vantage 500 deutz - lincoln electric

51
April, 2004 Safety Depends on You Lincoln arc welding and cutting equipment is designed and built with safety in mind. However, your overall safety can be increased by proper installation . . . and thoughtful operation on your part. DO NOT INSTALL, OPERATE OR REPAIR THIS EQUIPMENT WITHOUT READING THIS MANUAL AND THE SAFETY PRECAUTIONS CONTAINED THROUGHOUT. Most importantly, think before you act and be careful. OPERATOR’S MANUAL Copyright© 2004 Lincoln Global Inc. • World’s Leader in Welding and Cutting Products • • Sales and Service through Subsidiaries and Distributors Worldwide • Cleveland, Ohio 44117-1199 USA Tel: 216.481.8100 Fax: 216.486.1751 Web Site: www.lincolnelectric.com IM805 For use with machines having Code Numbers: 10995 Vantage 500 DEUTZ

Upload: others

Post on 19-Mar-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Vantage 500 DEUTZ - Lincoln Electric

April, 2004

Safety Depends on YouLincoln arc welding and cuttingequipment is designed andbuilt with safety in mind.However, your overall safetycan be increased by properinstallation . . . and thoughtfuloperation on your part. DONOT INSTALL, OPERATE ORREPAIR THIS EQUIPMENTWITHOUT READING THISMANUAL AND THE SAFETYPRECAUTIONS CONTAINEDTHROUGHOUT. Mostimportantly, think before youact and be careful.

OPERATOR’S MANUAL

Copyright© 2004 Lincoln Global Inc.

• World’s Leader in Welding and Cutting Products •• Sales and Service through Subsidiaries and Distributors Worldwide •

Cleveland, Ohio 44117-1199 USA Tel: 216.481.8100 Fax: 216.486.1751 Web Site: www.lincolnelectric.com

IM805

For use with machines having Code Numbers: 10995

Vantage 500 DEUTZ

Page 2: Vantage 500 DEUTZ - Lincoln Electric

ELECTRIC ANDMAGNETIC FIELDSmay be dangerous

2.a.Electric current flowing through any conductor causeslocalized Electric and Magnetic Fields (EMF). Weldingcurrent creates EMF fields around welding cables andwelding machines.

2.b.EMF fields may interfere with some pacemakers and weldershaving a pacemaker should consult their physician beforewelding.

2.c. Exposure to EMF fields in welding may have other healtheffects which are now not known.

2.d.All welders should use the following procedures in order tominimize exposure to EMF fields from the welding circuit:

2.d.1. Route the electrode and work cables together.Secure them with tape when possible.

2.d.2. Never coil the electrode lead around your body.

2.d.3. Do not place your body between the electrodeand work cables. If the electrode cable is on yourright side, the work cable should also be on yourright side.

2.d.4. Connect the work cable to the workplace asclose as possible to the area being welded.

2.d.5. Do not work next to welding power source.

1.h. To avoid scalding, do not remove theradiator pressure cap when the engine ishot.

For Diesel Engines: diesel engine exhaust andsome of its constituents are known to the State ofCalifornia to cause cancer, birth defects, and otherreproductive harm.

For Gasoline Engines: The engine exhaust from thisproduct contains chemicals known to the State ofCalifornia to cause cancer, birth defects, or otherreproductive harm.

ARC WELDING CAN BE HAZARDOUS. PROTECT YOURSELF AND OTHERS FROM POSSIBLE SERIOUS INJURY OR DEATH.KEEP CHILDREN AWAY. PACEMAKER WEARERS SHOULD CONSULT WITH THEIR DOCTOR BEFORE OPERATING.

Read and understand the following safety highlights. For additional safety information, it is strongly recommended that youpurchase a copy of “Safety in Welding & Cutting - ANSI Standard Z49.1” from the American Welding Society, PO Box351040, Miami, Florida 33135 or CSA Standard W117.2-1974 or WTIA (Welding Technology Institute of Australia), PO Box6165, Silverwater, NSW, 2128. A free copy of “Arc Welding Safety” booklet E205 is available from the Lincoln ElectricalCompany, 22801 St Clair Avenue, Cleveland, Ohio 44117-1199.

BE SURE THAT ALL INSTALLATION, OPERATION, MAINTENANCE AND REPAIR PROCEDURES AREPERFORMED ONLY BY QUALIFIED INDIVIDUALS.

1.a Turn the engine off before troubleshooting and maintenancework unless the maintenance work requires it to be running.

1.b. Operate engines in open, well ventilatedareas or vent the engine exhaust fumesoutdoors.

1.c. Do not add fuel near an open flame, weldingarc or when the engine is running. Stop theengine and allow it to cool before refuellingto prevent spilled fuel from vaporizing oncontact with hot engine parts and igniting.Do not spill fuel when filling tank. If fuel isspilled, wipe it up and do not start engineuntil fumes have been eliminated.

1.d.Keep all equipment, safety guards, covers and devices inposition and in good repair. Keep hands, hair, clothing andtools away from V-belts, gears, fans and all other movingparts when starting, operating or repairing equipment.

1.e. In some cases it may be necessary to remove safety guardsto perform required maintenance. Remove guards only whennecessary and replace them when the maintenancerequiring their removal is complete. Always use the greatestcare when working near moving parts.

1.f. Do not put your hands near the engine fan.Do not attempt to override the governor oridler by pushing on the throttle control rodswhile the engine is running.

1.g.To prevent accidentally starting petrol engines while turningthe engine or welding generator during maintenance work,disconnect the spark plug wires, distributor cap or magnetowire as appropriate.

i SAFETY i

CALIFORNIA PROPOSITION 65 WARNINGS

WARNING

FOR ENGINEpowered equipment.

Mar ‘95

Page 3: Vantage 500 DEUTZ - Lincoln Electric

ELECTRIC SHOCKcan kill.3.a. The electrode and work (or ground) circuits

are electrically “hot” when the welder is on.Do not touch these “hot” parts with your bareskin or wet clothing. Wear dry, hole-freegloves to insulate hands.

3.b. Insulate yourself from work and ground using dryinsulation. Make certain the insulation is large enough tocover your full area of physical contact with work andground.

In addition to the normal safety precautions, if weldingmust be performed under electrically hazardousconditions (in damp locations or while wearing wetclothing; on metal structures such as floors, gratingsor scaffolds; when in cramped positions such assitting, kneeling or lying, if there is a high risk ofunavoidable or accidental contact with the workpieceor ground) use the following equipment:

• Semiautomatic DC Constant Voltage (Wire) Welder.

• DC Manual (Stick) Welder.

• AC Welder with Reduced Voltage Control.

3.c. In semi-automatic or automatic wire welding, theelectrode, electrode reel, welding head, nozzle or semi-automatic welding gun are also electrically “hot”.

3.d. Always be sure the work cable makes a good electricalconnection with the metal being welded. The connectionshould be as close as possible to the area being welded.

3.e. Ground the work or metal to be welded to a good electrical(earth) ground.

3.f. Maintain the electrode holder, work clamp, welding cableand welding machine in good, safe operating condition.Replace damaged insulation.

3.g. Never dip the electrode holder in water for cooling.

3.h. Never simultaneously touch electrically “hot” parts ofelectrode holders connected to two welders becausevoltage between the two can be the total of the open circuitvoltage of both welders.

3.i. When working above floor level, use a safety belt toprotect yourself from a fall should you get a shock.

3.j. Also see items 6c and 8.

FUMES AND GASEScan be dangerous5.a. Welding may produce fumes and gases

hazardous to health. Avoid breathing thesefumes and gases. When welding, keep yourhead out of the fume. Use enoughventilation and/or exhaust at the arc to

keep fumes and gases away from the breathing zone. Whenwelding with electrodes which require special ventilationsuch as stainless or hard facing (see instructions oncontainer or MSDS) or on lead or cadmium plated steel andother metals or coatings which produce highly toxic fumes,keep exposure as low as possible and below ThresholdLimit values (TLV) using local exhaust or mechanicalventilation. In confined spaces or in some circumstances,outdoors, a respirator may be required. Additionalprecautions are also required when welding on galvanizedsteel.

5.b.Do not weld in locations near chlorinated hydrocarbonvapors coming from degreasing, cleaning or sprayingoperations. The heat and rays of the arc can react withsolvent vapors to form phosgene, a highly toxic gas, andother irritating products.

5.c. Shielding gases used for arc welding can displace air andcause injury or death. Always use enough ventilation,especially in confined areas, to ensure breathing air is safe.

5.d.Read and understand the manufacturer’s instructions for thisequipment and the consumables to be used, including thematerial safety data sheet (MSDS) and follow youremployer’s safety practices. MSDS forms are available fromyour welding distributor or from the manufacturer.

5.e.Also see Item 1b.

ARC RAYS can burn.4 a Use a shield with the proper filter and cover

plates to protect your eyes from sparks andthe rays of the arc when welding orobserving open arc welding. Headshieldand filter lens should conform to ANSIZ87.1 standards.

4.b.Use suitable clothing made from durable flame resistantmaterial to protect your skin and that of your helpers from thearc rays.

4.c. Protect other nearby personnel with suitable non flammablescreening and/or warn them not to watch the arc or exposethemselves to the arc rays or to hot spatter or metal.

Mar ‘95

ii SAFETY ii

Page 4: Vantage 500 DEUTZ - Lincoln Electric

FOR ELECTRICALLYpowered equipment.8.a. Turn off input power using the disconnect

switch at the fuse box before working on theequipment.

8.b. Install equipment in accordance with the National ElectricalCode, all local codes and the manufacturer’srecommendations.

8.c. Ground the equipment in accordance with the NationalElectrical Code and the manufacturer’s recommendations.

WELDING SPARKS cancause fire or explosion6 a Remove fire hazards from the welding area. If

this is not possible, cover them to prevent thewelding sparks from starting a fire. Rememberthat welding sparks and hot materials from

welding can easily go through small cracks and openings toadjacent areas. Avoid welding near hydraulic lines. Have a fireextinguisher readily available.6.b.Where compressed gases are to be used at the job site,

special precautions should be used to prevent hazardoussituations. Refer to AS1674 Parts 1 & 2 “Safety in Weldingand Cutting” (ANSI Standard Z49.1) and the operatinginformation for the equipment being used.

6.c. When not welding, make certain no part of the electrodecircuit is touching the work or ground. Accidental contact cancause overheating and create a fire hazard.

6.d.Do not heat, cut or weld tanks, drums or containers until theproper steps have been taken to insure that such procedureswill not cause flammable or toxic vapors from substancesinside. These can cause an explosion even though thevessel has been “cleaned”. For information purchase“Recommended Safe Practices for the Preparation forWelding and Cutting of Containers and Piping that have heldHazardous Substances”, AWS F4.1 from the AmericanWelding Society (see address above).

6.e.Vent hollow castings or containers before heating, cutting orwelding. They may explode.

6.f. Sparks and spatter are thrown from the welding arc. Wear oilfree protective garments such as leather gloves, heavy shirt,cuffless trousers, high shoes and a cap over your hair. Wearear plugs when welding out of position or in confined places.Always wear safety glasses with side shields when in awelding area.

6.g.Connect the work cable to the work as close to the weldingarea as possible. Work cables connected to the buildingframework or other locations away from the welding areaincrease the possibility of the welding current passingthrough lifting chains, crane cables or other alternate circuits.This can create fire hazards or overheat lifting chains orcables until they fail.

6.h.Also see Item 1c.

CYLINDER may explodeif damaged7.a. Use only compressed gas cylinders containing

the correct shielding gas for the process usedand properly operating regulators, designedfor the gas and pressure used. All hoses,

fittings, etc. should be suitable for the application andmaintained in good condition.

7.b.Always keep cylinders in an upright position and securelychained to an undercarriage or fixed support.

7.c. Cylinders should be located :

• Away from areas where they may be struck or subjected tophysical damage.

• A safe distance from arc welding or cutting operations andany other source of heat, sparks or flame.

7.d.Never allow the electrode, electrode holder, or any otherelectrically “hot” parts to touch a cylinder.

7.e.Keep your head and face away from the cylinder valve outletwhen opening the cylinder valve.

7.f. Valve protection caps should always be in place and hand-tight except when the cylinder is in use or connected for use.

7.g.Read and follow the instructions on compressed gascylinders, associated equipment, and CGA publication P-I,“Precautions for Safe Handling of Compressed Gases inCylinders”, available from the Compressed Gas Association1235 Jefferson Davis Highway, Arlington, VA 22202.

iii SAFETY iii

Mar ‘95

Page 5: Vantage 500 DEUTZ - Lincoln Electric

iv SAFETY iv

PRÉCAUTIONS DE SÛRETÉPour votre propre protection lire et observer toutes les instructionset les précautions de sûreté specifiques qui parraissent dans cemanuel aussi bien que les précautions de sûreté généralessuivantes:

Sûreté Pour Soudage A L’Arc1. Protegez-vous contre la secousse électrique:

a. Les circuits à l’électrode et à la piéce sont sous tensionquand la machine à souder est en marche. Eviter toujourstout contact entre les parties sous tension et la peau nueou les vétements mouillés. Porter des gants secs et sanstrous pour isoler les mains.

b. Faire trés attention de bien s’isoler de la masse quand onsoude dans des endroits humides, ou sur un planchermetallique ou des grilles metalliques, principalement dans les positions assis ou couché pour lesquelles une grandepartie du corps peut être en contact avec la masse.

c. Maintenir le porte-électrode, la pince de masse, le câble desoudage et la machine à souder en bon et sûr étatdefonctionnement.

d.Ne jamais plonger le porte-électrode dans l’eau pour lerefroidir.

e. Ne jamais toucher simultanément les parties sous tensiondes porte-électrodes connectés à deux machines à souderparce que la tension entre les deux pinces peut être le totalde la tension à vide des deux machines.

f. Si on utilise la machine à souder comme une source decourant pour soudage semi-automatique, ces precautionspour le porte-électrode s’applicuent aussi au pistolet desoudage.

2. Dans le cas de travail au dessus du niveau du sol, se protégercontre les chutes dans le cas ou on recoit un choc. Ne jamaisenrouler le câble-électrode autour de n’importe quelle partie ducorps.

