VMware ROI TCO Calculator Analysis Name: Report - Shared January 08, 2013

Upload: sc976430

Post on 19-Jun-2015

170 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VMware roitco_analysis

VMware ROI TCO Calculator Analysis Name: Report - Shared

January 08, 2013

Page 2: VMware roitco_analysis

Server Opening Questions

Server Opening Questions: Key Assumptions

Server Virtualization Savings On Server Hardware

Analysis Time Period

  

Number of Years (max 10 years) 5

Start Year 2013

End Year 2017

Start of 2013: Physical Servers (before virtualization)

CPU's / Server Cores / CPU Number of Workloads

Number of Servers

Avg Price / Server

Define Configuration of Physical Servers 1 1 200 400 $ 3,000

(server costs excluding HBA's and TOE cards) $

$

$

$

Number of Unvirtualized Workloads & Servers

      200 400

                 If 100% virtualized, what kinds of servers would host VM's?

CPU's / Server Cores / CPU Number of Workloads

Number of Servers

Avg Price / Server

Define Configuration of Host Servers 2 4 200 17 $ 10,000

(server costs excluding HBA's and TOE cards) $

$

$

$

Number of Virtual Machines & Host Servers       200 17

Current Consolidation Ratio (Workloads / Server)

         12:1

Maximum Consolidation Ratio (Workloads / Server)

         12:1

  

  

  

Assumes all host servers are new purchases, and existing servers are fully depreciated and retired as infrastructure transitions

     

Based on Average Number of Virtual Machines (VM's) per physical Core of: 1.50

     

Are servers leased?   No

(if yes, average price per server represents annual leasing cost)

   

   

   

Savings on Server Hardware Start 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

A) Extension of Unvirtualized Environment

Number of Workloads 200 210 221 233 245 258 0 0 0 0 0 258

Number of Servers 400 420 442 466 490 516 0 0 0 0 0 516

Servers retired   0 -400 0 0 -20 0 0 0 0 0 -420

Servers purchased for workload growth & refresh   20 422 24 24 46 0 0 0 0 0 536

Cash Expenditure (avg $ 3.0K per server)   $ 60,000

$ 1,266,000 $ 72,000

$ 72,000

$ 138,000 $ 0 $ 0 $ 0 $ 0 $ 0

$ 1,608,000

                         

B) Transition to Virtualized Environment

Virtualization Schedule (% workloads virtualized)   30% 50% 100% 100% 100%100%

100%

100%

100%

100%

 

Number of VM's                        

Virtualized Workloads   63 111 233 245 258 0 0 0 0 0 258

vCenter Server   1 1 1 1 1 0 0 0 0 0 1

vCenter Server Database   1 1 1 1 1 0 0 0 0 0 1

Total   65 113 235 247 260 0 0 0 0 0 260

                         

Number of Host Servers (12:1)   6 10 20 21 22 0 0 0 0 0 22

Servers retired   0 0 0 0 -6 0 0 0 0 0 -6

Server Virtulization

VMware ROI TCO Calculator 2

Page 3: VMware roitco_analysis

Server Virtualization Savings On Server Hardware: Key Assumptions

Servers purchased for workload growth & refresh   6 4 10 1 7 0 0 0 0 0 28

Cash Expenditure (avg $ 10.0K per server)   $ 60,000 $ 40,000

$ 100,000

$ 10,000 $ 70,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 280,000

                         

Remaining Unvirtualized Workloads 200 147 110 0 0 0 0 0 0 0 0 0

Remaining Unvirtualized Servers 400 147 110 0 0 0 0 0 0 0 0 0

Servers retired   0 -400 0 0 0 0 0 0 0 0 -400

Servers purchased for workload growth & refresh   0 110 0 0 0 0 0 0 0 0 110

Cash Expenditure (avg $ 3.0K per server)   $ 0 $ 330,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 330,000

                         

Server Hardware Savings (A-B)   $ 0 $ 896,000 $ -28,000$

62,000 $ 68,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 998,000

     

    

     

Annual growth in workloads: 5%  

     

Unvirtualized Server Refresh    

Simple: define aggregated refresh cycles nmlkji  

Existing unvirtualized servers useful life (yrs): 4  

Average age of existing servers (yrs)? 3  

New host servers useful life (yrs): 4  

     

Advanced: define servers retired for each year and category nmlkj  

     

     

Additional Advanced Functionality:    

Define non-linear growth for workloads? No (Manually adjust count of workloads)

Define changing consolidation ratios? No (Manually adjust count of host servers)

Define number of vCenter Server instances? No (Manually adjust number of vCenter Server + DB instances)

     

     

     

     

     

     

     

     

     

     

     

     

     

 

Server Virtulization

VMware ROI TCO Calculator 3

Page 4: VMware roitco_analysis

Savings on Server Power & Cooling

Savings on Server Power & Cooling: Key Assumptions

Server Impact On Server Storage

Savings on Server Power & Cooling 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

A) Extension of Unvirtualized Environment                      

Number of Servers   420 442 466 490 516 0 0 0 0 0 516

Power: Operating (kWatt hours)   825,552 868,795 915,970 963,144 1,014,250 0 0 0 0 0 4,587,710

Power: Cooling (kWatt hours)   1,073,218 1,129,434 1,190,760 1,252,087 1,318,524 0 0 0 0 0 5,964,024

Power: Rate (per kWatt hour)   $ 0.100 $ 0.103 $ 0.105 $ 0.108 $ 0.110 $ 0.113 $ 0.116 $ 0.119 $ 0.122 $ 0.125 $ 0.105

Power & Cooling Expense   $ 189,877 $ 204,818 $ 221,338 $ 238,556 $ 257,495 $ 0 $ 0 $ 0 $ 0 $ 0 $ 1,112,085

                         

B) Transition to Virtualized Environment                        

Number of Servers   153 120 20 21 22 0 0 0 0 0 22

Power: Operating (kWatt hours)   313,513 257,166 81,900 85,995 90,090 0 0 0 0 0 828,664

Power: Cooling (kWatt hours)   407,567 334,316 106,470 111,794 117,117 0 0 0 0 0 1,077,263

Power: Rate (per kWatt hour)   $ 0.100 $ 0.103 $ 0.105 $ 0.108 $ 0.110 $ 0.113 $ 0.116 $ 0.119 $ 0.122 $ 0.125 $ 0.103

Power & Cooling Expense   $ 72,108 $ 60,627 $ 19,791 $ 21,300 $ 22,872 $ 0 $ 0 $ 0 $ 0 $ 0 $ 196,697

                         Server Power & Cooling Savings (A-B) $ 117,769 $ 144,192 $ 201,548 $ 217,257 $ 234,623 $ 0 $ 0 $ 0 $ 0 $ 0 $ 915,388

