Page 1: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBK DESIGN OPTION Guidelines

Page 2: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

Authors : Heini Müller, Prabin Chhetri, Tobias Müller Editors : Karl Wehrle, Urs Hagnauer Proofreader : Madeleine Cannon Illustrations :PrabinChhetri,KesharJoshiLayoutandgraphics :KiirtistudioFirstedition :September2013Contact :SkatFoundation([email protected])

ISBN978-3-908156-49-9Copyrights©Skat,2013

ThisdocumentisnotintendedtobeaconstructionguideandentrepreneurswhoconsiderconstructingaVSBKarestronglyadvisedtocontactanexperiencedlocalorregionalVSBKexpert/consultant.

VSBK Design Option Guidelines

Page 3: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ iii

Acknowledgements v

Background vi

Purpose of this documentation vi

Potentials and limits of this documentation vii

Feedback and up-grading of this documentation vii

Overview of VSBK viii

01 Foundation 1

02 Unloading mechanism support unit 3

03 Trolley guide 5

04 Brick corbelling 7

05 Brick support I-beams 9

06 Girder system 11

07 Arch/slab 13

08 Shaft 16

09 Cavity between shaft and shaft support structure 19

10 Shaft support wall 21

Contents

Page 4: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

iv / VSBKDeSIgNOPTIONgUIDeLINeS

11 Kiln insulation boxes 23

12 Peep-hole pipes 25

13 Outer kiln wall structure 26

14 Working platform 29

15 Flue-ducts 31

16 Shaft top structure 33

17 Emission exhaust system 34

18 Flue gas dampers/valves 36

19 Shaft lid 38

20 Unloading bars 40

21 Unloading trolley 42

22 Brick unloading system 43

23 Access to the working platform 45

24 Roof 48

Page 5: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ v

TheVerticalShaftBrickKiln(VSBK)developmentprocessdocumentationstartedduringitsappliedResearch&Developmentstagein1997andreachedafirstimportantmilestoneinthelegendary“BrickbyBrick-TheHerculeanTaskofCleaninguptheAsianBrickIndustry"in2008.Yettheactualconstructiondevelopmentprocesshasbeencontinuedsince.Inparticularthe“South–South”VSBKtechnologytransfertoSouthAfricaliftedtheVSBKtechnologysignificantly.AdditionalconstructionoptionshavebeenrealizedthatpromotetheVSBKtechnology as a globally recognized clean brickproductionsystem.However,theresultofthisprocesshasuntilnowneverbeensystematicallydocumentedandupdated.

SkatwouldliketoexpressitssincereappreciationtoSwissDevelopmentCooperation(SDC)foritscontinuedsupporttothedevelopmentoftheVSBKtechnologyanditsadaptiontospecificlocalcontexts.Withoutthispersistentcommitmentandtrust into the involved partners over a period ofmorethanadecadethedevelopmentoftheVSBKtechnologyasatechnicalandeconomicalviableenvironmentfriendlyalternativetotraditionalbrickproductionsystemswouldnothavebeenpossible.

SkatlikestoexpresssincerethankstothepilotingentrepreneursfromvariouscountrieswhomadetheVSBKtechnologylearninganddevelopmentpossible.OnlythroughthespiritofVSBKpioneers,whowereandarepreparedtopracticallytestnewapproachesandatthesametimetakesomerisks,theVSBKtechnologycouldbeexposedandtestedinthepracticalbusinessenvironment.

Skatisalsoverygratefultoallpartnerorganizationsandindividualprofessionalsfromvariouscountries,whoeachintheirownwaycontributedtowardsimportant“puzzles”inordertoup-gradeandperfecttheVSBKtechnology.TheymadeaSouth-Southtechnologytransferpossible.

Specialthankstoallthosewhocontributedtothedevelopmentandcompilationofthisdocumentation,inparticulartotheeuropeanexpertsinenergy&environment,kilnconstructionandceramics,Mr.MaxMüller,germany,Mr.HansSchmid,Switzerland,Mr.ekhardRimpel,germany,andMr.AloisMüller,Switzerland,aswellastoMr.UrsHagnauer,formerVSBKProjectManager,Nepal.

LastbutnotleastSkat,asthepartnerinchargeforthetechnologytransfertoSouthAfricawouldalsoliketoacknowledgetheVSBKProjectinSouthAfricawhichfinancedthedevelopmentandpublicationofthisdocumentaswellasourconsortiapartner,Swisscontact,whofacilitatedtheprojectimplementation.

Karl WehrleSkatConsultancy

Acknowledgements

Page 6: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

vi / VSBKDeSIgNOPTIONgUIDeLINeS

ThispublicationispartoftheongoingeffortsoftheVSBKtechnologytransferprocessfromAsiatoSouthAfrica.ItispartofthetasksentrustedtoSkatinanoverallprocessofknowledgetransfer.ThefocusofthispublicationareboththemaindesignoptionsaswellasconstructionelementsoftheVerticalShaftBrickKiln.TheVSBKisthemostenergyefficientcoalfiredclaybrickproductiontechnology.eversinceSDCsupportedthesystematicVSBKtechnologytransferfromChinatoIndiain1996alotoflocalandinternationalVSBKworkingexperiencehasbeenaccumulated.Initsquesttocontributetocleanerclaybrickfiringsystems,andtherebytoacleanerenvironment,SDCalsosupportedtheVSBKtechnologytransfertoNepal,Vietnam,Afghanistan,Pakistanandsince2009toSouthAfrica.

IntheVSBKtechnologytransfertotheabovementionedcountries,excepttoVietnam,SkatConsultancyistheonlyinternationalorganisationthathasbeenaconstantpartnertoSDC’senvironmentalendeavoursince1996.ThisprofessionaltrustwascontinuallyacknowledgedbySkatConsultancywithitsprincipleworkingstrategy;tolocallyanchorthe

VSBKtechnologyandtherebybuildinglocalVSBKexpertswhileatthesametimecreatingandoverseeinganinternationalnetworkofexpertsandspecialiststosustaintheVSBKtechnologyaswellasitsconstantimprovements,documentationandinternationaldissemination,thereforemakingbestuseoftheinvestmentsmadebySDCandallotherpartners.