3. Un coup d’arc peut être plus sévère qu’un coup de soliel, donc:

a. Utiliser un bon masque avec un verre filtrant approprié ainsiqu’un verre blanc afin de se protéger les yeux durayonnement de l’arc et des projections quand on soude ouquand on regarde l’arc.

b. Porter des vêtements convenables afin de protéger la peaude soudeur et des aides contre le rayonnement de l‘arc.

c. Protéger l’autre personnel travaillant à proximité ausoudage à l’aide d’écrans appropriés et non-inflammables.

4. Des gouttes de laitier en fusion sont émises de l’arc desoudage. Se protéger avec des vêtements de protection libresde l’huile, tels que les gants en cuir, chemise épaisse,pantalons sans revers, et chaussures montantes.

5. Toujours porter des lunettes de sécurité dans la zone desoudage. Utiliser des lunettes avec écrans lateraux dans leszones où l’on pique le laitier.

6. Eloigner les matériaux inflammables ou les recouvrir afin deprévenir tout risque d’incendie dû aux étincelles.

7. Quand on ne soude pas, poser la pince à une endroit isolé dela masse. Un court-circuit accidental peut provoquer unéchauffement et un risque d’incendie.

8. S’assurer que la masse est connectée le plus prés possible dela zone de travail qu’il est pratique de le faire. Si on place lamasse sur la charpente de la construction ou d’autres endroitséloignés de la zone de travail, on augmente le risque de voirpasser le courant de soudage par les chaines de levage,câbles de grue, ou autres circuits. Cela peut provoquer desrisques d’incendie ou d’echauffement des chaines et descâbles jusqu’à ce qu’ils se rompent.

9. Assurer une ventilation suffisante dans la zone de soudage.Ceci est particuliérement important pour le soudage de tôlesgalvanisées plombées, ou cadmiées ou tout autre métal quiproduit des fumeés toxiques.

10. Ne pas souder en présence de vapeurs de chlore provenantd’opérations de dégraissage, nettoyage ou pistolage. Lachaleur ou les rayons de l’arc peuvent réagir avec les vapeursdu solvant pour produire du phosgéne (gas fortement toxique)ou autres produits irritants.

11. Pour obtenir de plus amples renseignements sur la sûreté, voirle code “Code for safety in welding and cutting” CSA StandardW 117.2-1974.

PRÉCAUTIONS DE SÛRETÉ POURLES MACHINES À SOUDER ÀTRANSFORMATEUR ET ÀREDRESSEUR

1. Relier à la terre le chassis du poste conformement au code del’électricité et aux recommendations du fabricant. Le dispositifde montage ou la piece à souder doit être branché à unebonne mise à la terre.

2. Autant que possible, I’installation et l’entretien du poste seronteffectués par un électricien qualifié.

3. Avant de faires des travaux à l’interieur de poste, ladebrancher à l’interrupteur à la boite de fusibles.

4. Garder tous les couvercles et dispositifs de sûreté à leur place.

Mar. ‘93

Page 6: Vantage 500 DEUTZ - Lincoln Electric

v v

Thank You for selecting a QUALITY product by Lincoln Electric. We wantyou to take pride in operating this Lincoln Electric Companyproduct ••• as much pride as we have in bringing this product toyou!

Read this Operators Manual completely before attempting to use this equipment. Save this manual and keepit handy for quick reference. Pay particular attention to the safety instructions we have provided for yourprotection. The level of seriousness to be applied to each is explained below:

WARNINGThis statement appears where the information must be followed exactly to avoid serious personal injuryor loss of life.

This statement appears where the information must be followed to avoid minor personal injury or damageto this equipment.

CAUTION

Please Examine Carton and Equipment For Damage ImmediatelyWhen this equipment is shipped, title passes to the purchaser upon receipt by the carrier. Consequently,Claims for material damaged in shipment must be made by the purchaser against the transportation companyat the time the shipment is received.

Please record your equipment identification information below for future reference. This information can befound on your machine nameplate.

Product _______________________________________________________________________________

Model Number _________________________________________________________________________

Code Number or Date Code_______________________________________________________________

Serial Number__________________________________________________________________________

Date Purchased_________________________________________________________________________

Where Purchased_______________________________________________________________________

Whenever you request replacement parts or information on this equipment, always supply the information youhave recorded above. The code number is especially important when identifying the correct replacementparts.

On-Line Product Registration

- Register your machine with Lincoln Electric either via fax or over the Internet.

• For faxing: Complete the form on the back of the warranty statement included in the literature packetaccompanying this machine and fax the form per the instructions printed on it.

• For On-Line Registration: Go to our WEB SITE at www.lincolnelectric.com. Choose “Quick Links” and then“Product Registration”. Please complete the form and submit your registration.

Page 7: Vantage 500 DEUTZ - Lincoln Electric

PageInstallation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section A

Technical Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2Location / Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2

Storing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2Stacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2Angle of Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-2Lifting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3High Altitude Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3High Temperature Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3Towing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3

Pre-Operation Engine Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Oil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Fuel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Fuel Cap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Engine Break-In, Engine Cooling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Battery Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4Muffler Outlet Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5Spark Arrestor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5

Welding Terminals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5Welding Output Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5Machine Grounding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-5

Remote Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6Auxiliary Power Receptacles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6Standby Power Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-6Connection of Vantage Premises Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-7Connection of Lincoln Electric Wire Feeders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-8, A-9

Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section BSafety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-1General Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-1

Recommended Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-1Controls and Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-2

Engine Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-2Welder Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-3Auxiliary Power Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-4

Engine Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-4Starting The Engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-4Stopping the Engine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-4Typical Fuel Consumption . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5

Welding Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5Duty Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5Stick Welding Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5CC-Stick Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5Downhill Pipe Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5Touch Start TIG Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-5Vantage Settings when using HI-FREQ Unit and TIG Module . . . . . . . . . . . . . . . . . . . . . .B-5

Typical Current Ranges for Tungsten Electrodes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-6CV-Wire Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-7Arc Gouging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-7Paralleling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-7

Auxiliary Power Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-7Simultaneous Welding and Auxiliary Power Loads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-7

Simultaneous Welding and Power Loads, Extension Cord Length Recommendations . . . . . . . . . . .B-8

vi vi

Vantage 500 DEUTZ

TABLE OF CONTENTS

Page 8: Vantage 500 DEUTZ - Lincoln Electric

Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section COptional Field Installed Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .C-1

Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section DSafety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-1Routine and Periodic Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-1Engine Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-1

Air Filter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-1Fuel Filters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-2Fuel Pre-Filter/Water Separator Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-2Water Separator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-2Secondary Fuel Filter . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-2Cooling System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-3Cooling Blower Belt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-3Battery Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-3Charging the Battery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-4

Nameplate / Warning Decal Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-4Welder / Generator Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-4Engine Maintenance Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-4

Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section E

Wiring, Connection Diagrams and Dimension Print . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section F

Parts Lists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .P-472 Series

vii vii

Vantage 500 DEUTZ

TABLE OF CONTENTS

Page 9: Vantage 500 DEUTZ - Lincoln Electric

TECHNICAL SPECIFICATIONS - Vantage 500 DEUTZ (K2271-1)

INPUT - DIESEL ENGINE

Make /Model Description Speed (RPM) Displacement Starting CapacitiesSystem

Deutz 3 cylinder High Idle 1900 173 cu. in 12VDC battery Fuel F3L 912 44HP (33 kw) (2.83L) & Starter (25 US gal)Diesel Engine @ 1800 RPM Full Load 1800 94.6L

Bore x Stroke Oil:9.5 QTS.

3.94” x 4.72” 9.0L(100mm x 120mm)

RATED OUTPUT @ 104°F(40°C) - WELDERDuty Cycle Welding Output Volts at Rated Amps

100% 500 Amps (DC multi-purpose) 40 Volts

60% 550 Amps (DC multi-purpose) 36 volts

50% 575 Amps (DC multi-purpose) 35 volts

PHYSICAL DIMENSIONSHeight (2) Width Depth Weight

42.0 in 31.5 in. 63.1 in. 1615 lbs.(1066.8 mm) (800.1mm) (1603mm) (733kg)

(Approx)1. Output rating in watts is equivalent to volt-amperes at unity power factor.

Output voltage is within +/- 10% at all loads up to rated capacity. When welding, available auxiliary power will be reduced.2. Top of Enclosure. Add 6.6” (167.6mm) for exhaust.

OUTPUT @ 104°F(40°C) - WELDER AND GENERATOR

Welding Range

30 - 575 Amps CC/CV20 - 250 Amps TIG

Open Circuit Voltage

60 Max OCV @ 1900 RPM

Auxiliary Power (1)

120/240 VAC

12,000 WATTS, 60 Hz.

A-1 INSTALLATION A-1

Vantage 500 DEUTZ

Page 10: Vantage 500 DEUTZ - Lincoln Electric

Read this entire installation section before you startinstallation.

SAFETY PRECAUTIONS

Do not attempt to use this equipment until you havethoroughly read all operating and maintenance manualssupplied with your machine. They include important safetyprecautions, detailed engine starting, operating andmaintenance instructions and parts lists.

ELECTRIC SHOCK can kill.

• Do not touch electrically live parts such asoutput terminals or internal wiring.

• Insulate yourself from the work and ground.

• Always wear dry insulating gloves.

-------------------------------------------------------------------------------------

ENGINE EXHAUST can kill.

• Use in open, well ventilated areas or ventexhaust outside

-------------------------------------------------------------------------------------

MOVING PARTS can injure.

• Do not operate with doors open or guards off.

• Stop engine before servicing.

• Keep away from moving parts

-------------------------------------------------------------------------------------

Only qualified personnel should install, use or service thisequipment.

LOCATION / VENTILATIONThe welder should be located to provide an unrestricted flow ofclean, cool air to the cooling air inlets and to avoid restricting thecooling air outlets. Also, locate the welder so that the engineexhaust fumes are properly vented to an outside area.

DO NOT MOUNT OVER COMBUSTIBLE SURFACESWhere there is a combustible surface directly under stationary orfixed electrical equipment, that surface should be covered with asteel plate at least .06”(1.6mm) thick, which should extend notless than 5.90”(150mm) beyond the equipment on all sides.

STORING1. Store the machine in a cool, dry place when it is not in use.

Protect it from dust and dirt. Keep it where it can’t beaccidentally damaged from construction activities, movingvehicles, and other hazards.

2. Drain the engine oil and refill with fresh 10W30 oil. Run theengine for about five minutes to circulate oil to all the parts.See the MAINTENANCE section of this manual for detailson changing oil.

3. Remove the battery, recharge it, and adjust the electrolytelevel. Store the battery in a dry, dark place.

STACKINGVantage machines cannot be stacked.

ANGLE OF OPERATION

To achieve optimum engine performance the Vantage should berun in a level position. The maximum angle of operation for theDeutz engine is 30 degrees fore and aft, 40 degrees right and 45degrees left. If the engine is to be operated at an angle,provisions must be made for checking and maintaining the oillevel at the normal (FULL) oil capacity in the crankcase. Whenoperating the welder at an angle, the effective fuel capacity will beslightly less than the specified 25 gallons.

A-2 INSTALLATION A-2

Vantage 500 DEUTZ

WARNING

CAUTION

Page 11: Vantage 500 DEUTZ - Lincoln Electric

LIFTINGThe Vantage lift bale should be used to lift the machine. TheVantage is shipped with the lift bale retracted. Before attemptingto lift the Vantage the lift bale must be secured in a raisedposition. Secure the lift bale as follows:

a. Open the engine compartment door.

b. Locate the 2 access holes on the upper middle regionof compartment wall just below the lift bale.

c. Use the lifting strap to raise the lift bale to the full uprightposition. This will align the mounting holes on the liftbale with the access holes.

d. Secure the lift bale with 2 thread forming screws. Thescrews are provided in the shipped loose parts bag.

• Lift only with equipment ofadequate lifting capacity.

• Be sure machine is stable whenlifting.

• Do not lift this machine using liftbale if it is equipped with a heavyaccessory such as trailer or gascylinder.

FALLING • Do not lift machine if lift bale is

EQUIPMENT can damaged.

cause injury. • Do not operate machine while

suspended from lift bale.

----------------------------------------------------------------------------HIGH ALTITUDE OPERATIONAt higher altitudes, output derating may be necessary. Formaximum rating, derate the welder output 5% for every 300meters (984 ft.) above 1500 meters (4920 ft.). For output of 500Aand below, derate the welder output 5% for every 300 meters(984 ft.) above 2100 meters (6888 ft.).

Contact a Deutz Service Representative for any engineadjustments that may be required.

HIGH TEMPERATURE OPERATIONAt temperatures above 40°C (104°F), output voltage deratingmay be necessary. For maximum output current ratings, deratewelder voltage rating 2 volts for every 10°C (21°F) above 40°C(104°F).

TOWINGThe recommended trailer for use with this equipment for road, in-plant and yard towing by a vehicle (1) is Lincoln’s K953-1. If theuser adapts a non-Lincoln trailer, he must assume responsibilitythat the method of attachment and usage does not result in asafety hazard nor damage the welding equipment. Some of thefactors to be considered are as follows:

1. Design capacity of trailer vs. weight of Lincolnequipment and likely additional attachments.

2. Proper support of, and attachment to, the base of thewelding equipment so that there will be no undue stressto the trailer’s framework.

3. Proper placement of the equipment on the trailer toinsure stability side to side and front to back when beingmoved and when standing by itself.

4. Typical conditions of use, such as travel speed,roughness of surface on which the trailer will beoperated, and environmental conditions.

5. Proper preventative maintenance of trailer.

6. Conformance with federal, state and local laws (1) .(1) Consult applicable federal, state and local laws regarding

specific requirements for use on public highways.

VEHICLE MOUNTING

Improperly mounted concentrated loads may causeunstable vehicle handling and tires or othercomponents to fail.

• Only transport this Equipment on serviceablevehicles which are rated and designed for suchloads.

• Distribute, balance and secure loads so vehicle isstable under conditions of use.

• Do not exceed maximum rated loads forcomponents such as suspension, axles and tires.

• Mount equipment base to metal bed or frame ofvehicle.

• Follow vehicle manufacture’s instructions.----------------------------------------------------------------------------

A-3 INSTALLATION A-3

Vantage 500 DEUTZ

WARNING

WARNING

Page 12: Vantage 500 DEUTZ - Lincoln Electric

PRE-OPERATION ENGINE SERVICEREAD the engine operating and maintenance instructionssupplied with this machine.