 

 

 

 

Servers   Weeks   Days/Week   Hours/Day Avg operating power (kW) per server:

Hours of Operation = 52 x 7 x 24 Existing - unvirtualized 0.225

           New - virtualized

(75% of nameplate rating) 0.469

Hours of Operation per Year   8,736      

Multiple of Operating Power required for Cooling   1.3 x

Annual growth rate of electricity rate   2.5 %

 

 

 

Manually adjust cost per kWatt hour each year?   No

 

 

 

Impact on Server Storage Start 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

                         

A) Extension of Unvirtualized Environment (25% of servers attached to shared storage)

Number of FC SAN HBA's 100 105 111 117 123 129 0 0 0 0 0 129

HBA's retired   0 -100 0 0 -5 0 0 0 0 0 -105

HBA's purchased   5 106 6 6 11 0 0 0 0 0 134

Cash Expenditure   $ 6,000 $ 127,200 $ 7,200 $ 7,200 $ 13,200 $ 0 $ 0 $ 0 $ 0 $ 0 $ 160,800

                         

Number of FC SAN Switches 10 10 10 10 12 12 0 0 0 0 0 12

FC SAN Switches retired   0 -10 0 0 0 0 0 0 0 0 -10

FC SAN Switches purchased   0 10 0 2 0 0 0 0 0 0 12

Cash Expenditure   $ 0 $ 55,000 $ 0 $ 11,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 66,000

                         

Number of iSCSI SAN TOE Cards 0 0 0 0 0 0 0 0 0 0 0 0

iSCSI SAN TOE Cards retired   0 0 0 0 0 0 0 0 0 0 0

iSCSI SAN TOE Cards purchased   0 0 0 0 0 0 0 0 0 0 0

Cash Expenditure   $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

                         

Amount of Storage (GB)                        

Direct Attached Storage (DAS) 15,000 15,750 16,575 17,475 18,375 19,350 0 0 0 0 0 19,350

SAN / NAS shared storage 5,000 5,250 5,525 5,825 6,125 6,450 0 0 0 0 0 6,450

                         

Server Virtulization

VMware ROI TCO Calculator 4

Page 5: VMware roitco_analysis

Server Impact On Server Storage: Key Assumptions

                         

Direct Attached Storage (DAS) retired   0 -15,000 0 0 -750 0 0 0 0 0 -15,750

SAN / NAS shared storage retired   0 -5,000 0 0 -250 0 0 0 0 0 -5,250

                         

Direct Attached Storage (DAS) purchased   750 15,825 900 900 1,725 0 0 0 0 0 20,100

SAN / NAS shared storage purchased   250 5,275 300 300 575 0 0 0 0 0 6,700

Cash Expenditure   $ 2,375 $ 50,113 $ 2,850 $ 2,850 $ 5,463 $ 0 $ 0 $ 0 $ 0 $ 0 $ 63,650

                         

Total Cash Expenditure: Unvirtualized   $ 8,375 $ 232,313 $ 10,050 $ 21,050 $ 18,663 $ 0 $ 0 $ 0 $ 0 $ 0 $ 290,450

                         

B) Transition to Virtualized Environment (100% of servers attached to shared storage)

Number of FC SAN HBA's 100 86 76 40 42 44 0 0 0 0 0 44

HBA's retired   0 -100 0 0 0 0 0 0 0 0 -100

HBA's purchased   0 76 0 2 2 0 0 0 0 0 80

Cash Expenditure   $ 0 $ 91,200 $ 0 $ 2,400 $ 2,400 $ 0 $ 0 $ 0 $ 0 $ 0 $ 96,000

                         

Number of FC SAN Switches 10 4 4 2 2 2 0 0 0 0 0 2

FC SAN Switches retired   0 -10 0 0 0 0 0 0 0 0 -10

FC SAN Switches purchased   0 4 0 0 0 0 0 0 0 0 4

Cash Expenditure   $ 0 $ 22,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 22,000

                         

Number of iSCSI SAN TOE Cards 0 0 0 0 0 0 0 0 0 0 0 0

iSCSI SAN TOE Cards retired   0 0 0 0 0 0 0 0 0 0 0

iSCSI SAN TOE Cards purchased   0 0 0 0 0 0 0 0 0 0 0

Cash Expenditure   $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

                         

Amount of Storage (GB)                        

Direct Attached Storage (DAS) 15,000 11,025 8,250 0 0 0 0 0 0 0 0 0

SAN / NAS shared storage 5,000 10,988 15,463 26,438 27,788 29,250 0 0 0 0 0 29,250

                         

Direct Attached Storage (DAS) retired   0 -15,000 0 0 0 0 0 0 0 0 -15,000

SAN / NAS shared storage retired   0 -5,000 0 0 -5,988 0 0 0 0 0 -10,988

                         

Direct Attached Storage (DAS) purchased   0 8,250 0 0 0 0 0 0 0 0 8,250

SAN / NAS shared storage purchased   5,988 9,475 10,975 1,350 7,450 0 0 0 0 0 35,238

Cash Expenditure   $ 29,938 $ 59,750 $ 54,875 $ 6,750 $ 37,250 $ 0 $ 0 $ 0 $ 0 $ 0 $ 188,563

                         

Total Cash Expenditure: Transition to Virtualized   $ 29,938 $ 172,950 $ 54,875 $ 9,150 $ 39,650 $ 0 $ 0 $ 0 $ 0 $ 0 $ 306,563

                         

Server Storage Impact (A-B) $ -21,563 $ 59,363 $ -44,825 $ 11,900 $ -20,988 $ 0 $ 0 $ 0 $ 0 $ 0 $ -16,113

           

           

Key features in vSphere such as High Availability and vMotion are enabled by shared storage between hosts. For customers who will not be implementing

physical a shared storage solution, a new software solution from VMware, the vSphere Storage Appliance (VSA), transforms cheaper internal host storage

(up to 3 hosts) into a single shared storage resource.

           

Ideal for customers planning to virtualize smaller environments with vSphere Essentials+.