TheVSBKtechnologyisnotpatented.Sinceitscommercial,environmentalandsocialdevelopmentwasfinancedbySDCthistechnologyisconsideredan“opensource”technology.Theresultsof17yearsofVSBKdesign/constructionexperienceandknowledgefromallstagesofthevariousVSBKtechnologytransfershavebeencollectedandcompiledas“VSBK Design Option Guidelines”.

ThisdocumentationistheresultofprofessionalinvolvementofexperiencedeuropeanbrickkilnexpertswithglobalVSBKtechnologyexpertsandlocalpractitioners/entrepreneurs.Hencethisdocumentationconsidersboth;thecurrentstate-of-artbrickkilnknow-howateuropeanlevelaswellasgloballyappliedpracticalandtechnicaloptions.

However,latestadaptationstolocalcontextsbylocalexpertsinSouthAfricacouldnotbeincludedinthisdocumentsincetheyarebeingclaimedasintellectualproperty.Dependingoninteresttheymaybemadeavailablethroughaconsultancycontract.

Purpose of this documentation

ThroughtheSDCsupported“South–South"VSBKtechnologytransfertoSouthAfricanewthinking,newviews,newexpertsandtherebynewpotentialswereleadingtoadditionalconstructionoptions.AwarenessoftheuniqueenergyandenvironmentaladvantagesoftheVSBKtechnologyisrapidlybeingdisseminatedatagloballevel.Withthisdocument,expertsnotonlyinSouthAfrica but also at global level are enabled tomakeaneducateddecisionofhowtoadapttheVSBKtechnologyandthereforecontributetowardsanincreasedglobalVSBKdemandwhileatthesametimereducingthegreenhousegasemissionfromapollutingindustrialsector.

ThepurposeofthisdocumentationistoprovideageneraloverviewofdifferentVSBKconstructionoptionsandmakesitclearthatthereisno'One-size-fits-all'.For

Background

Page 7: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ vii

aprofitableVSBKbusinessexperiencedprofessionalsshouldbeinvolvedwhoassesstheappropriatenessofagivenoptiontoagivensituationandthisdocumentaimstobeavaluableresourcefordecisionmakers.

Potentials and limits of this documentation

VSBKconstructionoptionsarealwayslinkedto,andwiththepurposeof,brickfiringanditsrelatedeconomics.AlthoughnumerousVSBKconstructionoptionsaregloballyimplementedbyvariousorganizations,expertsandentrepreneurs,theauthorsutilizedatwo-shaftVSBKdesignasreferenceandpurposefullylimitedthenumberofpossibleconstructionoptionsinthisdocumentinordertofocusonprovenpracticalandeconomicalpractices.Forindividualswithlimitedaccesstohightechsolutionsandhighup-frontfinancialinvestment,forwhateverreasons,currentindustrialized'stateoftheart'kilnconstructionmaterialsandtechniquesneedtobedownscaledintopracticalsolutions.Thisdocumentationnotonlyshowspracticaloptionsbutalsopresentspotentialfutureoptionsthatwillrequirelocalfine-tuningforviablefinaladaptiontothelocalcontext.ItwouldbewayoutofthescopeofthisdocumenttoexplainthedetailedaspectsoftheVSBKconstruction.Thisdocumenttries

toprovidebasicrationalesandexplanationswheredeemedessential.Itissometimesdifficulttopreciselyandappropriatelyprovidesketchesandexplanationstofullycomprehenddetailedconstructiondrawingsofdifferentoptions.Theycanbemadeavailable through a consultancy contract withanyoftheVSBKtechnologyserviceproviders.

ThisdocumentisnotintendedtobeaconstructionguideandentrepreneurswhoconsiderconstructingaVSBKarestronglyadvised to contact an experienced local or regionalVSBKexpert/consultant.

Feedback and up-grading of this documentation

AnyfeedbackandadditionalexperiencesregardingthevarioustechnicaloptionsismostwelcomedandcanbedirectedtoSkatFoundation([email protected]).SkatFoundation,alongwiththerespectiveexpertsandauthors,willaccordinglysecurefutureup-datestothisdocumentandmakethecollectedinformationavailabletoabroaderaudience,withreferencetothesourceofinformation.

Page 8: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

viii / VSBKDeSIgNOPTIONgUIDeLINeS

01 Foundation

02 Unloading mechanism support unit

03 Trolley guide

04 Brick corbelling

05 Brick support I-beams

06 Girder system

07 Arch/slab

08 Shaft

09 Cavity between shaft and shaft support structure

10 Shaft support wall

11 Kiln insulation boxes

12 Peep-hole pipes

13 Outer kiln wall structure

14 Working platform

15 Flue ducts

16 Shaft top structure

17 Emission exhaust system

18 Flue gas dampers/valves

19 Shaft lid

20 Unloading bars

21 Unloading trolley

22 Brick unloading system

23 Access to the working platform

24 Roof

Overview of VSBK

03

20

0405

10

11

1619

17

01

2221

06

08

13

07

09

12

1518

14

24

23

02

Page 9: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 1

OPTION 1 : R.C.C. raft foundation(Suitablefornon-cohesivesoils)

Advantages

• equalloaddistributiononanytypeofnaturalgrownsoil

• employedworkingpersonnelcanworkonacleanandsafeplatform

• groundwaterpenetrationcanbeminimized

Disadvantages & Limits

• expensiveconstructionoptionduetotheuseofmassconcreteandreinforcementsteel

FunctionThefoundationisthepartoftheVSBKthatisindirectcontactwiththegroundandthroughwhichstructuralloads,includingtheweightofgreenbricks,coalstorageandmovementsarebeingtransferred.

Design principlesAuniversalfoundationdesignforalltypesofgroundistechnicallyandeconomicallynotfeasiblesincekeyparametersvaryaccordingtothelocalsituationandcontext.Therefore,thefoundationhastobeprofessionally designed, case by case and according tolocalcontexts.

AVSBKshouldneverbeconstructedonback-filledsoilorlandslide-proneareas.Specialdesignprecautionsmustbetakenforareashavingahighgroundwatertableorearthquakeexperience.