Stop engine while fueling.• Do not smoke when fueling.• Keep sparks and flame away from

tank.• Do not leave unattended while

fueling.• Wipe up spilled fuel and allow

fumes to clear before startingengine.

• Do not overfill tank, fuelexpansion may cause overflow.

DIESEL FUEL ONLY--------------------------------------------------------------------------------------

OILThe Vantage is shipped with the engine crankcase filled with highquality SAE 10W-30 oil (API class CD or better). Check the oillevel before starting the engine. If it is not up to the full mark onthe dip stick, add oil as required. Check the oil level every fourhours of running time during the first 35 running hours. Refer tothe engine Operator’s Manual for specific oil recommendationsand break-in information. The oil change interval is dependent onthe quality of the oil and the operating environment. Refer to theengine Operator’s Manual for the proper service andmaintenance intervals.

FUEL USE DIESEL FUEL ONLYFill the fuel tank with clean, fresh diesel fuel. The capacity of thefuel tank is approx 95 liters. See engine Operator’s Manual forspecific fuel recommendations. Running out of fuel mayrequire bleeding the fuel injection pump. NOTE: Beforestarting the engine, open the fuel shutoff valve (pointer to be inline with hose).

FUEL CAPRemove the plastic cap covering from the Fuel Tank Filler neckand install the Fuel Cap.

ENGINE BREAK-IN

Lincoln Electric selects high quality, heavy-duty industrialengines for the portable welding machines we offer. Whileit is normal to see a small amount of crankcase oilconsumption during initial operation, excessive oil use,wetstacking (oil or tar like substance at the exhaust port),or excessive smoke is not normal.

Larger machines with a capacity of 350 amperes andhigher, which are operated at low or no-load conditions forextended periods of time are especially susceptible to theconditions described above. To accomplish successfulengine break-in, most diesel-powered equipment needsonly to be run at a reasonably heavy load within the ratingof the welder for some period of time during the engine’searly life. However, if the welder is subjected to extensivelight loading, occasional moderate to heavy loading of theengine may sometimes be necessary. Caution must beobserved in correctly loading a diesel/generator unit.

1. Connect the welder output studs to a suitableresistive load bank. Note that any attempt toshort the output studs by connecting thewelding leads together, direct shorting of theoutput studs, or connecting the output leadsto a length of steel will result in catastrophicdamage to the generator and voids thewarranty.

2. Set the welder controls for an output currentand voltage within the welder rating and dutycycle. Note that any attempt to exceed thewelder rating or duty cycle for any period oftime will result in catastrophic damage to thegenerator and voids the warranty.

3. Periodically shut off the engine and check thecrankcase oil level.

ENGINE COOLING SYSTEM

The Deutz engine is air cooled by a belt driven axial blower. Theoil cooler and engine cooling fins should be blown out withcompressed air or steam to maintain proper cooling (See theengine Owners Manual for procedures and frequency).

BATTERY CONNECTION

GASES FROM BATTERY can explode.

• Keep sparks, flame and cigarettes away frombattery.

To prevent EXPLOSION when:

• INSTALLING A NEW BATTERY — disconnectnegative cable from old battery first andconnect to new battery last.

• CONNECTING A BATTERY CHARGER — remove batteryfrom welder by disconnecting negative cable first, thenpositive cable and battery clamp. When reinstalling,connect negative cable last. Keep well ventilated.

• USING A BOOSTER — connect positive lead to battery firstthen connect negative lead to negative battery lead atengine foot.

BATTERY ACID can burn eyes and skin.

• Wear gloves and eye protection and be carefulwhen working near battery.

• Follow instructions printed on battery.

IMPORTANT: To prevent ELECTRICAL DAMAGE WHEN:

a) Installing new batteries.

b) Using a booster.

Use correct polarity — Negative Ground.

A-4 INSTALLATION A-4

Vantage 500 DEUTZ

WARNING

WARNING

DIESEL FUELcan cause fire.

Page 13: Vantage 500 DEUTZ - Lincoln Electric

The Vantage is shipped with the negative battery cabledisconnected. Before you operate the machine, make sure theEngine Switch is in the OFF position and attach the disconnectedcable securely to the negative (-) battery terminal.

Remove the insulating cap from the negative battery terminal.Replace and tighten negative battery cable terminal. NOTE: Thismachine is furnished with a wet charged battery; if unused forseveral months, the battery may require a booster charge. Besure to use the correct polarity when charging the battery.

MUFFLER OUTLET PIPERemove the plastic plug covering the muffler outlet tube. Usingthe clamp provided secure the outlet pipe to the outlet tube withthe pipe positioned such that it will direct the exhaust in thedesired position.

SPARK ARRESTORSome federal, state or local laws may require that petrol or dieselengines be equipped with exhaust spark arrestors when they areoperated in certain locations where unarrested sparks maypresent a fire hazard. The standard muffler included with thiswelder does not qualify as a spark arrestor. When required bylocal regulations, a suitable spark arrestor, must be installed andproperly maintained.

An incorrect arrestor may lead to damage to the engine oradversely affect performance.

--------------------------------------------------------------------------------------

WELDING TERMINALSThe Vantage is equipped with a toggle switch for selecting "hot"welding terminals when in the "WELD TERMINALS ON" positionor "cold" welding terminals when in the "REMOTELYCONTROLLED" position.

WELDING OUTPUT CABLESWith the engine off, route the electrode and work cables thru thestrain relief bracket provided on the front of the base and connectto the terminals provided. These connections should be checkedperiodically and tightened if necessary.

Listed in Table A.1 are copper cable sizes recommended for therated current and duty cycle. Lengths stipulated are the distancefrom the welder to work and back to the welder again. Cable sizesare increased for greater lengths primarily for the purpose ofminimizing cable voltage drop.

Table A.1 Combined Length of Electrode and Work Cables.

MACHINE GROUNDINGBecause this portable engine driven welder creates its ownpower, it is not necessary to connect its frame to an earth ground,unless the machine is connected to premises wiring (home, shop,etc.).

To prevent dangerous electric shock, other equipment poweredby this engine driven welder must:

a) be grounded to the frame of the welder using agrounding type plug,

or

b) be double insulated.

When this welder is mounted on a truck or trailer, its frame mustbe securely connected to the metal frame of the vehicle. Whenthis engine driven welder is connected to premises wiring such asthat in a home or shop, its frame must be connected to the systemearth ground. See further connection instructions in the sectionentitled “Standby Power Connections” as well as the article on grounding in the latest National Electrical Code andthe local codes.

In general, if the machine is to be grounded, it should beconnected with a #8 or larger copper wire to a solid earth groundsuch as a metal ground stake going into the ground for at least 10Feet or to the metal framework of a building which has beeneffectively grounded. The National Electric Code lists a number ofalternate means of grounding electrical equipment. A machinegrounding stud marked with the symbol is provided on thefront of the welder.

A-5 INSTALLATION A-5

Vantage 500 DEUTZ

CAUTION

AMPS Up to 150ft 150-200ft 200-250ft@100%

Duty Cycle

500 3/0 AWG 3/0 AWG 4/0 AWG

TOTAL COMBINED LENGTH OFELECTRODE AND WORK CABLES

Page 14: Vantage 500 DEUTZ - Lincoln Electric

REMOTE CONTROL

OUTPUTThe Vantage is equipped with a 6-pin and a 14-pin connector. The6-pin connector is for connecting the K857 or K857-1 RemoteControl or for TIG welding, the K870 foot Amptrol or the K936-2hand Amptrol. When in the CC-STICK, DOWNHILL PIPE, or CV-WIRE modes and when a remote control is connected to the 6-pin Connector, the auto-sensing circuit automatically switches theOUTPUT control from control at the welder to remote control.

When in TOUCH START TIG mode and when a Amptrol isconnected to the 6-Pin Connector, the OUTPUT dial is used to setthe maximum current range of the CURRENT CONTROL of theAmptrol.

The 14-pin connector is used to directly connect a wire feedercontrol cable. In the CV-WIRE mode, when the control cable isconnected to the 14-pin connector, the auto-sensing circuitautomatically makes the Output Control inactive and the wirefeeder voltage control active.

NOTE: When a wire feeder with a built in welding voltage controlis connected to the 14-pin connector, do not connect anything to

AUXILIARY POWER RECEPTACLESThe auxiliary power capacity of the Vantage is 12,000 watts of 60Hz, single phase power. The auxiliary power capacity rating inwatts is equivalent to volt-amperes at unity power factor. Themaximum permissible current of the 240 VAC output is 50 A. The240 VAC output can be split to provide two separate 120 VACoutputs with a maximum permissible current of 50 A per output totwo separate 120 VAC branch circuits. The output voltage iswithin ± 10% at all loads up to rated capacity.

The Vantage has two 20 Amp-120VAC (5-20R) GFCI duplexreceptacles and one 50 Amp-120/240 VAC (14-50R) receptacle.The 120/240 VAC receptacle can be split for single phase 120VAC operation. The auxiliary power receptacles should only beused with three wire grounded type plugs or approved doubleinsulated tools with two wire plugs. The current rating of any plugused with the system must be at least equal to the currentcapacity of the associated receptacle.

NOTE: The two 120V GFCI receptacles and the two 120 voltcircuits of the 120/240V receptacle are connected to differentphases and can not be paralleled.

STANDBY POWER CONNECTIONSThe Vantage is suitable for temporary, standby or emergencypower using the engine manufacturer’s recommendedmaintenance schedule.

The Vantage can be permanently installed as a standby powerunit for 240 volt-3 wire, 50 amp service. Connections must bemade by a licensed electrician who can determine how the120/240 VAC (60Hz) power can be adapted to the particularinstallation and comply with all applicable electrical codes. Thefollowing information can be used as a guide by the electrician formost applications. Refer to the connection diagram shown inFigure A.2.

1. Install the double-pole, double-throw switch between the powercompany meter and the premises disconnect.

Switch rating must be the same or greater than the customer’spremises disconnect and service over current protection.

A-6 INSTALLATION A-6

Vantage 500 DEUTZ

Page 15: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

A-7 INSTALLATION A-7

2. Take necessary steps to assure load is limited to the capacityof the Vantage by installing a 50 amp, 240 VAC double polecircuit breaker. Maximum rated load for each leg of the 240VAC auxiliary is 50 amps. Loading above the rated output willreduce output voltage below the allowable -10% of ratedvoltage which may damage appliances or other motor-drivenequipment and may result in overheating of the Vantageengine.

3. Install a 50 amp 120/240 VAC plug (NEMA Type 14-50) to thedouble-pole circuit breaker using No. 6, 4 conductor cable ofthe desired length. (The 50 amp, 120/240 VAC plug isavailable in the optional K802R plug kit.)

4. Plug this cable into the 50 Amp 120/240 Volt receptacle on theVantage case front.

Figure A.2 Connection of the Vantage to Premises Wiring

240 Volt60 Hz.3-WireService

POWER

COMPANY

METER

240 VOLT

120 VOLT

120 VOLT

LOADN

NEUTRALBUS

GROUND

PREMISESDISCONNECT AND

SERVICEOVERCURRENT

PROTECTION

GND

N

NOTE: No. 6 COPPER CONDUCTOR CABLE SEENATIONAL ELECTRICAL CODE FOR ALTERNATE WIRE

SIZE RECOMMENDATIONS.

240 VOLT

GROUNDED CONDUCTOR

50AMP240 VOLT

DOUBLEPOLE

CIRCUITBREAKER

DOUBLE POLE DOUBLE THROWSWITCH RATING TO BE THE SAMEAS OR GREATER THAN PREMISESSERVICE OVERCURRENTPROTECTION.

50 AMP, 120/240VOLT PLUG

NEMA TYPE 14-50

50 AMP, 120/240 VOLTRECEPTACLE

Page 16: Vantage 500 DEUTZ - Lincoln Electric

CONNECTION OF LINCOLN ELECTRICWIRE FEEDERS

Shut off welder before making any electrical connections.

-------------------------------------------------------------------------------------

CONNECTION OF LN-7, LN-8 OR LN-742 TO THEVANTAGE • Shut the welder off.

• Connect the LN-7, LN-8 or LN-742 per instructions on theappropriate connection diagram in the DIAGRAMS section.

• Set the “WIRE FEEDER VOLTMETER” switch to either “+” or “-” as required by the electrode being used.

• Set the “SELECTOR” switch to the “CV-WIRE” position.

• Adjust the “ARC CONTROL” knob to desired Crispness. SOFTfor MIG and CRISP for INNERSHIELD.

• Set the “WELDING TERMINALS” switch to the “REMOTELYCONTROLLED” position.

CONNECTION OF LN-15 TO THE VANTAGE

These connections instructions apply to both the LN-15 Across-The-Arc and Control Cable models. The LN-15 has an internalcontactor and the electrode is not energized until the gun triggeris closed. When the gun trigger is closed the wire will begin tofeed and the welding process is started.

• Shut the welder off.

• For electrode Positive, connect the electrode cable to the "+"terminal of the welder and work cable to the "-" terminal of thewelder. For electrode Negative, connect the electrode cable "-"terminal of the welder and work cable to the "+" terminal of thewelder.

• Across-The-Arc Model:Attach the single lead from the front of the LN-15 to workusing the spring clip at the end of the lead. This is a controllead to supply current to the wire feeder motor; it does notcarry welding current.

Control Cable Model:Connect Control Cable between Engine Welder and Feeder.

• Set the MODE switch to the "CV-WIRE " position.

• Across-The-Arc Model:Set the "WELD TERMINALS" switch to "WELD TERMINALSON"

Control Cable Model:Set the "WELD TERMINALS" switch to "REMOTELYCONTROLLED"

• Set the "WIRE FEEDER VOLTMETER" switch to either "+" or"-" as required by the electrode polarity being used.

• Set the "ARC CONTROL" knob to "0" initially and adjust to suit.

CONNECTION OF AN LN-23P WIRE FEEDER TOTHE VANTAGE• Shut the welder off.

• Connect the LN-23P per instructions on the appropriateconnection diagram in the DIAGRAMS section. (NOTE): Whenconnecting an LN-23P to the Vantage , a K350-1 adapter kitmust be used.