           

Virtualize storage with vSphere Storage Appliance? No      

           

Shared Storage

Do you currently have shared storage? Yes      

   

    % of shared storage by type           

Choose a shared storage technology: Select (total must = 100%) Percentage of servers attached to

Fibre Channel SAN gfedcb needs HBA & SAN Switch 100% shared storage:

iSCSI SAN gfedc Existing - unvirtualized 25%

NAS (NFS) gfedc New - virtualized 100%

           

Server Virtulization

VMware ROI TCO Calculator 5

Page 6: VMware roitco_analysis

Server Virtualization Savings On Server Networking

Server Virtualization Savings On Server Networking: Key Assumptions

Server Virtualization Savings On Server RackSpace

           

           

SAN Storage

           

HBA's per server 2     Cost per FC SAN HBA $ 1,200

        Useful life (yrs) 4

        Avg age of existing equip (yrs) 3

           

Number of ports per FC SAN Switch 24     Cost per FC SAN Switch $ 5,500

SAN Switch redundancy: 2x     Useful life (yrs) 4

        Avg age of existing equip (yrs) 3

           

           

Average storage per workload (GB)          

Existing - unvirtualized 100     Cost DAS per GB $ 1.50

New - virtualized (+50GB) 150     Cost SAN or NAS per GB $ 5.00

Reduction due to Thin Provisioning 25%     Useful life (yrs) 4

Savings on Server Networking Start 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

A) Extension of Unvirtualized Environment                      

Number of Network Switches 67 70 74 78 82 86 0 0 0 0 0 86

Switches retired   0 -67 0 0 -3 0 0 0 0 0 -70

Switches purchased   3 71 4 4 7 0 0 0 0 0 89

Cash Expenditure   $ 12,000 $ 284,000 $ 16,000 $ 16,000 $ 28,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 356,000

                         

B) Transition to Virtualized Environment                        

Number of Network Switches 67 26 20 4 4 4 0 0 0 0 0 4

Switches retired   0 -67 0 0 0 0 0 0 0 0 -67

Switches purchased   0 20 0 0 0 0 0 0 0 0 20

Cash Expenditure   $ 0 $ 80,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 80,000

                         

Server Networking Savings (A-B)   $ 12,000 $ 204,000 $ 16,000 $ 16,000 $ 28,000 $ 0 $ 0 $ 0 $ 0 $ 0 $ 276,000

       

 

 

 NIC's + TOE cards per

Server2

Cost per Network

Switch$ 4,000

  Ports per NIC / TOE card 2 Useful life (yrs) 4

  Ports per Network Switch 24Avg age of existing

equip?3

 

 

Savings on Server Rack Space 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

A) Extension of Unvirtualized Environment                      

Rack space required (Square Feet)   70 77 84 84 91 0 0 0 0 0 91

Annual expense   $ 84,000 $ 92,400 $ 100,800 $ 100,800 $ 109,200 $ 0 $ 0 $ 0 $ 0 $ 0 $ 487,200

                         

B) Transition to Virtualized Environment                        

Rack space required (Square Feet)   28 28 7 7 14 0 0 0 0 0 14

Annual expense   $ 33,600 $ 33,600 $ 8,400 $ 8,400 $ 16,800 $ 0 $ 0 $ 0 $ 0 $ 0 $ 100,800

                         

Server Rack Space Expense Savings (A-B)   $ 50,400 $ 58,800 $ 92,400 $ 92,400 $ 92,400 $ 0 $ 0 $ 0 $ 0 $ 0 $ 386,400

Server Virtulization

VMware ROI TCO Calculator 6

Page 7: VMware roitco_analysis

Server Virtualization Savings On Server RackSpace: Key Assumptions

Server Product Selection Editions

 

           

Include value of server rack space savings? Yes        

Calculate space in Square Feet or Square Meters? Square Feet        

           

Average server size (U's, please include any in-rack spacing)        

Existing - unvirtualized 1.0   Square Feet required per rack 7.0  

New - virtualized 2.0   Annual cost per Square Foot $ 1,200  

           

Average rack size (U's) 42.0        

   

   

   

You already know what you want         

  

        

Select your edition of vSphere:    Standard   

Advanced Features included:         

High Availability    gfedcb   

vMotion    gfedcb   

Data Recovery    gfedcb   

Hot Add    gfedc   

Fault Tolerance    gfedc   

vShield Zones    gfedc   

vSerial Port Concentrator    gfedc   

Storage vMotion    gfedc   

Distributed Resource Scheduler (DRS) + Distributed Power Mgmt (DPM) gfedc   

Third Party Multipathing    gfedc   

vStorage API's for Array Integration    gfedc   

I/O Control    gfedc   

vNetwork Distributed Switch    gfedc   

Host Profiles    gfedc   

Auto Deploy    gfedc   

Storage Distributed Resource Scheduler + Profile-Driven Storage gfedc   

        

Average configured vRAM of running VM's (GB's): 2.00   

        

Select your edition of vCenter Server: Standard   

Advanced Features included:         

Manage more than 3 vSphere hosts per vCenter Server instance gfedcb   

Linked Mode    gfedcb   

Orchestrator    gfedcb   

Server Virtulization

VMware ROI TCO Calculator 7

Page 8: VMware roitco_analysis

Server Product Selection Editions: Key Assumptions

Investment in VMware Software & Support (Over 5 Years: 260 Workloads on 22 Host Servers)

 

vSphere Edition: Standard        

       

Price per Unit (License + Subscription & Support): $ 1,318 Support & Subscription: Production Discounts? No

x Req'd Number of Units: 44 Years of SnS: 1

Total vSphere License + Subscription & Support [1 yr(s)]: $ 57,992 SnS Cost per Year $ 1,822

 

vCenter Server Edition: Standard        

Price per Unit (License + Subscription & Support): $ 6,244 Support & Subscription: Production Discounts? No

x Req'd Number of Units: 1 Years of SnS: 1

Total vCenter License + Subscription & Support [1 yr(s)]: $ 6,244 SnS Cost per Year $ 1,249

 

Total License & Support: $ 64,236        

 

OR          

 

Select to enter known costs gfedc gfedc gfedc gfedc gfedc

Enter Historical or ELA Cost 2013 2014 2015 2016 2017

VMware SW: Server Virtualization $ $ $ $ $

 

 

 

 

 

 

 

 

 

Server Virtulization

VMware ROI TCO Calculator 8

Page 9: VMware roitco_analysis

Server Product Selection Profesional Services Training

Services & Training 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

Investment                        

Onsite Assessment   $ 0                   $ 0

Operational Readiness   $ 0                   $ 0

vSphere Jumpstart   $ 0                   $ 0

P2V Jumpstart   $ 0                   $ 0

Fast Track                     $ 0

Install, Configure, Manage   $ 1,875                   $ 1,875

                         

Planning & Design                     $ 0

                         

P2V Acceleration (end to end application migration service)

Workload Migrations   63 45 117 0 0 0 0 0 0 0 225

Cost per Server  $ 2,720 $ 3,450 $ 1,877 0$ 0$ 0$ 0$ 0$ 0$ 0$ $ 0

Total                       $ 0

                         

vSphere Health Check (annual checkup)                      

Host Servers   6 10 20 21 22 0 0 0 0 0 79

Cost per Server  $ 2,175 $ 1,995 $ 1,860 $ 1,853 $ 1,848 0$ 0$ 0$ 0$ 0$ $ 1,896

Total   $ 13,053 $ 19,952 $ 37,199 $ 38,923 $ 40,648 $ 149,774

                         