01 FOuNDATION

Page 10: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

2 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 3 : Pillar foundation(Suitableforbothcohesiveandnon-cohesivesoils)

Advantages

• SuitableoptionforaframestructureVSBKconstruction

Disadvantages & Limits

• Generally requires horizontal concretetie-beamconnection

• Considerableamountsofshutteringmaterialisrequired

• Dependingontherequireddepthofthepillarsarelativelyexpensiveconstructionmethod

• Demandinginskill(preciseness)andsupervision

OPTION 2 : Brick footing(Suitableforcohesivesoils)

Advantages

• ABrickentrepreneurcanusehis/herownbricksforthisfoundationoptionandcanthereforeoptimizeexpenses

Disadvantages & Limits

• Notapplicableforalltypesofgrounds and especially not an optimaloptionincasesofhighgroundwatertable

• Requiresgoodbrickquality

01 FOuNDATION

Page 11: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 3

02 uNlOADING mEChANISm SuPPORT uNIT

OPTION 1 : m.S. I-beamsNote:M.S.I-beamsareinstalledperpendiculartothearchwallsinordertotransfertheloadofthebrickssettinginsidetheshafttothekilnfoundation.

Advantages

• economicaloptionduetotheutilisationofthearchwallfoundations

• Canaccommodatebothhydraulicandmanualunloadingmechanisms

Disadvantages & Limits

• Foreignmaterialcouldfallintothepitstructurewhichcouldcreatecomplicationsforunloading procedures and are likelydifficulttoclean

• Inareasofhighwatertable,awatertightpitstructureshould be ensured in order to avoidwatercontactwiththeunloadingmechanism

FunctionTheunloadingmechanismsupportunitaccommodatestheheightofthehydraulicpistonorscrew,protectstheunloadingmechanismfrompotentiallybeingblockedduringoperationandbearstheloadoftheentirebricksettinginsidetheshaftduringunloadingprocedures.

Design principlesTheunloadingmechanismsupportunitmustbeartheentirebricksettingloadanditsunloadingsysteminsuchawaythatnostructuralsettings/damageswillhindertheunloadingoperation.

Therelatedpitshouldbeprotectedfromthenearbyfilledsoilandgroundwatersothattheunloadingmechanismcanmovefreely.

Page 12: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

4 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : R.C.C. load bearing unitNote:Thisunitisseparatedfromthekilnstructure.Itbearstheentireloadofthebricksettinginsidetheshaftonitsownfoundation.

Advantages

• Pitstructureismaintenancefriendly

Disadvantages & Limits

• Doesnotutilisethearchwallfoundationforsupport,itsconstructionrequiresheavyduty concrete and steel reinforcementandisthereforeconsidered expensive

• Onlyfeasibleongroundwithsufficientbearingcapacity

02 uNlOADING mEChANISm SuPPORT uNIT

Page 13: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 5

OPTION 1 : Recessed mS C-channels

Advantages

• Lowwear&tearofthemasonrywallsduringunloading

• Correctpositioningoftrolleysbelowtheshaftisensured

• Trolleysandtheunloadedfiredbricksarepreventedfrombecomingwedgedbetweentheshaftsupportingwallsduring unloading procedures

Disadvantages & Limits

• Wall corbellings are required near ground level, hence the wallconstructionbecomesmorelabourintensiveandtherefore costly

FunctionThetrolleyguideassistsincorrectlypositioningthetrolleyforunloadingproceduresand,whentheunloadingtrolleyiscorrectlypositioned,actsasasafety feature to prevent unevenly loaded trolleys fromtoppling.

Design principlesThetrolleyguidesaremadewithMSC-Channelsandareproperlyanchoredintothearchwalls.

03 TROllEy GuIDE

Page 14: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

6 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 1: Screwed-on guides

Advantages

• Lowconstructioncost• Simplifiedtrolleylockshencenomovableparts

• easymaintenance

Disadvantages & Limits

• None

OPTION 2 : Protruded m.S. C-channels

Advantages

• Wallbrickcorbellingisnot required, hence the constructionbecomeslesstimeconsumingandthereforeless costly

Disadvantages & Limits

• Chancesofinjuriesduringunloading procedures

03 TROllEy GuIDE

Page 15: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 7

OPTION 1 : Two arch wall corbellings(1stand2nd ,oneachsideofthearchsupportingwalls)

Advantages

• Reducedriskoffiredbrickstumblingfromtheunloadingtrolley

• Lesswear&tearduetoM.S.C-Channeltrolleyguidesconstructedflushwiththearchwallsupportmasonry

Disadvantages & Limits

• Archsidewallbrickcorbellingconstructionbecomestimeconsumingandthereforecostly

• Could hinder pulling out the trolleyduetothesmallgapof3cmbetweenthewallandthetrolleyduringemergencyunloading

FunctionThebrickcorbellingsincreasethearchwalldistanceforunhinderedunloadingofthefiredbricksandmovementofthetrolley

Design principlesThebrickcorbellingofagivenbrickcourseshouldideallynotexceed3cm.

Wallcorbellingscanbemade,butasamatteroffact,areoptionaldependingonthequalityofgreenbricks,firingandoperationpractices.

Sincethearchmasonrywallsdistanceandtheshaftsizehavedifferentmeasurementstherefractoryshaftcorbellingisadvisabletoavoiddamagesduringoperation.

04 BRICK CORBEllING

Page 16: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

8 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : Corbelling at refractory brick shaft level

Advantages

• Easy to pull and push the trolley due to increased side space

• Constructionofthearchsidewallsislesstimeconsumingand therefore less costly

• Moreeconomicalbecausetheshaftsupportingcorbellinglayercanbeconstructedjustbeforethefirstrefractorybricklayeroftheshaft

Disadvantages & Limits

• ProtrudedM.S.C-channeltrolleyguides(see3,option2)mustbefixedotherwisethetrolleyguidelockbecomestoolongwhichcouldbedifficultduring unloading

• Increasedriskoffiredbrickstumblingfromtheunloadingtrolley due to increased side space

04 BRICK CORBEllING

Page 17: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 9

OPTION 1 : Brick support beam positioned for unloading 6 layers of bricks

Advantages

• Higher unloading capacity, also duringemergencysituations

• Reducedworkloadforpersonnel during regular operationsincelessunloadingproceduresareperformedforthesamenumberofbricksbeing unloaded

• Friendlyworkingenvironmentdue to less heat exposure

• Increasedcoolingdownratepossibility

Disadvantages & Limits

• Thedimensionsoftheunloadingscrew/hydraulicpiston increases due to the increasedliftheight

FunctionThebricksupportI-beamistherestingplaceforunloadingbarsandthegirdersystemduringoperation.Betweenunloadingproceduresthebeamsupportstheentirebricksettingloadinsidetheshaftandtransfersittothearchsupportingwall.

