j ~~~~~~~~~~~~~~~~~~~~~~~ 180 R.B. UNITED STATES AIR FORCE v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON AFB, ALASKA L ~~~SOURCE AREA ST18 DRYWELL AND CESSPOOL REMOVAL QUALITY PROGRAM PLAN - PART 1 SAMPLING AND ANALYSIS PLAN FINAL OCTOBER 1996 By. JACOBS ENGINERING GROUP INC. 4300 B STREET, SUITE 600 AncoraeAlaska 99503

Upload: truongque

Post on 10-Jun-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

j ~~~~~~~~~~~~~~~~~~~~~~~~File: 180R.B.

UNITED STATES AIR FORCEv ~~354TH CIVIL ENGINEER SQUADRON

INSTALLATION RESTORATION

L ~~EIELSON AFB, ALASKA

L ~~~SOURCE AREA ST18

DRYWELL AND CESSPOOL REMOVAL

QUALITY PROGRAM PLAN - PART 1SAMPLING AND ANALYSIS PLAN

FINAL

OCTOBER 1996

By.

JACOBS ENGINERING GROUP INC.4300 B STREET, SUITE 600

AncoraeAlaska 99503

Page 2: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Form ApprovedREPORT DOCUMENTATION PAGE 0MB No. 070440188

la. REPORT SECURITY CLASSIFICATION lb. RESTRICTIVE MARKINGSUnclassified Not Applicable