• Set the “WIRE FEEDER VOLTMETER” switch to “-”.

• Set the “SELECTOR” switch to “CV-WIRE” position.

• Set the “WELDING TERMINALS” switch to “REMOTELYCONTROLLED”.

• Set the ARC CONTROL to desired crispness.

• If you are using an LN-23P with the K350-1 adapter kit, theelectrode is not energized until the gun trigger is closed.

A-8 INSTALLATION A-8

Vantage 500 DEUTZ

WARNING

Page 17: Vantage 500 DEUTZ - Lincoln Electric

VANTAGE 500 DEUTZ

A-9 INSTALLATION A-9

CONNECTION OF THE LN-25 TO THE VANTAGEThe LN-25 with or without an internal contactor may be used withthe Vantage. See the appropriate connection diagram in theDIAGRAMS section.

NOTE: The LN-25 (K431) Remote Control Module and (K432)Remote Cable are not recommended for use with the Vantage.

• Shut the welder off.

• For electrode Positive, connect the electrode cable from the LN-25 to the “+” terminal of the welder and work cable to the “-”terminal of the welder. For electrode Negative, connect theelectrode cable from the LN-25 to the “-” terminal of the welderand work cable to the “+” terminal of the welder.

• Attach the single lead from the front of the LN-25 to work usingthe spring clip at the end of the lead. This is a sense lead tosupply current to the wire feeder motor; it does not carry weldingcurrent.

• Set the SELECTOR switch to the “CV-WIRE” position.

• Set the “WELDING TERMINALS” switch to “WELD TERMINALSON”

• Adjust the “ARC CONTROL” knob to desired crispness.Generally, welding is best if the “ARC CONTROL” is set toSOFT for MIG and CRISP for INNERSHIELD. You mayhowever, want to start in the middle and adjust (as needed)from there.

• If you are using an LN-25 with an internal contactor, theelectrode is not energized until the gun trigger is closed.

If you are using an LN-25 without an internal contactor, theelectrode will be energized when the Vantage is started.--------------------------------------------------------------------------------------• When the gun trigger is closed, the current sensing circuit will

cause the wire to begin to feed and the welding process isstarted.

CONNECTION OF AN NA-3 AUTOMATICWELDING SYSTEM TO THE VANTAGEFor connection diagrams and instructions for connecting an NA-3Welding System to the Vantage, refer to the NA-3 WeldingSystem instruction manual. The connection diagram for the LN-8can be used for connecting the NA-3.

CONNECTION OF PRINCE XL SPOOL GUN TOTHE VANTAGE

Connection of the Prince XL Spool Gun requires the use of theK1849-1 Adapter Module.

• Shut the Welder off.

• For electrode Positive, connect the electrode cable to the "+"terminal of the welder and work cable to the "-" terminal of thewelder. For electrode Negative, connect the electrode cable "-" terminal of the welder and work cable to the "+" terminal ofthe welder.

• Connect the Control Cable of the Spool Gun to the AdapterModule and connect the Control Cable of the Adapter Moduleto the Welder.

• Connect the Gas Hose.

• Set the MODE switch to the "CV-WIRE " position.

• Set the "WELD TERMINALS" switch to "WELD TERMINALSON".

• Set the "ARC CONTROL" knob to "0" initially and adjust to suit.

CAUTION

Page 18: Vantage 500 DEUTZ - Lincoln Electric

SAFETY INSTRUCTIONSRead and understand this entire section before operating

your Vantage.

Do not attempt to use this equipment until you havethoroughly read all operating and maintenance manualssupplied with your machine. They include important safetyprecautions, detailed engine starting, operating andmaintenance instructions and parts lists.

ELECTRIC SHOCK can kill.

• Do not touch electrically live parts such asoutput terminals or internal wiring.

• Insulate yourself from the work and ground.

• Always wear dry insulating gloves.

--------------------------------------------------------------------------------------

ENGINE EXHAUST can kill.

• Use in open, well ventilated areas or ventexhaust outside

• Do not stack anything near the engine.

--------------------------------------------------------------------------------------

MOVING PARTS can injure.

• Do not operate with doors open or guards off.

• Stop engine before servicing.

• Keep away from moving parts

--------------------------------------------------------------------------------------

Only qualified personnel should operate this equipment.

ADDITIONAL SAFETY PRECAUTIONSAlways operate the welder with the hinged door closed andthe side panels in place as these provide maximumprotection from moving parts and insure proper cooling airflow.

GENERAL DESCRIPTIONThe Vantage is a diesel engine-driven welding power source. Themachine uses a brush type alternating current generator for DCmulti-purpose welding and for 120/240 VAC auxiliary standbypower. The welding control system uses state of the art ChopperTechnology™.

RECOMMENDED APPLICATIONS

WELDERThe Vantage provides excellent constant current DC weldingoutput for stick (SMAW) and TIG welding. The Vantage alsoprovides excellent constant voltage DC welding output for MIG(GMAW), Innershield (FCAW), Outershield (FCAW-G) and MetalCore welding. In addition the Vantage can be used for ArcGouging with carbons up to 3/8”(10mm) in diameter.

The Vantage is not recommended for pipe thawing.

GENERATORThe Vantage provides smooth 120/240 VAC output for auxiliary powerand emergency standby power.

B-1 OPERATION B-1

Vantage 500 DEUTZ

WARNING

Page 19: Vantage 500 DEUTZ - Lincoln Electric

ENGINE CONTROLS (Items 1 through 8)

1. RUN STOP SWITCH

Toggling the switch to the RUN position energizes the fuelsolenoid for approximately 30 seconds. The engine must bestarted within that time or the fuel solenoid will deenergize, andthe switch must be toggled to reset the timer.

2. START PUSHBUTTON

Energizes the starter motor to crank the engine. With the engine"Run / Stop" switch in the "Run" position, push and hold the Startbutton to crank the engine; release as the engine starts. Do notpress while engine is running since this can cause damage to thering gear and/or starter motor.

3. HOUR METER

The hour meter displays the total time that the engine has beenrunning. This meter is a useful indicator for scheduling preventivemaintenance.

4. FUEL LEVEL GAUGE

Displays the level of diesel fuel in the fuel tank.

The operator must watch the fuel level closely to preventrunning out of fuel and possibly having to bleed the system.

5. ENGINE TEMPERATURE GAUGE

The gauge displays the engine oil temperature.

B-2 OPERATION B-2

Vantage 500 DEUTZ

CONTROLS AND SETTINGSAll welder and engine controls are located on the case front panel. Refer to Figure B.1 and the explanations that follow.

Figure B.1 Case Front Panel Controls

3

4 5 6 7 8 9

10

11

14

13

12

1

2

16

20

15

17 21

18

19

Page 20: Vantage 500 DEUTZ - Lincoln Electric

6. OIL PRESSURE GAUGE

The gauge displays the engine oil pressure when the engine isrunning.

7. ENGINE PROTECTION

The yellow engine protection light remains off with proper oilpressure and under normal operating temperatures. If the lightturns on, the engine protection system will stop the engine. Checkfor proper oil level and add oil if necessary. Check for loose ordisconnected leads at the oil pressure sender located on theengine. The light will remain on when the engine has been shutdown due to low oil pressure or over-temperature condition.

8. BATTERY CHARGING LIGHT

The yellow engine alternator light is off when battery chargingsystem is functioning normally. If light turns on, the engineprotection system will shut down the engine. Check the Enginecooling blower belt. Also the alternator or the voltage regulatormay not be operating correctly. The light may also come on dueto a faulty flashing circuit. The light will remain on when theengine is stopped and the run/stop switch is in the run position.

WELDING CONTROLS (Items 9 through 17)

9. OUTPUT CONTROL: The OUTPUT dial is used to preset theoutput voltage or current as displayed on the digital meters for thefour welding modes. When in the CC-STICK, DOWNHILL PIPE orCV-WIRE modes and when a remote control is connected to the6-Pin or 14-Pin Connector, the auto-sensing circuit automaticallyswitches the OUTPUT CONTROL from control at the welder tothe remote control. In the CV-WIRE mode, when the wire feedercontrol cable is connected to the 14-pin connector the auto-sensing circuit automatically makes OUTPUT CONTROL inactiveand the wire feeder voltage control active.

When in the TOUCH START TIG mode and when a Amptrol isconnected to the 6-pin Connector, the OUTPUT dial is used to setthe maximum current range of the CURRENT CONTROL of theAmptrol.

10. DIGITAL OUTPUT METERS:

The digital meters allow the output voltage (CV-WIRE mode) orcurrent (CC-STICK, DOWNHILL PIPE and TIG modes) to be setprior to welding using the OUTPUT control knob. During welding,the meters display the actual output voltage (VOLTS) and current(AMPS). A memory feature holds the display of both meters onthe seven seconds after welding is stopped. This allows theoperator to read the actual current and voltage just prior to whenwelding was ceased. While the display is being held the left-mostdecimal point in each display will be flashing. The accuracy of themeters is ± 3%.

11. WELD MODE SELECTOR SWITCH:

(Provides four selectable welding modes)

CV-WIRE

DOWNHILL PIPE

CC-STICK

TOUCH START TIG

12. ARC CONTROL:

The ARC CONTROL WIRE/STICK knob is active in the WIREand STICK modes, and has different functions in these modes.This control is not active in the TIG mode.

CC-STICK mode: In this mode, the ARC CONTROL knob sets theshort circuit current (arc-force) during stick welding. Increasingthe number from -10(Soft) to +10 (Crisp) increases the shortcircuit current and prevents sticking of the electrode to the platewhile welding. This can also increase spatter. It is recommendedthat the ARC CONTROL be set to the minimum number withoutelectrode sticking. Start with a setting at 0.

DOWNHILL PIPE mode: In this mode, the ARC CONTROL knobsets the short circuit current (arc-force) during stick welding toadjust for a soft or a more forceful digging arc (Crisp). Increasingthe number from -10 (Soft) to +10 (Crisp) increases the shortcircuit current which results in a more forceful digging arc.Typically a forceful digging arc is preferred for root and hotpasses. A softer arc is preferred for fill and cap passes whereweld puddle control and deposition (“stacking” of iron) are key tofast travel speeds. It is recommended that the ARC CONTROLbe set initially at 0.

CV-WIRE mode: In this mode, turning the ARC CONTROL knobfrom -10(soft) to +10(crisp) changes the arc from soft andwashed-in to crisp and narrow. It acts as an inductance/pinchcontrol. The proper setting depends on the procedure andoperator preference. Start with a setting of 0.

13. WELDING TERMINALS SWITCH

In the WELD TERMINALS ON position, the output is electricallyhot all the time. In the REMOTELY CONTROLLED position, theoutput is controlled by a wire feeder or amptrol device, and iselectrically off until a remote switch is depressed.

B-3 OPERATION B-3

Vantage 500 DEUTZ

Page 21: Vantage 500 DEUTZ - Lincoln Electric

14. WIRE FEEDER VOLTMETER SWITCH:

Matches the polarity of the wire feeder voltmeter to the polarity ofthe electrode.

15. 6 - PIN CONNECTOR

For attaching optional remote control equipment. Includes auto-sensing remote control circuit.

16. 14 - PIN CONNECTOR

For attaching wire feeder control cables. Includes contactorclosure circuit, auto-sensing remote control circuit, and 120VACand 42VAC power.

NOTE: When a wire feeder with a built in welding voltage controlis connected to the 14-pin connector, do not connect anything tothe 6-pin connector.

17. WELD OUTPUT TERMINALS + AND -

These 1/2 - 13 studs with flange nuts provide welding connectionpoints for the electrode and work cables. For positive polaritywelding the electrode cable connects to the “+” terminal and thework cable connects to this “-” terminal. For negative polaritywelding the work cable connects to the “+” terminal and theelectrode cable connects to this “-” terminal.

AUXILIARY POWER CONTROLS(Items 18-21)

18. 120/240 VAC RECEPTACLE

This is a 120/240VAC (14-50R) receptacle that provides 240VACor can be split for 120VAC single phase auxiliary power. Thisreceptacle has a 50 amp rating. Refer to the AUXILIARY POWERRECEPTACLES section in the installation chapter for furtherinformation about this receptacle. Also refer to the AUXILIARYPOWER OPERATION section later in this chapter.

19. CIRCUIT BREAKERS

These circuit breakers provide separate overload currentprotection for each 120V circuit at the 240V receptacle, each120V receptacle, the 120VAC in the 14-Pin connector, the 42VACin the 14-Pin connector and battery circuit overload protection.

20. 120VAC GFCI RECEPTACLES

These two 120VAC (5-20R) receptacles with ground fault circuitinterruption protection provide 120VAC for auxiliary power. Eachreceptacle has a 20 amp total rating. They are designed to protectthe user from the hazards of ground faults. When the GFCI hastripped there will be no voltage available from the receptacle. Ifthe GFCI has tripped, any device plugged into the GFCIreceptacle should be unplugged and the reason for tripping theGFCI should be determined. If the device is found to be damagedor defective, it should be repaired or replaced before any furtheruse. The GFCI should be checked for proper operation prior toeach use by pressing the test button. The GFCI can be reset bypushing the reset button. Refer to the AUXILIARY POWERRECEPTACLES section in the installation chapter for furtherinformation about these receptacles. Also refer to the AUXILIARYPOWER OPERATION section later in this chapter.

21. GROUND STUD

Provides a connection point for connecting the machine case toearth ground. Refer to “MACHINE GROUNDING” in theInstallation chapter for proper machine grounding information.

ENGINE OPERATION

STARTING THE ENGINE1. Open the engine compartment door and check that the fuel

shutoff valve located to the left of the fuel filter housing is in theopen position (lever to be in line with the hose).

2. Check for proper oil level. Close engine compartment door.

3. Remove all plugs connected to the AC power receptacles.

4. Set the RUN/STOP switch to “RUN”. Observe that the engineprotection and battery charging lights are on. After 10 seconds,the engine protection light will turn off.

5. Within 30 seconds, press and hold the engine START buttonuntil the engine starts.

6. Release the engine START button when the engine starts.

7. Check that the engine protection and battery charging lightsare off. The engine protection light is on after starting, theengine will shutdown in a few seconds. Investigate anyindicated problem.