Design principlesThebricksupportI-beamsmustbedesignedtocarrytheentirebricksettingwithintheshaft.

Thetemperatureattheunloadingplacecanattimesbeashighas400°C,whichneedstobeconsideredwhenestimatingtheI-beamdimensions.TheI-beamsshouldbecompletelystraight,neverevenslightlytwistedorbentandmustbepositionedparalleltoeachother.

05 BRICK SuPPORT I-BEAmS

Page 18: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

10 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : Brick support I-beam positioned for unloading 4 layers of bricks (including a lower arch and reduced overall kiln height)

Advantages

• Duetothedecreasedliftheightthedimensionsoftheunloadingscrew/hydraulicpiston decreases

• Decreasesoverallconstructioncostsduetothereducedkilnheight

Disadvantages & Limits

• Unloadingdifficultiesduringemergencysituations;hencean experienced & disciplined workingcrewisrequired

• Increasedworkloadforpersonnel during regular operationsincemoreunloading procedures are performedforthesamenumberofbricksbeingunloaded

• Increased heat exposure to workingpersonnel

05 BRICK SuPPORT I-BEAmS

Page 19: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 11

OPTION 1 : Girder system with side locks

Advantages

• Noelectricityrequired• Lessupliftmovementofscrew/hydraulicpistonandthereforeeasierforworkingpersonnel

Disadvantages & Limits

• Girder rail prone to bending duetoheatradiationandconstant load

• Increasesconstructiontimeduetofixingofalltherelatedmetalparts

FunctionAfterthetrolleyissecurelypositionedbeneaththefiredbricks,thegirdersystemfacilitatesthereleaseof the unloading bars and hence the load of the entirebricksettingistransferredtothetrolleyandtheunloadingsystem.

Design principlesThegirdersystemneedstobedesignedinawaythatitisabletocarrytheentirebrickload.Further,ithasbeensuredthatthereleasemechanismcannotbetriggeredaccidently(orunintentionally)andthebrickloadcanbetransferredontothetrolleywithoutpotentiallyinjuringworkingpersonnelwhenreleasingthesystem.

Whenahydraulicunloadingsystemisinplacethewholegirdersystemisnotrequired.

06 GIRDER SySTEm

Page 20: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

12 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : Girder system with wedge locks(MSsquarerod/wedge)

Advantages

• Costeffective• Noelectricityrequired• Lessupliftmovementofscrew/hydraulicpistonandthereforeeasierforworkingpersonnel

Disadvantages & Limits

• None

06 GIRDER SySTEm

Page 21: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 13

OPTION 1 : Arch constructed with brick

Advantages

• Locallyavailablebrickscanbe used, therefore reduced constructioncosts

Disadvantages & Limits

• Requiresanarchmould• Archconstructionwillincreasetheoverallkilnconstructiontime

FunctionThearch/slabstructureensuressafeaccesstounloadthefiredbricks.Italsodistributestheloadsofabovebuildstructuralandnon-structuralloadsintoitssupportingwalls.Further,airentering through this access opening is aiding boththecombustionandthebrickcoolingprocess.

Design principlesDifferentArchtypescanbedesigned.

Concretebeamsandarches;insituorprefabricated;areviablealternativestobrickarches.Afewofthemareshownasoptionsinthisdocument.

Beingarch,beamorslab,thefundamentaldesign criteria is that the structure is safely bearingtheloadplacedontopofit.Concretebased structures should not be exposed to temperaturesabove300°C.

07 ARCh/SlAB

Page 22: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

14 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : In situ R.C.C. beam and slab

Advantages

• Savesonoverallnumberoffiredbricksforthekilnconstruction

• Noarchconstructionskillrequired

Disadvantages & Limits

• Requiresshutteringmaterial• Willincreasetheoverallkilnconstructiontime

• Willlikelygetsomedamageincaseofhightemperatureexposure(e.g.brickmeltinginsidetheshaft)

FuTuRE OPTION 1 : Precast R.C.C. beams with 1 layer of front bricks attached as insulation and protection

Advantages

• Reducesoverallkilnconstructiontimeincasethepre-fabricationisdoneinfactories

Disadvantages & Limits

• Requiresamechanicalliftingdevice to place it

• Forachievingeconomicaladvantagesalargenumberofshaftsneedtobeconstructed

07 ARCh/SlAB

Page 23: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 15

FuTuRE OPTION 2 : Precast R.C.C. arch with 1 layer of front bricks attached

Advantages

• Reducesoverallkilnconstructiontimeincasethepre-fabricationisdoneinfactories

Disadvantages & Limits

• Requiresamechanicalliftingdevice to place it

• Forachievingeconomicaladvantagesalargenumberofshaftsneedtobeconstructed

07 ARCh/SlAB

Page 24: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

16 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : English bond refractory masonry without expansion joints

Advantages

• Uniformexpansionandcontractionproperties

• Uniformthermalmassproperties

Disadvantages & Limits

• Specialmasonryskillsrequired• expansionwilldevelopuncontrolledmasonrycracks

FunctionTheshaftisthecoreelementofthekilnandhastoaccommodatethefiringofthebricksaspertheappropriatefirescheduleaswellastoprovideresistancetomechanicalwearandtearfromverticalmovementoftheloadedbricks.

Design principlesTheshaftdimensionmustbedesignedaccordingtothedrygreenbricksizeandmaximumproductioncapacity.

Further,thefollowingdesigncriteriashouldbeconsideredtoallowfortrouble-freebrickfiring:

• Heatresistanceoftheshaftwallingmaterialinthecentralfiringzoneupto1200°C

• Acidicemissionresistanceinthepre-heatingzone• Structuralexpansionproperties• Perfectverticality• Selfsupportingstructure

08 ShAFT

Page 25: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 17

FuTuRE OPTION 1 : English bond refractory brick masonry with expansion joints

Advantages

• Uniformexpansionandcontractionproperties

• Uniformthermalmassproperties

• Controlledexpansionwillavoiduncontrolledmasonrycracks,hencelowermaintenance

Disadvantages & Limits

• Specialmasonryskillsarerequiredandtheconstructionsystemistimeconsuming,therefore costly

• Requiresspecialbrickblocksorcuttings

• Specialcornersupportessentialtoensureexpansionatdefinedjoints

OPTION 2 : English bond refractory masonry; substituted with fired bricks in sections with temperatures below 500°C (pre-heating and cooling zone)

Advantages

• Mosteconomicaloptionundertheconditionthatthefiringzoneisalwaysmaintainedatthecentreoftheshaft

Disadvantages & Limits

• Chancesofshaftdamagesifthefirepositionisnotproperlymaintainedatthecentreoftheshaft

• Firepositionadjustmentislimitedtorefractorymasonryarea

• Potentialdamagestofiredbrickmasonryinthepre-heatingzoneduetoacidicemissions

08 ShAFT

<500oC

>500oC

<500oC

Page 26: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

18 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 2 : Prefabricated fire resistance refractory concrete elementsNote:Thispossiblefutureoptionrequiresprofessionaloverallkilnconstructionplanningandpracticaldetaildesigns.

