0 intro uph(new)

Upload: dodi-ardianto

Post on 08-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 0 Intro Uph(New)

    1/27

    1

    Tema:PROFESIONALISME & SERTIFIKASI

    UNTUK MANAJER PROYEK

    KERJA SAMAUNIVERSITAS PELITA HARAPAN

    &

    IKATAN AHLI MANAJEMEN PROYEK

    INDONESIA

    INTRODUKSI ATAS IMPLEMENTASI METODE

    PROJECT MANAGEMENTPADA BANGUNAN GEDUNG.

  • 8/6/2019 0 Intro Uph(New)

    2/27

    2

    Tom Peters dalam bukunya, Liberation Management (1992):

    "Almost all of tomorrow's work will be done inproject configurations...the professionalservice firm is the best possible model forfuture survival."

    Mungkin beliau terlalu membesarkan hal ini, namun

    terdapat cukup banyak bukti nyata bahwa manajemen

    proyek makin diakui sebagai suatu disiplin yang

    sangat penting, yang akan berkontribusi terhadapkesuksesan suatu organisasi baik dalam sektor

    pemerintah ataupun swasta.

  • 8/6/2019 0 Intro Uph(New)

    3/27

    3

    Advertisement inKOMPASJanuary 2006.

    PT Siemens Indonesia is looking for bright talented individuals to fill the following positions:PROCESS MANAGEMENT (Code: 205/0601)

    Responsibilities:

    Responsible for Siemens Process Framework, Process Management strategy, methodology,

    implementation, optimization and reporting

    Project management & controlling Supporting compliance and governance issues (ISO, SOA, Occupational, H&S, etc)

    Supporting Company initiative/program/special projects

    Roadmap & Communication plan

    Candidates should fulfill the following requirements:

    S1 degree majoring in IT related field 3 5 years working experience, handling similar function

    Good project management skills

    Sound knowledge of Business Process (CRM/SCM/PLM)

    Etc.

  • 8/6/2019 0 Intro Uph(New)

    4/27

    4

    3 PIHAK UTAMA DALAM INDUSTRI JASA KONSTRUKSI

    ISTILAH DALAM UNDANG2

    JASA KONSTRUKSI No 18/ 1999.

    PENGGUNA JASA

    PENYEDIA JASA

    PEMILIK:PEMBERI TUGAS

    EMPLOYER (Ing.)

    BOUWHEER (Bel.)

    KONTRAKTOR:PEMBORONG

    SELLER/ PENJUAL

    KONSULTAN:PERENCANA (Arsitek, Struktur, MEP)

    BIAYA (Quantity Surveyor)

    PENGAWASAN (CM, MK)

    INDUSTRI

    KONSTRUKSI

  • 8/6/2019 0 Intro Uph(New)

    5/27

    5

    HIGH SELLING PRICE

    PROFIT

    LOW PRODUCTION COST

    OWNERS MOTTO: BUY LOW SELL HIGH

  • 8/6/2019 0 Intro Uph(New)

    6/27

    6

    MASA PELAKSANAAN PROYEK

    TAHAPPRA KONSTRUKSITAHAP KONSTRUKSI

    1. AKTIVITAS DESIGN

    2. AKTIVITAS TENDER

    3. AKTIVITAS PELAKSANAAN

    4. AKTIVITAS SERAH TERIMA

    PROJECT LIFE CYCLE

    CM / MK

    PM

  • 8/6/2019 0 Intro Uph(New)

    7/27

    7

  • 8/6/2019 0 Intro Uph(New)

    8/27

    8

    ORGANISASI PROYEK (MULTI KONTRAKTOR)

    PEMILIK/ OWNER

    KONSULTAN QS KONSULTAN PM/ CM KONSULTAN A/E

    GENERAL CONTRACTOR( MAIN CONTRACTOR )SPECIALIST

    SUPPLIERS

    NOMINATEDSUB CONTRACTORS

    SANITAIR

    FURNITURE

    dsbDOMESTIC

    SUB CONTRACTORS

    SPECIALIST

    CONTRACTORS

    LIFTGENSET

    dsb

    INSTALASI MEP

    dsbCOMMAND

    CONTRACT

  • 8/6/2019 0 Intro Uph(New)

    9/27

    9

    C M

    BERARTI

    CONSTRUCTION MANAGEMENT

    . CONSTR SUPERVISION

    . QUALITY ASSURANCE

    MANAGEMENT OF

    - SCOPE CHANGES

    - DESIGN CHANGES

    - TIME CHANGES

    - VALUE ENGINEERING

    Bukan semata- mata Problem Solving saja, tetapi yangLebih penting adalah Problem Prevention, Pro-Active.

