1 Rajkot Urban Development Authority (RUDA) Volume II Tender Document and Technical Bid Name of Work Invited by: Chief Executive Authority, Rajkot Urban Development Authority, Rajkot Opened by: Director ( Projects), Rajkot Urban Development Authority Jamnagar Road, Rajkot Phone No: 0281-2476874-2476799 Supplying, Erecting, Testing & Commissioning of Lift including free maintenance of 5 year of lift in RUDA building, Jamnagar road, Rajkot.

Upload: others

Post on 12-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

1

Rajkot Urban Development Authority (RUDA)

Volume – II

Tender Document and Technical Bid

Name of Work

Invited by:

Chief Executive Authority, Rajkot Urban Development

Authority, Rajkot

Opened by:

Director ( Projects), Rajkot Urban Development

Authority Jamnagar Road, Rajkot

Phone No: 0281-2476874-2476799

Supplying, Erecting, Testing & Commissioning of Lift

including free maintenance of 5 year of lift in RUDA

building, Jamnagar road, Rajkot.

Page 2: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

2

Name of Work: Supplying, Erecting, Testing & Commissioning of

Lift including free maintenance of 5 year lift for RUDA building,

Jamnagar road, Rajkot.

CONTENT OF

Volume – II

Tender Document and Technical Bid

No. Description Page No.

1 Information and Instructions for Tenderers 3

2 Time Schedule 14-18

3 Declaration Form 19

4 Memorandum of Tender For work 20-21

5 Form of Tender for Electrical Works R & B Department 22-23

6 General Condition of Work 24-27

7 General Condition of Contract 28-45

8 Special Condition of Contract 46-48

9 Detailed Technical Specification 49-52

10 Features of Lift 53-56

11 Technical Questionery 57-60

12 Scope of work covered under All in Comprehensive Service Contract 61-63

13 Maintenance of Lift 64-72

14 Annexure – A : DD/FDR ( EMD) 73-74

15 Annexure – B : FDR (Security Deposit) 75-77

16 Annexure – C : Performance Bond 78-80

17 Annexure – D : Model Form of Warranty Clause 81

Page 3: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

3

INFORMATION and INSTRUCTIONS FOR TENDERERS

1.0 Mode of Submitting Tender:

The tenders shall be submitted in Electronic format only on online Web-site

www.nprocure.com till the date and time shown in Details Notice Inviting

On-Line Tender.

Offers in Physical form will not be accepted in any case.

Bidders who wish to participate in online tenders will have to procure / should

have legally valid Digital Certificate (Class-III) as per Information

Technology Act-2000 using which they can sign their electronic bids. Bidders

can procure the same from any of the license certifying Authority of India are

as mentioned under :

Sr. No. Name of Certifying Agency Website Address

1. (n) Code solution (G.N.F.C) www.gnvfc.com

2. Safescrypt www.safescrypt.com

3. TCS www.tcs.-ca.tcs.co.in

4. MTNL www.mtnltrustline.com

2.0 Competency of Tenderer:

No contract will be awarded except to responsible bidders capable of

performing the class of work contemplated. Before the award of the contract,

any bidder may be required to show that he has the necessary facilities,

experience, ability and financial resources to perform the work in satisfactory

manner within the time stipulated. Tender may be required to furnish the

tender inviting authority with the statements as to their experience and their

financial status. Tenderer shall be a original manufacturer of Lifts.

3.0 Tenderer to inform Himself:

Tenderer will be deemed to have inspected the site and to have satisfied

himself as to the nature of all works, all existing roads, water-way and other

means of communication and access to and from the site and work and the

building that may be required for temporary purpose in connection with the

construction, completion and maintenance of the works and must make his

own inquiries as to work, yard sites and depot, and dumps and as to

acquisition of such additional sites, rates and areas as may be necessary for

temporary purpose for constructing, completing and maintaining the works

Page 4: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

4

and availability of water for construction activities, power, quarries and

labour.

4.0 Late / Delayed physical receipt of tender fee, EMD and other documents

After online submission of tender, original D.D. of tender fee, EMD and other

documents should reach the office of tender opening authority within time and

last date stipulated for the purpose in any of the modes of physical submission,

the same is received early or later than the time Specified will not be accepted

in any case, their bid will not be opened online and will be considered NON-

RESPONSIVE.

5.0 Payment - The tenderer must understand clearly that the rates to be quoted are

for completed works and include all the taxes duties & costs due to labour,

scaffolding plant, supervision, civil work,electrical work,service work, power,

royalties and octroi etc. and to include all extras to cover the cost of night

work if and when required and no claim for additional payment beyond the

price/rates quoted will be entertained and the tenderers will not be entitled

subsequently to make any claim on the ground of misrepresentation or on the

ground that he was supplied with information given by any person (whether

the member is the employee of RUDA or not). Any failure on his part to

obtain all necessary information for the purpose of making his tender and

filling the several prices and rates therein shall not relieve him from any risks

or liabilities arising out of or consequent upon the submission of the tender.

6.0 Tender Forms - This form will state work to be carried out as well as the date

of submitting and opening tenders and the time allowed for carrying out the

work, also the amount of earnest money to be deposited with the tender and

the amount of the security deposit to be paid by the successful tenderer and

percentage, if any, to be deducted from bill. It will also state whether a refund

of Quarry Fees, Royalties, Octroi dues and ground rents will be granted.

Copies of the specifications, designs and drawings and estimated rates, and

any other documents required in connection with work which shall be signed

by the Director Projects for the purpose of identification shall also be open for

inspection by Contractor at the office of the Director Projects during office

hours. However every 'blank' in the form of the e-tender and in the Schedule

and Annexures must be filled up by the tenderer and must be submitted online.

Page 5: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

5

7.0 Quoting of Rates :-

The Tenderer shall quote the rate per unit for all items listed in Schedule-B in

figures as well as in words. Thereafter the system will work out the total

amount of each item in Column No.7 of Schedule-B and sum up the total at

the end of column No.7 on each page and on last page of Schedule-B. After

striking the total of all items, he may give rebate if he desires on the total

amount so worked out and thereafter express in the figures, as the net amount

of his offer which will be termed as "Tendered Amount"

The following rule shall apply only to the works having estimated cost

above Rs.100 lacs (Rupees One Hundred lacs) (G.R. R&B.Department

No. TNC-1777-281-C, dated 30-7-1992 may be referred to)

(a) Tenders are normally not permitted to suggest any alteration in the works

specified in the tender form or in the time allowed for carrying out the work or

any other conditions. However, if it is felt necessary by the tenderer to have

any conditions, he shall have to clearly mention the same in very clear terms

in the appropriate section of technical bid. The tenderer will have to fill in

necessary details online in 'technical bid' and 'price-bid' separately. No such

tender shall include more than one work but contractors who wish to tender

for two or more works shall submit a separate tender or each work online.

(b) If price-bid contains any conditions, the same shall be rejected outright.

(c) It should be very clearly understood by all the tenderers that the technical bid

should be restricted only to technical matters and conditions / stipulations

having financial implications. The technical and price bids shall contain

adequate cross reference wherever necessary to ensure clear and proper

correlation of them with two bids without any ambiguity whatsoever. The

price bid of main tender should not be disclosed in the technical bid.

(d) The Pre - Qualification bid will be opened first online on specified day or any

other suitable time thereafter by the competent tender opening authority of the

RUDA. The technical bid, tenderers who qualified in Pre – Qualification Bid,

will be opened online on same day or any other suitable time thereafter by the

competent tender opening authority of the RUDA. Bidders who wish may

remain present. The technical bid shall be evaluated first and wanting details,

if any and clarifications in respect of conditions if any will be called from the

tenderers. In such case, the contractor will be required to submit clarification/

Page 6: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

6

details (including with respect to conditions if any) within the stipulated time

allowed for the purpose. If the contractor does not furnish the wanting details /

clarification in time, his tender would be liable for rejection.

(e) The conditions specified in technical bid should invariably be accompanied by

proper financial evaluation with mode of calculation specifying assumptions,

quantities, rate and ceiling amounts for each condition and shall also

accompany the information in the form stating

(a) Sr. No.

(b) Description of the condition

(c) Financial evaluation (Vide RandB.D. G.R.No. TNC/7777/281-C, dated 30-

9-92)

(d) Ceiling amount to be added in price-bid, in case condition is not accepted.

(f) Ceiling amounts shall be binding on the contractors and are liable to be added

to the tender amount.

(g) The evaluation as given by the contractor as modified by tender opening

authority with the ceiling limit will then be intimated to all the bidders. No

further opportunity shall be given to the contractors to modify/ withdraw

conditions at that stage. After completion of evaluation of the technical bid in

all respects the competent authority will decide about date of opening of price

bid and the same will be intimated to the bidders. After opening of price bid

and their evaluation the tender inviting authority reserves the right to negotiate

about the tender(s) further will any or all the contractors.

8.0 Earnest Money:-

Earnest money in specified form @ 1% of the estimated cost must be sent

electronically. Tenderer may pay earnest money in the form of Crossed

Demand Draft ones with a validity period of not less than six months of

Nationalized or Scheduled blank or Narmada drawn in favour of RUDA

rajkot. Earnest money by Cash, Cheque and Bank Guarantee shall not be

accepted.

If the contractor does not turn up to pay the Security Deposit and

execute contract agreement within specified (or extended) time after

intimation to him about acceptance of his offer, the earnest money paid for this

work will be forfeited and tenderer's tender shall be rejected and then

Page 7: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

7

according to aforesaid provision of tender, action to blacklist the Contractor

will be initiated without Delay.

8.2 Tender not supported with tender fee. Earnest Money and documents and not

submitted in electronic format (by scanning) while uploading the bid shall be

rejected as NON Responsive. If the tenderer modifies or withdraws his tender,

the Earnest Money shall be forfeited and the tenderer may be disqualified

from tendering for future works under the Government.

8.3 The Earnest Money will be returned to the unsuccessful tenderers. The Earnest

Money will be returned to the successful tenderer after he furnishes security

deposit and duly enters into the contract.

8.4 Within Ten days or within such time as may be decided by the Tender Inviting

Authority from date of receipt of the letter accepting his tender, the successful

tenderer shall furnish the required security deposit and attend the office of the

Tender Inviting Authority for execution of the contract documents. If he fails

to furnish the security deposit or execute the contract document, his Earnest

Money shall be forfeited and action to blacklist the contractor will be initiated

without delay

9.0 Accompaniments of Tender: (to be submitted in electronic format only

through on line (by scanning) as duly certified true copies)

The contractor shall have to furnish:

(i) Copy of Partnership Deed or Memorandum as well as Articles of Association

in case of the company and intimate permanent addresses of his partners/

Directors of Company. All copies submitted shall be duly attested.

(ii) Copies of certificate regarding previous experience, as required.

(iii) Declaration showing all works completed during preceding 5 years and works

on hand with the Contractor and the value of woks that remained to be

executed in each case.

(iv) P.A.N. issued by Income-Tax Department.

(v) Copy of Provident Fund Registration – Code No.

(vi) Duly filled in and digitally signed declaration form and Memorandum of

Work as provided in Tender Documents.

Page 8: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

8

(vii) A solvency certificate of an amount equal to 25 per cent of the amount of

work put to tender will have to be produced. Such solvency certificate should

be issued by either Scheduled bank or nationalized bank.

(viii) Required Annexure duly filled in when pre-qualification in involved.

(ix) All above documents are to be submitted in electronic format only as part

of tender document failing which the tender will be rejected outright and

will be considered as NON-RESPONSIVE.

10.0 Tender liable to be Invalid:

It may please be noted that the tender is liable to be considered invalid

especially, if the requirements as per Instruction No. (i) to (ix) above are not

complied with.

