor all their projects
BIG or small.
5. Use of a common language.
-
8/6/2019 0 Intro Uph(New)
19/27
19
1. Ensures the successful completion of a project.
2. Benchmarking of the Indonesian PM industry.
3. Ability to compete in the global market.
4. Responsibility to the Public.
5. Commitment to the Indonesian Construction Law
(UUJK no 18/ 1999 and PP no 28/ 2000).
CERTIFICATIONWILL FULFILL:
-
8/6/2019 0 Intro Uph(New)
20/27
20
1. Task Skills, the skill to do particular tasks.
2. Task Management Skills, to plan & organize a number of tasks.
3. Contingency Skills, to deal with irregularities, breakdowns and
problems with the work.
4. Role Environment Skills, to fit in with the workplace
environment.
5. Transfer Skills, to adjust and develop knowledge and skills to
suit new situations.
Competence Assessment Criteria
The Five Dimensions of Competence:
-
8/6/2019 0 Intro Uph(New)
21/27
21
* VALID, relates to the performance criteria.
* AUTHENTIC, is it own work? or group effort.
*CURRENT, for the l
ast 3- 5 ye
ars.
* CONSISTENT, at least 2 projects as reference.
* SUFFICIENT, enough to confirm competence.
Judging Evidence of Competence
Evidence documents to judge competence
should meet the following criteria:
-
8/6/2019 0 Intro Uph(New)
22/27
22
Mjr. Proyek
Utama
Mjr. Proyek
Madya
Ahli
Mjr. Proyek
(Muda)
Ahli
KonstrBerat &
Pek Sipil
Ahli
Industri
& Pabrik
Ahli
Arsitek-
tural &
Monu-
mental.
Ahli
Pengem
bangan
KimPras
Wil
Ahli
Teknologi
Informasi
& Telkom
Anggota IAMPIS1 + PENGALAMAN 3 THD3 + PENGALAMAN 6 TH
Idem Ahli M.P plus additional skill
(ketrampilan koordinasi & integrasi)
Idem M.P Madya plus additional skill(ketrampilan pengaturan strategis)
BIDANG
KEAHLIAN
(antara lain)
Persyaratan Mengikuti Sertifikasi
D
s
t
-
8/6/2019 0 Intro Uph(New)
23/27
23
Assessment for Ahli M.P Classification
Written test, 100 questions of the multiple choice type,
using the Indonesian language.
The questions relate to the understanding of the PMBOK
methodology, its application and real life experiences
on the workplace.
Time allocated for the test is 90 minutes.
Passing grade is 68 correct answers.
-
8/6/2019 0 Intro Uph(New)
24/27
24
Assessment for the M.P Madya and
M.P Utama cl
assific
ation.
Stage one: To take the written test for the Ahli M.P
classification. Only if one passes, then one is allowed
to proceed to Sta
ge Two. Stage Two: To participate in the assessment process
by means ofa personal interview with the appointed
IAMPI assessor. This interview will cover ones work
experience and is related to the nine knowledge areasof the PMBOK Guide.
Time for stage two can take up to several hours and
can be spread over several meetings.
-
8/6/2019 0 Intro Uph(New)
25/27
25
Sample Test Question:
You are about to take over a project from another project
manager and find out the following information about
the project. Task ZZ has an early start of day 15 and a
late start of day 20, task ZZ is a difficult task. SPI
(schedule performance index) is 1.1 and the CPI (costperformance index) is 0.8. There are eleven stakeholders
on the project. Based on this information, which of the
following would you be most concerned about?
(a) Float.
(b) Schedule.
(c) Cost.
(d) The number ofavailable resources.
-
8/6/2019 0 Intro Uph(New)
26/27
26
Road Map To
Project Management Maturity
Common
Language
CommonProcesses
Singular
Methodology
Benchmarking
Continuous
Improvement
Basic
Knowledge
Process
Definition
Process
Control
Process
Improvement
H. Kerzner
-
8/6/2019 0 Intro Uph(New)
27/27
27
RISET INDUSTRI
BODY OF KNOWLEDGE
STANDAR KOMPETENSI
PENDIDIKAN
SERTIFIKASI
Jenjang Sertifikasi