  • 8/6/2019 0 Intro Uph(New)

    10/27

    10

    Definisikan Proyek.

    Uraikan dalam elemen yg lebih kecil yg mudah di kontrol.

    Dapatkan sumberdaya yang tepat dan memadai.

    Susunlah tim proyek untuk melaksanakan pekerjaan.

    Rencanakan pelaksanaan pekerjaan dan alokasikan

    sumberdaya.

    Monitor dan kontrol pekerjaan.

    Laporkan kemajuan pekerjaan kepada

    pemilik (sponsor) proyek.

    Tutup proyek setelah rampung.

    Review untuk mendapatkan pelajaran

    (lesson learned).

    Tugas Seorang Manajer Proyek

  • 8/6/2019 0 Intro Uph(New)

    11/27

    11

    FAKTOR-FAKTOR PENUNJANG PROFESIONALISME

    SEORANG (PM) PROFESIONAL:

    1. MENGUASAI ILMU/ KOMPETENSI YANG UP-TO-DATE.

    2. BERTINDAK SESUAI KODE ETIK DARI ASOSIASINYA.

    (PERILAKU INDEPENDEN & BERINTEGRITAS TINGGI).

    3. MENDAPAT IMBALAN JASA YANG LAYAK SESUAI

    DENGAN TINGKATAN KOMPETENSINYA.

    4. MENDAPAT PENGAKUAN RESMI ATAS PROFESINYA.5. MENDAPAT PERLINDUNGAN TERHADAP TUNTUTAN

    ATAS HASIL KARYANYA.

  • 8/6/2019 0 Intro Uph(New)

    12/27

    12

    CERTIFICATION

    OF THE

    PROJECT MANAGEMENT

    PROFESSION IN INDONESIA

  • 8/6/2019 0 Intro Uph(New)

    13/27

    13

    What is CERTIFICATION?

    Certification is the assessment process to acquire

    recognition for the competence and skill classification and

    qualification in the relevant field .

  • 8/6/2019 0 Intro Uph(New)

    14/27

    14

    WORKPLACE COMPETENCY BASED

    ASSESSMENT.

    Emphasizing on what people need to do and to know

    in their jobs

    Indicating the standard of performance required in

    the job by industry or enterprise.

    ASSESSMENT PERFORMED BY PEERS (IAMPI).

  • 8/6/2019 0 Intro Uph(New)

    15/27

    15

    WHAT ARE THE BENEFITS OF

    CERTIFICATION?

    Monetary Reward?

    More and More Work?

  • 8/6/2019 0 Intro Uph(New)

    16/27

    16

    1. Expansion and improvement of PM knowledge, experience

    and personal attitude in managing projects.

    2. Better control on project objectives.

    3. Distinction of having a nationally acknowledged IAMPI

    certificate of their qualification.

    4. Impetus in moving ahead in their career path.

    5. Increased networking with other PM professionals.

    BENEFITS FOR PROJECT MANAGERS and

    MEMBERS of the PROJECT MANAGEMENT TEAM.

    (YOU & THE GANG . . .)

  • 8/6/2019 0 Intro Uph(New)

    17/27

    17

    BENEFITS FOR EMPLOYERS (YOUR BOSS . . . )

    1. Improvement of personnels performance, guaranteeing

    a competitive edge in the global market place.

    2. Enhanced professionalism.

    3. Assuring that project management competence andcompetitiveness is upgraded.

    4. Better equipped to control and monitor all their projects

    BIG or small.

    5. Use of a common language.

  • 8/6/2019 0 Intro Uph(New)

    18/27

    18

    BENEFITS FOR EMPLOYERS (YOUR BOSS . . . )

    1. Improvement of personnels performance, guaranteeing

    a competitive edge in the global market place.

    2. Enhanced professionalism.

    3. Assuring that project management competence andcompetitiveness is upgraded.

    4. Better equipped to control and monitor all their projects

    BIG or small.