11.0 Right of rejection of tenders.

(i) Right is reserved by the Tender Inviting Authority to reject any or all tender(s)

without assigning any reason thereof.

(ii) In addition to the above, the tender will also be liable to be rejected outright if:

(a) The tenderer proposes any alteration in the work specified or in the

time allowed for carrying out the work or in any condition.

(b) The tenderer or in the case of a firm, each partner or the person holding

the power of attorney thereof does not digitally sign Memorandum of

Work or signature/s is/are not attested by a witness.

(c) Any person who submits the tender shall fill forms online including the

rates of items put to tender.

12.0 Method of Tendering:-

12.1 If the tender is made by an individual, it shall be digitally signed by the

individual above his full name and current address.

12.2 If the tender is made by a proprietary firm, it shall be digitally signed by the

proprietor above his full name and the full name of his firm with its current

address.

12.3 If the tender is made by a firm of partnership, it shall be digitally signed by a

Partner of the firm holding the power of attorney and digital certificate for the

firm. A certified copy of the power of attorney shall be provided in physical

form along with other documents. A certificated copy of the partnership deed,

Page 9: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

9

full name and current address of the firm and full name and the current

addresses of all the partners of the firm shall also be provided along with other

documents.

12.4 If the tender is made by a limited company or a limited corporation, it shall be

digitally signed by duly authorized person holding digital certificate for the

company/ corporation and power of attorney for signing the tender in which

documents. Such limited Company or Corporation may be required to furnish

satisfactory evidence of its existence before the contract is awarded.

12.5 All digital signatures in the tender documents shall be dated.

13.0 Eligibility and qualification requirement.

To establish acceptability of the satisfaction of Tender Inviting Authority the

tenderer shall provide the following:

13.1 Details of plant and machinery immediately available with tenderer for use on

the works.

13.2 Details of plant and machinery proposed to be procured for the works.

13.3 Details of technical, supervisory and administrative personnel already

employed by the tenderer that the proposes to utilize for this work and such

other personnel he proposes to employ further for the work.

13.4 Copies of registration certificate and P.A.N. allotted by income Tax Office.

13.5 Separate Notes in sufficient details on each of the following:

(i) Method and technique of construction

(ii) Sequence of execution of various important components of the work;

(iii) Cash-flow arrangement

14.0 Deviation or modifications In Tender Documents:

14.1 All tenderers are cautioned that tender containing any condition and/or

deviation from the contractual terms and conditions, specifications, quoting/

offering rates/ prices in different manner than specified in the tender and/or

any other requirements of tender shall make the tender liable for outright

rejection and shall be considered as non-responsive for all practical purposes.

The decision of the Tender inviting authority in this regard shall be final and

binding to the tenderer.

Page 10: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

10

14.2 Alternative tenders are not acceptable.

15.0 Submission of tender

15.1 Tender shall be submitted in an online manner only on website

www.rnb.nprocure.com

Last date and time of online submission as specified in Details Notice Inviting

On-Line Tender.

15.2 Tender fee, EMD and other documents should be submitted in electronic

format only through on line (by scanning) while uploading the bid. However

for the purpose of realization of D.D. of EMD & tender fee the bidder shall

send the same in original through R.P.A.D. or Speed Post or hand delivery, So

as to reach the office of Tender Inviting Authority within 2 (two) days counted

from the stipulated last date of receiving of the tenders online for this wok.

16.0 Evaluation of Tenders

16.1 Technical evaluation will be made of the tenderer's proposed method and

technique of construction, construction programmer, sequence of components

of the work, proposed resources assigned to do the work to determine the

acceptability, adequacy and reasonability of rates, his past performance and

present resourcefulness.

16.2 To assist in the examination, evaluation and comparison of tender, the tender

inviting authority may ask tenderer individually for clarification of their

tenders including breakdown of unit rates. The request for clarification and

response shall be in writing but no change in substance of the tender shall be

sought, offered or permitted at that stage.

16.3 Award may be made to the tenderer whose responsive tender is determined to

be the lowest evaluated tender and who meets the appropriate standards of

capacity and financial resources.

17.0 Receipt of Payments:

Receipt of payment made on account of any work, when executed by a firm

shall be signed by all the partners except where the contractors are described

in their tender as firm in which case the receipt shall be signed in the name of

the firm by one of the partners or by some other person having authority to

give effectual receipts for the firm.

Page 11: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

11

18.0 Opening of tenders:

The Authorized Officer / competent authority shall open tender online on

website www.rnb.nprocure.com on specified day or any other suitable time

thereafter, in his office in the presence of intending Tenderers or their

representative who wish to remain present at that time. He will enter the

amount of the tenders in a comparative statement in a suitable form. In the

event of a tender being accepted, the contractor shall, there upon for the

purpose of identification, sign copies of the specifications and other

documents mentioned in his tender.

19.0 General rules and directions:

19.1 No receipt for any payment made by a Contractor will be entertained by the

RUDA in regard to any matter relating to this tender or the contract shall be

valid and binding on the Employer unless it is signed by the Authorized staff

members of the Government.

19.2 All works shall be measured net by standard measure and according to the

rules and customs of the R and B Department or any other method approved

by the R and B Department without reference to any local custom. The

measurements of work will be taken according to the usual method in use in

the Roads and Buildings Department and no proposal to adopt alternative

method will be accepted. The Director Projects’ decision as to what is the

usual method in use the Roads and Building department will be final.

19.3 Under no circumstance shall any Contractor be entitled to claim enhanced rate

for any item in this contract except as provided in contract conditions.

19.4 The contractor shall not be permitted to tender for the work in which his near

relative is working as the office in the sphere of his jurisdiction in the Tender

inviting authority.

Note:- By term "near relative" is meant wife, husband, parents, children,

brothers, sisters, uncles, aunts, consigns, and in laws.

19.5 The contractor should compulsorily furnish his latest address (es) including

the latest address of his partners and the place(s) of filing his/their income-tax

returns along with the tender. Any changes, in such addresses, during the

Page 12: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

12

tenure of contract should invariably and forthwith be intimated by the

Contractor to the Executive Engineer.

20.0 Submission of additional information / documents:

In addition to various specified documents and information required to be

submitted along with tender, the bidder may be required to provide any other

document/ relevant information as considered necessary by the tender inviting

authority and the tenderer shall be required to provide the same as per the

requirement of the tender inviting authority. Even the successful bidder may

be required to provide the same as and when required by the authority during

subsistence of the contract.

21.0 Bank:

Wherever the word "Bank" is used in the document, it would mean Schedule

or Nationalized Bank & schedule & Pvt. Banks approved by GOG only.

22.0 Tender validity period

The tender for the work shall remain open for a period of 180 days counted

from the stipulated last date of receiving of the tenders online for this wok.

23.0 The successful contractor shall exhibit the board in prominent place of

worksite showing the brief details of project work under execution, financier,

cost of work and broad details of inputs/ specifications and targeted goals.

(RandB.D. G.Rs. No. TNC-1090-24-C dated 18-11-1991, 17-8-02 and 25-10-

02)

24.0 The contractor will not use the premises of project/ work under construction

for his staff, labourers or for any other purpose. If he do so, market rent for

such unauthorized used will be recovered. The marker rent will be decided by

the Engineer-in-charge.

Page 13: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

13

TIME SCHEDULE

The Machine Room and Hoist way are ready.

The installation work of Lift may be taken up on hand immediately.

The Time Schedule is as under.

(A) For Preparation and Approval of Drawing for Lift 14

Days

(1) For 13 Passenger

(a)Supplying of material for Erection of new lift: 1 nos.. 08

Days

(b) Scaffolding & Miscellaneous work by Lift Agency 08

Days

© Manufacturing & Material Receiving at site within time of( from the date of Drawing

Approval it is 31 Days)

15

days

(d) Erection , Final Testing & Commissioning of Lifts Including License from Lift

Inspector(from the date of receipt of material at site)

15

Days

Note. Liquidated damages clause for delay in work shall be applicable at every stage of entire work.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 14: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

14

DECLARATION FORM

The tenderer will have to make declaration enlisted in the form attached herewith and

shall affix his signature to the form in token of correctness of declaration made therein

(G.R. RandB.D. No. TNC-IIB-22 (10)-C dated 24-5-90 should be referred to)

1. I/We hereby declare that I/we have visited the site and fully acquainted

myself/ourselves with the local situations regarding materials, labour and other

factors pertaining to the work before submitting this tender.

2. I/We hereby declare that I/We have carefully studied the conditions of

contract, specifications and other documents of this work and agree for

execute the same accordingly.

DECLARATION CERTIFICATE (G. R. date 4-2-89 as revised by GR.

No.TNC - 1083/ 6681/ 4/ C, dated 31-8-1994)

3. I/We hereby declare that my/our near relative are not working in RUDA

Date :

………………………

Place :

……………………..

(Digital Signature of the Contractor with

Seal)

Page 15: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

15

MEMORANDUM OF TENDER FOR WORKS

I/We hereby tender for the execution of the work specified in the underwritten

memorandum for the RUDA at the tendered rates specified by me/ us in Schedule

showing items and rates of works to be carried out and in accordance in all respects

with the specifications, designs, drawings and instructions in writing referred to in this

tender and in clauses of the annexed conditions.

1. General Description of work (If it includes sub works, the details thereof will be

given Separately):

Buy Backing of Uninstalled Lift Material and Supplying, Erecting, Testing &

Commissioning of Lifts for RUDA building, Jamnagar road, Rajkot.

2. Estimated Cost … … … Rs. 2926239.00/-

3. Earnest Money … 1% Rs. 29262.00/-

4. Security Deposit … 5% Rs.

(i) In the form of DD/FDR … 2.5% Rs.

(ii) To be deducted from bills … 2.5% Rs.

(iii) Retention money to be deducted

from bill at the rate 5%of bill amount… 5% Rs.

Total … 10% Rs.

5. Time Limit for completion of work … … … 02 Months

Deposit furnished in the form of interest bearing documents as per item 4 (i) can

further be extended for renewal if so desired and communicated by the contractor in

writing before one month from the date expiry date.

Should this tender to accepted, I/We hereby agree to abide by and fulfill all the terms

and provisions of the conditions of the contract annexed here to so far as applicable

Page 16: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

16

and in default thereof to forfeit and pay to RUDA in office the sums of money

mentioned in the said conditions.

(Receipt No. dated from the BANK in respect of

sum Rs.* is forwarded herewith

representing the earnest money + (a) the full of value of which is to be absolutely

forfeited to RUDA should I/We not deposit the full amount of security deposit

specified in the above memorandum in accordance with Clause I of the said

conditions, otherwise the said sum of above Rs. shall be refunded).

Date:-

Place:- * Digital Signature of the Contractor

** Signature of the Contractor

(Witness) *** (At the time of execution of contract document)

Name and address

(Occupation)

* Digital Signature of Contractor before submission of tender

** Signature of the Contractor of the time of execution of contract document.

*** Signature of witness to Contractor's signature at the time of execution of contract

document.

The above tender is hereby accepted by me on behalf of the Government of Gujarat

Dated the day of 2015.

Signature of

Contractor’s

Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 17: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

17

FORM OF TENDER FOR ELECTRICAL WORKS

I/We do hereby tender to execute the whole of the work of Supplying,

Erecting, Testing & Commissioning of Lift for RUDA building including free

maintenance of lift for 5 years, Jamnagar road, Rajkot.

1. Described in the accompanying tender for the case of measured works, at the

several rates, set forth in the tender hereto attached and signed by me/us and

should this tender be accepted. I/we further undertake to complete the work

within the time stated below reckoned for the date of acceptance of tender.

2. I/We do agree and bind myself / ourselves to abide by and fulfill the general

conditions of contract and Special Conditions of contract annexed to the

Specification or in default thereof to pay to the purchaser, as reasonable

compensation for such breach of such conditions, the sums of money

mentioned in the said conditions.

