wetlands at fairview park · pdf fileinflatable rubber dam temporarily holds water. water...

1
Victoria Ave. Placentia Ave. V Wilson St. Adams Ave. Fairview Park Talbert Nature Preserve Estancia High School S an t a Ana River Costa Mesa Golf Course PROJECT LOCATION Talbert Nature Preserve COSTA MESA Graphic by SCOTT BROWN / Courtesy of Orange County Register FAIRVIEW CHANNEL PLACENTIA AVE. RIPARIAN HABITAT PARK Source: City of Costa Mesa Senior Engineer BALTAZAR MEJIA Note: Drawing is meant as representational, not exact depiction Future boardwalk POND A POND B POND C POND D POND E POND F Channels connecting ponds Plant-filter zones in each pond California Bullrush (Scirpus californicus) Cattails (Typha latifolia and Typha domingensis) Wetland plants break down the compounds, such as fertilizer or oil, into elements that the plants can use. For example, fertilizer is turned into proteins that plants use to build tissue and grow. POND D PROFILE GOING WITH THE FLOW 12-foot-wide multipurpose path connects to river trail Viewing platforms Water flow EXAMPLES OF PLANTS IN POND Trails COASTAL SCRUB HABITAT Untreated water enters. Water exits in channel to next pond. Ultraviolet rays hitting the water’s surface will kill bacteria. Plants absorb pollutants, convert to gases and release into air. Boardwalk is in planning and approval stages. It’s likely to be built in 2014. Water percolates down, replenishing the ground water supply. Water is diverted from the Greenville-Banning Channel that runs along side the Santa Ana River. Here is the path it will take: Up to 5 feet deep About 2 feet deep Concrete berm creates shallow end. Wetland plants grow in the shallow end only. The rest of the pond is open water. A system of ponds connected by channels filters runoff water so that it does not need to be sent to the Orange County Sanitation District’s plant. Besides helping to replenish ground water, the system creates a scenic wetlands and vibrant riparian habitat. Wetlands at Fairview Park Greenville- Banning Channel Inflatable rubber dam temporarily holds water. Water diverted to well room. Pump moves 500 gallons per minute up to Pond A. POND A POND B POND C POND D POND E POND F Gravity forces water to flow from pond to pond. At Pond F, a gauge determines if the pond system is full. If so, the meter sends an electronic signal to the pump to stop or reduce the flow. Mosquito fish added to control insects. Overflow pond used to monitor water level of system. Meter Dam 1 2 3 4 5 PLAC h Map area

Upload: ngothuan

Post on 17-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Wetlands at Fairview Park · PDF fileInflatable rubber dam temporarily holds water. Water diverted to well room. Pump moves 500 gallons per minute up to Pond A. POND B POND A POND

Victoria Ave.

Placentia Ave.

Mesa Verde Dr.

Wilson St.

Adams Ave.

Fairview Park

Talbert Nature

Preserve

EstanciaHigh SchoolS

anta

Ana

Riv

er

Costa MesaGolf

Course

PROJECT LOCATION

Talbert Nature

Preserve

COSTA MESA

Graphic by SCOTT BROWN / Courtesy of Orange County Register

F A I R V I E W C H A N N E L

PL

AC

EN

TIA

AV

E.

R I P A R I A N H A B I T A T

PA R K

Source: City of Costa Mesa Senior Engineer BALTAZAR MEJIA

Note: Drawing is meant as representational, not exact depiction

Future boardwalk

POND A

POND B

POND CPOND D

POND E

POND F

Channels connecting ponds

Plant-filter zones in each pond

California Bullrush (Scirpus californicus)

Cattails (Typha latifolia and Typha domingensis)

Wetland plants break down the compounds, such as fertilizer or oil, into elements that the plants can use. For example, fertilizer is turned into proteins that plants use to build tissue and grow.

POND D PROFILE

GOING WITH THE FLOW

12-foot-wide multipurpose path connects to river trail

Viewingplatforms

Waterflow

EXAMPLES OF PLANTS IN POND

Trails

C O A S T A LS C R U B

H A B I T AT

Untreated water enters.

Water exits in channel to next pond.

Ultraviolet rays hitting the water’s surface will kill bacteria.

Plants absorb pollutants, convert to gases and release into air.

Boardwalk is in planning and approval stages. It’s likely to be built in 2014.

Water percolates down, replenishing the ground water supply.

Water is diverted from the Greenville-Banning Channel that runs along side the Santa Ana

River. Here is the path it will take:

Up to 5 feet deep

About 2 feet deep

Concrete berm creates shallow end.

Wetland plants grow in the shallow end only. The rest of the pond is open water.

A system of ponds connected by channels filters runoff water so that it does not need to be sent to the Orange County Sanitation District’s plant. Besides helping to replenish ground water, the system creates a scenic wetlands and vibrant riparian habitat.

Wetlands at Fairview Park

Greenville-BanningChannel

Inflatable rubber dam temporarily holds water.

Water diverted to well room.

Pump moves 500 gallons per minute up to Pond A.

POND APOND BPOND CPOND D

POND EPOND F

Gravity forces water to flow from pond to pond.

At Pond F, a gauge determines if the pond system is full. If so, the meter sends an electronic signal to the pump to stop or reduce the flow.

Mosquito fish added to control insects.

Overflow pond used to monitor water level of system.

Meter

Dam

1

2

345

San

ta A

na R

iverP

LA

CE

NT

IA A

VE

.

A system of ponds connected by channels filters runoff water so that it does not need to be sent to the Orange County Sanitation District’s plant. Besides helping to replenish ground water, the system creates a scenic wetlands and vibrant riparian habitat.

Map area