2a. SECURITY CLASSIFICATION AUTHORITY 3. DISTRIBUTION/AVAILABILITY OF REPORT* ~~~~~~Not Applicable Not for Public Release

* ~~~2b. DECLASSIFICATIONIDOWNGRADING SCHEDULE Distribution is limited.Not Applicable ________________________________

4. PERFORMING ORGANIZATION REPORT NUMBER(S) 6. MONITORING ORGANIZATION REPORT NUMBER(S)Not Applicable Not Applicable

Jacobs Engineering Group Inc. applicable)AFEER

LI S~~c. ADDRESS (City State, and Zip Cods) 7b. ADDRESS (City, Stat., and Zip Code)

8a. NAME OF FUNDING/SPONSORING 8b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATIONORGANIZATION (if applicable) NUMBER

P ~~~~~AFCEEIERD USAF Contract No. F41624-94-D-81 15

8c. ADDRESS (City, State, end Zip Code) 1 0. SOURCE OF FUNDING NUMBERS

7' ~~~Brooks AFB, TX 78235-5363 PROGRAM PROJECT NO. TASK NO. WORK UNITL. ~ ~~~~~~~~~~~~ ~~~~ELEMENT NO. ACCESSION NO.

p 11~~I. TITLE (include Security Classification)

L P~~~~~EReson: Source Area STI 8, Draft Health and Safety Plan, EBelson Air Force Base, Alaska (Unclassified)

12. PESNLAUTHOR(S)Jacobs Engineering Group Inc.

13a. TYPE OF REPORT lab. TIME COVERED 14. DATE OF REPORT WYear. Month, Day) 16. PAGE COUNTDraft FROM: June 1998 1996 August 12

1 TO: December 199616. SUPPLEMENTARY NOTATION

14 ~~~~~Not Applicable

17. C~OSATI CODES 18. SUBJECT TERMS (Continue on reverse If necessaryand Identify by block number)

0 ~~~FIELD GROUP SUB-GROUPDraft Health and Safety Plan, Eielson Source Area ST18,

- B~~~~~~~~~~~~~~~~~~~~~~~Eelson Air Force Base, Alaska

ij ~~19. ABSTRACT (Continue on reverse If necessary and Identify by block number)

The Draft Health and Safety Plan has been prepared to describe the removal action at Source Area STiB o n Elelson Air Force Base.

f ~~~20. DISTRIBUTIONIAVAILABILITY OF ABSTRACT 21. ABSTRACT SECURITY CLASSIFICATION

x I UnclassifiedlUnllmlted E I Same as RPT. [DTIC Users Undlassikid

22.. NAME OF RESPONSIBLE INDIVIDUAL 22b. TELEPHONE (include Area Code) 22c. OFFICE SYMBOL

Samner Karmi (210) 538-5297 AFCEEJERD

DO Form, 1473, June 88. Prev/ous editions are obsolete.

I:\EMELSN\O5K7820l\1\W ffiELSP2flOC iDRAFT REVO010/29/96 5:23 PM

Page 3: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

I

iI

I \EIELSON\05K78201\W~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~hEIELHSP2.DOC iv ~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DRAFT REV 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

10/29/96 5:23 PM~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 4: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

This report has been prepared for the United States Air Forte (Air Force) by JacobsEngineering Group Inc. for the purpose of aiding in the implementation of a final remedialaction plan under the Air Force Installation Restoration Program (IRP). Because the report

relates to actual or possible releases of potentially hazardous constituents, its release before anAir Force final decision on remedial action may be in the public's interest. The limitedobjectives of this report and the ongoing nature of the IRP, along with the evolvingknowledge of site conditions and chemical effects on the environment and health, must beconsidered when evaluating this report because subsequent facts may become known that maymake this report's findings premature or inaccurate.

Copies of this report may be purchased from the following agencies:

* Government agencies and their contractors registered with the Defense TechnicalLI ~~~Information Center (DTIC) should direct requests for copies of this report to Defense

Technical Information Center, 8725 John J. Kingman Road, Suite 0944, Fort Benoir, VA

22060.

*Nongovernment agencies may purchase copies of this document from National TechnicalE ~~~~Information Service (NTIS), 5285 Port Royal Road, Springfield, VA 22161.

I:~ ~ 1\MSM5780%AERP.OI~~~~R~RVD~ ~ ~~~1/99 :3P

Page 5: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

I

I

I

I

Page 6: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

EXECUTIVE SUMMARY

P ~~~The Quality Program Plan (QPP), Part 1, the Health and Safety Plan (HSP) has been prepared

to describe the health and safety procedures to be followed during the removal of cesspools

and drywells at Source Area ST18 (ST18) at Eielson Air Force Base, Alaska (Eielson). This

work is being performed in support of ongoing environmental restoration efforts by the Air

Force Center for Environmental Excellence (AFCEE) and the 354th Civil Engineering

Squadron/Installation Restoration (354 CES/CEYR).

The HSP describes specific requirements and procedures to be followed when performing site

activities. The HSP is organized into the following seven sections.

* Section 1.0 presents an introduction to the HSP.

* Section 2.0 describes the responsibilities of safety personnel onsite.

* Section 3.0 presents general health and safety requirements.

* Section 4.0 provides a hazard evaluation.

L *~~~ Section 5.0 addresses personal protective equipment.

*Section 6.0 is the site safety work plan.

f * ~~~Section 7.0 is the emergency response and contingency plan

*Section 8.0 presents record keeping requirements.

1 * ~~~Section 9.0 describes site postings.

*Section 10.0 is the plan approval.

*Section 1 1.0 presents the references used to prepare this document.

U

IA\EIELSON\05K75201\WP\EIELHSP2.DOC viiDRAFrREVO10/29/96 5:23 PM

Page 7: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

II

I

II

I

Page 8: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

LIST OF ACRONYMS AND ABBREVIATIONS

ab above backgroundAbs absorption through skinACGIH American Conference of Governmental Industrial HygienistsAFB Air Force Base

t ~~AFCEE Air Force Center for Environmental ExcellenceAFS Air Force StationAIHA American Industrial Hygiene AssociationANSI American National Standards InstituteAST aboveground storage tanksCAA Civil Aeronautics AuthoritiesCES Civil Engineer SquadronCEVR Civil Engineering Environmental RestorationCFR Code of Federal RegulationsCGI combustible gas indicatorC1H Certified Industrial HygienistCOE U.S. Army Corps of EngineersCon contact with skin, eyes, or mucous membranesCOR Contracting Officer's RepresentativeCPR cardiopulmonary resuscitation