Select to enter known costs   gfedc gfedc gfedc gfedc gfedc gfedc gfedc gfedc gfedc gfedc  

Enter Historical or PSO Credit cost   $ $ $ $ $ $ $ $ $ $ $ 0

                         

Services & Training   $ 14,928 $ 19,952 $ 37,199 $ 38,923 $ 40,648 $ 0 $ 0 $ 0 $ 0 $ 0 $ 151,649

 

Server Virtulization

VMware ROI TCO Calculator 9

Page 10: VMware roitco_analysis

Server Product Selection Profesional Services Training: Key Assumptions

Server Beyond Server Consolidation Savings On Labor

Professional Services & Training

Assessment Select to reviewWindows

Servers

Cost

per ServerInvestment  

Virtualization Assessment gfedc 420 66$ $ 0 onsite assessment

         

Operational Readiness Select to reviewDatacenter

Sitesper Site Investment  

Accelerator gfedc 1 $ 93,000 $ 0 organizational analysis & virtualization roadmap

         

Training Select to reviewDatacenter

Sitesper Site Investment  

vSphere Jumpstart gfedc 1 $ 10,000 $ 0 onsite: setup 2 vSphere hosts & 1 vCenter Server

P2V Jumpstart gfedc 1 $ 6,000 $ 0 onsite: demonstrate 4 workload migrations

         

Select to review Participants per Participant Investment  

Fast Track gfedc 1 $ 4,250 offsite: install, config, manage + advanced tasks

Install, Configure, Manage gfedcb 1 $ 1,875 $ 1,875 offsite: install, config, manage

         

Planning & Design Select to reviewDatacenter

Sites

Cost

per SiteInvestment  

Premium gfedc 1 $ 48,900 Design, installation, and operational documents & roadmap

         

Application Migration Select to review        

P2V Acceleration gfedc End to end application migration service

         

Annual Checkup Select to review        

vSphere Heath Check gfedcb Annual checkup for host servers

 

 

 

Savings on Server Provisioning Labor Start 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

                       

A) Extension of Unvirtualized Environment                      

Existing Servers 400 420 442 466 490 516 0 0 0 0 0 516

Servers retired   0 -400 0 0 -20 0 0 0 0 0 -420

Servers purchased: number to provision   20 422 24 24 46 0 0 0 0 0 536

Hours required for server provisioning   200 4,220 240 240 460 0 0 0 0 0 5,360

                       

B) Transition to Virtualized Environment                        

New Host Servers (12:1) 0 6 10 20 21 22 0 0 0 0 0 22

Servers retired   0 0 0 0 -6 0 0 0 0 0 -6

Servers purchased: number to deploy   6 4 10 1 7 0 0 0 0 0 28

Hours required for physical server deployment   60 40 100 10 70 0 0 0 0 0 280

                       

New VM's to provision   63 48 122 12 13 0 0 0 0 0 258

Hours required for VM provisioning   126 96 244 24 26 0 0 0 0 0 516

                       

Hours required for server provisioning   186 136 344 34 96 0 0 0 0 0 796

                       

IT Administration Labor Savings (A-B) Hours 14 4,084 -104 206 364 0 0 0 0 0 4,564

FTE Equivalent 0.01 2.08 (0.05) 0.11 0.19 0.00 0.00 0.00 0.00 0.00 2.33

Value $ 592 $ 172,794 $ -4,400 $ 8,716 $ 15,401 $ 0 $ 0 $ 0 $ 0 $ 0 $ 193,103

                       Business Downtime Savings [(A-B) * 40%]

Hours 6 1,634 -42 82 146 0 0 0 0 0 1,826

Opportunity Cost Savings (@ $ 0.1K per hour)

Value $ 560 $ 163,360 $ -4,160 $ 8,240 $ 14,560 $ 0 $ 0 $ 0 $ 0 $ 0 $ 182,560

Server Virtulization

VMware ROI TCO Calculator 10

Page 11: VMware roitco_analysis

Server Beyond Server Consolidation Savings On Labor: Key Assumptions

Server Beyond Server Consolidation vSphere vMotion

Server Beyond Server Consolidation vSphere vMotion: Key Assumptions

Server Beyond Server Consolidation Availability

   

     

Hours to provision a server     Administration Labor  

Existing Physical or New Physical 10.0   Calculate value of hours saved? Yes

New Virtual Machines 2.0   Cost per Hour 42$

     

Assuming all new workloads are virtualized    

     

Full-Time Employee (FTE) Administrator hours per year    

Weeks per Year 49      

Days per Week 5      

Hours per Day 8      

Hours per FTE per Year 1,960      

     

Percentage of Business Downtime in relation to Administration Hours spent   Business Downtime  

Virtualized 40%   Calculate value of hours saved? Yes

      Cost per Hour 100$

     

 

 

 

vSphere Feature: vMotion 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

                       

A) Extension of Unvirtualized Environment                      

Existing Servers   420 442 466 490 516 0 0 0 0 0 516

Maintenance events   1,680 1,768 1,864 1,960 2,064 0 0 0 0 0 9,336

Total hours of application downtime   1,680 1,768 1,864 1,960 2,064 0 0 0 0 0 9,336

                       

B) Transition to Virtualized Environment                        

Host Server (12:1)   6 10 20 21 22 0 0 0 0 0 79

Unvirtualized Servers   147 110 0 0 0 0 0 0 0 0 0

Maintenance events   612 480 80 84 88 0 0 0 0 0 1,344

Total hours of application downtime   588 440 0 0 0 0 0 0 0 0 1,028

                       

Downtime Savings (A-B) Hours 1,092 1,328 1,864 1,960 2,064 0 0 0 0 0 8,308

Opportunity Cost Savings (@ $ 0.1K per hour)

Value $ 109,200 $ 132,800 $ 186,400 $ 196,000 $ 206,400 $ 0 $ 0 $ 0 $ 0 $ 0 $ 830,800

     

       

 

Does selected edition of vSphere include vMotion feature? yes      

Do you have or plan to have shared storage? yes      

Is vMotion enabled for this environment? yes      

       

Average number of Server maintenance events per server per year? 4      

      Calculate opportunity cost of downtime? yes

Average number of Hours of downtime per event?     Cost per Hour 100$

Unvirtualized Workloads 1.0      

VM's 0.0      

 

 

 

vSphere Features: High Availability & Fault Tolerance 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

                       

Server Virtulization

VMware ROI TCO Calculator 11

Page 12: VMware roitco_analysis

Server Beyond Server Consolidation Availability: Key Assumptions

Savings on Server Administration Labor

A) Extension of Unvirtualized Environment                      

Existing Servers   420 442 466 490 516 0 0 0 0 0 516

                       