3. I/We do further agree to make good at my/ our expense all defect in the

installation which appear within 5 years from the date of completion of

erection work or bringing the installation into beneficial use when such defects

are due to defective workmanship or material executed or supplied by me/us.

Signature(s)

Dated at: The_____ Day of ___________ 2015

The above tender is hereby accepted by me for and on behalf of the RUDA

Dated at: The_____ Day of ___________ 2015

Signature of

Contractor’s

Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 18: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

18

GENERAL CONDITIONS OF WORK

1) The work of the Electrical Installation shall be carried out as per IS

Specifications IS 732 – Code Part I, II and III – 1982 of practice of Electrical

wiring and fitting in building.

i) For Hospital I. S. 7732 of 1985.

ii) For Educational Installation I. S. 108941 – 1984

iii) For Aluminum Conductor I. S. 398 – 1984 Part III

2) The fitting should be fixed with mild steel hooks to be supplied and erected

and duly grounded in the cement concrete by the contractor where ever

possible the decision of the Director Projects, in respect of the feasibility of

providing such hooks in the cement concrete, shall be final and binding on the

contractors.

3) The work shall have to be completed within the prescribed time limit unless

the extension in the time limit at the instance and the request of the contractor

is granted by the authorities in which case, the application for the extension in

time limit have to made by the contractors by registered post before the date of

expiry of the schedule time limit under the agreement.

4) Materials required for the work shall be supplied to the contractor as per rates

mentioned in the Schedule ‘A’ attached herewith and cost of materials will be

recovered from their bills.

5) The several documents forming the contract are the essential parts of the

contract and requirement occurring in one is as binding as through occurring

in all, they are intended to be mutually explanatory and complementary and to

describe and provide for a complete work.

6) In the event of any discrepancy the several documents forming the contract or

in any one documents the following order of precedence should apply.

(a) Dimension and quantities :

(i) Drawing

(ii) Schedule ‘B’ of the tender form

(iii) Specification.

On drawing figures, dimension unless obvious in contact will be followed in

preference to sealed dimension.

Page 19: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

19

(b) Description :

(i) Schedule B of the tender form

(ii) Drawings

(iii) Specification.

In case of defective description or an ambiguity the Director Projects in charge

should issue further instructions directing in what manner the work is to be

carried out is being understood that the latest modern Standard Engineering

practice is to be followed. The contractor should forthwith comply with such

instruction.

The Contractor should take no advantage if any apparent error,

omission in drawings or a specification and the Director (Projects) in charge

should be permitted to make fulfill the intent of the pans and specifications.

7) Controlled materials (Essentiality certificate)

(i) As regards ’Controlled materials’, the RUDA will help to arrange for

the permits as far as possible and holt the contractor in securing the

same. All incidental charge in procuring these materials shall be borne

by the contractor himself. Though the RUDA will help to arrange for

the permit as far as possible and help the contractor in obtaining the

materials, it shall not be accept any responsibility for any delay or loss

on account of delay caused to the contractor while obtaining the same.

(ii) The Contractor shall submit the monthly returns in the prescribed form

as to receipts and actual use of the controlled materials during the

month to the Executive Engineer of every calendar month.

(iii) The Contractor shall submit the Director Projects or his representative

to inspect the stock of the controlled ma by him at any

time whenever the Executive Engineer or representative so desires.

8) The tender for the work shall remain open for a period of 180 days (One

Hundred eighty days) from the date of opening of tenders for the works. The

offer having validity less than 180 days will be rejected outright. The tenderer

will not be allowed to withdraw or modify the offer on his/their own during

the course of finalization of tender.

Page 20: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

20

9) The Contractor shall employ only such labourers who shall produce a valid

certificate of having been vaccinated against small pox within a period of last

three years.

10) The Contractor shall provide drinking water facilities to the workers, labourers

to comply with the provisions, the Engineer In charge shall give notice for such

facility to the workers labourers within a period of ten days from the date of the

notice in writing the Engineer In charge shall there upon make the arrangement

for the drinking water at the cost of the contractor.

(Govt. Resolution PWD No. TNC-2171 (I) 76-C Dt.4.7.73)

11) Wires of I. S. I. Mark will be allowed to be use on the work.

12) The rates should be written both in words and figures, inclusive of all taxes and

duties.

13) The percentage additions in total amount tendered of any items is not allowed,

however, if overall reduction in percentage is offered, the same should be stated

in prescribed clause added at the end of Schedule B in words and figures. If no

reduction is to be made, the gap should be filled in by the words ‘NIL’.

(Govt Resolution No. CDN/1269/PAC/51-C Date: 15/04/1978)

14) Whenever Government materials are issued, the contractor shall be responsible

for the safe custody and proper use of the materials.

15) Loose electric fitting should be done connected at the time of handing over

possession of building to concerned civil or administrative department and

accordingly after taking over possession of these connections concerned

Civil/Administrative department is responsible for fittings.

Page 21: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

21

GENEREAL CONDITIONS OF CONTRACT

1. Definition of terms

a. In constructing these general conditions and the annexed specification

the following works shall have the meaning here assigned to them

unless there is something in the subject or context inconsistent with

such constructions:

b. The RUDA shall include his successors and assigns.

c. The ENGINEER shall mean the Director Projects or such other officer

as may be appointed by the Director Projects to supervise the work on

behalf of RUDA.

d. The CONTRACTOR shall mean the Tenderer whose tender, shall be

accepted by the RUDA, and shall include the tenderer’s legal personal,

representatives or successors and assigns.

e. PLANT shall mean and include on machine, fixed or movable used for

the generation or transmission of power or accreted by power.

f. WORK or WORKS shall mean the whole of the plant and material to

be provided and work to be done executed or carried out by contractor

under the contract.

g. The CONTRACT shall mean all the documents by which the

agreement by the contractor to be provided to execute or carry out the

plant work or works shall be constituted or by which the terms of such

agreement or any of them are contained or set forth specially as per

these General conditions, any special conditions attached to or issued,

with these conditions, the specification the Drawings, the invitation for

tenders (if any) or any other letter, notice or documents upon or with

reference to which the Tender is made and the schedule of prices (if

any) furnished by the contractor with his Tender.

h. The SPECIFICATION shall mean the specification annexed to these

General conditions and Schedule there to (if any).

i. The SITE shall mean the whole of the premises, building and ground

in or upon which the Plant work or works is or are to be provided,

executed, erected done or carried out.

Page 22: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

22

j. The DRAWINGS shall mean the drawings issued with the

specification which will ordinarily be identified by being signed by the

Engineer and any further drawing submitted by the contractor with his

tender and duly signed by him and accepted or approved by the

Engineer and all other drawings supplied or furnished by the contractor

or by the Engineer in accordance with these General conditions.

k. The SPECIAL CONDITIONS shall mean the special condition of

contract (if any) attached to general conditions.

l. The SCHEDULE shall mean the schedule or schedules attached to the

specifications.

2. Contractor to inform himself fully

a. The contractor shall be deemed to have carefully examined the

invitation for Tenders (if any) the general and any special conditions,

the specification and Drawing and Schedule of price (if any). Incase of

discordance or want of agreement between or amongst the several

things herein described as the grounds or data of contact, then these

conditions shall have precedence of and be held to be more correct and

binding than the specification or any conditions refereed to therein, or

in any other documents forming the part of contract and in like manner

detailed drawings shall be held to be more correct, and binding than

general drawings and instruction shall be held to be more correct and

binding than general drawing and instruction shall be held to be more

correct and binding then figured dimensions shall be held to be more

correct than dimensions by scale but subject nevertheless, in case of

doubt o dispute as to any of the matters aforesaid to the determination

and decision of Engineer as hereinafter is more particularly mentioned

and provided always that nothing herein contained shall limit the

powers of the Engineer herein after mentioned.

3. Security Deposit

a. The contractor shall within ten days of the intimation, to him

acceptance of a tender, deposit a sum equal to five percent of the

amount put to tender as security for the performance of the contact.

The Security Deposit shall be in form of FDR.

4. Mistake in Contractor’s Drawings.

Page 23: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

23

a. The contractor shall be submit such drawing as may be required and

shall be responsible for any discrepancies, errors or omissions in any

drawing of other particulars supplied by him not with standing that

such drawing or particulars may have been approved by Engineer.

5. Patent Right etc.

a. The contractor shall fully indemnify the Governor of Gujarat against

all actions, suits, claims, demands, costs, charges and expenses arising

from or incurred by reason of any infringement or alleged

infringement, of any letters patent, design, trade mark or name

copyright or other protected rights in respect of any machine, plant,

work materials thing or system or method of using, fixing, working or

arrangement used or fixed or supplied by the contractor but this

indemnity shall not extend or apply to any action, suit, claim, demand,

cost charges, or expenses arising from or incurred by reason of the use

of the work or any part thereof otherwise than in the manner or for a

purpose contemplated by the contract. All royalties and other similar

payments which may have to be paid for the use of any machine,

plant, work, material, thing, system, or method as aforesaid (Whether

payable in one sum or by installments or otherwise) shall be covered

by the contract price and payable by the contractor.

b. In the event of any claim or demand being made or action or suit

brought against the Governor of Gujarat in respect of any such matter

or matters as all negotiations for the settlement of such claim or

demand and such action aforesaid the contractor shall be duly notified,

thereof, and he shall conduct or suit also be conducted by him subject

if and so far as the Governor of Gujarat shall think proper under the

Supervision and Control of Governor of Gujarat through the officer

duly authorized on his behalf.

6. Workmanship and Materials

a. The work shall be carried out in all respects with workmanship and

materials of the best and most substantial and approved qualities to the

entire satisfaction of the Engineer who may reject any plant, apparatus

of material or workmanship which shall in his opinion be of defective

Page 24: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

24

quality and such rejection to be final and conclusive. The Contractor

shall at his own expenses provide all material, labour, haulage, power,

tools, tackles and apparatus necessary to execute and complete the

works and plant in the manner aforesaid.

7. Use of Work Pending Completion.

a. The RUDA shall be al liberty at any time to put into beneficial use the

whole or any part of the work he may desire to use pending the formal

completion and taking over of the same.

8. Power to vary or omit work.

9. The Engineer shall have full power, subject to the provision next hereinafter

contained, from time to time before the works have been taken over by notice

in writing to order the contractor to alter, amend, omit, and to or otherwise

vary any work, and any such order shall be without prejudice to the liability of

the contractor under the contract and the contractor shall carry out any

alterations, amendments, omissions, additions or variations so ordered and he

be bound in carrying them out by the same conditions (as far as possible) as

though the said alternations, amendments, omissions, additions or variations,

so ordered as aforesaid shall be difference of cost (if any) occasioned by any

alternations, amendments shall be, added to or deducted from the contract

price, as the case may require. The amount of such difference (if any) shall

subject to the provision hereinafter contained be ascertained and determined in

accordance with rates specified in the schedule of price, so far as the same

shall be applicable, but the Governor of Gujarat shall not become liable for

payment of any change in respect of any such alternations, amendments,

omission, additions or variations unless the order of instructions for the

performance of the same shall have been given in writing by the Engineer.

a. Tender rates shall apply for excess up to a maximum of 30% over the

b. tendered work.

c. For excess any, beyond 30%, payment shall be made as per mutually agreed

rates. However, the agency will furnish the conclusive evidence of the rates

of the involved components of exceeding items prevailing on the date of

commencement of erection of that item, and the rate prevailing on the date of

exceeding excess.

Page 25: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

25

d. In the event of any order being under the powers made conferred by this

clause reasonable and proper allowances shall be made in time for any delay

occasioned thereby and in money for any plant or materials already prepared

or work done and requiring to be altered in consequence thereof.