CTD cumulative trauma disorderDDD dichlorodiphenyldichloroethaneDDE dichlorodiphenyldichloroetheneDDT dichlorodiphenyltrichioroethaneDHHS U.S. Department of Health and Human ServicesDOT U.S. Department of TransportationDRMO Defense Reutilization and Marketing OfficeDRO diesel-range organicEH&S Environmental Health and Safety (used to identify' the Corporate

Health and Safety Manual for Environmental Programs)EPA U.S. Environmental Protection AgencyeV electron voltsGFCI ground fault circuit interruptGRO gasoline-range organicHSM Project Health and Safety ManagerHSO Site Health and Safety OfficerHSP Health and Safety PlanIng ingestionInh inhalationIRP Installation Restoration ProgramJacobs Jacobs Engineering Group Inc.JSA job safety analysiskV kilovolts

1:\EIELSON\05K78201\WVhEIELHSP2J)OC ixDRAFT REVO010129fl6 5:23 PM

Page 9: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

LEL lower explosive limitMGH Million Gallon Hillmg/rn 3 milligram per cubic meterMSDS Material Safety Data SheetNFPA National Fire Protection AssociationNIOSH National Institute for Occupational Safety and Health02 oxygenOSHA U.S. Occupational Safety and Health AdministrationOVA organic vapor analyzerPAPR powered air purifying respiratorPEL permissible exposure limitPHSM Program Health and Safety ManagerPID photoionization detectorPjM Project ManagerPOC point of contactPOL petroleum, oil, and lubricantsPPE personal protective equipmentppm parts per mil'lionQPP Quality Program Planreg regulator

RI/FS Remedial Investigation/Feasibility StudySCBA self-contained breathing apparatusSOP standard operating procedureSPF sun protection factorSTEL short-term exposure limitSVE soil vapor extractionTBD to be determinedTCE trichloroetheneTLV threshold limit valueTPHG total petroleum hydrocarbons - gasolineUL Underwriter's LaboratoriesUVA ultraviolet AUVB ultraviolet BWBGT wet bulb globe temperature (index)1

I1\EIELSON\05K7820l1W\W~EILHSP2.DO)C xLDRAFT REV 010/29/96 5:23 PM

Page 10: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

j ~~~~~~~TABLE OF CONTENTS

EXECUTIVE SUMMARY........................................................................ vii

LIST OF ACRONYMS AND ABBREVIATIONS .............. ................................ ix

T ~~1.0 INTRODUCTION............................................................................ 1-11.1 ELELSON AFB DESCRIPTION AND HISTORY...................................... 1-2

1.1.1 Site History .............................. *............................................ 1-2

1.1.2 Site Description .............................................................. *........ 1-3

1.2 OBJECTIVES...................................................................*.......... 1-3

2 ~~~~~1.3 DESCRIPTION OF FIELD ACTIVITIES .............................................. 1-3

2.0 HEALTH AND SAFETY PERSONNEL .................................................. 2-1

L ~~2.1 PROJECT ORGANIZATION ........................................................... 2-1

2.2 PROGRAM HEALTH AND SAFETY MANAGER................................... 2-1

b ~~~~~2.3 PROJECT HEALTH AND SAFETY MANAGER ....................................- 2-2

2.4 SITE HEALTH AND SAFETY OFFICER ............................................. 2-2

2.5 SITE MANAGER......................................................................... 2-3

2.6 FIELD TEAM PERSONNEL............................................................ 2-3

3.0 GENERAL HEALTH AND SAFETY REQUIREMENTS............................... 3-13.1 SITE SAFETY MEETINGS ............................................................. 3-1

3.1.1 Employee Health and Safety Briefing .............................................. 3-1

3.1.2 Daily Tailgate Meetings ............................................................. 3-1

3.2 FIRST AID AND CARDIOPULMONARY RESUSCITATION TRAINING ......3-23.3 PERSONNEL TRAINING REQUIREMENTS ........................................ 3-2

U ~~~3.3.1 Preassignment Training.............................................................. 3-2

3.3.2 Supervisor Training.................................................................. 3-2

LI 3.4 EMPLOYEE MEDICAL SURVEILLANCE ........................................... 3-2

3.4.1 Baseline or Preassigrnment Monitoring ............................................. 3-3

3.4.2 Annual Monitoring................................................................... 3-4

3.4.3 Exit Physical ......................................................................... 3-4

3.4.4 Exposure,lInjury, or Medical Support............................................... 3-4

4.0 HAZARD EVALUATION.................................................................. 4-1

4.1 CONTAMINANT SOURCE AREA DESCRIPTION .................................. 4-1

I:\EIELSOI'A05K78201\WVhIELHSP2.DOC xiDRAFT REV 010129196 5:23 PM

Page 11: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE OF CONTENTS

SECTION PAGE

4.2 CHEMICAL HAZARDS AND CONTROL ............................................ 4-1

4.3 PHYSICAL HAZARD EVALUATION ................................................ 4-1

4.4 BIOLOGICAL HAZARDS AND CONTROLS........................................ 4-2

4.5 HEAT AND COLD STRESS ............................................................ 4-3

4.6 CONFINED SPACE HAZARD ......................................................... 4.3

4.7 ERGONOMIC HAZARDS .............................................................. 4.3

4.8 POTENTIAL INFECTIOUS WASTES OR SEWAGE ................................ 4-4

5.0 PERSONAL PROTECTIVE EQUIPMENT............................................... 5-1

5.1 LEVEL DPROTECTION................................................................ 5-1

5.2 LEVEL C AND B PROTECTION ....................................................... 5-1

5.3 SAFETY EQUIPMENT AND MATERIALS........................................... 5-1

5.4 LIMITATIONS............................................................................ 5-2

5.5 COMMUNICATION ..................................................................... 5-2

5.5.1 Site Communication ................................................................. 5-2