Server OS or HW failure events   21 23 24 25 26 0 0 0 0 0 119

Hours to recover   84.0 92.0 96.0 100.0 104.0 0.0 0.0 0.0 0.0 0.0 476.0

Downtime (application hours)   84.0 92.0 96.0 100.0 104.0 0.0 0.0 0.0 0.0 0.0 476.0

                       

B) Transition to Virtualized Environment                        

Virtual Machines (VM's)   65 113 235 247 260 0 0 0 0 0 260

VM's protected by FT   0 0 0 0 0 0 0 0 0 0 0

                       

VM's unprotected by FT, but HA enabled   65 113 235 247 260 0 0 0 0 0 260

Number Servers unprotected by FT (12:1)   6 10 20 21 22 0 0 0 0 0 22

Remaining Physical Servers   147 110 0 0 0 0 0 0 0 0 0

                       

Server HW failure events   8 6 1 2 2 0 0 0 0 0 19

Hours to recover   31.6 23.3 2.6 5.2 5.2 0.0 0.0 0.0 0.0 0.0 67.9

Downtime (application hours)   45.2 44.7 31.2 62.4 62.4 0.0 0.0 0.0 0.0 0.0 245.8

                       

Shadow VM's created by FT   0 0 0 0 0 0 0 0 0 0 0

Additional Servers required (12:1)   0 0 0 0 0 0 0 0 0 0 0

CapEx for Additional Servers   $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0 $ 0

                       

Downtime Savings (A-B) Hours 38.8 47.3 64.8 37.6 41.6 0.0 0.0 0.0 0.0 0.0 230.2

Opportunity Cost Savings (@ $ 0.1K per hour)

Value $ 3,882 $ 4,734 $ 6,480 $ 3,760 $ 4,160 $ 0 $ 0 $ 0 $ 0 $ 0 $ 23,017

Additional Server Expenses from FT

 

 

Does selected edition of vSphere include HA feature?   yes    

Do you have or plan to have shared storage?   yes (HA and FT require shared storage)  

Is HA enabled for this environment?   yes

Percent of Server OS or HW failures per Year        

  5%      

 

Average number of Hours to recover per event        

Existing - unvirtualized 4.0      

New - virtualized 2.6      

 

 

 

Does selected edition of vSphere include FT feature?   no    

Is FT enabled for this environment?   no    

 

Percent of VM's protected by FT 0%   Calculate opportunity cost of downtime? Yes

(support for 1 vCPU workloads only)     Cost per Hour 100$

 

 

 

 

 

 

 

 

 

Savings on Server Administration Labor 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Total

                       

Server Virtulization

VMware ROI TCO Calculator 12

Page 13: VMware roitco_analysis

Savings on Server Administration Labor: Key Assumptions

ROI on Server Consolidation Server Consolidation Benefits

                       

A) Extension of Unvirtualized Environment                      

Number of Workloads   210 221 233 245 258 0 0 0 0 0 258

Hours required for application administration   9,147 9,626 10,148 10,671 11,237 0 0 0 0 0 50,829

                       

B) Transition to Virtualized Environment                        

Number of Workloads - virtualized   65 113 235 247 260 0 0 0 0 0 260

Number of Workloads - unvirtualized   147 110 0 0 0 0 0 0 0 0 0

Hours required for application administration   8,678 8,746 8,225 8,645 9,100 0 0 0 0 0 43,394

                       

IT Administration Labor Savings (A-B) Hours 469 880 1,923 2,026 2,137 0 0 0 0 0 7,436

FTE Equivalent 0.24 0.45 0.98 1.03 1.09 0.00 0.00 0.00 0.00 0.00 3.79

Value $ 19,843 $ 37,219 $ 81,381 $ 85,725 $ 90,431 $ 0 $ 0 $ 0 $ 0 $ 0 $ 314,598

                       Business Downtime Savings [(A-B) * 40%] Hours 188 352 769 810 855 0 0 0 0 0 2,974

Opportunity Cost Savings (@ $ 0.1K per hour) Value $ 18,760 $ 35,187 $ 76,938 $ 81,044 $ 85,493 $ 0 $ 0 $ 0 $ 0 $ 0 $ 297,422

 

Average Workloads per FTE Administrator        

Existing - unvirtualized 45      

New - virtualized 56      

Estimate 24% increase in infrastructure administration efficiency

 

vSphere & vCenter productivity features        

Feature in

selected edition?

Shared

Storage?

Feature

Enabled?

Increase in

Workloads / AdminFeature    

no yes no 0.000.00 Distributed Resource Scheduler  

no   no 0.000.00 vNetwork Distributed Switch & Host Profiles  

no   no 0.000.00 Storage Distributed Resource Scheduler + Profile-Driven Storage

yes   yes 5.50 Orchestrator (vCenter)  

no   no 0.000.00 Auto Deploy  

no   no 0.000.00 vShield Zones  

no   no 0.000.00 I/O Control  

yes   yes 4.50 Update Manager  

yes   yes 0.30 Data Recovery  

no   no 0.000.00 Hot Add  

no   no 0.000.00 3rd Party Multipathing  

no   no 0.000.00 vStorage API's for Storage Array Integration  

no   no 0.000.00 vSerial Port Concentrator  

yes   yes 0.30 Linked Mode (vCenter)  

    Total 10.60      

 

Annual Administrator Hours per Workload        

Hours per FTE per Year 1,960   Administration Labor  

Existing - unvirtualized 44   Calculate value of hours saved? Yes

New - virtualized 35   Cost per Hour 42$

 

Percentage of Business Downtime in relation to Administration Hours spent   Business Downtime  

Virtualized 40%   Calculate value of hours saved? Yes

      Cost per Hour 100$

 

 

Server Consolidation Benefits      

Investment   Over 5 Years  

VMware Software License & Support      

Year 1: 12 vSphere, 1 vCenter Server   $ 22,060  

Server Virtulization

VMware ROI TCO Calculator 13

Page 14: VMware roitco_analysis

Year 2+: 32 vSphere, 0 vCenter Server   $ 42,176  

Total: 44 vSphere, 1 vCenter Server   $ 64,236  

       

New Servers      

Year 1: 6 servers   $ 60,000  

Year 2+: 132 servers   $ 550,000  

Total: 138 servers   $ 610,000  

       

Storage (TB's of DAS / SAN / NAS)      

Year 1: 5.8 TB's   $ 29,938  

Year 2+: 36.6 TB's   $ 276,625  

Total: 42.5 TB's   $ 306,563  

       

Networking      

Year 1: 0 switches   $ 0  

Year 2+: 20 switches   $ 80,000  

Total: 20 switches   $ 80,000  

       