10. Protection and Liability for Accidents, Theft and Damage

a. The contractor shall at all times until the commencement of period

maintain property a sufficiently cover up and protect all materials

delivered on site from damage or injury by exposure to the weather and

shall take every proper precaution against accident, damage or injury

to the same from any cause. The contractor shall be and remain

answerable and liable for all accident and damage thereto which until

the commencement of the period of maintenance may arise or be

occasioned by the acts or omissions of the contractor or his workmen,

agents, servants or sub-contractors and all losses and damages arising

from such accidents, damage, or injuries as aforesaid shall be made

good in the most complete and substantial manner by and at sole cost

of the contractor and to the satisfaction of the Engineer.

b. Provided that should the Engineer certify that the work has been

completed but that owning to circumstances over which the contractor

has no control the work cannot be taken over the contractor shall not

be held liable for any loss of or damage to the work occasioned by

such delay in taking over and occurring more than One Month after

date of completion of the work as certified by the Engineer.

c. Until the work shall be or deemed to taken over as hereinafter provided

the contractor shall also indemnify to Governor of Gujarat from and

against all claims and demands, suits, proceedings, cost and expenses

in respect of or in connection with any injury to person or damage to

property by whom so ever sustained or by defective design work or

materials made done furnished or supplied by the contractor. The

contractor shall also be responsible for thefts of any property of the

Governor of Gujarat or of others committed by any employees of his

own or his subcontractors and shall be liable for the costs of replacing

any property stolen.

11. Insurance

Page 26: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

26

a. Subject as hereinafter provided the contractor shall at his own expense

insure and at all times prior to the commencement of the period of

maintenance keep insured against destruction or damage by fire or

earthquake storm and tempest such plant and materials ordered for the

work as may for the time being be upon the site for the full value of

such plant and materials.

12. Materials brought on the site

a. All materials, tools and tackle brought to and delivered upon the site

for the purpose of the work shall from the time of their being so

brought vest in and be the property of the RUDA but may be used for

the purpose of the work but for that purpose only and not on any

account be removed or taken away by the contractor or any other

person without the express permission in writing of the Engineer, but

the contractor shall nevertheless (subject as hereinafter provided) be

solely liable and responsible for any loss or destruction thereof or

damage there to unless resulting from causes beyond the contractor’s

control not being causes insurance against destruction or damage from

which is provided for in clause 11. The RUDA shall have a lien on

such materials, tools and tackle for any sum which may to any time

prior to the completion of the works be due or owing to him by the

contractor under in respect of or by reason of the contract and shall be

at liberty to sell and dispose of any of such materials, tools and tackle

remaining after the completion of the works in such manner as he shall

think fit, and to apply the proceeds in or towards the satisfaction of

such sum or sums so due or owing as aforesaid but subject to such lien

and power of sale and disposal such surplus materials, tools and tackle

shall being to the contractor and may be removed and disposed of by

him as he shall think fit after the lien is withdrawn by the Engineer in

charge.

13. Default

a. If the contractor shall at any time fail in the opinion of the Engineer to

proceed with the work with due diligence and expedition, or shall

refuse, neglect or omit to comply with any orders given to him in

writing by the Engineer in accordance with the provisions of these

Page 27: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

27

conditions or shall commit any other breach of the provision of the

contract, the Engineer shall be at liberty to give notice in writing to the

contractor to make good the failure neglect, omission or breach of

contract and should the contractor fail to comply with any such notice

within such period as may be prescribed in such period as may be

prescribed in such notice then and in such case the RUDA shall be at

liberty to employ workmen other than those of the contractor to

perform and execute the work in respect of which the failure, neglect

or omission referred to in such notice shall have been committed or

occurred. If the RUDA shall be think fit, It shall be lawful for him to

enter into a new contract with any other persons, or person, for the

execution of such part of the work as may not have been executed and

in that event the RUDA shall without incurring any liability to the

contractor be entitled to use all or any of the materials, tools, tackle or

other things which may then be on site for the purpose of completing

the work or any part thereof and to provide any additional materials

tools, or tackle required for the provide any additional materials tools,

or tackle required for the purpose and the cost of executing any such

work and providing any such materials shall be paid by the contractor

to the RUDA on demand.

b. Subject to and after satisfaction of the lien of the RUDA for any sum

due to him by the contractor for any expenses, cost or charges incurred

in the completion of the work all materials, tools, tackle or other things

remaining on the site and unsold after such completion shall forthwith

hereafter be removed by contractor.

14. Replacement of Defective work of material.

a. If during the progress of the work, the Engineer shall notify in writing

to the contractor that in his opinion the contractor has executed any

unsound or has supplied any material inferior in quality to those

stipulated for by the contractor, the contractor shall at his own expense,

within ten days of his receiving the notice, proceed with due expedition

to remove or alter and reconstruct or replace the work, or as the case

may be supplied fresh materials up to the standard of the specification.

In place of the work or materials complained of by the notice (as the

Page 28: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

28

case may be) and in case the contractor shall fail to do so the RUDA

may after the expiration of ten days from the giving of such notice in

writing stating that the RUDA intention so to do forthwith at the cost

of the contractor remove the work or materials complained of and

perform all such work or (as the case may be) supply all such materials

in place of those complained of any such removed and performance of

work or supply of materials shall be paid by the contractor to the

RUDA on demand, provided always that nothing in this clause shall be

deemed to deprived the RUDA or effect any other right or remedies

under the contract or otherwise which he may have in respect of such

defects or deficiencies. No payment which have been made on account

of materials delivered or work executed shall be looked on as

acceptance of such or any work or materials.

15. Cutting away and making good

a. The tender is to include all necessary cutting and making good for the

purpose of the contract of the wood work, walls, floors, etc. of the site.

The contractor will be held responsible for, and will have to make

good at his own expenses, to the satisfaction of the Engineer, any

damages to or disfigurement of the site which may have been caused

by the acts or omissions of himself or his servants or agents in

connection with the carrying out of the contract.

16. Contractor’s Representative and Workmen.

a. The contractor shall employ at least one competent representative

whose name or names shall have previously been communicated in

writing to the Engineer by the Contractor to superintend the carrying

out the works. The said representative, or if more than one shall be

employed then, one if such, representatives, shall always be present on

the site during working hours and any written orders or instructions

which the Engineer may give to the said representative of contractor,

shall be deemed to have been given to the contractor.

b. The Engineer shall be at liberty to object to any representative or

person employed by the contractor in the execution of or otherwise

about the work, who, in the Engineers opinion shall misconduct

himself or be incompetent or negligent and the contractor shall remove

Page 29: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

29

every person so objected to forthwith upon receipt from the Engineer

of notice in writing requiring him to do so.

17. A Minimum age of persons employed and employment of donkeys or

other animals

a. The contractor shall not employ any person who is under the age of 18

years.

18. The contractor shall not employ donkeys or other animals with breaching of

string or thin rope. The breaching must be at least three inches side and should

be of tape (Nawar).

19. No animal suffering from sores, lameness or emaciation or which is immature

shall be employed on the work.

20. If contractor does not accept the preceding conditions nos. (i), (ii) and (iii) his

tender shall not be accepted and his name shall be removed from the list of

contractors.

21. The Engineer shall remove from the work any person or animal found working

which does not satisfy these conditions and to responsibility shall be accepted

by the Governor of Gujarat for any delay caused in the completion of the work

by such removal.

22. SUBMISSION OF SAMPLES

a. The contractor shall not without written sanction of Engineer use for

the execution of the work any materials plant or stores of any type of

description other than those specified in his tender. He shall, if

required to do so, or at his options, deposit samples, at the office of the

Engineer of approval and the Engineer shall within 14 days of the

receipt of the samples, express in writing to the contractor his approval

or otherwise of the samples deposited, and all materials, plant and

stores used in the execution of the work must be in every way equal to

the deposited samples. All the deposited samples will be returned to

the contractor within one month of the work being taken over.

23. DEDUCTIION FROM CONTRACT PRICE

a. The amount or all costs or works, expenses or other sums which under

the contract shall be payable by the contractor to the RUDA from any

moneys due or becoming due by him to the contractor under contract,

Page 30: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

30

without prejudice to the RUDA, right to recover the same by the

ordinary process of law.

24. TERMS OF PAYMENT

a. Subject to any deduction which the RUDA may be authorized to make

under the contract, the contractor shall be entitled upon the certificate

of the Engineer to the effect hereinafter stated payments of R.A. Bills

shall be made to the contractor as per items, in measurable units

executed according to the specifications. The payment shall be made as

per the following: and subject to availability of Fund/Grant.

25. Terms and Conditions

1. 65% of the cost of materials brought to the sites. (The details of the cost of

materials shall have to be furnished by the Agency on prorate basis, and) of

the contact value.

2. Balance amount on account of the cost of material and 25% of the contract

value shall be paid after the satisfactory installation, testing and

commissioning of the Lifts.

3. Balance amount of 5% of the contract value shall be paid to the contractor

after satisfactory running of the Lifts up to 2 months from the date of handling

over the Lift to the department.

4. 5 % after completion of defect liability period.

26. Certificate of Engineers

a. Every application to the Engineer for a certificate must be

accompanied by a detailed claim (in duplicate) setting forth (in the

order of the Schedule for price, if any) particulars of the plant or

materials delivered and work executed to the date of the claim, and the

certificate as to such of the plant and work mentioned in the claim as is

in the opinion of the Engineer in accordance with the contract shall be

issued within 14 days of the application. No application for a

certificate shall be made within 14 days of previous applications.

b. After successful installation of the lift, it shall be the duty / work of

contractor to the get the lift inspected from Electrical inspector for

required certification of viability of the lift operation.

27. Certificate not to affect rights of the RUDA or Contractor

Page 31: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

31

a. The Engineer may by any certificate make any correction or

modification in any certificate previously issued by him; any payment

shall be regulated and adjusted accordingly. No certificate of the

Engineer shall nor shall any payments on account by the Governor of

Gujarat to the Contractor, Nor extension of time for the execution of

the works by the contractor which may be granted by or on behalf of

the Governor of Gujarat against the contractor under or relieve him any

of his obligations for or in respect of the due performance of the

contract, or be interpreted as approval of work done or of material

supplied.

28. Suspension of Work

a. The RUDA shall pay to the contractor all proper expenses arising from

suspension of the works, by order in writing of the Engineer or any

other officer on behalf of the RUDA unless such suspension is due to

some default on the part of the contractor or any sub- contractor under

him.

b. Damages for delay in completion.

i.If the contractor fails to complete the work under contract by the

stipulated date, he shall pay liquidated damages of 0.1 % of the

contract value per day to maximum 10% of value of work from the

date of delaying the said work up to the date of completion and

handing over.

ii.Delays requiring payment of ten percent liquidated damages of the

value of work for performance shall be sufficient cause for termination

of contract and for forfeiture of security deposit including amount of

performance bond in and registration of the contractor shall also be

kept in abeyance for three years from the date as fixed in all cases.

If the contractor shall desire and extension of the time for completion

of work on the ground of his having been unavoidably hindered in it

execution or on any other ground he shall apply in writing to the

RUDA before the expiration of the period stipulated in the tender or

before expiration of 30 days from the date on which he was hindered

Page 32: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

32

as aforesaid on which the cause for making for extension occurred

whichever is earlier and the RUDA may if in his opinion, there are

reasonable and bonafide grounds for granting an extension, grant such

extension as he thinks necessary or proper. The decision of the RUDA

in this matter shall be final.

The date of receipt of application by the Executive Engineer shall be

considered as the date of application for the purpose of counting the

period as mentioned above.