8. Allow the engine to warm up for several minutes beforeapplying a load. Allow a longer warm up time in cold weather.

COLD WEATHER STARTING

With a fully charged battery and the proper weight oil, the engineshould start satisfactorily even down to about 0°F. If the enginemust be frequently started below 10°F, it may be desirable toinstall the optional ether start kit (K825-1). Installation andoperating instructions are included in the kit.

STOPPING THE ENGINE1. Switch the RUN/STOP switch to “STOP”. This turns off the

voltage supplied to the shutdown solenoid. A backup shutdowncan be accomplished by shutting off the fuel valve located onthe fuel line.

B-4 OPERATION B-4

Vantage 500 DEUTZ

Page 22: Vantage 500 DEUTZ - Lincoln Electric

B-5 OPERATION B-5

Vantage 500 DEUTZ

TYPICAL FUEL CONSUMPTIONRefer to Table B.2 for typical fuel consumption of the VantageEngine for various operating scenarios.

WELDER OPERATION

DUTY CYCLEDuty Cycle is the the ratio of the uninterrupted on-load duration to10 minutes. The total time period of one complete on-load and no-load cycle is 10 minutes. For example, in the case of a 60% dutycycle, load is applied continuously for 6 minutes followed by a no-load period of 4 minutes.

STICK WELDING MODEThe Vantage can be used with a broad range of DC stickelectrodes.

The MODE switch provides two stick welding settings as follows:

CC-STICK MODEThe CC-STICK position of the MODE switch is designed forhorizontal, vertical-up and overhead welding with all types ofelectrodes, especially low hydrogen. The OUTPUT CONTROLknob adjusts the full output range for stick welding.

The ARC CONTROL knob sets the short circuit (arc-force) currentduring stick welding. Increasing the number from -10 (Soft) to +10(Crisp) increases the short circuit current and prevents sticking ofthe electrode to the plate while welding. This can also increasespatter. It is recommended that the ARC CONTROL be set to theminimum number without electrode sticking. Start with the knobset at 0.

DOWNHILL PIPE MODEThis slope controlled setting is intended for “out-of-position” and“down hill” pipe welding where the operator would like to controlthe current level by changing the arc length. The OUTPUTCONTROL knob adjusts the full output range for pipe welding.

The ARC CONTROL knob sets the short circuit current (arc-force)during stick welding to adjust for a soft or a more forceful diggingarc (Crisp). Increasing the number from -10 (Soft) to +10 (Crisp)increases the short circuit current which results in a more forcefuldigging arc. Typically a forceful digging arc is preferred for rootand hot passes. A softer arc is preferred for fill and cap passeswhere weld puddle control and deposition (“stacking” of iron) arekey to fast travel speeds. It is recommended that the ARCCONTROL be set initially at 0.

TOUCH START TIG MODEThe Vantage can be used in a wide variety of DC TIG weldingapplications.

The TOUCH START TIG setting of the MODE switch is for DCTIG (Tungsten Inert Gas) welding. To initiate a weld, theOUTPUT CONTROL knob is first set to the desired current andthe tungsten is touched to the work. During the time the tungstenis touching the work there is very little voltage or current and, ingeneral, avoids tungsten contamination. Then, the tungsten isgently lifted off the work in a rocking motion, which establishes thearc.

To stop the arc, simply lift the TIG torch away from the work piece.When the arc voltage reaches approximately 30 volts, the arc willgo out and the machine will automatically reset to the touch startcurrent level. The tungsten may then be retouched to the workpiece to restrike the arc. The arc may also be started and stoppedwith an Amptrol or Arc Start Switch.

The ARC CONTROL is not active in the TIG mode.

In general the ‘Touch Start’ feature avoids tungsten contaminationwithout the use of a Hi-frequency unit. If the use of a highfrequency generator is desired, the K930-2 TIG Module can beused with the Vantage. The settings are for reference.

The Vantage is equipped with the required R.F. bypass circuitryfor the connection of high frequency generating equipment.

The Vantage and any high frequency generating equipment mustbe properly grounded. See the K930-2 TIG Module operatingmanuals for complete instructions on installation, operation, andmaintenance.

When using the TIG Module, the OUTPUT control on the Vantageis used to set the maximum range of the CURRENT CONTROLon the TIG Module or an Amptrol if connected to the TIG Module.

VANTAGE SETTINGS WHEN USING THE K930-2TIG MODULE• Set the WELD MODE switch to the setting.

• Set the WELDING TERMINALS switch to the “RemotelyControlled” position. This will keep the solid state contactor openand provide a “cold” electrode until the triggering device(Amptrol or Arc Start Switch) is pressed.

Table B.2Deutz F3L912 Engine Fuel Consumption

Deutz B3.3 Running Time for44HP(33Kw) 25Gal.(94.6 L)@1800 RPM (Hours)

High Idle - .66 Gal./hour 37.9no load 1900 RPM (2.50 Lts./hour)

DC CC Weld 1.94 Gal./hour 12.9Output 500 (7.34 Lts./hour)Amps @ 40 Volts

Auxiliary Power 1.31 Gal./hour 19.112,000 VA (4.96 Lts./hour)

Page 23: Vantage 500 DEUTZ - Lincoln Electric

Table B.3 TYPICAL CURRENT RANGES (1)

FOR TUNGSTEN ELECTRODES (2)

DCEN (-) DCEP (+) Approximate Argon Gas Flow Ratel/min (c.f.m.)

TungstenElectrode 1%, 2% 1%, 2% TIG TORCHDiameter Thoriated Thoriated Aluminum Stainless Steel Nozzlemm (in) Tungsten Tungsten Size (4), (5)

.25 (0.010) 2-15 (3) 2-4 (3-8) 2-4 (3-8) #4, #5, #6

.50 (0.020) 5-20 (3) 3-5 (5-10) 3-5 (5-10)

1.0 (0.040) 15-80 (3) 3-5 (5-10) 3-5 (5-10)

1.6 (1/16) 70-150 10-20 3-5 (5-10) 4-6 (9-13) #5, #6

2.4 (3/32) 150-250 15-30 6-8 (13-17) 5-7 (11-15) #6, #7, #83.2 (1/8) 250-400 25-40 7-11 (15-23) 5-7 (11-15)

4.0 (5/32) 400-500 40-55 10-12 (21-25) 6-8 (13-17) #8, #104.8 (3/16) 500-750 55-80 11-13 (23-27) 8-10 (18-22)

6.4 (1/4) 750-1000 80-125 13-15 (28-32) 11-13 (23-27)

(1) When used with argon gas. The current ranges shown must be reduced when using argon/helium or pure helium shielding gases.

(2) Tungsten electrodes are classified as follows by the American Welding Society (AWS):

Pure EWP1% Thoriated EWTh-12% Thoriated EWTh-2

Though not yet recognized by the AWS, Ceriated Tungsten is now widely accepted as a substitute for 2% Thoriated Tungsten inAC and DC applications.

(3) DCEP is not commonly used in these sizes.

(4) TIG torch nozzle “sizes” are in multiples of 1/16ths of an inch:

# 4 = 1/4 in. 6 mm# 5 = 5/16 in. 8 mm# 6 = 3/8 in. 10 mm# 7 = 7/16 in. 11 mm# 8 = 1/2 in. 12.5 mm#10 = 5/8 in. 16 mm

(5) TIG torch nozzles are typically made from alumina ceramic. Special applications may require lava nozzles, which are less prone tobreakage, but cannot withstand high temperatures and high duty cycles.

B-6 OPERATION B-6

Vantage 500 DEUTZ

Page 24: Vantage 500 DEUTZ - Lincoln Electric

CV-WIRE MODE Connect a wire feeder to the Vantage and set welder controlsaccording to the instructions listed earlier in this section.

The Vantage in the ”CV-WIRE” position, permits it to be used witha broad range of flux cored wire (Innershield and Outershield)electrodes and solid wires for MIG welding (gas metal arcwelding). Welding can be finely tuned using the “ARCCONTROL”. Turning the ARC CONTROL clockwise from -10(soft) to +10(crisp) changes the arc from soft and washed-in tocrisp and narrow. It acts as an inductance/pinch control. Theproper setting depends on the procedure and operatorpreference. Start with the knob set at 0.

For any electrodes, the procedures should be kept within therating of the machine. For additional electrode information, Seewww.lincolnelectric.com or the appropriate Lincoln publication.

ARC GOUGINGFor optimal performance when arc gouging, set the Vantage“WELD MODE” switch to the “CC - STICK” position, and the“ARC CONTROL” to 10.

Set the “OUTPUT” knob to adjust output current to the desiredlevel for the gouging electrode being used according to theratings in the following table:

* Maximum current setting is limited to the Vantage maximum of575 Amps.

PARALLELINGWhen paralleling machines in order to combine their outputs, allunits must be operated in the CC - STICK mode only at the sameoutput settings. To achieve this turn the WELD MODE switch tothe CC - STICK position. Operation in other modes may produceerratic outputs, and large output imbalances between the units.

AUXILIARY POWER OPERATIONStart the engine and set the IDLER control switch to the desiredoperating mode. Full power is available regardless of the weldingcontrol settings, if no welding current is being drawn.

The auxiliary power of the Vantage consists of two 20 Amp-120VAC (5-20R) GFCI duplex receptacles and one 50 Amp-120/240 VAC (14-50R) receptacle. The 120/240VAC receptaclecan be split for single phase 120 VAC operation.

The auxiliary power capacity is 12,000 watts of 60 Hz, singlephase power. The auxiliary power capacity rating in watts isequivalent to volt-amperes at unity power factor. The maximumpermissible current of the 240 VAC output is 50 A. The 240 VACoutput can be split to provide two separate 120 VAC outputs witha maximum permissible current of 50 A per output to two separate120 VAC branch circuits. Output voltage is within ± 10% at allloads up to rated capaci

NOTE: The two 120V GFCI receptacles and the two 120V circuitsof the 120/240V receptacle are connected to different phases andcannot be paralleled.

The auxiliary power receptacles should only be used with threewire grounded type plugs or approved double insulated tools withtwo wire plugs.

The current rating of any plug used with the system must be atleast equal to the current capacity of the associated receptacle.

SIMULTANEOUS WELDING AND AUXILIARYPOWER LOADSIt must be noted that the above auxiliary power ratings are withno welding load. Simultaneous welding and power loads arespecified in table B.4. The permissible currents shown assumethat current is being drawn from either the 120 VAC or 240 VACsupply (not both at the same time).

ELECTRODE CURRENT RANGEDIAMETER (DC, electrode positive)

(1/8”) 30-60 Amps(5/32”) 90-150 Amps(3/16”) 200-250 Amps(1/4”) 300-400 Amps(5/16”) 350-450 Amps(3/8”) 450-575 Amps*

B-7 OPERATION B-7

Vantage 500 DEUTZ

Page 25: Vantage 500 DEUTZ - Lincoln Electric

B-8 OPERATION B-8

Vantage 500 DEUTZ

TABLE B.5 Vantage Extension Cord Length Recommendations

Current(Amps)

1515202025303850

Voltage(Volts)

120240120240240240240240

Load(Watts)1800360024004800600072009000

12000

3060

(9)(18)

40753060

(12)(23)(9)(18)

75150501009075

(23)(46)(15)(30)(27)(23)

12522588175150120100

(38)(69)(27)(53)(46)(37)(30)

175350138275225175150125

(53)(107)(42)(84)(69)(53)(46)(38)

300600225450250300250200

(91)(183)(69)(137)(76)(91)(76)(61)

Maximum Allowable Cord Length in ft. (m) for Conductor Size

Conductor size is based on maximum 2.0% voltage drop.

14 AWG 12 AWG 10 AWG 8 AWG 6 AWG 4 AWG

TABLE B.4 Vantage Simultaneous Welding and Power Loads

Welding Output Permissible Power Watts Permissible Auxiliaryat NEMA Voltage (Unity Power Factor) Current in Amperes

(V=.04I + 20) @ 120VAC * +/- 10% @ 240 VAC +/- 10%

0-250A/30V 12,000 100** 50350A/34V 8,100 68** 34400A/36V 5,600 46 23450A/38V 2,900 24 12500A/40V 0 0 0

* Each duplex receptacle is limited to 20 amps.** Not to exceed 50A per 120 VAC branch circuit when splitting the 240 VAC output.

Page 26: Vantage 500 DEUTZ - Lincoln Electric

OPTIONAL FIELD INSTALLED ACCESSORIESK704 ACCESSORY SET - Includes 35 feet (10 m) of electrodecable and 30 feet (9 m) of work cable, headshield, work clampand electrode holder. Cable is rated at 500 amps, 60% duty cycle.

K767-2 FOUR WHEELED STEERABLE YARD TRAILER - For inplant and yard towing.

K802N POWER PLUG KIT - Provides four 120V plugs rated at 20 amps eachand one dual voltage, full KVA plug rated at 120/240V, 50 amps. 120V plug maynot be compatible with NEMA common household receptacles.

K802-R POWER PLUG KIT - Provides four 120V plugs rated 15 amps eachand one dual voltage, full KVA plug rated at 120/240V, 50 amps, 120V plug iscompatible with NEMA common household receptacles.

K857 25 ft. (7.5 m) or K857-1 100 ft. (30.4 m) REMOTE CONTROL -Portable control provides same dial range as the output control on the welderfrom a location up to the specified length from the welder. Has convenientplug for easy connection to the welder. The Vantage 500 DEUTZ is equippedwith a 6-pin connector for connecting the remote control.

K953-1 TRAILER - Two-wheeled trailer with optional fender and lightpackage. For highway use, consult applicable federal, state, and local lawsregarding possible additional requirements. There is a choice of 2 hitches,a fender & a light package. Order:K953-1 TrailerK958-1 Ball HitchK958-2 Lunette Eye Hitch K959-1 Fender & Light KitK965-1 Cable Rack

K887-1 ETHER START KIT - Provides maximum cold weather startingassistance for frequent starting below 10 oF(-12.2 oC). Required Ether tankis not provided with kit.

K899-1 SPARK ARRESTOR KIT - Easily mounts to standard muffler.

K949-1 OIL DRAIN KIT - Includes ball valve, hose and clamp.

K1751-1 COLD WEATHER KIT - Air recirculation system maintain Deutzengine temperature in extremely cold weather conditions.