Advantages

• Reducedshaftconstructiontime

• Theshapeoftheelementcanbebothverticalorhorizontal

Disadvantages & Limits

• Requiresamechanicalliftingdevice to place it

• Skilltomaintainthetotalverticalityoftheshaftisrequired

• Fire resistant refractory concrete is considered expensive

• Will develop uncontrolled cracksifnoexpansionjointsare provided

08 ShAFT

Page 27: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 19

OPTION 1 : unfilled cavity (2-3 cm approx.)

Advantages

• Basicallynoexpenses(Howevertoensureanequalcavity size it is of advantage toplacealowcostthermocolboard.Thisthermocolboardwillmeltassoonasthekilnisinoperationandauniformcavitywillremain)

Disadvantages & Limits

• Someheatlossduetoairmovement,hencereducedinsulationvalue

• Riskofmortarandothermaterialfillingupthecavityifnot carefully protected during construction

• Increased heat exposure at the shafttoparea

FunctionThe cavity is required to ensure structurally independentexpansionandcontractionoftheshaftstructure.

Design principlesThemainprinciplefordesigningthiscavitiyistoensurethestructuralintegrityoftheshaft.

Thetopandbottomofthiscavityshouldbeclosedwithaflexiblematerialafterthekilnisfullydriedoutinordertoavoidheatloss.

09CAVITy BETwEEN ShAFT AND ShAFT SuPPORT STRuCTuRE

Page 28: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

20 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 1 : Filled cavity(Stonewoolorglasswoolinsulationblanket/board)

Advantages

• Costbenefitfactorisgood

Disadvantages & Limits

• Riskofsaggingwhenfixinginsulationblanketstoaverticalsurface

OPTION 2 : Filled cavitiy (Calciumsilicateboard)

Advantages

• Easy to install since they are availableasselfsupportingboards

Disadvantages & Limits

• Damagepotentialifexposedtocontactwithwater

• Couldbeacostlyoptiondepending on selected materialquality

09CAVITy BETwEEN ShAFT AND ShAFT SuPPORT STRuCTuRE

Page 29: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 21

OPTION 1 : English bond brick masonry in mud mortar

Advantages

• Lowconstructioncost• Provides reasonable stability forchimneysystem

Disadvantages & Limits

• Chancesofwallsaggingduetomudmortarshrinkage

FunctionTheshaft-supportwallensurestheindependentworking(expansion/contraction)oftheshaft,reduceslateralpressureandactsasaninsulationlayer.Thechimneysareusuallyconstructedontopoftheshaftsupportingwall.

Design principlesTherearemanyshaftsupportwallconstructionsystemspossible,alldependingoneconomicalinsulatingbuildingmaterials.

Note:Usinga'K-value'calculatorforselectingthesizeofthemosteconomicalinsulationmaterial/structureisrecommended.

Note:Ifashaftisconstructedwithexpansionjoints,theshaftcornersmustbesupportedtoensurecorrectexpansiondirection.(see8,futureoption1)

10 ShAFT SuPPORT wAll

Page 30: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

22 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 1 : Vermiculite concreteNote:Vermiculitecanalsobeusedasinsulationmaterialbetweenbothstructures;theshaftandthesupportingwall.Note:Itisnecessarytoconsultprofessionalswhoareexperiencedinpracticalapplicationofvermiculiteconcretetechnologyforakilnconstruction.

Advantages

• Lowthermalconductivitymaterial,hencegoodinsulation

• Can be precast or constructed in-situ

• Doesnotrequireanyfurtherinsulationorstructure,exceptaprotectionlayer,e.gsteel

• Thekilnsizecanbereduced,hencematerialandlabourcostcan be reduced

Disadvantages & Limits

• Isanexpensiveinsulationmaterial

• Vermiculiteconcretehasreduced load bearing capacity

FuTuRE OPTION 2 : Insulation bricks walls

Advantages

• Potentialofslimkilnstructureandcostreduction.

Disadvantages & Limits

• Insulationbricksareexpensive• Insulationbrickshavereduced

load bearing capacity

10 ShAFT SuPPORT wAll

Page 31: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 23

OPTION 1 : Filled with ungraded soil

Advantages

• Cheapest and easily available fillingmaterial

Disadvantages & Limits

• Lowinsulationvalue,theheatlossisrelativelyhigh

• Difficulttoavoidwaterpenetrationduringconstruction

• Chancesofshaftbulgingincreaseswiththefrequencyofshutdownsduetorepeatedcompactingoffineparticles

FunctionKilninsulationboxesareconstructedtodistributetheloadofinsulationmaterialusedtominimizeenergylosses.Theyalsoproviderigiditytothekilnstructureanddefinethesizeoftheworkingplatform.

Design principlesTheboxdimensionsmustberelatedtotheinsulationmaterialvaluetobeusedandtherequiredworkingspaceandtypeofplatform.Thetopoftheinsulationboxes(platform)shouldideallybecoveredtoavoidheatloss.

Note:Fillingmaterialshouldbeasdryaspossible.

11 KIlN INSulATION BOxES

Page 32: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

24 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : Filled with graded brick gravel

Advantages

• Inrelationtotheinsulationvalue it is a good and economicalfillingmaterial

• enhancedinsulationpropertiesduetocreationofmicro-pores

• Decreasedriskofshaftbulging

Disadvantages & Limits

• Difficulttomaintainpropermaterialgradingduringfillingprocess

• Difficulttoavoidwaterpenetrationduringconstruction

11 KIlN INSulATION BOxES

Page 33: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 25

OPTION 1 : m.S. pipes

Advantages

• Astraight-forward,practicalandeconomicalsystemforfireposition/temperaturemonitoring

Disadvantages & Limits

• Potentialofexcessairenteringtheshaftifthepipesarenot properly sealed during operation

FunctionPeep-holepipesarenarrowopeningsinthekilnstructurewhichallowavisualand/ormechanicalfiretemperaturemonitoring.