    5. Use of a common language.

  • 8/6/2019 0 Intro Uph(New)

    19/27

    19

    1. Ensures the successful completion of a project.

    2. Benchmarking of the Indonesian PM industry.

    3. Ability to compete in the global market.

    4. Responsibility to the Public.

    5. Commitment to the Indonesian Construction Law

    (UUJK no 18/ 1999 and PP no 28/ 2000).

    CERTIFICATIONWILL FULFILL:

  • 8/6/2019 0 Intro Uph(New)

    20/27

    20

    1. Task Skills, the skill to do particular tasks.

    2. Task Management Skills, to plan & organize a number of tasks.

    3. Contingency Skills, to deal with irregularities, breakdowns and

    problems with the work.

    4. Role Environment Skills, to fit in with the workplace

    environment.

    5. Transfer Skills, to adjust and develop knowledge and skills to

    suit new situations.

    Competence Assessment Criteria

    The Five Dimensions of Competence:

  • 8/6/2019 0 Intro Uph(New)

    21/27

    21

    * VALID, relates to the performance criteria.

    * AUTHENTIC, is it own work? or group effort.

    *CURRENT, for the l

    ast 3- 5 ye

    ars.

    * CONSISTENT, at least 2 projects as reference.

    * SUFFICIENT, enough to confirm competence.

    Judging Evidence of Competence

    Evidence documents to judge competence

    should meet the following criteria:

  • 8/6/2019 0 Intro Uph(New)

    22/27

    22

    Mjr. Proyek

    Utama

    Mjr. Proyek

    Madya

    Ahli

    Mjr. Proyek

    (Muda)

    Ahli

    KonstrBerat &

    Pek Sipil

    Ahli

    Industri

    & Pabrik

    Ahli

    Arsitek-

    tural &

    Monu-

    mental.

    Ahli

    Pengem

    bangan

    KimPras

    Wil

    Ahli

    Teknologi

    Informasi

    & Telkom

    Anggota IAMPIS1 + PENGALAMAN 3 THD3 + PENGALAMAN 6 TH

    Idem Ahli M.P plus additional skill

    (ketrampilan koordinasi & integrasi)

    Idem M.P Madya plus additional skill(ketrampilan pengaturan strategis)

    BIDANG

    KEAHLIAN

    (antara lain)

    Persyaratan Mengikuti Sertifikasi

    D

    s

    t

  • 8/6/2019 0 Intro Uph(New)

    23/27

    23

    Assessment for Ahli M.P Classification

    Written test, 100 questions of the multiple choice type,

    using the Indonesian language.

    The questions relate to the understanding of the PMBOK

    methodology, its application and real life experiences

    on the workplace.

    Time allocated for the test is 90 minutes.

    Passing grade is 68 correct answers.

  • 8/6/2019 0 Intro Uph(New)

    24/27

    24

    Assessment for the M.P Madya and

    M.P Utama cl

    assific

    ation.

    Stage one: To take the written test for the Ahli M.P

    classification. Only if one passes, then one is allowed

    to proceed to Sta

    ge Two. Stage Two: To participate in the assessment process

    by means ofa personal interview with the appointed

    IAMPI assessor. This interview will cover ones work

    experience and is related to the nine knowledge areasof the PMBOK Guide.

    Time for stage two can take up to several hours and

    can be spread over several meetings.

  • 8/6/2019 0 Intro Uph(New)

    25/27

    25

    Sample Test Question:

    You are about to take over a project from another project

    manager and find out the following information about

    the project. Task ZZ has an early start of day 15 and a

    late start of day 20, task ZZ is a difficult task. SPI

    (schedule performance index) is 1.1 and the CPI (costperformance index) is 0.8. There are eleven stakeholders

    on the project. Based on this information, which of the

    following would you be most concerned about?

    (a) Float.

    (b) Schedule.

    (c) Cost.

    (d) The number ofavailable resources.

  • 8/6/2019 0 Intro Uph(New)

    26/27

    26

    Road Map To

    Project Management Maturity

    Common

    Language

    CommonProcesses

    Singular

    Methodology

    Benchmarking

    Continuous

    Improvement

    Basic

    Knowledge

    Process

    Definition

    Process

    Control

    Process

    Improvement

    H. Kerzner

  • 8/6/2019 0 Intro Uph(New)

    27/27

    27

    RISET INDUSTRI

    BODY OF KNOWLEDGE

    STANDAR KOMPETENSI

    PENDIDIKAN

    SERTIFIKASI

    Jenjang Sertifikasi