Additional CapEx for Fault Tolerance      

0% of VM's protected   $ 0  

       

Professional Services & Training   $ 151,649  

Other   0$  

Tax (5%) 5% $ 60,622  

       

Total Investment   $ 1,273,070

       

       

Savings   Over 5 Years  

       

Server Consolidation      

Servers   $ 998,000  

Power & Cooling   $ 915,388  

Storage   $ -16,113  

Networking   $ 276,000  

Rack Space   $ 386,400  

IT Administration Labor Savings      

Hours saved from Server Provisioning   4,564  

Hours saved from Administration Productivity Features   7,436  

Total Hours saved   12,000  

FTE Equivalent (avg per year)   1.22  

Value   $ 507,701  

       

Downtime Savings (application hours)      

Hours saved from Planned Downtime: Server maintenance   8,308  

Hours saved from Planned Downtime: Storage maintenance   1,820  

Hours saved in recovery from Server OS / HW failure   230  

Hours returned to business from faster IT administration   4,800  

Total Hours saved   15,158  

Value   $ 1,333,799  

       

Additional Power & Cooling for FT servers   $ 0  

Additional Power Savings with DPM   $ 0  

Other   0$  

       

Total Savings   $ 4,401,175

Return on Investment   246%

Payback on Investment   1.5 years

Server Virtulization

VMware ROI TCO Calculator 14

Page 15: VMware roitco_analysis

5 Year Total Savings: $ 4,378,158

Summary Analysis

VMware ROI TCO Calculator 15

Page 16: VMware roitco_analysis

5 Year Total Investment: $ 1,273,070

Reduction (over 5 years): 43%

Summary Analysis

VMware ROI TCO Calculator 16

Page 17: VMware roitco_analysis

Summary Analysis

VMware ROI TCO Calculator 17

Page 18: VMware roitco_analysis

Reduction (over 5 Years): 43%

Summary Analysis

VMware ROI TCO Calculator 18

Page 19: VMware roitco_analysis

Data Summary

Summary of Virtualized Infrastructure Environment

Server Infrastructure

WORKLOADS

Server Infrastructure 2013 2014 2015 2016 2017

Unvirtualized Workloads                          

Extension of Existing 210 221 233 245 258

% Virtualized 30% 50% 100% 100% 100%

                         

VM's: Dev & Test + Production                          

Total1 65 113 235 247 260

                         

VM's: Business Continuity + Disaster Recovery                 

Total 0 0 0 0 0

                         

VM's: Network Security                          

Total 0 0 0 0 0

1 Includes vCenter Server instances

SERVERS

Server Infrastructure 2013 2014 2015 2016 2017

Dev & Test + Production                          

Total 6 10 20 21 22

Consolidation                          

(VM's to Servers) 11:1 11:1 12:1 12:1 12:1

                         

Business Continuity + Disaster Recovery                 

Total 0 0 0 0 0

                         

Network Security                          

Total 0 0 0 0 0

STORAGE (GB's)

Server Infrastructure 2013 2014 2015 2016 2017

Total 22,013 23,713 26,438 27,788 29,250

Infrastructure Administration (Hours)

Server Infrastructure 2013 2014 2015 2016 2017

Unvirtualized                          

Workloads1 210 221 233 245 258

Administrators (FTE) 5 7 5 6 6

Hours 9,347 13,846 10,388 10,911 11,697

                         

Virtualization Savings                          

+vSphere -483 -4,964 -1,819 -2,232 -2,501

+AppSpeed 0 0 0 0 0

+vCloud Director 0 0 0 0 0

+SRM 0 0 0 0 0

+vShield Edge & App 0 0 0 0 0

Savings -483 -4,964 -1,819 -2,232 -2,501

                         

Total 8,864 8,882 8,569 8,679 9,196

Reduction 5% 36% 18% 20% 21%

1 Including count of specialized Network Security hardware (Firewalls & Load Balancers) if applicable

Summary Analysis

VMware ROI TCO Calculator 19

Page 20: VMware roitco_analysis

APPENDIX A: Detail of Virtualized Server Infrastructure Environment

Server Infrastructure

WORKLOADS

Server Infrastructure 2013 2014 2015 2016 2017

Unvirtualized Workloads                          

Extension of Existing 210 221 233 245 258

% Virtualized 30% 50% 100% 100% 100%

                         

VM's: Dev & Test + Production                 

vSphere1 65 113 235 247 260

+vCloud Director 0 0 0 0 0

Total 65 113 235 247 260

                         

VM's: Business Continuity + Disaster Recovery              

+Fault Tolerance 0 0 0 0 0

+SRM 0 0 0 0 0

Total 0 0 0 0 0

                         

VM's: Network Security                          

+vShield Edge 0 0 0 0 0

+vShield App 0 0 0 0 0

Total 0 0 0 0 0

1 Includes vCenter Server instances

SERVERS

Servers: Dev & Test + Production              

vSphere 6 10 20 21 22

+CapacityIQ 0 0 0 0 0

+vCloud Director 0 0 0 0 0

+Chargeback 0 0 0 0 0

Total 6 10 20 21 22

Consolidation                          

(Workloads to Servers) 11:1 11:1 12:1 12:1 12:1

                         

Servers: Business Continuity + Disaster Recovery              

+Fault Tolerance 0 0 0 0 0

+SRM 0 0 0 0 0

Total 0 0 0 0 0

                         

Servers: Network Security                          

+vShield Edge 0 0 0 0 0

+vShield App 0 0 0 0 0

Total 0 0 0 0 0

STORAGE

Server Infrastructure 2013 2014 2015 2016 2017

Storage (GB's)                          

vSphere                          

Direct Attached 11,025 8,250 0 0 0

SAN / NAS 10,988 15,463 26,438 27,788 29,250

                         

+vCloud Director 0 0 0 0 0

+Fault Tolerance 0 0 0 0 0

+SRM 0 0 0 0 0

+vShield Edge 0 0 0 0 0

+vShield App 0 0 0 0 0

Total 22,013 23,713 26,438 27,788 29,250

Summary Analysis

VMware ROI TCO Calculator 20

Page 21: VMware roitco_analysis

INFRASTRUCTURE ADMINISTRATION

Server Infrastructure 2013 2014 2015 2016 2017

Infrastructure Administration (Hours)                       

Unvirtualized                          

Workloads                          

Dev & Test + Production 210 221 233 245 258

Fault Tolerance 0 0 0 0 0

Disaster Recovery 0 0 0 0 0

Network Security1 0 0 0 0 0

Total 210 221 233 245 258

                         

Administrators (FTE) 5 7 5 6 6

Hours 9,347 13,846 10,388 10,911 11,697

                         