5.5.2 Communication of Health and Safety Concerns .................................... 5-3

5.5.3 Hazard Communication.............................................................. 5-3

6.0 SITE SAFETY WORK PLAN.............................................................. 6-1

6.1 SITE WORK ACTIVITIES .............................................................. 6-1

6.1.1 ShteClearing and Preparation ....................................................... 6-1

6.1.2 Warning Signs and Barricades ...................................................... 6-1

6.1.3 Material Storage and Handling...................................................... 6-1

6.1.4 Hazardous Waste Storage and Handling............................................ 6-2

6.2 SITE ENTRY PROCEDURES........................................................... 6-2

6.3 AIR MONITORING...................................................................... 6-3

6.3.1 Environmental Monitoring .......................................................... 6-3

6.3.2 Personal Exposure Monitoring...................................................... 6-3

6.4 WORK ZONES........................................................................... 6-4

6.5 VISITORS................................................................................. 6-4

6.6 DECONTAMINATION PROCEDURES............................................... 6-4

6.6.1 Personnel.............................................................................. 6-4

I:\EIELSON\05K7820flW\EIELHSP2.DOC xiiDRAFT REVO010/29/96 5:23 PM

Page 12: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L ~~~~~~~TABLE OF CONTENTS

SECTIO AG

6.6.2 Samples and Equipment ............................................................. 6-56.7 DISPOSAL OF WASTE MATERIALS GENERATED ONSITE ..................... 6-5

7.0 EMERGENCY RESPONSE/CONTINGENCY PLAN ................................... 7-1

7.1 EMERGENCY RESPONSE BRIEFING ............................................... 7-1

T ~~7.2 EMERGENCY PROCEDURES ......................................................... 7-1

K ~~~~~~~7.2.1 Pre-Emergency Planning............................................................. 7-1

7.2.2 Emergency Equipment and Supplies................................................ 7-2

7.2.3 Emergency Medical Treatment............................. ......................... 7-3

7.2.4 Fire.................................................................................... 7-3

L ~~~~~~7.2.5 Personal Protective Equipment Failure ............................................. 7-3

7.2.6 Other Equipment Failure............................................................. 7-4

- 7.3 EMERGENCY RESPONSE AND ACCIDENT FOLLOW-UP ....................... 7-4

7.3.1 Exposure to Bloodborne Pathogens................................................. 7-4

7.3.2 Evacuation ............................................................................ 7-5

p ~~~~~~7.4 EARTHQUAKE .......................................................................... 7-6

L ~~~~~~7.5 UNCONTROLLED RELEASES........................................................ 7-6

p ~~~~~~7.6 EMERGENCY RESPONSE CONTACTS.............................................. 7-6

7.6.1 Contacts for Emergencies ........................................................... 7-7

7.6.2 Hospital Location and Information ................................................. 7-7

L ~~~~~~7.7 VEHICLE ACCIDENT PROCEDURE ................................................. 7-7

1 ~~~~~8.0 RECORD KEEPING ........................................................................ 8-1

9.0 SITE POSTINGS ............................................................................ 9-1

10.0 PLAN APPROVAL....................................................................... 10-1

1 1.0 REFERENCES ............................................................................ 11-1.

ITEIELSON\05K78201\WAhEILHSP2.DOC xiiiDRAFT REV 0J ~~~~~10)29/96 5:23PM

Page 13: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE OF CONTENTS

SETONPGLIST OF TABLES

Table 4-1 Project Hazard Analysis............................................................... 4-7Table 4-2 Suspected Contaminants at Each Site................................................. 4-9Table 4-3 Chemical Exposure Hazard Summary............................................... 4-10Table 4-4 Physical Hazards and Controls ...................................................... 4-12Table 4-5 Symptoms and Treatment of Heat and Cold Stress................................. 4-15Table 5-1 Personal Protective Equipment Requirements ....................................... 5-4Table 5-2 Reasons to Upgrade or Downgrade Level of Protection ............................ 5-5Table 6-1 Equipment Specification and Action Levels ......................................... 6-7Table 6-2 Personnel Decontamination Procedures............................................... 6-8

LIST OF FIGURES

Figure il'- Location Map, Eielson AFB, Alaska ................................................ 1-4Figure 1-2 Site Locations Map, Eielson AFB, Alaska .......................................... 1-5

Figure 6-1 Typical Level D and D+ Decontamination Minimum Layout ..................... 6-9Figure 6-2 Typical Level B and C Decontamination Minimum Layout ..................... 6-10

Figure 7-1 Emergency Response Operations, Eielson AFB, Alaska ........................... 7-9Figure 7-2 Emergency Route Map, Eielson MFB, Alaska..................................... 7-11

LIST OF APPENDICES

Appendix A Employee Sign OffAppendix B Generic Chemical Hazard ProfilesAppendix C Physical (Safety) Hazards and Controls

Appendix D Site Tailgate Meeting and Exclusion Zone Entry LogAppendix E Code of Safe PracticesAppendix F Material Safety Data Sheet (MSDS) InformationAppendix G Hazard CommunicationAppendix H Health and Safety FormsAppendix I Visitor's LogAppendix J Equipment Decontamination Procedutes

Appendix K Accident Investigation and NotificationIAppendix L Job Safety Analyses

I:\EIELSON\05K78201\WVhIPELHSP2.DOC xivDRAFT REVO10f29/96 5:23 PM

Page 14: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

1.0 INTRODUCTION