Design principlesPeep-holesmustbedesignedtoallowvisualmonitoringofthefirepositionand/orinsertfiremonitoringequipment(thermocouples)fromtheoutsideofthekilnstructure.

Further,theyshouldbepositionedinawaythattheydonotbendundertheweightoftheinsulationfilling.

Theexactnessofthefirescheduleplottingincreaseswiththenumberofbuilt-inpeep-holepipes.

Therespectivebatchheightandthesoilshrinkagedefinesthepositionanddistanceofthepeep-holepipes.

12 PEEP-hOlE PIPES

Page 34: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

26 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : load bearing brick masonry with buttresses

Advantages

• Can support above built structures(loadingplatform,roof,mechanicaltransportingdevicesetc.)andgreenbrickstorage

• Buttressessupportingtheaccesstoplatformcanreduceconstructioncosts

Disadvantages & Limits

• Buttressesincreasetherequiredconstructionarea

FunctionTheouterkilnwallstructureencasestheinsulationfillingaroundtheshaftsupportingwallsandensuresstructuralrigidityandprotectionagainsttheelements.

Design principlesTheouterkilnwallstructuremustbedesignedsothatitcanprotecttheinsulationandtheshaftstructureagainstmechanicalimpact.

Note:Sufficientweepholesmustbeprovidedtoavoidkilnstructuredamagesduetowaterevaporationduringtheinitialfiring.Theseweepholeshouldbeclosedonlyafterthekilniscompletelydriedout.

13 OuTER KIlN wAll STRuCTuRE

Page 35: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 27

OPTION 3 : metal

Advantages

• Can be prefabricated, hence reducesconstructiontime

• Slimmeststructurepossible• Masspre-fabricationpotential

Disadvantages & Limits

• Metalcorrosionislikelythemainproblem,hencehighexpensesformaintenancework

• Separateplatformforbrickstorage required

• Requiresamechanicalliftingdevice to construct it

• High-valueinsulationrequired,hence expensive

• Relativelyunfavourableconstructioncarbonfootprintduetosteelrequirements

OPTION 2 : Concrete frame structure with in-filled brick masonry

Advantages

• Slimkilnstructurepossiblesincenobuttressesarerequired

• Overallconstructiontimereductionpossible

Disadvantages & Limits

• Scaffoldingandformworkincreasetheconstructioncosts

• Additionalcostforreinforcementsteelandconcrete

• Relativelyunfavourableconstructioncarbonfootprintdue to concrete and steel requirements

13 OuTER KIlN wAll STRuCTuRE

Page 36: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

28 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 1 : load bearing brick masonry without buttresses

Advantages

• Potentialofslimkilnstructure.• Nobulkyinsulationboxes

required

Disadvantages & Limits

• Separateplatformstructurerequiredformovementandstorage

• High-valueinsulationmaterialrequired, hence is considered expensive

13 OuTER KIlN wAll STRuCTuRE

Page 37: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 29

OPTION 1 : Partial R.C.C. working platform on buttress

Advantages

• Requireslessreinforcementsteel due to support by masonrybuttresses

• Boxinsulationfillingmaterialcan be topped up

Disadvantages & Limits

• Increased dust exposure potential

• Timeconsumingbecauseofshutteringwork,concretecuringtimeandde-shutteringwork

FunctionTheworkingplatformisconstructedforfreemovementofpersonnelandforstoragespace.

Design principlesTheworkingplatformdesignisbasedonbothloadbearing(buttress)structureorframestructureoptions.

However,theworkingplatformmustbeopen,ventilatedandprovideenoughspacesothatworkingpersonnelcanmovealongandloadgreenbricksintotheshaftwithouthindrancebyanystructureorequipment.

Note:IncaseofaslimVSBKstructure,e.g.metal,aseparateplatformstructureisrequired.

14 wORKING PlATFORm

Page 38: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

30 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 3 : Full R.C.C. working platform

Advantages

• Adds considerable rigidity to thekilnstructure

• Mechanicalgreenbricktransportationpossible

• Lowdustworkingenvironmentachievable

• Decreasedheatlossatplatformlevel

Disadvantages & Limits

• Highconstructioncost• Duetothesettlingoftheboxinsulationfillingmaterialagapiscreatedinbetweentheinsulationfillandtheplatform

• Addsweighttothefoundation

OPTION 2 : Partial R.C.C. working platform on cantilever

Advantages

• Boxinsulationfillingmaterialcan be topped up

Disadvantages & Limits

• Increasedreinforcementsteelandconcreterequirement,henceanexpensiveoption

• Timeconsumingbecauseofshutteringrequirement,concretecuringtimeandde-shutteringwork

• Increased dust exposure potential

14 wORKING PlATFORm

Page 39: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 31

OPTION 1 : lower and upper flue-duct system constructed with refractory/fired bricks

Advantages

• Simplecleaningsystempossible

• Bestsuitedfornaturaldraughtsystem

• Costsavingspotentialifconstructedwithfiredbricks

Disadvantages & Limits

• Theflueductsystemistheweakestpartoftheshaft,henceperiodicalmaintenanceis required

• Timeconsumingbrickcuttingworkduringconstruction

FunctionTheflue-ductsarethelowersectionoftheshaftemissionexhaustsystemwhichsystematicallychannelsthefluegasesintothechimneys.

Design principlesTheflueductsmustbedesignedtofunctioninawaythatallfluegassesarepassingthroughtheexhaustgassystem(naturalandforceddraughtsystem)withoutposinghealthhazardstoworkingpersonnel.Furtheritmustbeensuredthattheleastamountofexcessaircanenterthesystematthetopoftheupperflueductsduringunloading.

Theflueductsystemshouldbeconstructedwithacid-resistantmaterialssinceacidicgasesarereleasedduringthefiringprocess.