Virtualization Savings                          

+vSphere -483 -4,964 -1,819 -2,232 -2,501

+AppSpeed 0 0 0 0 0

+vCloud Director 0 0 0 0 0

+SRM 0 0 0 0 0

+vShield Edge & App 0 0 0 0 0

Savings -483 -4,964 -1,819 -2,232 -2,501

                         

Total 8,864 8,882 8,569 8,679 9,196

Reduction 5% 36% 18% 20% 21%

1 Including count of specialized Network Security hardware (Firewalls & Load Balancers) if applicable

Summary Analysis

VMware ROI TCO Calculator 21

Page 22: VMware roitco_analysis

Charts Data

Investment vs. Savings vs. ROI (cumulative)

2013 2014 2015 2016 2017

Investment ($) $ 133,271 $ 819,389 $ 1,048,744 $ 1,112,489 $ 1,273,070

Savings ($) $ 307,562 $ 2,211,276 $ 2,784,557 $ 3,563,838 $ 4,378,158

ROI (%) 131% 170% 166% 220% 244%

Annual Savings $ 307,562 $ 1,903,713 $ 573,281 $ 779,282 $ 814,320

5 Year Payback NA 1.5 NA NA NA

Distribution of Savings

Total 5 Yrs

Server Total

CapEx Client HW + MS VDA $ 0 $ 0

Server HW $ 998,000 $ 998,000

Storage HW $ -16,113 $ -16,113

Networking & Security HW $ 276,000 $ 276,000

OpEx Infrastructure Admin Productivity $ 507,701 $ 507,701

Power & Cooling $ 915,388 $ 915,388

Rack Space & Office Space $ 386,400 $ 386,400

Other Planned Downtime $ 830,800 $ 830,800

Unplanned Downtime $ 0 $ 0

Business Downtime $ 479,982 $ 479,982

Other $ 0 $ 0

Total $ 4,378,158 $ 4,378,158

Distribution of Investment

Total 5 Yrs

Server Total

Investment VMW SW + SnS $ 64,236 $ 64,236

Client HW + MS VDA $ 0 $ 0

Server HW $ 610,000 $ 610,000

Storage HW $ 306,563 $ 306,563

Networking & Security HW $ 80,000 $ 80,000

Services + Training $ 151,649 $ 151,649

Other $ 0 $ 0

Tax $ 60,622 $ 60,622

Total $ 1,273,070 $ 1,273,070

Total Cost of Ownership

Total Analysis Horizon 5 Yrs

Physical Virtualized Reduction%

CapEx $ 2,254,450 $ 1,060,798 53%

OpEx $ 3,976,655 $ 2,318,816 42%

Other $ 3,574,896 $ 2,212,013 38%

Total $ 9,806,001 $ 5,591,628 43%

Summary Analysis

VMware ROI TCO Calculator 22

Page 23: VMware roitco_analysis

Total Cost of Ownership - Total 5 Yrs

Physical Virtualized Reduction%

Server Total Server Total Server Total

CapEx Client HW + MS VDA $ 0 $ 0 $ 0 0%

Server HW $ 1,608,000 $ 1,608,000 $ 610,000 $ 610,000 62% 62%

Storage HW $ 290,450 $ 290,450 $ 306,563 $ 306,563 (6)% (6)%

Networking & Security HW $ 356,000 $ 356,000 $ 80,000 $ 80,000 78% 78%

VMW SW + SnS $ 0 $ 64,236 $ 64,236

OpEx Infrastructure Admin $ 2,377,371 $ 2,377,371 $ 1,869,669 $ 1,869,669 21% 21%

Power & Cooling $ 1,112,085 $ 1,112,085 $ 196,697 $ 196,697 82% 82%

Rack Space & Office Space $ 487,200 $ 487,200 $ 100,800 $ 100,800 79% 79%

Services + Training $ 0 $ 151,649 $ 151,649

Other Planned Downtime $ 1,167,000 $ 1,167,000 $ 336,200 $ 336,200 71% 71%

Unplanned Downtime $ 47,600 $ 47,600 $ 47,600 $ 47,600 0% 0%

Business Downtime $ 2,247,573 $ 2,247,573 $ 1,767,591 $ 1,767,591 21% 21%

Other + Tax $ 112,723 $ 112,723 $ 60,622 $ 60,622 46% 46%

Total $ 9,806,001 $ 9,806,001 $ 5,591,628 $ 5,591,628 43% 43%

Server Workloads: Average Cost per Workload / VM per Hour (excluding any desktop workloads in analysis)

Server Analysis Horizon 5 Yrs

Physical Virtualized Reduction%

CapEx $ 0.22 $ 0.10 53%

OpEx $ 0.39 $ 0.23 42%

Other $ 0.35 $ 0.22 39%

Total $ 0.96 $ 0.54 43%

Number of Workloads / VM's (5 year avg) Physical Virtualized

Production + Preproduction 233 235

Business Continuity & Disaster Recovery 0 0

Network Security 0 0

Total 233 235

Server Workloads: Cumulative Cost per Workload / VM per Hour, over time (excluding any desktop workloads in analysis)

Cumulative Total Cost of Ownership

2013 2014 2015 2016 2017

CapEx $ 111,997 $ 745,491 $ 926,726 $ 948,512 $ 1,060,798

OpEx $ 495,658 $ 985,638 $ 1,413,582 $ 1,849,413 $ 2,318,816

Other $ 470,093 $ 955,450 $ 1,365,331 $ 1,774,527 $ 2,212,013

Cumulative TCO Server $ 1,077,748 $ 2,686,579 $ 3,705,639 $ 4,572,452 $ 5,591,628

Server Workloads / VM's

Physical Workloads 147 110 0 0 0

VM's 65 113 235 247 260

Total Workloads / VM's 212 223 235 247 260

Cumulative Avg thru each year 212 218 223 229 235

Cumulative Cost per Server Workload per Hour (based on cumulative average of server workloads / VM's thru each year)

CapEx $ 0.06 $ 0.20 $ 0.16 $ 0.12 $ 0.10

OpEx $ 0.27 $ 0.26 $ 0.24 $ 0.23 $ 0.23

Other $ 0.25 $ 0.25 $ 0.23 $ 0.22 $ 0.22

Total $ 0.58 $ 0.71 $ 0.63 $ 0.57 $ 0.54

Summary Analysis

VMware ROI TCO Calculator 23

Page 24: VMware roitco_analysis

Green Savings

1 Assumes 667 lbs of CO2 offset per tree

2 Assumes 12,000 miles per year and 20 mpg

3 Assumes 1.583 lbs of CO2 per kWh

Virtual Infrastructure: Green Savings

Energy Savings Total Analysis Horizon 5 Yrs

Number of Servers & Network Security Appliances

A) Extension of Unvirtualized Environment

Dev & Test + Production 516

Business Continuity + Disaster Recovery 0

Network Security appliances 0

Total 516

B) Transition to Virtualized Infrastructure

Dev & Test + Production 20

Business Continuity + Disaster Recovery 0

Network Security hosts 0

Desktop hosts 0

Total 20

Reduction (A-B) 496

Power & Cooling Energy Savings (Kilo-Watt Hours)