K1816-1 Full KVA Adapter Kit - Plugs into the 120/240V NEMA14-50R receptacle on the case front (which accepts 4-prongplugs) and converts it to a NEMA 6-50R receptacle (whichaccepts 3-prong plugs) for connection to Lincoln Equipment witha NEMA 6-50P plug,

Pipe Thawing with an arc welder can cause fire, explosion,damage to electric wiring or to the arc welder if doneimproperly. The use of an arc welder for pipe thawing is notapproved by the CSA, nor is it recommended or supportedby Lincoln Electric.-------------------------------------------------------------------------------------

C-1 ACCESSORIES C-1

Vantage 500 DEUTZ

WARNING

Page 27: Vantage 500 DEUTZ - Lincoln Electric

SAFETY PRECAUTIONS

• Have a qualified technician do the maintenance andtroubleshooting work.

• Turn the engine off before working inside the machine.

• Remove guards only when necessary and replace them whenthe maintenance requiring their removal is complete.

• Always use the greatest care when working near moving parts.

--------------------------------------------------------------------------------------

Read the Safety Precautions in front of this manual and theengine instruction manual before working on this machine.

Keep all equipment safety guards, covers and devices in positionand in good repair. Keep hands, hair, clothing and tools awayfrom V-belts, gears, fans and all other moving parts when starting,operating or repairing the equipment.

ROUTINE AND PERIODICMAINTENANCE

DAILY• Check the crankcase oil level .

• Refill the fuel tank to minimize moisture condensation in thetank.

• Open the water drain valve located on the bottom of the waterseparator element 1 or 2 turns and allow to drain into acontainer suitable for diesel fuel for 2 to 3 seconds. Repeat theabove drainage procedure until diesel fuel is detected in the co

WEEKLYBlow out the machine with low pressure air periodically. Inparticularly dirty locations, this may be required once a week.

ENGINE MAINTENANCERefer to the “Periodic Checks” section of the Engine Operator’sManual for the recommended maintenance schedule of thefollowing:

a) Engine Oil and Filterb) Air Cleanerc) Fuel Filter - and Delivery Systemd) Cooling Blower Belte) Batteryf) Cooling System

Refer to Table D.1 at the end of this section for various enginemaintenance components.

AIR FILTER

EXCESSIVE AIR FILTER RESTRICTION WILL RESULT INREDUCED ENGINE LIFE.

--------------------------------------------------------------------------------------

The air filter element is a dry cartridge type. It can be cleaned andreused; however, damaged elements should not be reused. Stopengine after 100 hours of running time and clean filter element ,replace the filter if necessary. Service air cleaner regularlyaccording to Engine Operator’s Manual.

1. Locate the air filter canister located behind the engine door onthe top of the engine.

2. Remove air filter element.

3. Remove loose dirt from element with compressed air or waterhose directed from inside out.

Compressed Air: 100 psi maximum with nozzles at leastone inch away from element.

Water Hose: 40 psi maximum without nozzle.

4. Soak element in a mild detergent solution for 15 minutes. Donot soak more than 24 hours. Swish element around in thesolution to help remove dirt.

5. Rinse elements from inside out with a gentle stream of water(less than 40 psi) to remove all suds and dirt.

6. Dry element before reuse with warm air at less than 160°F(71°C). Do not use a light bulb to dry the element.

D-1 MAINTENANCE D-1

Vantage 500 DEUTZ

WARNING

CAUTION

Page 28: Vantage 500 DEUTZ - Lincoln Electric

7. Inspect for holes and tears by looking through the elementtoward a bright light. Check for damaged gaskets or dentedmetal parts. Do not reuse damaged elements. Protect elementfrom dust and damage during drying and storage.

8. Reinstall air filter element.

After six cleanings replace air filter. A cleaned filter will haveapproximately 70% of the life of a new filter element. A restrictedfilter element may not appear excessively dirty.

FUEL FILTERS

When working on the fuel system

• Keep naked lights away, do not smoke !

• Do not spill fuel !

-------------------------------------------------------------------------------------

The Vantage is equipped with a Fuel Pre-Filter/Water SeparatorAssembly located before the lift pump and a Secondary FuelFilter located after the lift pump and before the fuel injectors. TheFuel Pre-Filter/Water Separator is mounted to the engine blockjust below the lift pump. The Secondary Fuel Filter is mounteddirectly to the engine just above the oil filter.

FUEL PRE-FILTER/WATER SEPARATORASSEMBLY

The pre-filter is a 150 micron screen designed to protect againstgross fuel contamination of the water separator element and theSecondary Fuel Filter. If the pre-filter becomes plugged it may beremoved, inspected, cleaned and reinstalled. In general this onlyneeds to be done with each water separator element change(about every 1,000 hrs.) However if at any time excessive fuelcontamination is suspected or a sudden fall-off in engineperformance is detected the pre-filter screen should be inspectedand cleaned. Follow the following procedure:

1. Close the fuel shutoff valve (Lever should be perpendicular tothe hose) located on the side of the Fuel Pre-Filter/WaterSeparator Assembly.

2. Unscrew the cap ring located on the top of the filter headerand remove the plastic center cap and O-ring.

3. Remove the large white volume plug located directly under thecenter cap in the upper cavity of the filter header. Use a smallscrewdriver (or similar device) to lift the plug part way out ofthe cavity to assist with its removal.

Be careful not to damage the pre-filter screen with thetool used to remove the plug.

4. Using a pair of pliers, gently tug on the pull tabs of the pre-filterscreen in an alternating pattern to gradually remove the pre-filter screen.

5. Brush off any debris and rinse in diesel fuel.

6. Re-install the pre-filter screen into the upper cavity of the filterheader making sure the four pull tabs are pointing up. Puttingyour fingers on the pull tabs, push down evenly until the lowerbody of the pre-filter screen contacts the floor of the uppercavity.

7. Re-insert the large white volume plug into the upper cavity.

8. Place the O-ring onto the angled seal surface of the filterheader and re-install the plastic cap. Make sure its flange restson the O-ring.

9. Screw on the cap ring and tighten hand tight.

10. Remember to open the fuel shutoff valve (Lever in line withthe hose) before starting the engine.

WATER SEPARATOR ELEMENT

The water separator element is a two stage filter with a specialfiltration/water separating media, and an expanded waterreservoir providing maximum protection against water in the fuel.The recommended change interval for the water separatorelement is 1,000 hours. The procedure for changing the elementis as follows:

1. Close the fuel shutoff valve (Lever should be perpendicular tothe hose) located on the side of the Fuel Pre-Filter/WaterSeparator Assembly.

2. Rotate the quick change ring (located just below filter header)clockwise approximately 1/2 turn and slide it down and off ofthe element.

3. Grasp the element and pull down with a slight rocking motionto remove the element from the grommet post on the bottomof the filter header.

4. Slide the new element onto the grommet post on the bottomof the filter header until the element no longer easily moves upinto the filter header. Now rotate the element (may take almost1 full turn) with a slight upward pressure until the elementbegins to further engage the header. With the properorientation now established apply additional pressure to seatthe element in the filter header. You should feel the element“pop” into place when properly seated.

Note: The element will only go on one way. Never useexcessive force when mounting the element to theheader.

5. Slide the quick change ring up over the element and rotatecounter clockwise until an audible click or pop is heard. If youdo not hear the click you have not rotated the ring far enoughand the element is not in the locked position. Anotherindication that the ring is in the locked position is that one set(it doesn’t matter which one) of arrows located on the outsideof the ring should be located directly under the air vent valve.

6. Open the fuel shutoff valve (lever in line with the hose).

7. Open the air vent valve on the front of the filter header untilfuel emerges free of air bubbles and then close the air ventvalve.

Note : Consult your engine operation manual for information onair bleeding the entire fuel system.

SECONDARY FUEL FILTER

The Secondary Fuel Filter is a spin on cartridge type mountdirectly to the engine. Consult your engine operation manual forcomplete information on service intervals and element changingprocedures.

D-2 MAINTENANCE D-2

Vantage 500 DEUTZ

WARNING

Page 29: Vantage 500 DEUTZ - Lincoln Electric

VANTAGE 500 DEUTZ

COOLING SYSTEM

The cooling system of the Deutz engine needs to be checked andcleaned periodically. Consult the engine owners manual for theproper frequency and procedure.

COOLING BLOWER BELT

The following procedure should be followed to replace the coolingblower belt:

1. Allow the machine to cool.

2. Unfasten and slide the battery holder out from the welder.

3. Disconnect the negative battery cable.

4. Remove engine case side.

5. Loosen air cleaner hose clamp and detach hose.

6. Remove the engine end panel with air box and air cleanerattached for access to the engine.

7. Loosen the alternator mounting bolts and rotate the alternatortowards the engine.

8. Remove the old cooling blower belt and install a new one.

9. Adjust the cold belt tension to 63-73 lbs. midway between anytwo pulleys.

10. Reinstall the air cleaner hose, engine case side and endpanel. Reattach the negative battery cable. Slide in andrefasten the battery holder.

11. Check the cooling blower belt tension after 100 hours ofoperation. (Follow steps 1,2,3,4,5,6,9 & 10)

BATTERY HANDLINGGASES FROM BATTERY can explode.

• Keep sparks, flame and cigarettes away frombattery.

To prevent EXPLOSION when:

• INSTALLING A NEW BATTERY - disconnectnegative cable from old battery first andconnect to new battery last.

• CONNECTING A BATTERY CHARGER -Remove battery from welder by disconnectingnegative cable first, then positive cable andbattery clamp. When reinstalling, connectnegative cable last. Keep well ventilated.

• USING A BOOSTER - connect positive lead tobattery first then connect negative lead toengine foot.

BATTERY ACID CAN BURN EYES AND SKIN.

• Wear gloves and eye protection and be carefulwhen working near battery. Follow instructionsprinted on battery.

--------------------------------------------------------------------------------------

PREVENTING ELECTRICAL DAMAGE

1. When replacing, jumping, or otherwise connecting the batteryto the battery cables, the proper polarity must be observed.Failure to observe the proper polarity could result in damage tothe charging circuit. The positive (+) battery cable has a redterminal cover.

2. If the battery requires charging from an external charger,disconnect the negative battery cable first and then the positivebattery cable before attaching the charger leads. Failure to doso can result in damage to the internal charger components.When reconnecting the cables, connect the positive cable firstand the negative cable last.

PREVENTING BATTERY DISCHARGE

Turn off the RUN/STOP to stop when engine is not running.

PREVENTING BATTERY BUCKLING

Tighten nuts on battery clamp until snug.

D-3 MAINTENANCE D-3

Page 30: Vantage 500 DEUTZ - Lincoln Electric

CHARGING THE BATTERYWhen you charge, jump, replace, or otherwise connect batterycables to the battery, be sure the polarity is correct. Improperpolarity can damage the charging circuit. The Vantage positive (+)battery terminal has a red terminal cover.

If you need to charge the battery with an external charger,disconnect the negative cable first, then the positive cable beforeyou attach the charger leads. after the battery is charged,reconnect the positive battery cable first and the negative cablelast. Failure to do so can result in damage to the internal charger

components.

Follow the instructions of the battery charger manufacturer forproper charger settings and charging time.

NAMEPLATES / WARNING DECALSMAINTENANCEWhenever routine maintenance is performed on this machine - orat least yearly - inspect all nameplates and labels for legibility.Replace those which are no longer clear. Refer to the parts list forthe replacement item number.

WELDER / GENERATORMAINTENANCE

STORAGEStore the Vantage in clean, dry protected areas.

CLEANINGBlow out the generator and controls periodically with low pressureair. do this at least once a week in particularly dirty areas.

BRUSH REMOVAL AND REPLACEMENTIt is normal for the brushes and slip rings to wear and darkenslightly. Inspect the brushes when a generator overhaul isnecessary.

Do not attempt to polish slip rings while the engine isrunning.

--------------------------------------------------------------------------------------

D-4 MAINTENANCE D-4

Vantage 500 DEUTZ

WARNING

Table D.1 Engine Maintenance Components

ITEM

Air Cleaner Element

Cooling Blower Belt

Oil Filter Element

Fuel Filter Element

Water Separator Element

Fuel Pre-Filter Screen

Battery

MAKE

DonaldsonAC

LincolnGates

DeutzPurolator

NapaFram

DeutzPurolator

NapaFram

LincolnStanadyne

LincolnStanadyne

PART NUMBER

P181052A302C

T13536-37585

1174418PER2168

1820PH3776

1174423PC423358

P4102

M16890-C31572

M16890-B29575

BCIGroup

34

Page 31: Vantage 500 DEUTZ - Lincoln Electric

This Troubleshooting Guide is provided to help you locate andrepair possible machine malfunctions. Simply follow the three-step procedure listed below.

Step 1. LOCATE PROBLEM (SYMPTOM).

Look under the column labeled “PROBLEM (SYMPTOMS)”. Thiscolumn describes possible symptoms that the machine mayexhibit. Find the listing that best describes the symptom that themachine is exhibiting.

Step 2. POSSIBLE CAUSE.

The second column labeled “POSSIBLE CAUSE” lists theobvious external possibilities that may contribute to the machinesymptom.

Step 3. RECOMMENDED COURSE OF ACTION

This column provides a course of action for the Possible Cause,generally it states to contact your local Lincoln Authorized FieldService Facility.

If you do not understand or are unable to perform theRecommended Course of Action safely, contact your local LincolnAuthorized Field Service Facility.

HOW TO USE TROUBLESHOOTING GUIDE

Service and Repair should only be performed by Lincoln Electric Factory Trained Personnel. Unauthorized repairsperformed on this equipment may result in danger to the technician and machine operator and will invalidate your factorywarranty. For your safety and to avoid Electrical Shock, please observe all safety notes and precautions detailedthroughout this manual.

_______________________________________________________________________________________________

E-1 TROUBLESHOOTING E-1

Vantage 500 DEUTZ

WARNING

CAUTION

If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local LincolnAuthorized Field Service Facility for technical troubleshooting assistance before you proceed.

Page 32: Vantage 500 DEUTZ - Lincoln Electric

PROBLEMS(SYMPTOMS)

Major Physical or Electrical Damage isEvident.

Engine will not crank

Engine will crank but not start.