If the contractor or his workmen, or servants shall break, deface, injure

or destroy and part of the building or the work in question in/or which

they may be working or any building, road, fence, enclosure or glass

land or cultivated ground contingencies to the premises on which the

work or any part thereof is being executed or if any damage shall be

done to the work from any cause whatever before completion of the

work or before the completion of the maintenance period whichever is

later or any damages occurred/caused due to normal flood or rain or if

any imperfection become apparent in it within three months from the

grant of a certificate of completion, final or otherwise by the Engineer-

in-Charge shall be final the contractor shall make good the same at his

own expense or in default the Engineer –in-charge may cause the same

to be made good by other contractor and deduct expenses (of which the

certificates of the Engineer-in-charge shall be final) from any sums that

may then be due or may thereafter become due to the contractor or

from his security deposit or the proceeds of sale thereof a sufficient

portion thereof.

29. Penalty Clause during 5 Years of Free maintenance: if the contractor fails

to rectify any defects/damages arising during maintenance period

within 24 hours of intimation by RUDA officials either verbally or in

writing than a penalty of Rs.1000/- per day which may be extendable

upto Rs.5000/- if the said defect is not cleared within the next 72

hours.

Page 33: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

33

If even after such intimations the defect is not solved than RUDA shall

carry out the work at the risk and cost of the contractor. The same

amount shall be deducted from the Security deposit submitted.

30. Force Major Clause: However, neither party shall be liable to the other for

any loss damage occasioned / caused by or arising out of acts of God,

and in particular. Unprecedented floods, volcanic eruption, earthquake

or other conclusion of nature and other acts such as but restricted to

invasion, the act of foreign countries hostilities or warlike operation

before or after declaration of rebellion military or usurped power

which prevent performance of the contract and which could not have

been foreseen or avoided by a prudent person.

NOTE: Unprecedented Flood means the flood crossing the high flood

level of the Past year(s) which is on the available record.

31. Time of taking over

a. The work shall for the purpose of all provisions of these conditions be

deemed to have been completed and taken over by the RUDA when

the Engineer, shall have certified in writing that it has been completed

in accordance with contract conditions and such certificate shall not be

unreasonably withheld nor shall the Engineer delay kits issue on

account of commissions or defects which in his opinion do not effect

the efficient use of the work, but such issue shall be without prejudice

to the contractor’s liability to make good any such omissions and

defects with the greatest possible expedition.

32. Death and Bankruptcy.

a. If the contractor shall die, or become insolvent or bankrupt or have a

receiving order made against him nor compound with or make any

proposal carrying on his business under inspection or for the benefit of

his creditors, or commit an act of insolvency or bankruptcy, or being a

corporation be ordered to be wound up or to the contractor his legal

representative to determine the contract and the Governor of Gujarat

may in that event complete the contract in such time and manner and

by such person as he shall think fit.

b. Settlement of Disputes

Page 34: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

34

c. All the disputes regarding the Contract shall be subject to settlement as

per arbitration act.

33. Contract Drawings

a. The contractor shall submit to the Engineer for his approval on or

before the dates stipulated for this purpose in the specification copies

of all the drawings of the general arrangements of the plant as set out

therein and of such detailed drawings as may be reasonably necessary.

b. Within 14 days from the receipt by him of such copies or in absence of

such notification within 30 days from the receipt of such copies, the

copies in ink or tracing cloth or Ferro Gallic prints mounted on cloth,

of all drawings as approved shall be supplied to the engineer by the

contractor respectively and shall thereupon the signed by the contractor

and become the property of the RUDA. Such signed copies of the

drawing shall not be departed from in any way whatsoever except with

the written permission of the Engineer. During the execution of the

work, the signed copies shall always be kept available for reference on

the site.

c. In the event of the contractor desiring to keep in his own possession a

signed copy of the drawings approved, he shall supply three copies

instead of two and in this case the Engineer shall sign the third copy

and return the same to the contractor.

34. Manner of Execution, Quality of Materials, etc.

a. The plant shall be manufactured, constructed, provided, put in position

and maintained in the best and most substantial and workmen like

manner and materials of the best and approved qualities having regard

to their respective uses.

35. Tests on Site

a. In all cases where the special conditions are provided for tests on the

site whether of plant, materials or workman ship the RUDA except

where otherwise specifically stipulated shall provide free of charge

such labor, materials, fuel, stores, apparatus and instruments as may be

requisitioned from time to time efficiently to carry out such tests in

accordance with the conditions.

Page 35: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

35

b. Where electrical energy is required for tests on site and a supply is

available on the site from an existing installation, such electrical

energy shall be supplied to the contractor by the Government free of

charge at the pressure and frequency of the ordinary supply is

available. The electrical energy necessary for such tests shall be

provided to the contractor.

c. All the Testing Charges will be born by the Agency, and it will not be

reimbursed.

36. Delivery of Lifts and materials

a. No plant and materials shall be

tendered for delivery until and intimation in writing shall have been

given to the contractor by the Engineer that RUDA is ready to take

delivery.

37. Tests on Completion

On the completion of the works on the site in accordance with the contract the

contractor shall give the Engineer notice in writing of such completion. The

Engineer shall after receipt of such notice, by notice in writing under his hand

for date and an hour on that date for the making of the test on site if any such

are provided for the contract.

a. The contractor shall carry out such tests upon the date and at the hour

so fixed and if the Engineer or his authorized representative shall

attend on that date at that hour such test shall be carried out in the

presence of the Engineer or such representative.

b. If any portion of the plant fails under the tests to satisfy the contract

conditions similar test according to the contract of the portion so

failing shall if required by the Engineer or by the contractor be

repeated within a time to be fixed by the Engineer and the provision of

this clause shall apply to such repeat 20 test as if they were the original

tests and the contractor shall pay to the RUDA all reasonable expenses

to which may be put by such tests.

c. If the tests or any repeated test so required as aforesaid be not made by

the contractor on the date fixed as aforesaid for the same by the

Page 36: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

36

Engineer may proceed to make such test himself at the contractor’s

risk and expense.

d. If in any test under this clause the plant tested shall fail to satisfy the

contract conditions the Governor of Gujarat shall as from the date

stipulated by the contract for completion nevertheless have the right of

using such plant until the same shall satisfy such conditions and such

use shall be at the contractor’s risk. In the event of the question

whether the works have been completed in accordance with the

contract or any question regarding such completion being submitted to

Arbitration as any portion of the plant, the Engineer may certify to be

capable of being used on conditions of paying to the contractor a sum

calculated (according to the period or the use) at the rate of 5% per

annum upon the amount withheld or deducted in respect of such plant.

38. Rejection of Defective Work

a. If the works, or any portion thereof shall not in the opinion of the

Engineer on the stipulated tests (if any) being made in accordance with

the contract satisfy the contract conditions within three months after

the date stipulated for completion the Engineer may give notice in

writing to the contractor setting for the particular of the defects of

particulars in respect of which the works in his opinion fails to comply

with the contract conditions and requiring the contractor to make good,

after or replace the same within such time to be specified in the notice

as the Engineer may consider reasonable and the contractor shall

make good, alter or replace the same as required by such notice and so

as to make it employ with the requirements of the contract conditions

with the time so specified. Should he fail to do so, within that time the

Governor of Gujarat may make good, alter or replace the same as so

required and the cost of such making alteration good or replacement

(less in the case of any replacement any sum which would have

become due to the contractor under the contract in respect of the works

replaced and which shall not have been paid to him) shall be paid by

the contractor to the Governor of Gujarat on demand or should the

Governor of Gujarat not make good, alter or replace any defective

Page 37: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

37

works in respect of which such notice as aforesaid shall be given

within six weeks from the date of the given of such notice the

contractor shall repay to the Governor of Gujarat all sums (if any) paid

by him to the contractor in respect of such works. Nothing contained in

this clause shall prejudice or affect the rights of the Governor of

Gujarat under the contract whether in the way of enforcement of

penalties or otherwise in respect of any delay in the completion of this

work.

39. Use of plant of works pending making good.

a. If at expiration of the time specified for making good, altering or

replacing the plant of works, in any notice given by the Engineer to the

contractor under the last preceding clause the contractor shall not have

duly made good, altered or replaced the same in accordance with the

contract the Governor of Gujarat shall be at liberty if he things fit to

make use of the same for such time as shall be reasonably sufficient

according to the circumstances to enable him, to make good, alter or

replace the same (whichever he made see fit to do ) provided that in

respect of the period of such user, the Governor of Gujarat shall not be

entitled to any damages under clause 24 of these conditions an in the

case of complete replacement, the contractor shall be entitled to be

paid in reasonable sum for the same.

40. Workman’s Compensation in case of injury

a. The contractor shall be responsible for any compensation and shall pay

to his workmen, compensation payable for injuries under, the

workmen’s Compensation Act, 1923 (VII OF 1923) hereinafter called

the said Act. If such compensation it shall be recoverable by

Government from the contractor under sub section (2) of the said

section such compensation shall be recovered in the manner laid down

in clause 3 and 10 of the conditions of contract.

41. The Apprentices

a. The contractor shall afford or procure as the case may be every facility

to Indian apprentices of practical training in the factory, owned,

managed, controlled or patronized by them, so as to enable the Indian

Page 38: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

38

Apprentices to acquire full knowledge of the technique and work of

their trade industry calling or profession.

42. Set-off Clause

a. Any sums of money due to the contractor (including the security

deposit returnable to the contractor) under this contract shall be

appropriated by the RUDA and shall be set off against any claim of the

Govt. for the payment of sum of a money arising out of or under any

other contract made by the contractor with the Govt. when no such

amount for purpose of the recovery from the contractor against such

any claim of govt. is available a recovery shall be made from the

contractor as arrears of land revenue.

43. Appointment of Local Labourers.

a. The contractor should as far as possible obtain the requirement of

labourers, skilled and unskilled from the nearest employment

exchange, so as to utilize the local employment potential. If there are

no local employment exchange or such exchanges are not able to

provide required locally suitable local labour should be utilized to

maximum extent possible.

44. Fair-Wages

a. If a contractor fails to pay within 7 days to the labourer(s), worker(s)

the minimum wages Act, 1949 as in force from time to time the

Executive Engineer or the officer of a equal rank shall be at liberty to

deduct the amount payable to the labourer(s), Worker(s) from

contractor's bill or deposit(s) payable by the contractor after making

due inquiries and shall not be entitled to any payment or compensation

on account of any loss that he (contractor) may have to incur of the

action as aforesaid. Before the action as aforesaid is enforced notice is

writing to the contractor shall be issued by the Executive Engineer or

the Officer of the equal rank to pay the wages as per Minimum Wages

Act in force at the relevant time. If the contractor does not act as

aforesaid with 7 days then the action contemplated as above shall be

taken against him.

Page 39: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

39

Signature of

Contractor’s

Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 40: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

40

SPECIAL CONDITIONS OF CONTRACT

(A) Scope of Work

To provide necessary scaffolding in each elevator hoist way required during

the erection period and carry out minor builder’s work comprising of cutting

in walls, floors, partitions together with any repairs made necessary thereby

including grouting of all bolts, steel members, indicator and button boxes in

position of the elevator equipment.

The contractor shall also provide fascia plates between two landing doors,

doors posts (as required) machine beams, bearing plates, buffer support

channels, hitch beams, hitch plates and the stretcher angles (wherever hoist

way dimensions are in excess of what is required) at their cost and also erect

the same, where required.

Contractor shall also carry out necessary wiring work pertaining to elevator

equipment so also provide the light outlet in the pit and hoist way from the

main switches provided in the machine room.

Living accommodation for the erections shall also be provided by the lift

contractor.

(B) Following items shall be carried out / provided by the RUDA.

Three phase power supply in the machine room terminated in triple pole iron

clad switch fuse unit for the appropriate rating as per requirement of the lift

contractor for each lift separately, including required earthing.

Single-phase power supply in the machine room terminated in two nos.