Jacobs Engineering Group Inc. (Jacobs) has prepared this Health and Safety Plan (HSP) for

the remedial actions at the Ejelson Air Force Base (AFB), Alaska, at the Source Area ST18

(STI8) in Operable Unit 2 (0U2). The format of this HSP complies with the format

designated by the Air Force Center for Environmental Excellence (AFCEE).I

This HSP has been written for use by Jacobs and any other individuals with authorized access

to areas where site control is established to conduct fieldwork. It may also be used as a

guidance document by properly trained and experienced personnel. However, Jacobs does not

1. ~~guarantee the health and safety of any person entering this site. Because of the nature of this

- site and the activity occurring thereon, it is not possible to discover, evaluate, and provide

protection for all possible hazards that may be encountered; however, a summary of suspected

-hazards is listed in Section 4.0. Strict adherence to the health and safety guidelines stated in

E ~~~this HSP will reduce, but not eliminate, the potential for injury on the site. The health and

I ~~~safety guidelines in this plan were prepared specifically for this site and should not be used onany other site without prior research by trained health and safety professionals.

This HSP will be kept onsite during field activities and will be reviewed and updated as

F' ~~necessary to reflect current site conditions and operations. This HSP requires that the

Program Health and Safety Manager (PHSM), project Health and Safety Manager (HSM), and

f ~~~site Health and Safety Officer(s) (HSO) shall be familiar with the following:

*applicable federal, state, and local regulations;

standard operating procedures (SOPs) contained in the Jacobs Corporate Health andSafety Manual for Environmental Field Programs (known as the EH&S Manual) (Jacobs

I ~~~~undated a) and Jacobs Corporate Safety Manual (Jacobs undated b). These manuals willbe available at the site office;

*requirements found in the AFCEE Handbook for the Installation Restoration Program(IRP) Remedial Investigations and Feasibility Studies (RI/ES) (U.S. Air Force [Air Force]1993);

I * ~~requirements found in the U.S. Army Corps of Engineers (COE) Safety and HealthRequirements Manual (COE 1992); and

I:\EIELSON\05K78201\WIP\IELHSP2.DOCCDRAFT REVO010/29/96 5:23 PM

Page 15: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

*procedures contained in the work plan(s) for this project and Quality Program Plan (QPP)documents for the project.

In addition to this HSP, each subcontractor is expected to have a health and safety program

covering its specific operational activities, for example, concrete cutting, excavating, or

drilling. In any case where overlaps or conflicts occur between requirements in this HSP and

a subcontractor's health and safety procedures, the requirement that protects the employee's

health and safety to the greatest degree will take precedence.

The overall purpose of this HSP is to create a site health and safety program that effectively

identifies, evaluates, controls, and reduces health and safety hazards.

This HSP is written for the site conditions, purposes, dates, and personnel specified and must

be amended if these conditions change. Jacobs claims no responsibility for use of this plan by

others.

1.1 EIELSON AFB DESCRIPTION AND HISTORY

The following sections describe the site and its history.

1.1.1 Site History

Eielson AFB (Eielson) is located in the Tanana River Valley in interior Alaska, 23 miles

southeast of Fairbanks, Alaska, and approximately 130 miles south of the Arctic Circle.

Eielson lies on 22,035 acres with an additional 40,052 acres in off-base right-of-ways and

operating areas. Construction of Eielson began in 1943 and was completed in 1944.

Industrial operations started in the early I 950s and were insignificant prior to that date. The

major industrial operations included propulsion shops, aerospace ground equipment and

vehicle maintenance shops, pneudraulics shops, and inspection labs. The waste generated was

oils, fuels, solvents, and cleaners at varying quantities ranging from 25,000 to 40,000 gallons

per year. The location map of Eielson is shown in Figure 1- 1.

1 \EffiLOWM5K782O\I\WPEIELHSP2.DOC 1-2ORAFr REVO010129/96 5:23 PM

Page 16: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I ~ ~1.1.2 Site Description

Source Area ST18 (ST18) is the area of concern (Figure 1-2) and includes cesspools and

drywells. The scope of work calls for the removal and restoration of two cesspools and two

drywells with all associate piping.

I ~~1.2 OBJECTIVES

The objectives of the work to be performed under this removal action are as follows:

* Sample existing sludge in the structures;

* Containerize and transport hazardous sludge;

* Pressure wash structures and dispose of rinsate;

* Excavate and remove structures and associated piping;

* Containerize, transport, and dispose of any contaminated waste streams;

*Take confirmation samples to determine if site is clean; and

*Backfill excavations to grade.

1.3 DESCRIPTION OF FIELD ACTIVITIES

The field activities are as follows:

*site mobilization;

*surveying;

*utility location;

*sludge sampling;

*excavating and backfilling;

*containerization, transportation, and disposal of waste streams;

* confirmation soil sampling;

* site restoration; and

* site cleanup.

T:\EEELSON\05K78201\/P'\EIELHSP2 DCC 113DRAFT REVO0

10/29/96 5:23 PM

Page 17: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

seau fore

C~~~~~~C

k ~~~~orcuie

Rub Fairbank

0~~~~~~~

1-4~~~~~~~~~~~~~-

Page 18: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

t ~~~~~~~~~~~~~~48M0 7

1 8-3

3 0 9'

53 18-7 t

k ~~~- -n-- -u -X - x- m*--

18-

r

1 8-8

LEGEN EIE~~~~~~~~~~~~~~~~G LSO IR FRCEBAS

18-1 Groundwater MonitoringE GA~ O~PI~

GonWe trMoiorn 354 CES/CEVR

* Base Well ~~~~~~~~SITE LAYOUTA Bs upyWl SOURCE AREA ST18

Drywell~~ ~~~~~~~~~ ,'=75' PROJECTNUMBS FIG=Ro Cesspool DATE 8-7-96 05K<78201 0 -

1-5

Page 19: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

*1

II

I

I

Page 20: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

K ~~~~~2.0 HEALTH AND SAFETY PERSONNEL