Engine shuts down shortly after starting.

Engine shuts down while under a load.

Engine runs rough.

Engine will not shut off

POSSIBLE AREAS OFMISADJUSTMENT(S)

1. Contact your Local Lincoln AuthorizedField Service Facility.

1. Battery low.

2. Loose battery cable connections whichmay need Inspected, cleaned or tighten.

3. Faulty wiring in engine starting circuit.

4. Faulty engine starter. Contact authorizedlocal Engine Service Shop.

1. Out of fuel.

2. Fuel shut off valve is in the off positionmake sure the valve lever is in a verticaldirection.

3. Engine shut down solenoid not pulling in.

4. On/Off switch on for more than 30 sec.before starting, the On/Off switch willneed to be switch off and turned back on.

5. Fuel Filters dirty/clogged, main filterelement and/or Inline Fuel Filter mayneed to be replaced.

6. High oil temperature or low oil pressure.(engine protection light lit)

1. Low oil pressure (engine protection lightlit). Check oil level (Consult engineservice dealer).

2. High oil temperature. (engine protectionlight lit).

3. Faulty oil pressure switch.

4. Faulty oil temperature switch. Contactauthorized local Engine Service Shop.

5. Low output of battery charging alternator(battery charging light lit).

1. High oil temperature. .

1. Dirty fuel or air filters may needcleaned/replaced.

2. Water in fuel.

1. Fuel Shutdown solenoid not functioningproperly / linkage binding.

RECOMMENDEDCOURSE OF ACTION

If all recommended possible areasof misadjustment have beenchecked and the problem persists,Contact your local LincolnAuthorized Field Service Facility.

ENGINE PROBLEMS

E-2 TROUBLESHOOTING E-2Observe all Safety Guidelines detailed throughout this manual

Vantage 500 DEUTZ

CAUTIONºIf for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local LincolnAuthorized Field Service Facility for technical troubleshooting assistance before you proceed.

______________________________________________________________________________________________________________

Page 33: Vantage 500 DEUTZ - Lincoln Electric

PROBLEMS(SYMPTOMS)

Battery does not stay charged.

No welding output or auxiliary output.

Welder has some/ no output and nocontrol. Auxiliary output OK

No welding output. Auxiliary output OK.

No auxiliary power.

POSSIBLE AREAS OFMISADJUSTMENT(S)

1. Faulty battery .

2. Faulty engine alternator.

3. Loose or broken lead in charging circuit.

4. Loose fan belt may need tightening.

1. Broken lead in rotor circuit.

2. Faulty field diode module.

3. Faulty Weld Control P.C. Board.

4. Faulty rotor.

1. Faulty remote kit.

2. Faulty output control potentiometer.

3. Faulty output control wiring.

4. Faulty Weld Control PCB, PullCoil/Battery PCB or Chopper PCB.

1. WELDING TERMINALS switch in wrongposition,be sure to place switch inWELDING TERMINALS ALWAYS ONposition.

2. Faulty Weld Control PCB, PullCoil/Battery PCB or Chopper PCB.

1. Open breakers.

2. Faulty receptacle.

3. Faulty auxiliary circuit wiring.

4. GFCI tripped.

RECOMMENDEDCOURSE OF ACTION

If all recommended possible areasof misadjustment have beenchecked and the problem persists,Contact your local LincolnAuthorized Field Service Facility.

Vantage 500 DEUTZ

E-3 TROUBLESHOOTING E-3

FUNCTION PROBLEMS

CAUTIONIf for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local LincolnAuthorized Field Service Facility for technical troubleshooting assistance before you proceed.

______________________________________________________________________________________________________________

Page 34: Vantage 500 DEUTZ - Lincoln Electric

F-1 DIAGRAMS F-1

Vantage 500 DEUTZ

NO

TE

:T

his

diag

ram

is f

or r

efer

ence

onl

y. I

t m

ay n

ot b

e ac

cura

te f

or a

ll m

achi

nes

cove

red

by t

his

man

ual.

The

spe

cific

dia

- gr

am f

or y

our

part

icul

ar m

achi

ne is

pas

ted

insi

de t

he m

achi

ne o

n on

e of

the

encl

osur

e pa

nels

.

OU

TPU

T C

ON

TRO

LC

CW

RE

CTI

FIE

RB

RID

GE

HO

UR

MET

ER

ALT

75

PIN

CH

PO

T

278

SILV

ER

-23

2R

238A

231

42A

41A

405A

+

232C

FUEL

OIL

PR

ESS

UR

E

241

228

STA

RT

BU

TTO

N

5L22

923

2B5M

247

232M

232K

232N

232A

OIL

TEM

PER

ATU

RE

243

222

MO

DE

SEL

EC

TOR

SW

ITC

H

206A

+

206A

W2

W2

W3

W3 ST

ATO

RW

ELD

WIN

DIN

GS

W5W

4

W5W

4W

1W1

W6 W

6

214

S5 218

12 3

220

A

4

R1

76

VIEW

EDFR

OM

BAC

K

77

-

15

4

51

8

PRO

GR

AMM

ING

916

18

J31

220

VOLT

MET

ER

M1M2M3M4M5

M6

M9

M10

15

AMM

ETER

M1M2

M3M4M5

M6

M9

M10

2523

J43

PU

LL C

OIL

BDB1

B2B3

B4

PE

RIP

HE

RA

L B

D

WE

LD B

OA

RD

270403

405

VIEW

ED F

RO

M B

ACK

277

10K

279

244A 2A

WE

LDIN

G T

ERM

INAL

CO

NTR

OL

SW

ITC

HSH

OW

N IN

"ALW

AYS

ON

" PO

SITI

ON

278279

277

2 120

4S20

6S

206S

403

5T

208B

208B

256

260

270

262A

405

214

232R

262A

262

208A

208B

+

W4

& W

5W

2 &

W3

W1

& W

6

204S

232F

3 TU

RN

STH

RU

TOR

OID

16

127

J32

234

271247

PCB3

PCB1

PC

B8

5S26

5 232N

3

41

J30

6

G43

42

A.0

2

208

31 32 4B

21

77B21 2B75B

GN

D-A

41A

42A

76B

115V

AC

CO

NTA

CTO

R

WO

RK

REM

OTE

CO

NTR

OL

42VA

C

GR

OU

ND A

MPH

EN

OL

1

VO

LTM

ETE

RAM

MET

ER

206B

GN

D-K

J A D CH BK E F GI

405A

I

2B 4B GN

D-B

A B C D E F

76B

75B

REM

OTE

CO

NTA

CTO

R

GR

OU

ND

AM

PHE

NO

L 2

CO

NTR

OL

2A 4A75A

76A

77A

77B

232K

-+

23 25

W7

W8

W9

W10

23A

25A

AUXI

LIAR

Y G

RO

UN

D S

TUD

, BO

TTO

MC

ENTE

R O

F C

ON

TRO

L BO

X

32

32

GR

OU

ND

STU

D O

NC

ON

TRO

L PA

NEL

GR

OU

ND

STU

D O

NR

ECEP

TAC

LE P

ANEL

POS

NEG

POS

POS

NEG

NEGRIG

HT

SID

EC

HO

PP

ER

PC

B5

NEG

POS

NEGPO

S

LEFT

SID

EC

HO

PP

ER

PCB6

B6 B5

B4B1

B2B3

1314

B6 B5

B4B1

B2B3

18

91

6J7

J3

1 9168 1

6

712

1

169

8

610

J4J5

610

CO

NTR

OL,

MO

DE

SEL.

CH

OPP

ER,P

OW

ER,P

WM

,TH

ERM

AL

25A23A

1314

77

7675

24

75A

76A

77A

271200

500

239

CV

CC TI

G

PIPE 40

5B

R4

232B

232C

206C

208C

B8B7

B8B7

INSU

LATE

DN

EUTR

ALS

TUD

ON

BOTT

OM

RIG

HT

OF

CO

NTR

OL

BOX

GR

OU

ND

STU

DO

N O

UTP

UT

PAN

EL

GN

D-J

3 TU

RN

STH

RU

TOR

OID

12 V

OLT

GR

OU

ND

STU

D O

N L

EFT

SID

EBA

CK

OF

CO

NTR

OL

BOX

5N

5S5L

5M5T

GN

D-A

GN

D-B

315H

GN

D-J

L1 C

HO

KE

5J

5K

5K

5A5B

5G

ND

-C

GN

D-D

GN

D-E

M1 M

2M3 M

4M5 M

6M9 M

10

41

41

41

J53

J52

J51

13A14

AB7 B8B7 B8

50A

11C

B4

6B

SILV

ER

J12

CB120

A

8J1

1SI

LVER

HO

T (G

OLD

)

12C

B350A

3A

HO

T (G

OLD

)

11

5C

5B 5E

STAT

OR

AU

XILI

ARY

WIN

DIN

GS

GN

D-C

5

1211

5/23

0V

3

GN

D-D

5A

GN

D-E

6A

9

CB220

A

3

6A

J10

32A

9 8

6

5C 5E

6

GN

D-H

GN

D-F

281

281

405B

243

VAN

TAG

E 50

0 W

IRIN

G D

IAG

RAM

(DEU

TZ)

42B

41ASTA

TOR

42V

WIN

DIN

G

41

42

42A

10A

CB6

32A

32

M1 M

2M3 M

4M5 M

6M9 M

10

POS

POS

POS

NEG

NEG

NEG

12VD

CIN

SULA

TED

STU

D

GO

LDG

OLD

SILV

ER

EN

GP

RO

T

BY

PA

SSFI

LTE

RA

SSE

MB

LY

PO

LAR

ITY

SW

ITC

H

J6SH

UN

TJ1

AMPH

ENO

L,I.D

.J2

ENG

INE,

PER

IPH

ERAL

SWIT

CH

SH

OW

N IN

POSI

TIVE

PO

LAR

ITY

POSI

TIO

N

50M

V=40

0AM

PS

ALTE

RN

ATO

R

STAR

TER

SO

LEN

OID

STAR

TIN

GM

OTO

R 281

5F

239

5NEN

GIN

E SU

PPO

RT

LEFT

SID

E

ENG

INE

BLO

CK

+ -

238

12V

BAT

TER

Y

OIL

TE

MPE

RA

TUR

ESE

NSO

R &

SW

ITC

H

OIL

PR

ES

SU

RE

SEN

SOR

& S

WIT

CH

RU

N/S

TOP

SW

ITC

HSW

ITC

H

SWIT

CH

SHOW

N IN

"RUN

" POS

ITIO

N

235

238B

236A

CB520

A

232F

G23

6B

232A

241

228

232H

STO

PR

UN

229

5J

234

235

WK

FUEL

LVL

.S

EN

SO

R

SENS

OR

SENS

OR

238A

231

-+

-

+

201

BRU

SH

6R

OTO

R

3200

MFD

BRU

SH

201A

200A

201

300V

5H

200B

200

POSI

TIVE

BR

USH

CO

NNE

CTE

DTO

SLI

P R

ING

NEA

RES

TTO

TH

E LA

MIN

ATIO

N

PULL

CO

ILH

OLD

CO

IL

J54

P54

RED

WH

TBL

K

12

34

232M

SH

UTD

OW

N S

OLE

NO

ID

265

262

222

218

250

250

SEN

SEEX

C

+-

POS

NEG

Page 35: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-2 DIAGRAMS F-2

CONNECTION DIAGRAM:

Page 36: Vantage 500 DEUTZ - Lincoln Electric

F-3 DIAGRAMS F-3

Vantage 500 DEUTZ

CONNECTION DIAGRAM:

GN

D

75

76 77

GR

EE

N

K29

1 O

R K

404

75

INP

UT

CA

BLE

76

N.E

.

77K

775

OP

TIO

NA

L R

EM

OTE

CO

NTR

OL

DAMA

GED.

THE

ENGI

NE G

OVER

NOR

SETT

ING

IS P

RE-S

ET AT

THE

FACT

ORY

- DO

NOT

ADJU

ST A

BOVE

RPM

SPE

CIFI

CATI

ONS

LISTE

D IN

81

42 41

3131

3232

22

44

2121

GN

D

82

N.D

.LN

-7

WIR

EFE

ED

ER

Keep

gua

rds

in p

lace

.

CO

MM

AN

DE

R /

K86

7 /

K77

5 /

LN-7

CO

NN

EC

TIO

N D

IAG

RA

M

Keep

aw

ay fr

om m

ovin

g pa

rts.

WA

RN

ING

Onl

y qu

alifi

ed p

erso

nnel

sho

uld

inst

all,u

se

or s

ervi

ce th

is e

quip

men

t.

SPA

RE

Do

not o

pera

te w

ith p

anel

s op

en.

7-20

00

S2

3983

Dis

conn

ect N

EG

ATIV

E (-

) BAT

TER

Y L

EA

D

ELE

CT

RO

DE

ELE

CTR

OD

E C

AB

LETO

WIR

E F

EE

D U

NIT

K86

7 U

NIV

ER

SA

L

AD

AP

TER

PLU

G

CAUT

ION

:

ANY

INCR

EASE

OF T

HE H

IGH

IDLE

ENG

INE

RPM

BY C

HANG

ING

THE

GOVE

RNOR

SET

TING

OR

OVER

RIDI

NG TH

E TH

ROTT

LE LI

NKAG

E W

ILL C

AUSE

AN

INCR

EASE

IN TH

E TH

E AC

AUX

ILIAR

Y VO

LTAG

E. IF

THIS

VOLT

AGE

GOES

OVE

R 14

0 VOL

TS, W

IRE

FEED

ER C

ONTR

OL C

IRCU

ITS

MAY

BE

THE

ENGI

NE W

ELDE

R OP

ERAT

ING

MANU

AL.

N.A

. W

ELD

ING

CA

BLE

MU

ST

BE

OF

PR

OP

ER

CA

PAC

ITY

FO

R T

HE

CU

RR

EN

T A

ND

DU

TY C

YC

LE O

F IM

ME

DIA

TE A

ND

FU

TUR

E

A

PP

ILIC

ATIO

NS.

SE

E O

PE

RAT

ING

MA

NU

AL.

PLA

CE

WIR

E F

EE

DE

R S

WIT

CH

TO

"WIR

E F

EE

DE

R W

ITH

CO

NTR

OL

CA

BLE

PO

SIT

ION

.