Double pole iron clad switch fuse unit for the appropriate rating as per

requirement of the lift contractor for each lift separately, including required

earthing.

Exhaust fan will be provided by the Lift Agency of adequate capacity as

indicated by the lift Inspector for the proper ventilation in each machine room

iron ladder for going into the pit.

Suitable storage accommodation for lift material.

Free of cost Temporary electric Power Supply of required characteristic during

the erection of the elevators of illumination and operating of contractors tools

as well as for starting, testing and adjusting the elevator.

Page 41: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

41

(C) General

(1) Furnishing Technical Data

The necessary data regarding the hoist way and machine room details and

dimensions and such other technical information may be obtained by the

successful tenderers from RUDA concerned to prepare detailed layout

drawings and to shed with the performance of the contract.

(2) Submission of the Preliminary and final Layout Drawings.

The contractor shall submit to the department the final layout drawing within

7 (Seven) Days from the date of receipt of work order.

(3) Approval to Drawings.

The layout drawing will be returned to the contractor/s within 7 (seven) days

from the date of submission thereof.

(4) Free Maintenance

The contractor shall provide free maintenance service for the period of

05 Years from the date of handing over of the lift installation, covered under

this contract for beneficial use.

(5) Insurance

The contractor shall take materials –cum – erection risk insurance policy

under which the materials should be covered from the time they are dispatched

from the factory till the elevator is installed and handed over. The contractor

should also take the third party compensation insurance policy to cover their

employs working at the site.

(6) Prices

The rates should be quoted inclusive of delivery of materials to the site,

fabrication and installation of the lift equipment, and commissioning and

testing, of the lift, inclusive of all taxes, Excise duty, Octroi, and all other

imposts. The tenderer should clearly indicate the imposts and taxes as

applicable at present at their present rates, i.e. on the date of submission of

tender documents.

(7) Completion

The contractor/s shall undertake and complete the installation work of lift as

specified in Time Schedule.

(8) Deviations and Technical Information

Page 42: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

42

For all items offered against Schedule ‘B’ for each tender item separately.

The tenderers may give their offer based on their own design without effecting

the cage carrying capacity, Speed of the lift shall be 1.5 / 1.75 MPS, type of

machine, A.C.V.V.F control, operation, type of car and hoist-way, door and

door operations specified in Schedule ‘B’ of tender documents, however, the

deviation in technical specifications shall be brought out clearly as to what

respect the same defers from technical specifications shall be brought out

clearly as to what respect the same defers from technical specifications

appended with the tender documents, stating technical as well as financial /

commercial implications thereof from the specified.

(9) The contractor shall have to provide free maintenance service for 5 years as

per contract. Scope of work covered under Maintenance and Service period is

shown ahead separately. Maintenance and Service period will start from the

date of completion of work.

(10) No price escalation shall be given.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 43: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

43

DETAILED TECHNICAL SPECIFICATION

Motor

The A.C. Motor designed for elevator service will have high starting torque with low

starting current, suitable for existing machine.

Micro Processor Based Controller

It is technologically advanced system. The operational card file contains a logic board

with microprocessor chip, random access memory (RAM) and erasable programmable

read only memory (EPROM) chips to monitor and take over the command of the

elevator.

The Motion controlled consist of high performance, fully digital control V.F. drive

which the directly control the torque and speed of the elevator motor and thus

provides constant speed control under all loads conditions.

A large numbers of user friendly features are included in the microprocessor based

controller such as:

1. Detection stuck hall button

2. Motor over current protection (Built in inverter drive)

3. Fast speed / Deceleration protection

4. Passenger over load warning device/ optional

The system continuously monitors critical aspect of system health. Self health

diagnostic capabilities are built in to the control system to speed up trouble shutting

and can be monitored from seven segments display provided in the logic board. This

facilitates quick identification of fault and restoration to normal operation.

1.0 AUTOMATIC MICRO SELF LEVELLING:

For achieving accurate leveling at the floor the Lift should be provided with

the Micro Self Leveling Features. This Micro self leveling should, within its

zone, be entirely automatic and independent of the operating device and

should correct for over travel, under travel and rope stretch automatically. The

leveling in-accuracy should not exceed 12 mm irrespective of the load. Re-

traveling of car should not be possible with open doors.

Page 44: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

44

2.0 OPERATION: A.C. Variable voltage variable frequency:

2.2 MEMORY SYSTEM:

The system should have memory so that the calls once registered should not

get cancelled until it is attended to.

2.3 ATTENDENT OPERATION:

It should be possible to have with/without attendant operation.

2.4 FIREMAN SWITCH:

A key switch (or toggle switch in break glass) should be provided at ground

floor for the lift so that in emergency, the fireman can assume the complete

control of the required lift.

2.5 SEPARATE CAR AND HALL DOOR HOLD OPEN TIME:

Separate adjustable timers should be provided to establish minimum transfer

time for car and floor stops, the floor stop time being longer then the car stop

time to allow person waiting to leave and enter the car. It should be possible to

adjust the transfer time of ground floor separately from the time for normal

stop.

2.6 DIRECTION REVERSAL:

When a lift arrives at a floor where both the up and down floor calls have been

registered and no calls is registered in the car, in the direction in which the lift

is not to travel then the car door should close, floor lantern should reverse and

then the car door should re-open again, so that passengers traveling in the

opposite direction can make that lift. In other words, the lift should not travel

for one more floors before reversing the travel direction.

2.7 ADVANCE INTIMATION:

At the main lobby, there should be advance illumination of the up signals for

the lift which is going to be first dispatched. Similarly, for other floor when

the lift reaches, a predetermined distance from the floor where it is going to

stop the corresponding direction signals should be illuminated and going

should sound. This will facilitate the passengers to enter the lift with watering

time.

Page 45: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

45

3.0 CONTROLLER:

3.1 The relays and switches to use should be suitably designed for lift control

circuits.

3.2 The relays should be so mounted that they are visible for quick location of

faults and easy maintenance.

3.3 The contacts should be self wiping type.

3.4 Without dismantling the relay from controller body, it should be possible to

adjust the air gap between the contacts.

3.5 When required, it should be possible to replace the contact alone.

3.6 Proper identification marking should be provided on contacts relays and

switches.

3.7 In the event of spring failure, gravity switch should get released the relay.

3.8 The main power contact should be copper, to carbon type.

3.9 All the wiring of controller should be terminated in terminal block fitted on

the controller body.

3.10 A controller disconnect switch should be provided on the controller.

3.11 Suitable arc blowers and arc deflectors should be provided for main power

relays.

3.12 A reserve phase relay should be provided to protect the equipment against

phase reversal, low voltage and phase failure.

3.13 For easy maintenance and fault finding the wiring shall be distributed in

different zones with indicators.

4.0 SELECTOR:

The floor stop switches should not be installed in the shaft but the same should

be mounted on a selector located in the machine room.

5.0 SAFETIES:

Equipment offered should conform and comply with Indian Standard

Specification, Bombay Lift Act. as applicable to Gujarat State Indian

Electricity Rules and their relevant specifications and standards.

Page 46: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

46

6.0 TEST CERTIFICATE

6.1 It will be necessary for the supplier to furnish the certificate in

regard to the items such as Machine, Motor, Motor Generator Set, Ropes,

Safeties, Controller, Selector, Governors, Buffers etc.

6.2 There should be minimum 6 ropes of ½” diameter with 8 x 9 seal construction

as per IS : 2365 of 1962.

6.3 The hoist ropes should be attached to the car and counter weight by means of

spring fastenings to reduce stopping jerks.

6.4 The ropes are to be fitted in forged steel thimble rod to give strong and reliable

grip.

7.0 ELETRIC WIRING:

All necessary wiring in lift duct should be done in throughing for easy

maintenance.

8.0 COMPENSATING ROPES:

Each lift should be provided with compensating ropes to compensate for the

weight of the main rope.

9.0 SAFETIES:

Equipment offered should conform and comply with Indian Standard

Specification, Bombay Lift Act as applicable to Gujarat State Indian

Electricity Rules and their relevant specifications and standards.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 47: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

47

FEEATURES OF THE LIFT

Name of Work: - Buy Backing of Uninstalled Lift Materials and

Supplying, Erecting, Testing & Commissioning of Lift

for RUDA.

Sr. No. Particular of Lifts :

1 Type of Lift Service

: Passenger Lift.

2 Load

a. Number of Passengers

b. Capacity in Kg

:

13 Passenger-1nos 900 kg

3 Rated Speed in Meter Per Second

: 1.5 / 1.75 Mtr. / sec.

4 Total Travel in Meters : approximate 25 Mtrs.

5 Service to be provided

a. Stops

b. Opening

:

:

:

8 Stops

8 Openings

6 Inside size of the lift well in mm

(Width and Depth to be cleared)

: About 2400mm x 2400 mm.x 1500 mm

7 Clear Inside size of the Lift Car

: As per I.S.S. (2000mm x 1550mm)

8 Available Power Supply (Volts / Phase)

: 440 V. 3 phase 50 Hz. A.C. Supply.

9 Type of Control : Microprocessor base with ACVVVF

drive. With close / open.

10 Type of Operation

: Fully Collective

11 Car Entrance Door

(a) Number, Size and type of Opening

of Doors

(b) Operation (Manual / Automatic)

:

:

:

Protected by 8 Nos Steel sliding doors

stainless steel finish with 1000mm x

2000mm high.

Automatic

12 Construction Design and Finish of Car

Body Work

: Stainless Steel

Grade 304

13 Type of Signal System

: Automatic.

14 Details of Landing Doors with

Numbers, Size and Type of the Doors

: 8 Nos. 1000mm x 2000mm high steel

sliding door.

Page 48: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

48

15. Additional Items if Any : Single should be provided such as :-

1. Luminous buttons at all door.

2. Digital hall position at all floors.

3. Digital car position and

Direction in indicators in car

4. Car operation panel with

luminous buttons.

5. Battery operated alarm bell and

emergency light.

6. Intercom.

7. Over load warning indicator in

car.

8. Rescue Device.

9. Floor Announcing System.

10. Overload Alarm System.

11. Infra red light curtain safety

screen for automatic door.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 49: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

49

TECHNICAL QUESTIONERY

Name of work: Buy Backing of Uninstalled Lift Material and

Supplying, Erecting, Testing & Commissioning of

Lifts for RUDA. (This Technical Questionnaire should be filled in by the Tenderer for all items

covered under Schedule “B” and must be submitted along with Tender Documents).