* ~~~The following sections describe the project organization and health and safety responsibilities.

2.1 PROJECT ORGANIZATION

The positions of personnel involved in the Eielson AFB remnediation, names of personnel- ~~~filling each position, and their telephone numbers are as follows:

Jacobs Project Manager (PjM) Mr. Tim Grace (907) 563-3322

AFCEE Contracting Officer's Mr. Samar Karmi (907) 552-4532L ~~~Representative (COR)

Program Manager Mr. Robert Sick (907) 563-3322

PHSM Dr. Terry Briggs (303) 595-8855

p ~~~HSM Mr. Rick Dearholt (907) 563-3322

Site Manager TBD (907) 563-3322

1' HSO TBD Field: TBDI: ~~~~~~~~~~~~~~~~~~~Anchorage Office:

(907) 563-3322

The following sections describe the duties of those personnel directly responsible for

enforcing health and safety procedures for this project.

2.2 PROGRAM HEALTH AND SAFETY MANAGER

The Program Health and Safety manager (PHSM) is responsible for the following:

*overseeing development and implementation of the health and safety program;

*providing project personnel with technical guidance for conducting fieldwork in a safe andI ~~~~healthful manner;

*reviewing and approving site-specific HSPs;

*providing medical surveillance and health and safety records to the HSM;

*conducting field audits, as necessary, in accordance with Jacobs policies and procedures;and

*managing the occupational medical program.

IA\EIELSON\05K78201\WP\EIELHSP2.DOC 241DRAFT REV 010/29/96 5:23 PM

Page 21: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

2.3 PROJECT HEALTH AND SAFETY MANAGER

The project Health and Safety Manager (HSM) has the following responsibilities:

* administering this HSP;1

* developing and approving the site-specific HSP;

* directing the investigation into all accidents and near-misses that occur onsite to detenminefundamental causes and actions to be taken to prevent recurrence;

* reviewing subcontractor health and safety documents as required;

* assisting the HSO in planning, coordinating, and implementing the project health andsafety program;

* providing industrial hygiene and occupational safety guidance to the HSO; and

• conducting regular site audits, including audits of subcontractors.