N.B

. U

SE

VO

LTM

ETE

R S

WIT

CH

TO

SE

LEC

T D

ES

IRE

D E

LEC

TRO

DE

PO

LAR

ITY.

PO

SIT

ION

TH

E "S

ELE

CTO

R" S

WIT

CH

TO

"WIR

E W

ELD

ING

CV

".

N.C

. IF

OP

TIO

NA

L R

EM

OTE

OU

TPU

T C

ON

TRO

L IS

US

ED,

CO

NTR

OL

IS A

UTO

MAT

ICA

LLY

SW

ITC

HE

D T

O R

EM

OTE

CO

NTR

OL.

N.D

. IN

SU

LATE

EAC

H U

NU

SE

D L

EA

D IN

DIV

IDU

ALL

Y.

N.E

. S

PLI

CE

LE

AD

S A

ND

INS

ULA

TE.

}be

fore

ser

vici

ng.

Do

not t

ouch

ele

ctric

ally

live

par

ts.

}

14 P

INA

MP

HE

NO

L

TO W

OR

K

TO W

OR

K

Page 37: Vantage 500 DEUTZ - Lincoln Electric

F-4 DIAGRAMS F-4

Vantage 500 DEUTZ

CONNECTION DIAGRAM

Page 38: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-5 DIAGRAMS F-5

CONNECTION DIAGRAM

Page 39: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-6 DIAGRAMS F-6

CONNECTION DIAGRAM

CAU

TIO

N :

N.A

. W

ELD

ING

CA

BLE

MU

ST

BE

OF

PR

OP

ER

CA

PAC

ITY

FO

R T

HE

CU

RR

EN

T A

ND

DU

TY C

YC

LE O

F IM

ME

DIA

TE A

ND

FU

TUR

E

A

PP

ICAT

ION

S. S

EE

OP

ER

ATIN

G M

AN

UA

L.

7532314142

N.C

. IN

SU

LATE

EAC

H U

NU

SE

D L

EA

D IN

DIV

IDU

ALL

Y.N

.D.

SP

LIC

E L

EA

DS

AN

D IN

SU

LATE

.

THE

ENGI

NE W

ELDE

R OP

ERAT

ING

MANU

AL.

GN

D

31 4 21 B CA

14 P

INA

MP

HE

NO

L

TO W

OR

K

TO W

OR

KE

LEC

TRO

DE

TOW

IRE

FE

ED

UN

ITE

LEC

TRO

DE

CA

BLE

WIR

E

FEE

DE

R

K19

6K

867

UN

IVE

RS

AL

AD

AP

TER

PLU

GIN

PU

T C

AB

LE

S2

3989

C

OM

MA

ND

ER

/ K

867

/ LN

-8 C

ON

NE

CTI

ON

DIA

GR

AM

7-20

00

2 4 76

77

ANY

INCR

EASE

OF T

HE H

IGH

IDLE

ENG

INE

RPM

BY C

HANG

ING

THE

GOVE

RNOR

SET

TING

OR

OVER

RIDI

NG TH

E TH

ROTT

LE LI

NKAG

E W

ILL C

AUSE

AN

INCR

EASE

IN TH

E TH

E AC

AUX

ILIAR

Y VO

LTAG

E. IF

THIS

VOLT

AGE

GOES

OVE

R 14

0 VOL

TS, W

IRE

FEED

ER C

ONTR

OL C

IRCU

ITS

MAY

BE

DAMA

GED.

THE

ENGI

NE G

OVER

NOR

SETT

ING

IS P

RE-S

ET AT

THE

FACT

ORY

- DO

NOT

ADJU

ST A

BOVE

RPM

SPE

CIFI

CATI

ONS

LISTE

D IN

N.B

. U

SE

VO

LTM

ETE

R S

WIT

CH

TO

SE

LEC

T D

ES

IRE

D E

LEC

TRO

DE

PO

LAR

ITY.

PO

SIT

ION

TH

E S

ELE

CTO

R S

WIT

CH

TO

"WIR

E W

ELD

ING

CV

".

SPA

RE

82

Onl

y qu

alifi

ed p

erso

nnel

sho

uld

inst

all,u

se

81

befo

re s

ervi

cing

.

or s

ervi

ce th

is e

quip

men

t.

Keep

aw

ay fr

om m

ovin

g pa

rts.

N.C

.

Keep

gua

rds

in p

lace

.

}D

isco

nnec

t NE

GAT

IVE

(-) B

ATTE

RY

LE

AD

Do

not t

ouch

ele

ctric

ally

live

par

ts.

21

Do

not o

pera

te w

ith p

anel

s op

en.

GN

D

N.D

.

32 2

WA

RN

ING

}

LN-8

Page 40: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-7 DIAGRAMS F-7

CONNECTION DIAGRAM

Page 41: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-8 DIAGRAMS F-8

CONNECTION DIAGRAM

Page 42: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-9 DIAGRAMS F-9

CONNECTION DIAGRAM

or s

ervi

ce th

is e

quip

men

t.O

nly

qual

ified

per

sonn

el s

houl

d in

stal

l,use

Kee

p aw

ay fr

om m

ovin

g pa

rts.

Kee

p gu

ards

in p

lace

.M

OV

ING

PA

RT

S c

an in

jure

WAR

NIN

G

Do

not t

ouch

ele

ctric

ally

live

par

ts.

befo

re s

ervi

cing

.D

isco

nnec

t NEG

ATI

VE (-

) Bat

tery

lead

Do

not o

pera

te w

ith p

anel

s op

en.

ELE

CT

RIC

SH

OC

K c

an k

ill

14 P

IN

AMPH

ENOL

TO W

ORK

+_

ENGI

NE W

ELDE

RS /L

N-8 C

ONNE

CTIO

N DI

AGRA

M

S24

787-

6

4-14

-200

0

TO LN

-8 IN

PUT

CABL

E PL

UG

ELEC

TROD

E CA

BLE

TO W

IRE

FEED

UNI

T

CAUT

ION:

ANY

INCR

EASE

OF

THE

HIGH

IDLE

ENG

INE

RPM

BY C

HANG

ING

THE

GOVE

RNOR

SET

TING

OR

OVER

RIDI

NG T

HE T

HROT

TLE

LINKA

GE W

ILL C

AUSE

AN IN

CREA

SE IN

THE

AC

WIR

E FE

EDER

VOL

TAGE

, WHI

CH C

AN D

AMAG

E TH

E CO

NTRO

L CIR

CUIT

. THE

ENG

INE

GOVE

RNOR

SET

TING

IS P

RE-S

ETAT

THE

FAC

TORY

– DO

NOT

ADJ

UST

ABOV

E RP

M SP

ECIF

ICAT

IONS

LIST

ED IN

THE

ENG

INE

WEL

DER

OPER

ATIN

G MA

NUAL

.

N.A.

WEL

DING

CAB

LES

MUST

BE

OF P

ROPE

R CA

PACI

TY F

OR T

HE C

URRE

NT A

ND D

UTY

CYCL

E OF

IMME

DIAT

E AN

D FU

TURE

APP

LICAT

IONS

. SEE

OPE

RATI

NG M

ANUA

L.N.

B. C

ONNE

CT W

ELDI

NG C

ABLE

S TO

OUT

PUT

STUD

S FO

R DE

SIRE

D PO

LARI

TY. P

OSIT

ION

THE

WIR

E FE

EDER

VOL

TMET

ER S

WIT

CH T

OMA

TCH

THE

POLA

RITY

OF

THE

ELEC

TROD

E CA

BLE.

N.C.

PLA

CE ID

LER

SWIT

CH IN

“HI

GH” P

OSIT

ION.

K595

CON

TROL

CAB

LE

Page 43: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-10 DIAGRAMS F-10

CONNECTION DIAGRAM

Page 44: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-11 DIAGRAMS F-11

CONNECTION DIAGRAM

Page 45: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-12 DIAGRAMS F-12

CONNECTION DIAGRAM

Page 46: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-13 DIAGRAMS F-13

CONNECTION DIAGRAM

Page 47: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

F-14 DIAGRAMS F-14

DIMENSION PRINT

TRAI

LER

MOUN

TING

HOL

E LO

CATI

ONS.

*

M18

962-

1

A

28.99

1.26

19.63

6.53

24.97

6.55

23.69

50.38 54

.44

14.63

37.30

45.38

63.10

6.56

42.00

48.64

23.38

31.1332

.0849

.05

31.50

45.67

10.22

*

*

*

*

BOTT

OM V

IEW

OF

WEL

DER

BA

CENT

ER O

F GR

AVIT

Y W

ITH

OIL

IN E

NGIN

E AN

D FU

LL F

UEL T

ANK.

NO

TE

: Thi

s di

agra

m is

for

refe

renc

e on

ly. I

t may

not

be

accu

rate

for

all m

achi

nes

cove

red

by th

is m

anua

l. T

he s

peci

fic d

iagr

am fo

r a

part

icul

ar c

ode

is p

aste

d in

side

the

mac

hine

on

one

of th

e en

clos

ure

pane

ls.

If th

e di

agra

m is

ille

gibl

e, w

rite

to t

he S

ervi

ce D

epar

tmen

t fo

r a

repl

acem

ent.

Giv

e th

e eq

uipm

ent

code

num

ber.

Page 48: Vantage 500 DEUTZ - Lincoln Electric

NOTES

VANTAGE 500 DEUTZ

Page 49: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

WARNING

AVISO DEPRECAUCION

ATTENTION

WARNUNG

ATENÇÃO

Spanish

French

German

Portuguese

Japanese

Chinese

Korean

Arabic

READ AND UNDERSTAND THE MANUFACTURER’S INSTRUCTION FOR THIS EQUIPMENT AND THE CONSUMABLES TOBE USED AND FOLLOW YOUR EMPLOYER’S SAFETY PRACTICES.

SE RECOMIENDA LEER Y ENTENDER LAS INSTRUCCIONES DEL FABRICANTE PARA EL USO DE ESTE EQUIPO Y LOSCONSUMIBLES QUE VA A UTILIZAR, SIGA LAS MEDIDAS DE SEGURIDAD DE SU SUPERVISOR.

LISEZ ET COMPRENEZ LES INSTRUCTIONS DU FABRICANT EN CE QUI REGARDE CET EQUIPMENT ET LES PRODUITS AETRE EMPLOYES ET SUIVEZ LES PROCEDURES DE SECURITE DE VOTRE EMPLOYEUR.

LESEN SIE UND BEFOLGEN SIE DIE BETRIEBSANLEITUNG DER ANLAGE UND DEN ELEKTRODENEINSATZ DESHERSTELLERS. DIE UNFALLVERHÜTUNGSVORSCHRIFTEN DES ARBEITGEBERS SIND EBENFALLS ZU BEACHTEN.

● Do not touch electrically live parts orelectrode with skin or wet clothing.

● Insulate yourself from work andground.

● No toque las partes o los electrodosbajo carga con la piel o ropamojada.

● Aislese del trabajo y de la tierra.

● Ne laissez ni la peau ni desvêtements mouillés entrer en contactavec des pièces sous tension.

● Isolez-vous du travail et de la terre.

● Berühren Sie keine stromführendenTeile oder Elektroden mit IhremKörper oder feuchter Kleidung!

● Isolieren Sie sich von denElektroden und dem Erdboden!

● Não toque partes elétricas eelectrodos com a pele ou roupamolhada.

● Isole-se da peça e terra.

● Keep flammable materials away.

● Mantenga el material combustiblefuera del área de trabajo.

● Gardez à l’écart de tout matérielinflammable.

● Entfernen Sie brennbarres Material!

● Mantenha inflamáveis bemguardados.

● Wear eye, ear and body protection.

● Protéjase los ojos, los oídos y elcuerpo.

● Protégez vos yeux, vos oreilles etvotre corps.

● Tragen Sie Augen-, Ohren- und Kör-perschutz!

● Use proteção para a vista, ouvido ecorpo.

Page 50: Vantage 500 DEUTZ - Lincoln Electric

Vantage 500 DEUTZ

WARNING

AVISO DEPRECAUCION

ATTENTION

WARNUNG

ATENÇÃO

Spanish

French

German

Portuguese

Japanese

Chinese

Korean

Arabic

LEIA E COMPREENDA AS INSTRUÇÕES DO FABRICANTE PARA ESTE EQUIPAMENTO E AS PARTES DE USO, E SIGA AS PRÁTICAS DE SEGURANÇA DO EMPREGADOR.

● Keep your head out of fumes.● Use ventilation or exhaust to

remove fumes from breathing zone.

● Los humos fuera de la zona derespiración.

● Mantenga la cabeza fuera de loshumos. Utilice ventilación oaspiración para gases.

● Gardez la tête à l’écart des fumées.● Utilisez un ventilateur ou un

aspirateur pour ôter les fumées deszones de travail.

● Vermeiden Sie das Einatmen vonSchweibrauch!

● Sorgen Sie für gute Be- undEntlüftung des Arbeitsplatzes!

● Mantenha seu rosto da fumaça.● Use ventilação e exhaustão para

remover fumo da zona respiratória.

● Turn power off before servicing.

● Desconectar el cable dealimentación de poder de lamáquina antes de iniciar cualquierservicio.

● Débranchez le courant avantl’entretien.

● Strom vor Wartungsarbeitenabschalten! (Netzstrom völligöffnen; Maschine anhalten!)

● Não opere com as tampas removidas.● Desligue a corrente antes de fazer

serviço.● Não toque as partes elétricas nuas.

● Do not operate with panel open orguards off.

● No operar con panel abierto oguardas quitadas.

● N’opérez pas avec les panneauxouverts ou avec les dispositifs deprotection enlevés.

● Anlage nie ohne Schutzgehäuseoder Innenschutzverkleidung inBetrieb setzen!

● Mantenha-se afastado das partesmoventes.

● Não opere com os paineis abertosou guardas removidas.

Page 51: Vantage 500 DEUTZ - Lincoln Electric

World’s Leader in Welding and Cutting Products• Sales and Service through Subsidiaries and Distributors Worldwide •

Cleveland, Ohio 44117-1199 USA Tel: 216.481.8100 Fax: 216.486.1751 Web Site: www.lincolnelectric.com