15 FluE-DuCTS

Page 40: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

32 / VSBKDeSIgNOPTIONgUIDeLINeS

FuTuRE OPTION 1 : lower and upper flue-duct system constructed with refractory castables

Advantages

• Reducedconstructiontime• Bestsuitedforforceddraughtsystem

• Calibrationofindividualflueopenings possible

• economicviabilityincreaseswithnumbers

Disadvantages & Limits

• Limitedtocountrieswithfireresistantconcretecastingexperience

15 FluE-DuCTS

Page 41: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 33

OPTION 1 : R.C.C. shaft top anchored on the shaft supporting wall

Advantages

• Allowsverticalexpansionmovementoftherefractoryshaft

• Reducedshaftbulgingprobability

Disadvantages & Limits

• None

FunctionTheshafttopprotectstheflueductsystemfrommechanicalandliveloadimpacts.Furtheritprovides a base for the lid cover and usually also for naturaldraughtchimneys.

Design principlesTheshafttopstructureshouldnotdisturbaverticalexpansionoftherefractoryshaft.

Itshouldbedesignedinsuchawaythatadditionalfeatureslikeflueductguides,lid-coverbaseandchimneyscanbesecurelyfixed.

Theexpansiongapmustbesealedwithflexiblematerialtoavoidheatlossafterthekilnisfullydriedout.

16 ShAFT TOP STRuCTuRE

Page 42: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

34 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : Natural draught with flue ducts

Advantages

• Noelectricityrequired,henceaneconomicaloption

• Canbeconstructedwithmaterialotherthanmetal,i.e.firedbricks

Disadvantages & Limits

• Draughtcanvarywithweatherconditions

• Difficulttoerectandtieupthechimneys,especiallyinhighwindproneareas

• Highwearandtearofmetalpartsduetocorrosionfromacidicemissions

FunctionTheemissionexhaustsystemistoprovidethedraftforproperfirepositioningaswellastodischargeexhaustgasesatasafeheight.

Design principlesTheemissionexhaustsystemmustbedesignedbyrespectiveexperts.

17 EmISSION ExhAuST SySTEm

Page 43: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 35

FuTuRE OPTION 1 : Natural draught without flue ductsNote:Thissystemispreferredformultipleshafts.

Advantages

• elongatedfiringcurve• Uniformdraught• User friendly draught control• OneShaft-onechimney• Duringloading,emissionscan

be extracted separately• Inbuiltshaftlid,hencereduced

health hazard

Disadvantages & Limits

• Anticorrosivematerialrequired for the hood

• Potentialofincreasedhoodsystemmaintenance

OPTION 2 : Forced draught with flue ducts

Advantages

• Uniformdraught,hencebetterfirepositioncontrol

• Onechimneycanbeusedformultipleshafts

• Brickqualityislikelytobemoreuniform

Disadvantages & Limits

• Requires electricity, including a back-upsystem

• exhaustgastemperaturesmustbemaintainedtoavoidcorrosionofmetalparts

• Increasedmaintenancecosts

17 EmISSION ExhAuST SySTEm

Page 44: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

36 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : m.S. sheet flat dampers

Advantages

• Areaneconomicaloption• User friendly to operate and

repair

Disadvantages & Limits

• Probability of excess air entering

• Highcorrosionpotential

FunctionFluegasdampers/valvesregulatetheairflowwithinthesystem,thereforesteeringtheappropriatefirescheduleandensuringacleanworkingenvironmentwhileloadingthebricks.

Design principlesTheupperandlowerflueductsystemrequirestwoindependentvalves/damperseach,hence4valves/dampersarerequiredpershaft.

Valvesanddampersshouldbedesignedsothatleastamountofflue-gassescanpasswhentheyarecompletelyshut.

Damperslotsmustbeconstructedsothatnoexcessaircanenterintotheemissionexhaustsystem.

18 FluE GAS DAmPERS/VAlVES

Page 45: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 37

OPTION 2 : m.S. sheet butterfly dampers

Advantages

• Areaneconomicaloption• User friendly to operate• Reduced probability of excess

air

Disadvantages & Limits

• Highcorrosionpotential• Replacementonlypossibleduringshaftclosure,henceexpensive

18 FluE GAS DAmPERS/VAlVES

OPTION 3 : Valves for forced draught system

Advantages

• easiertocontroltheairflow• Airflowmetergaugecanbe

installed

Disadvantages & Limits

• expensiveairflowmanagementsystem

• Highcorrosionpotentialifgreenbrickswith>1%moisturecontentareloaded

• Potentialexcessairproblemsifgapbetweenrefractoryshaft(flueductchannelopening)andvalvemouthisnotsealed

Page 46: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

38 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : m.S. sheet lid/elements

Advantages

• Isaneconomicaloption

Disadvantages & Limits

• Highcorrosionpotential

FunctionTheshaftlidsupportstheefficiencyofthecountercurrentairflowprinciple(energyefficiency)andensuresacleanworkingandgeneralenvironmentonaVSBK.

Design principlesShaftlidshouldbedesigneduser-friendlyaswellaslightweight,fireandpreferablycorrosionresistantmaterials.

19 ShAFT lID

Page 47: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 39

OPTION 2 : Stainless steel sheet

Advantages

• Lowercorrosionpotential

Disadvantages & Limits

• expensiveoption

19 ShAFT lID

Page 48: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

40 / VSBKDeSIgNOPTIONgUIDeLINeS

FunctionTheunloadingbarssupportthebricksettinginsidetheshaftduringregularoperationandtransferthebricksettingloadtothebricksupportI-beams.

Design principlesAnunloadingbarshouldbedesignedlightweight,smallincrosssectionandmustbeabletoresisthighheatstressesunderconstantloadofapprox.4tons.

Note:Unloadingbarsaretobeconsideredoperationwear-and-tearmaterial.

20 uNlOADING BARS

OPTION 1 : m.S. square bars

Advantages

• LighterthanM.S.I-bars

Disadvantages & Limits

• Highchanceofbrickbreakagesduetoreducedflangewidth

Page 49: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 41

OPTION 3 : Reinforced m.S. square bars

Advantages

• Canbeusedforlargershaftdimension

Disadvantages & Limits

• Highchanceofbrickbreakagesduetoreducedflangewidth

20 uNlOADING BARS

OPTION 2 : m.S. I-bars

Advantages

• StrongerthanM.S.squarebars• Lesschanceofbrickbreakagesduetobiggerflangewidth

Disadvantages & Limits

• HeavierthanM.S.squarebarsand therefore rarely used for largershaftdimension

Page 50: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

42 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : m.S. trolleys

Advantages

• Locally available and economicalfabrication

• Lightweighttrolleyscanbedesignedwhenusinga hydraulic unloading mechanism

Disadvantages & Limits

• Trolleyweightincreaseswithlargershaftsize

FunctionTheunloadingtrolleyisusedtounloadthefiredbricksandtotransportthemtotheunloadingstations.