Sr.No Items Compliance of Bidder

1 2 3

[A] Machine FOR 1.5 / 1.75 MPS ONLY

1 Drive Sheave Diameter

2 Grooving Angle.

3 Roping Arrangement

4 Rope Diameter

5 No. of Ropes

[B] LIFT A. C. MOTOR :

1 Make and Type

2 Rated K.W.

3 Rated H.P.

4 Rated R.P.M.

5 Full Load Running Current

6 Insulation Class.

Page 50: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

50

[C] CONTROLLER

1 Type of Contacts.

2 Operating Voltage

3 Make of Main Relays

4 Type of Rectifier.

[D] HOISTWAY ENTRANCE

1 Material

2 Gauge

3 Size of Vision Panels

4 Class Specification

5 Type of Roller used for Hangers

6 Materials of Rollers

[E] RAILS

1 Rail size : A. Car rails

B. Counter Weight

2 Maximum Car Rail Deflection, under Normal Operation.

3 Modules of Section.

4 Moment of Inertia found Flanges.

Page 51: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

51

5 Radius of Gyration Around Flanges.

[F] HOISTWAY ROPES

1 Name of Manufacture.

2 No. of Performed Strand.

3 Wires per Strand.

4 Lay

5 Tensile Strength of Rope

6 Safety Factor of Rope

[G] BUFFERS

1 Type of Car Buffers

2 No. of Car Buffers

3 Type of Counter Weight Buffers

4 No. of Counter Weight

Buffers

5 Stroke of Car Buffers

6 Stroke of Counter Weight Buffers.

7 Average Retardation Speed Buffer at Rated Load

8 Peak Retardation for all Buffers at Rated Load

Page 52: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

52

9 Duration of Peak Retardation at Rated Load

[J] SAFETIES

1 Furnish the List of Safeties Included.

2 The Equipment Offered Must Confirm to ISI

Bombay

3 Lift Act. as applicable to Gujarat State and Indian Electricity Rules 1956

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 53: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

53

Scope of Work covered under

All in Comprehensive Maintenance and Service Contract

(1) Maintaining the Lift to keep the equipment properly adjusted and in proper safe operating condition

by regular and systematically examining, adjusting, lubricating all parts / components, including

warranted repairs of replacement of machine, motor generator, controller and parts as required

including worm gears, thrust, bearings, break magnet coils or brake motors, brake shoes, brushes,

winding, commutators, rotating elements contacts, coils, resistance for operating and motor circuits,

magnet frames and other mechanical part due to wear and tear, using only genuine and original parts

(Manufactures invoice / Mark on parts shall be the proof the party being genuine, use of in genuine

parts with incorrect invoice, marks will be considered as breach of contract.) Mark of parts and

components will be got approved, if the original figments of manufacturer’s do not exit.

(2) Renewing guide shoes ribs or guides rails when necessary to ensure smooth and quiet operation and

to keep the guide rails properly lubricated.

(3) Renewing all wire ropes as often as necessary to maintain the adequate factor of safety to equalize

the tension on all hoisting ropes and repairing or replacing conductor cable.

(4) Maintenance of car enclosure, removable panels, door panels, plenum chambers, hung ceiling light

diffusers, light tubes and bulbs, handrails, mirrors and carpet, if any, hoist way enclosure, hoist way

gates, doors, frames, hand buttons, sills and batteries is not included in this contract. A printed price

list of these items published by the manufactures in this contract. A printed with the offer and fresh

price lists from time to time shall be furnished in advance for approval and settlement of payments of

these exclusive items of contract.

(5) Lubricating, servicing and checking of all components which should be done minimum once in a

month. The Executive Engineer/ Deputy Executive Engineer/ Engineer-in-charge can call back the

service of repairing crew any time during the month, during regular working hours as well as during

overtime hours and it will be obligatory on the part of agency to respond within 24 hours after

registration / intimation of call back.

(6) Servicing, repairing and replacement of spare parts, etc. should be carried out with the knowledge of

authorized representative/s of Electrical Division and his signature should be obtained in token of

works carried out.

(7) Preventive repairs shall be attended to in a phased program and the Section Officer In charge shall

notify such maintenance closures to public.

(8) The contractor shall as far as possible, attend the call of the Engineer In charge quickly for such of

these items which are required to be done under the terms of contract. If no response to attend the

Page 54: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

54

call is for the coming from the contractor within 48 hours till the report undertaking the work,

recovery calculated on hourly rate basis for the service contract would be recovered from him.

(9) The lifts under contracts should function satisfactorily for the entire period of contract. The lift

installation shall be inspected once in months by the Section Engineer of the firm jointly with the

Authority representative of RUDA and suggestion and remedial measures to the bottle-neck, if any,

and for better functioning be sorted out. The lift working days are considered as 300 days per year

and stoppage on account of maintenance and repairs are allowed at 15 days in a year. The liquidated

damages for closure for any more periods, than stipulated above shall be recovered daily rated basis

by dividing the annual contract price by 300 days.

50 % of yearly contract value will be paid every six months as down payment against performance of

bank guarantee of the amount equal to down payment which will be settled against work done within

six months. In event of failure of attending repairs at any time, the work will be got done

departmentally or through another agency at his risk and cost, and the additional expenditure

incurred so, will be payable by the defaulter agency while making the payment of remaining 50 % of

contract value at the end of six months, the amount of work done at the risk and cost shall be

adjusted against work done for which satisfactory maintenance is certified by the Deputy Executive

Engineer In charge. The bank guarantee shall be renewed year after year for the above said amount

till completion of the contract.

10. A log book will be maintained for each lift and the record of work done for servicing, maintenance

and repairs, etc. will be recorded there in jointly by the contractor and Liftman In charge to keep

track of periodical work done in each lift. This will be considered basic record for all purpose for all

purposes including these specified in paras.

11. All Legal Liability in case of passenger trap in the elevator, insurance, fire shall be covered in the all-

in-service contract and hence no subsequent claim in this regard shall be entertained.

The accepting authority or the Director Projects In-charge of the work reserves the right to terminate

and/or suspend the contract at any time after giving 10 days prior notice of his intension to do so

without assigning reasons thereof.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 55: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

55

FREE MAINTENANCE OF LIFT FOR 5 YEARS

The inspection and tests of the lifts should be performed by a qualified Engineer, Who should be

thoroughly acquainted with the mechanical and electrical details of the lifts. Inspection of lifts should be

carried out such month during which time necessary oiling should be done and adjustment are made as per

requirement. Agency should inform the authorized person of this department the condition of the lifts every

month and thus given an opportunity of removing the defects before damage is done to the equipment or

accidents occur to the passengers.

INSPECTION

1. Switches and Fuses

Check the size of the motor fuses and the setting of any circuit – breaker should be checked against

the nameplate rating of the motor.

2. Motors

In motors if plain bearings with ring lubricator are fitted, it should be noted whether the oil is at the

correct level and whether any leakage is occurring at the drain plug, tap or oil gauge. Ball or roller

bearings are packed with grease by the makers, and replacement is only necessary about every six

months, where a little pure petroleum jelly should be used. Excessive wear of the bearings can often

be detected by a distinct knock and results in un-due strain being placed on the coupling and the

worm gear bearings.

3. Brake

The brake and the coupling upon which the brake are usually operated. The coupling should be

examined to ensure that the bolts are tight and that the keys joining the shafts on each side are not

loose. If the motor winding wheel is inserted, and turned in each direction, looseness of the key on

the motor shaft can be detected. Similarly, the key on the worm shaft may be observed, but in this

case the brake must be released. Particular attention should be given to the adjustment of the brake,

as an incorrectly adjusted brake will cause faintly floor leveling. When the design permits, each half

should be adjusted independently so that the clearances of both shoes are the same. The clearances

between the brake lining should be as small as possible, and will be found in practice to be between

1/100” (0.25 mm and .4 mm), if correctly adjusted. Next adjust the solenoid plunger so that the

maximum possible pull is obtained. This is the case when the maximum number of lines of force is

present in the air gap. Under these, conditions the brake should just operate when the magnetic

circuit closes. The spring pressure should then the adjusted until smooth and rapid stopping is

obtained, the actual stopping distance will vary with the car speed. After the brake has set, the car

Page 56: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

56

travel should not exceed about 4” (100 mm) for each 100 ft/min. (0.5 m/s.) of running speed. The

operation of any emergency brake

4. Gearing

Examine the level of the oil in the gearbox which if the gear is of the under type, the should be

sufficiently high just to cover the worm. If the over-type gear is employed, the level should be about

4” (100mm) above the bottom of the worm wheel. The gear oil recommended by the makers should

be used. The oil should be free from metal particles and should not be semi solid, gummy of have an

offensive odour. The gear case should be examined for leaks and tightened where necessary, and if

the gland is showing signs of leakage, the gland nuts should be tightened up in rotation. Wear of the

gear teeth can be detected by removing the gearbox cover and turning the motor by hand. A double

thrust race is usually fitted at the outer end of the work shaft to accommodate the worm thrust in both

directions of travel, and an inspection of this thrust race is necessary to ensure that excessive wear

has not taken place. If undue wear is present, the thrust is likely to be transferred to the motor

bearings, which may overheat and cause a break-down. Wear may be compensated for by removing

the thrust and making adjustment.

5. Sheaves and Pulleys

The sheave or drum and any diverting pulleys should be examined to detect whether any looseness

on the shafts is present due to the keys working loose. If looseness is present, the key should be

driven in tightly, but it may be necessary to fit a new key. With a traction drive, the sheave grooves

should be examined for wear and if-ridges are present in the grooves these may, in time cause rope

slip which will result in rope wear. The sheave seat to the same depth in the grooves. The presence of

a crack in the sheave, drum or diverting pulleys may be detected by hammer testing. Test the bearing

bolts for tightness.

6. Controller

The contacts on the controller are copper-to-carbon or copper to copper, and in the latter case, if

cleaning is necessary, care may be taken to ensure that any “roll” incorporated in the designs is not

reduced or destroyed. If this is done, welding of the contactors may result. When an appreciable

amount of cleaning or filling of contacts is necessary the profile of the contacts should be tested with

a template having the same curvature as a new contact, before the contacts are replaced. The

mechanical interlock, between the reversing contactors should be examined if such an interlock is

fitted. The pins on which the various contactors operated should be perfectly free and should

occasionally be given a drop of thin oil. Careful inspection of any controller dashpots is necessary to

ensure that they provide the time lags intended. It is important to use only the type of dashpot oil

recommended by the makers, or the settings will become inaccurate. An electrical insulation test

Page 57: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

57

should be taken on motor and control circuits at a voltage of 500 V D.C. and when taken from the

main switch with all coils in circuit should be less than 1 M. Ohm.

7. Floor Selector

After the brake has been correctly adjusted, an inspection may be made of the floor selector gear if

the lift is automatically controlled, and any necessary adjustments made. The operation of each

striker arm and its associated switch should be examined to see whether the best possible leveling is

obtained at each floor. This adjustment will provide the best average leveling in the up direction for

all loads if the counterweight is equal to the weight of the car plus 50% full load. Hence, with 50%

full load, accurate leveling in the up direction should be obtained. If, however, the counterweight is

say equal to car plus 40% full load, it will be necessary for the car load during the load leveling test

to be equal to 80% full load instead of full load. This will ensure that correct leveling is obtained in

the up direction with 40% full load in the car. The strikers operating the down direction switches

must be adjusted in a similar manner to that for switches, but with the car traveling in the down

direction. During these down direction tests it will be noted that the empty car will again level high

and the loaded car low. When a two speed motor is employed, the floor selector will have slowing

switches fitted for each direction is addition to stopping switches. The slowing switch strikers should

be adjusted so that the lift speed is reduced to the low speed value before the stopping switches are

operated and the brake applied. If stopping and leveling are performed by direction switches in the

well and a cam is fitted on the car instead of a floor selector in the motor room, it will be necessary,

in order to check the leveling to take measurements at the floors after stopping the lift at each, floors

when traveling up empty. Adjustments should be made to the positions of the switches (except the

ground floor switch) so that the stopping distances above each floor are equal. Similarly, the position

of the ground floor switch should be adjusted until the stopping distances below each floor are equal

when the car travels down loaded. When the switches and cam have been adjusted, the only reason

for inaccurate floor leveling will be that the brake is out of adjustment. It will probably be found

more convenient to test these direction switches, when fitted, after the motor room inspection has

been completed.

8. Final Terminal Stopping Switch

This should occasionally be tested by holding in the appropriate controller contactors and allowing

the car to operate the switch after over traveling each terminal landing in turn. The final limit switch

is usually operated by a striker on the car engaging with a stop on the limit switch operating rope.

One stop being fitted for each terminal landing. The over-run, after passing the terminal floor and

before the limit switch operated, may be adjusted by altering the position of the rope stop. Two plaint

marks on the operating rope or pieces of adhesive tape are after used to indicate that when the marks

are opposite to each other, the rope stops are in their correct position in the well.