2.4 SITE HEALTH AND SAFETY OFFICER

The site Health and Safety Officer (HSO) assists the HSM and Site Manager in all duties

related to the implementation of this HSP. The HSO is located onsite and directly oversees

health and safety activities in the field. The responsibilities of the HSO are as follows:

* verifies current certifications of individuals' medical fitness, training, and respirator fit asdescribed in Section 3.0, before authorizing access to areas where site control isestablished;

* conducts emergency planning action items in accordance with Section 7.2. 1;

* arranges for health and safety equipment to be available onsite in accordance with this

* conducts employee health and safety site orientation before the start of field activities;

* oversees the health and safety performance of specific crews;

* establishes and enforces site controls;

* conducts periodic inspections of work practices to determine effectiveness of this HSP(deficiencies are noted, reported to the Site Manager, PjM, and HSM);

* assists in independent health and safety site audits conducted by the Jacobs HSM, theJacobs corporate personnel, the regulatory agencies, or the client;

* conducts accident investigations of injuries, illnesses, and other incidences;

I.TffiELSNN05K78201\WP\E1ELHSP2.D0C 2-2DRAFT REV 010/29/96 5:23 PM

Page 22: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

.posts U.S. Occupational Safety and Health Administration (OSHA) and other agency

posters in a central and conspicuous location;

*maintains the site tailgate and exclusion zone entry log;

*has "stop-work authorization' when an imminent hazard or potentially dangerous workpractice exists; and

*completes and submits record keeping forms in accordance with this HSP and corporate

sops.

2.5 SITE MANAGER

The Site Manager promotes a safe working enviromnment through a concerted effort with the

H4SM and PHSM, implements the HSP, and has "stop-work authorization" when an imminent

hazard or potentially dangerous work practice exists.

2.6 FIELD TEAM PERSONNEL

Personnel selected to work on this project will be trained or have experience in performing the

assigned work safely. All personnel are encouraged to report any health and safety concerns

to the HSO or HSM immediately. Personnel will be listed below after they are assigned.

Personnel:

Subcontractors who will be working onsite must present certification that they are trained in

accordance with hazardous waste laws, have been approved by a physician for hazardous

waste work, and are fit to wear a respirator. A copy of this HSP will be given to potential