Design principlesThe unloading trolley should be designed in such a waythatitcanbearthebricksettingloadwithoutwarpingorbending.

Itmustbeaslightaspossiblebutstrongenoughtohandleemergencysituations.

21 uNlOADING TROllEy

Page 51: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 43

OPTION 1 : Screw jack mechanismNote:Screwmustbefabricatedwithhighcarbonsteel.

Advantages

• Noelectricityrequired• Anelectromotorcanbe(retro)fittedtomechanicallyoperatethescrewjackmechanism

Disadvantages & Limits

• Complexandtimeconsumingfabricationprocess

• Maintenance of nut is high as itismadeofcast-iron

• Accidentpronesystemandhardworkforpersonnel

FunctionThebrickunloadingsystemraisesandlowersthetrolleyandthebricksettingsinsidetheshaft.

Design principlesTheunloadingmechanismmustbecapableofbearingtheentirebricksettingloadinsidetheshaftandtoliftittothepointwherethesupportbarscanberetractedduringtheunloadingofthebrickswithoutthethreatofsuddenfailure.

Bothscrewjackandhydraulicunloadingsystemareingeneraldesignedtocarryandliftupto30tonsofweight(bricksandtrolley).

22 BRICK uNlOADING SySTEm

Page 52: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

44 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 2 : hydraulic mechanism

Advantages

• easytohandle,workingpersonnel are not exposed to hardworkandfallingcoal

• Nogirdersystemrequired,henceconstructiontimeandcost saving

• Fewerworkersrequired• Manualpowerpackcanbeappliedincaseofpowerfailure

• Trolleytrackcanbenarrowedand therefore trolley movementiseasier

Disadvantages & Limits

• Requires electricity, including a back-upsystem

• Expensive lubricants required• Requires special dust protection

22 BRICK uNlOADING SySTEm

Page 53: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 45

OPTION 1 : Ramp/staircase

Advantages

• Possiblythemosteconomicalconstructionoption

• Requires no electricity• Dependingongradientangle,mechanicalequipmentcanbeusedtocarrybricks

Disadvantages & Limits

• Drudgeryworkforemployedpersonnel

• Highgreenbrickhandlingdamagepotential

FunctionIsthemeanstotransportgreenbricksandcoaluptotheworkingplatformlevelforanuninterruptedfiringprocess.

Design principlesThemaindesignparameteristotransportdrygreenbricksfromthegroundleveltotheworkingplatformlevelinthemosteconomicalway,ensuringthatthegreenbrickqualityisnotcompromised.

23 ACCESS TO ThE wORKING PlATFORm

Page 54: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

46 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 3 : lift

Advantages

• Reduced drudgery• Lessworkforcerequiredwhencomparedtomanualtransportationsystem

• Lowgreenbrickdamagepotential

Disadvantages & Limits

• Requirespower(electricityorfuelgenerator)tooperate

OPTION 2 : Conveyor belt

Advantages

• Reduces drudgery• Lessworkforcerequiredwhencomparedtomanualtransportationsystem

• Veryefficientandswifttransportationsystem

Disadvantages & Limits

• Highdrygreenbrickhandlingdamagepotential

• Highwearandtear,hencehighmaintenanceandrepaircostpotential

• Requirespower(electricityorfuelgenerator)tooperate

• Potentialoffallinggreenbricksincreasestheriskofinjury

23 ACCESS TO ThE wORKING PlATFORm

Page 55: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 47

OPTION 4 : Gantry

Advantages

• Reduced drudgery • Lessworkforcerequiredcomparedtoanyothersystem

• Lowgreenbrickdamagepotential

• Mechanized loading of green bricksintogantrycagepossible

Disadvantages & Limits

• Highinitialinvestment• Onlyeconomicalforlargenumbersofshafts

• Requirespower(electricityorfuelgenerator)tooperate

• Requiresconsiderableplatformspace

23 ACCESS TO ThE wORKING PlATFORm

Page 56: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

48 / VSBKDeSIgNOPTIONgUIDeLINeS

OPTION 1 : high-end level(Corrugated/plainplasticroofingsheetsorP.V.C.corrugated/plainsheetsonslopedM.S.pipetrussesandpurlins)(Slopedconcreteorferro-cementroof)

Advantages

• Isresistanttodamagingemissions

Disadvantages & Limits

• Is an expensive roof

FunctionTheroofprotectsthekilnstructureandworkingpersonnelfromtheelementssuchasrain,sunandwind.

Design principlesRoofshouldbedesignedaseconomicallyaspossiblewhileatthesametimeensuringthatthekilnremainsdry,greenbricksandworkingpersonnelareprotected.

Aroofmonitorisessentialtoensureproperventilationthatreducestheaccumulationofharmfulemissions.Theheightoftheroofshouldbeenoughforthefiremastertoworkefficientlyabovetheshafttopforloadingbricks.

24 ROOF

Page 57: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

VSBKDeSIgNOPTIONgUIDeLINeS \ 49

OPTION 3 : Budget level(Biodegradablematerials:Bamboomatsorclayroofingtilesontimberorbambootrussesandpurlins)

Advantages

• Isalowcostandfunctionalroofingoption

Disadvantages & Limits

• Requiresregularreplacement/repairduetorelativeshortlifespanofmaterial

• Potentialofrainleakingexists

OPTION 2 : Normal range level(Colourcoatedroofsheets/corrugated/plain,galvanizedironsheetsonslopedM.S.pipetrussesandpurlins)

Advantages

• Isaneconomicalsolution

Disadvantages & Limits

• Requires frequent maintenanceduetocorrosionproblems

24 ROOF

Page 58: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness

Note

Page 59: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness
Page 60: VSBK DESIGN OPTION Guidelines - Skat · 2017-01-24 · VSBK DeSIgN OPTION gUIDeLINeS \ vii a profitable VSBK business experienced professionals should be involved who assess the appropriateness