A) Extension of Unvirtualized Environment 10,551,734

B) Transition to Virtualized Infrastructure 2,048,909

Server Virtualization Savings (A-B) 8,502,824

C) Net impact of Desktop Client transition 79,170

Savings (A - B + C) 8,581,994

Environmental Impact Equivalents

Planting trees1 20,377

Cars off the road2 1,151

CO2 emission avoided3

lbs 13,585,297

kg 6,162,187

Summary Analysis

VMware ROI TCO Calculator 24

Page 25: VMware roitco_analysis

Compare Platforms

Comparison Against Competing Platforms

(for virtualized Server workloads only)

Year 1: Transition to Virtualized Infrastructure VMware Microsoft Red Hat Citrix

       

Server Consolidation        

Workloads Virtualized 63 63 63 63

Management workloads required 2 4 2 3

Total 65 67 65 66

       

Windows VM's (OS) 34 36 34 35

Linux VM's (OS) 31 31 31 31

       

Number of Host Servers 6 9 9 9

Current Consolidation Ratio 11:1 7:1 7:1 7:1

Max Consolidation Ratio 12:1 8:1 8:1 8:1

Total Number of CPU's 12 18 18 18

       

Servers with Windows VM's 3 5 5 5

Total Number of CPU's 6 10 10 10

       

Servers with Linux VM's 3 4 4 4

Total Number of CPU's 6 8 8 8

       

Infrastructure        

Server HW $ 60,000 $ 90,000 $ 90,000 $ 90,000

Server Power & Cooling $ 5,651 $ 8,477 $ 8,477 $ 8,477

Server Storage $ 11,563 $ 25,250 $ 25,250 $ 25,250

Server Networking $ 0 $ 0 $ 0 $ 0

Server Rack Space $ 8,400 $ 8,400 $ 8,400 $ 8,400

Total Cash Expenditure $ 85,614 $ 132,127 $ 132,127 $ 132,127

       

Server OS        

Server OS        

Windows Server 2008        

Units 6 10 10 10

Cost $ 22,493 $ 37,488 $ 37,488 $ 37,488

       

Novell SUSE Linux Enterprise Server        

Units 3 4 4 4

Cost $ 3,300 $ 4,400 $ 4,400 $ 4,400

       

Red Hat Enterprise Linux        

Units 0 0 0 0

Cost $ 0 $ 0 $ 0 $ 0

Total Cash Expenditure $ 22,493 $ 37,488 $ 37,488 $ 37,488

       

Virtualization Software        

Virtualization        

VMware: vSphere + vCenter $ 22,060      

       

Microsoft System Center: Hyper-V        

SMSD licenses   $ 16,853    

SCCM Server license with SQL   $ 1,651    

SCOM Server license without SQL   $ 0    

SCOM Server license with SQL   $ 3,303    

Essentials 2007 with SQL Server 2008   $ 0    

Essentials 2010   $ 0    

Essentials Server ML   $ 0    

SCVMM Workgroup Edition   $ 0    

Summary Analysis

VMware ROI TCO Calculator 25

Page 26: VMware roitco_analysis

Total   $ 21,806    

       

Red Hat Enterprise Virtualization: KVM     $ 13,482  

       

Citrix: XenServer + Essentials       $ 18,000

       

Total Cash Expenditure $ 22,060 $ 21,806 $ 13,482 $ 18,000

       

Total Cost of Infrastructure + Software $ 130,166 $ 191,420 $ 183,096 $ 187,614

Number of VM's (excluding Mgmt) 63 63 63 63

Cost per VM $ 2,066 $ 3,038 $ 2,906 $ 2,978

VMW per VM cost advantage 32% 29% 31%

Summary Analysis

VMware ROI TCO Calculator 26

Page 27: VMware roitco_analysis

Compare Platforms

 

   

General  

   

Windows Workloads % of Total 50%        

Windows VM's 32        

Linux VM's 31        

   

Linux VM's Server OS Novell        

(Support assumed to be Production level, at lower of per Server cost of $1,100 or per VM cost of $375)  

   

Include VMware infrastructure advantage from Thin Provisioning and Distributed Power Management  

  Yes        

   

VMware VM density advantage: 50%        

   

   

Microsoft  

                  Note: Non-USD prices here translated from USD price points  

Server OS          

Windows Server 2008          

Edition Datacenter        

License cost, per CPU $ 2,999        

Software Assurance (1 year) $ 750        

   

Virtualization          

Microsoft System Center License SA Units    

SMSD licenses, per CPU $ 749 $ 187 18    

SCCM Server license with SQL $ 1,321 $ 330 1    

SCOM Server license without SQL $ 579 $ 145 0    

Summary Analysis

VMware ROI TCO Calculator 27

Page 28: VMware roitco_analysis

SCOM Server license with SQL $ 1,321 $ 330 2    

Essentials 2010 with SQL Server 2008 $ 870 $ 218 0    

Essentials 2010 $ 103 $ 26 0    

Essentials Server ML (1 MLP) $ 103 $ 26 0    

   

   

   

Red Hat  

                  Note: Non-USD prices here translated from USD price points  

Server OS          

Red Hat Enterprise Linux          

Edition Advanced Platform        

Premium Support $ 2,499        

   

Virtualization          

Red Hat Enterprise Virtualization for Servers Support Units      

Premium $ 749 18      

   

   

Citrix  

                  Note: Non-USD prices here translated from USD price points  

   

Virtualization          

Citrix XenServer Support Units      

Preferred Extend (5 incidents pack) $ 3,000 3      

(unit count assumes one 5 incidents pack for every 3 servers)          

   

Citrix Management and Automation          

Edition Advanced        

  License Units      

License cost, per Server $ 1,000 9      

   

   

   

   

   

   

   

   

   

   

   

   

   

   

Summary Analysis

VMware ROI TCO Calculator 28

Page 29: VMware roitco_analysis

VMware, Inc. 3401 Hillview Avenue Palo Alto CA 94304 USA Tel 877-486-9273 Fax 650-427-5001 www.vmware.com Copyright © 2010 VMware, Inc. All rights reserved. This product is protected by U.S. and international copyright and intellectual property laws. VMware products are covered by one or more patents listed at

http://www.vmware.com/go/patents. VMware is a registered trademark or trademark of VMware, Inc. in the United States and/or other jurisdictions. All other marks and names mentioned herein may be trademarks of

their respective companies.