Page 58: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

58

9. Governor

The over speed governor must be lubricated where necessary and kept clean. During inspection the

weights should be operated by hand to see that firstly, the control cut off switch operates and

secondly, the governor gripping jaws are released and grip the governor rope.

10. Ropes

Before leaving the motor room a careful visual examination should be made of those portions of the

lifting ropes which pass over the sheave or drum during a complete journey of the lift. Any

“needling” of the ropes, i.e. broken wires, should be carefully noted, the detection of these “needles”

being greatly facilitated by the aid of a small mirror used for the underside of the ropes or by a way

of cotton waste held lightly against the ropes. If performed ropes are used, much greater care will be

necessary in detecting broken wires as they retain their original position in the strands even when

fractured. The presence of a few broken wires does not indicate that the rope should be immediately

renewed, as the factor of safety is usually about 10, about rather that the ropes should be kept under

careful observation during subsequent visit. It is very difficult to quote any rule for determining

when no broken wires have been visible, and others when the rope has given long service after a

comparatively large number of wires have been broken. The decision to renew a rope rests largely

upon the engineer’s experience and is usually governed by the number of adjacent broken wires.

Undue rope stretch is another indication of approaching rope failure.

11. Call Buttons

Call the car to each landing by pressing the landing buttons in turn and if the lift is arranged for dual

control and the inspector’s mate rides in the car during these tests, the operation of the car call

indicator and position indicator can be observed at the same time.

12. Landing Gates or Doors

The lock of each landing gate or door, should be tested by ascertaining that it is impossible to open

any gate or door by pulling or lifting, or to stop the lift by breaking the electric interlock circuit,

unless the car is at that landing.

It should also not be possible to move the car away from any landing with the gate or door at that

landing open and if this is confirmed at each landing, then the landing door electric interlocks are

breaking contacts satisfactorily.

If gates are fitted, it is now a convenient time to note whether they can be opened or closed readily

and if not a drop of oil on each picket pin and on the overhead supporting roller pins, unless the latter

are of the ball breaking type, will ensure easy operation. See that door hangers and tracks are clear

and adequately lubricated.

13. Car Floor Switch

Page 59: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

59

Check that the car door or gate electric switch shall prevent the lift from being started or kept in

motion unless the car gates or doors are closed.

14. Car Door or Gate Electric Contact

If this switch closes and opens satisfactorily the car may be moved by the car buttons or car switch if

the door is open. The cover of the switch should be removed occasionally and if necessary the

spindles lightly oiled and the contacts cleaned. The position of this interlock may be such, however,

that it may have to be inspected from the top of the car.

15. Car Push Buttons

Test these by brings the car to each floor in turn by pressing the appropriate button. It should be

possible to stop the motion of the car at any position in the well by operating the stop-button. If any

button is uncertain in its action, the cover plate should be removed and the contacts cleaned and if

necessary is new spring fitted.

16. Emergency Signal

The bell, buzzer of telephone fitted in the car should be operated and should be clearly audible

outside the lift well when the car midway between adjacent landings. In some building this signal is

arranged to give warning in the maintenance engineer’s room.

17. Lighting Fitting

Examine to see that it is securely fastened tat the illumination is adequate and that the switch

operates satisfactorily.

18. Door operating gear

Examine the motor and door operating levels clean and lubricate if necessary. Watch the operation of

the gear when the doors open and close.

19. Retiring Cam Mechanism

Operate the cam by pulling the connecting chain by hand and not if the cam advances and retires

freely. Observe whether it clears the door lock striker arm or the sill trip level when in the retired

position. The operating solenoid or motor and levers should be examined and lubricated.

20. Governor Rope Release Carrier

Visually examine the rope grip and the springs to see that they are clean and not rusted. This release

should be tested by engaging the governor jaws (usually in the machine room) with the governor

rope by hand and then lowering the car either by the motor hand wheel or at the slow leveling speed.

The Shackle should then pull out of its carrier and if the descent of the car is not checked the safety

gear will operate.

Page 60: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

60

21. Rope Tension

If rope equalizing gear is not fitted, the rope tensions may be tested with the car about half way

between the top of the well and the counterweight. Pull each rope in turn with a spring balance and

note the deflections with equal pulls. IF any rope can be deflected more than the others, it is not

carrying its proper share of the load and adjustments should be made at its screwed support.

22. Counterweight

When the car is opposite the counterweight, the counterweight shoes and guide lubricators may be

inspected in a similar manner to that adopted for the car fittings. Examining the counterweight

sections to see that none is displaced in the frame and that the nuts and pins are in their proper

positions at the ends of the tie rods. IF 2 to 1 roping is employed see that the pulley at the top of the

counterweight is adequately lubricated. In many lifts the counterweight oil buffers are fitted to the

bottom of the counterweight and if this is the case examining the oil level in them. Make sure that the

counterweight guard at the mid-well position is securely fixed. Inspect the counterweight safety gear

as described later for the car gear.

23. Guides

When moving the car slowly from the top to the bottom of the well, the guide surfaces, joints, clips

and brackets should be inspected for wear or looseness and when the car is at the bottom landing

may noticeable bend in the guides can be detected by sighting along the face of each car and

counterweight guide in turn.

24. Landing Gate or Door Locks

These should be examined periodically and if necessary the striker arms adjusted and worn rubbers

renewed. The covers should be removed the inside of the box wiped free of cost, the mechanism

lightly oiled and the contacts cleaned, with center opening swing doors and locks are mounted on the

underside of the door top frame and these may be inspected from the landing or the inside of the car.

25. Slowing and Stopping Switches

If slowing and stopping are performed by switches on the car and cams in the well or vice versa it

should be noted whether the switches and cams are in proper alignment and are securely fastened.

The slowing switches should operate sufficient in advance of the stopping switches to enable the

motor to reach its slow leveling speed before the application of the brake. The normal terminal

stopping switches are frequently fitted on the car and are operated by cams in the well, and these

should receive careful attention. After inspection, all these switches should be tested by operating the

car at normal speed between the extremes of travel.

26. Car Safety Gear

Page 61: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

61

IF of the wedge type, examine the jaws for freedom from contact with the guides and turn the drum

by hand or pull the safety cable the jaws tough the guides. Note that there is sufficient cable left on

the drum so that it will not be pulled from the drum when the safety operates. See that the levers are

adequately lubricated and that there is no excessive slack in the safety rope.

27. Car and counterweight Buffers

If these are of the special or volute spring pattern, examine to see that they fit vertically and securely

in their bases and the spring are not distorted.

With oil buffers ascertain that they have a sufficient supply of oil by inspection of gauge provided on

each and whether there is any side play in the position. If the counterweight buffers as well as the car

buffers are mounted in the pit, they will all be the spring return type and may be partly depressed by

standing on the top of the plunger. After release, the piston should return to its top position.

28. Governor Rope Pulley

Inspect during operation to make sure that the pulley frame is free to slide in its guides and that the

parts are adequately lubricated.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot

Page 62: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

62

ANNEXURE – A

F.D.R. / D.D.

[EARNEST MONEY DEPOSIT]

Page 63: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

63

ANNEXURE - B

SECURITY DEPOSIT SHALL

BE SUBMITTED IN FORM OF F.D.R ONLY

Page 64: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

64

ANNEXURE – C

PERFORMANCE BOND

_____________________________________________________________

(The date of this Bond must not be prior to the date of the instrument in connection with which it is given)

_____________________________________________________________________

Principal (Contractor)

_____________________________________________________________________

Surety (Bank)

_____________________________________________________________________

Sum of Bond

(Express in Words and Figures)

_____________________________________________________________________Contract No. and Date

_____________________________________________________________________KNOW ALL MEN

BY THESE PRESENTS THAT WE, THE PRINCIPALS AND SURETY above named are held and firmly

bound up to the ____________________

Hereinafter called and Employer in the amount stated for payment of which sum, well and truly to be made.

We bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these

presents subject to the provisions of which the aforesaid Contractor on demand and without demand on a

claim being made by the Employer.

THE CONDITIONS OF THIS OBLIGATION IS SUCH, that whereas the principals have entered into a

contract with the Employer numbered and dates as shown above and hereto attached for the execution of

work___________________________________________________________________________________

______________________________________________________________________________________

NOW THEREFORE, if the Principal shall well and truly perform and fulfill all the undertakings, covenants,

terms, conditions and agreements of said contract during the original terms of the said contract and any

extensions thereof that may be granted by the Employer with or without notice to the surety and during the

life or any guarantee required under the contract and shall also well and truly perform and fulfill all the

Undertakings, covenants, terms, conditions and agreements of any all duly and unduly authorized

modifications of said contract that may hereafter be made, notice of which modifications to the surety being

Page 65: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

65

hereby waived or shall pay over, make good and reimburse to the Employer all loss and damages which the

employer may sustain by reason of failure or default on the part of said Principal so to do.

We _____________________________________ further agree that the guarantee herein contained shall

remain in full force and effect during the period that would be taken for the validity of the said contract, and

that it shall continue to be enforceable till all the dues of the employer under or by virtue of the contract

have been fully paid and its claims satisfied or discharged or till the employer certifies that the terms and

conditions of the contract have been fully and properly carried out by the said contractor and accordingly

discharges the guarantee. Unless a demand or claim under this guarantee is made on us in writing on or

before the ______________________________________________________________________________

We shall be discharged from all liability under this guarantee thereafter.

IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their several

seals on the date indicated above the name and corporate seal of each corporate partly being hereto affixed

and these presents duly signed by its undersigned representatives, pursuant to authority of its governing

body.

In the presence of witness

Principal Individual

1. ______________________________ as to ________________________ (Seal)

2. ______________________________ as to ________________________ (Seal)

3. ______________________________ as to ________________________ (Seal)

4. ______________________________ as to ________________________ (Seal)

by _________________________________ offices Corporate Seal

Attested Corporate Surety _____________________________________

Business Address ________________________________________________________________________

_______________________________________ Affixed by _______________________________

Corporate Seal___________________________________________________________________________

Title___________________________________________________________________________________

For and on behalf of the Employer

Page 66: Volume II Tender Document and Technical Bidrajkotuda.com/pdf/tender/02Tender-Document-And-Technical-Bid-lift-rev2.pdf · Lift including free maintenance of 5 year lift for RUDA building,

66

ANNEXURE - D

MODEL FROM OF WARRANTY CLAUSE FOR A PERIOD OF 24 MONTHS

The contractors / seller hereby declares that the goods / store / articles sold to the buyer under this

contract shall be of the best quality ( and workmanship ) and shall be strictly in accordance with the

specifications and particulars contained / mentioned in the clause hereof and the contractor / seller hereby

guarantees that the said goods / stores / articles would continue to conform to :-

Description and quality aforesaid for a period of 24 months from the date of commissioned and

issue of acceptance certificate to the purchaser and that notwithstanding the fact that by the purchaser (

Inspector ) may have inspected and / or approved the said goods / stores / articles, if during the aforesaid

period of TWNETY FOUR months the said goods / stores / articles be discovered and to conform to the

description and quality aforesaid or have deterioration and the decision of the Purchaser in that behalf will

be final and conclusive ) and Purchaser will be entitled to reject the said goods / stores / articles or such

portion thereof as may be discovered not to conform to the said description and quality. On such rejection

the goods / stores / articles will be at the seller’s risk and all the provisions herein contained relating to

rejection of goods, etc. shall apply. The contractor / seller shall, if so called upon to do, replace the goods,

etc. or such portion thereof as is rejected by the purchaser otherwise the contractor / seller shall pay to the

Purchaser such damages as may arise by reason of the breach of the condition herein contained. Nothing

herein contained shall prejudice any other right of the purchaser in that behalf under this contract or

otherwise.

Signature of Contractor’s Dy. Executive Engineer

RUDA;Rajkot Director ( Projects),

RUDA;Rajkot