subcontractors. Before working onsite and after receiving our safety orientation,

* ~~~subcontractors shall agree to abide by this HSP by signing the sign off sheet in Appendix A.

The HSO or Site Manager will inform the subcontractor's site manager of any health and

safety violations. Under certain conditions, such as if personnel are not equipped with the

proper personal pro~tective equipment (PPE) or personnel are entering an unshored or sloped

LAE1ELSON\05K78201\WP'EfiELHSP2 DOC 2-3DRAFT REV 010/29/96 5:23 PM

Page 23: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

trench, the HSO or Site Manager may stop subcontractors from working and may seek to

terminate the contract.

I:\EIELSON\05K78201\WPhFELHSP2D)OC 2-4JDRAFT REV 010/29/96 5:23 PM

Page 24: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

3.0 GENERAL HEALTH AND SAFETY REQUIREMENTS

Health and safety requirements include safety meetings and briefings, first aid and

cardiopulmonary resuscitation (CPR) training, and medical surveillance.

3.1 SITE SAFETY MEETINGS

L ~~~Site safety meetings include the pre-access briefing and daily tailgate meetings as described in

the following sections.

p ~~3.1.1 Employee Health and Safety Briefing

The HSO or Site Manager shall conduct a health and safety briefing before authorizing

b ~~~individual access to areas where site control is established. The HSO or Site Manager shall

document attendance at the briefing and the topics discussed, including at least the following:

* work plan and individual assignments;

* potential hazards of the work to be performed (Section 4.0 and Appendices B and C);

* site controls and air monitoring action levels that will be in effect onsite;

U * ~~~PPE to beused;

*communication procedures, including evacuation and emergency signals; and

*emergency response and contingency plan and rescue operations.

3.1.2 Daily Tailgate Meetings

The HSM or Site Manager shall conduct daily health and safety tailgate meetings before field

team personnel perform fieldwork. The HSM or Site Manager shall document attendance

(using the form in Appendix D) and the topics discussed, including at least the following:

* any potential hazards of the specific work to be performed that day that were not

previously discussed;

* discussion and resolution of any health and safety concerns or problems since the previousI ~ ~~~tailgate meeting; and* evacuation routes and emergency signals warnings.

t I\ErELSON\05K18201\WA\EEELHSP2.DOC 3-1DRAFT REVOU10fl9/96 5:23 PM

Page 25: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Daily meetings may be augmented by additional meetings if warranted.

3.2 FIRST AID AND CARDIOPULMONARY RESUSCITATION TRAINING

Jacobs field staff are trained in CPR on an annual basis, bloodborne pathogen protection on an

annual basis, and standard first aid every three years. At least one first aid- and CPR-trained

employee must be present during any task performed onsite with the potential for exposure to

safety and health hazards.

3.3 PERSONNEL TRAINING REQUIREMENTS

Training records and training content are maintained for Jacobs employees by the Jacobs

Medical and Training Coordinator in Jacobs' Anchorage Office.

3.3.1 Preassignment Training

Only personnel with documentation in compliance with the training requirements of Section

29 of the Code of Federal Regulations (CER), Part 1910.120 (e) will enter exclusion zones.

Employees of subcontractors will provide documentation of required training before

fieldwork begins. This documentation will be maintained in project files,

3.3.2 Supervisor Training

Onsite managers and supervisors directly responsible for employees engaged in hazardous

waste operations must be trained as specified in 29 CER 1910.120 (e)(4). This training

includes additional hours of training specifically for hazardous waste operations supervisors.

3.4 EMPLOYEE MEDICAL SURVEILLANCE

The HSO or Site Manager shall authorize individuals access to areas where site control is

established (to conduct fieldwork in accordance with this HSP) only if current certification of

medical fitness, training, and respirator fit are in accordance with 29 CFR 1910.120. Copies

I \EIELS0NAOSK7820i\VW1iELHSP2.D0C 3-2DRAFT REVO010/29/96 5:23 PM

Page 26: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

of certifications shall be on file. (Refer to the Jacobs EH&S Manual [Jacobs undated a],

Sections 3.0 and 5.0.)

Employees of any subcontractors will provide documentation of their participation in a

il ~~medical surveillance program before fieldwork begins. Documentation will be maintained in

the project files.

3.4.1 Baseline or Preassignment Monitoring

Before being assigned to a hazardous or potentially hazardous activity involving exposure to

L ~~toxic materials, each employee must receive a preassignmnent or baseline physical

examination. The content of the examination is to be determined by the employers' medical

consultant. As suggested by the U.S. Department of Health and Human Services (DHHS),

Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities

(DHHS et al. 1985), the minimum medical monitoring requirements for work at Bielson AFB

are as follows:

*complete medical and work histories;n * ~~~physical examination;

*pulmonary function test, forced vital capacity, and forced expiratory volume;

*chest X ray;

*electrocardiogram;

L * ~~~eye examination and visual acuity;

*audiometry;B *l urinalysis; and

f * ~~~blood chemistry, including hematology and serum analyses.

At present, no additional testing for specific contaminant health effects is required. The

preassignmnent physical examination will categorize employees as fit for duty and able to wear

respiratory protection.

L ~~~I:EIELSON\05K78201\Wn'hEIELHSP2.DOC 3-3DRAFT REVO010/29/96 5:23 PM

Page 27: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

3.4.2 Annual Monitoring

In addition to the baseline physical examination, all employees are required to obtain an

annual physical exam, unless the advising physician believes a shorter interval is appropriate.

The employers' medical consultant will prescribe an adequate physical examination that meets

the OSHA requirements in 29 CFR 1910.120. The preassigrnment medical monitoring criteria

outlined previously may be applicable.

All personnel working in contaminated or potentially contaminated areas at Eielson AFB will

verify that their medical monitoring is current (within 12 months). Jacobs' subcontractors will

keep documentation onsite specifying that all employees are fit for duty. Each certificate will

be signed by an attending physician.

3.4.3 Exit Physical

Enrollment in the medical monitoring program will end when the employee terminates the

program or the company. At that time, an exit examination for the employee is required.

Each employee will undergo an exit physical examination unless written documentation

waiving this requirement is provided.

3.4.4 Exposure, Injury, or Medical Support

As follow-up to an injury or a possible exposure above an established exposure limit, all

employees are entitled and encouraged to seek medical attention and physical testing.

Depending on the type of exposure, it is critical to perform follow-up testing within 24 to 48

hours. It will be up to the employers' medical consultant to advise what type of test or tests

are required to accurately monitor for exposure effects.

1:\EIELSON\05K78201\\VhEIELHSP2.DOC 3-4DRAFT REVO0I0/29S96 5:23 PM

Page 28: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

4.0 HAZARD EVALUATION

The following sections describe the types of hazards expected on this project and the methods

that will be used to control those hazards. Table 4-1 summarizes the project tasks, hazards,

and controls. All tasks will be conducted in compliance with the Jacobs Code of Safe

Practices (Appendix E).

L

4.1 CONTAMINANT SOURCE AREA DESCRIPTION

For this work effort, areas of potential contamination include the cesspools and drywells.

4.2 CHEMICAL HAZARDS AND CONTROL

I ~~~The suspected contaminants onsite are listed in Table 4-2. The physical, chemical, and health

effects of hazardous chemical substances are itemized in Table 4-3. Generic chemical hazard

profiles are provided in Appendix B for those chemicals that are typically used for

decontamination. These profiles are organized by groups (e.g., corrosives and petroleum-

based hydrocarbons).

L ~~~More detailed information specific to each chemical is provided in Material Safety Data

Sheets (MSDSs) in Appendix F. Refer also to the Jacobs EH&S Manual, SOPs 7.0 through

7.9 (Jacobs undated a).

Nok~: Anyone bringing chemicals to this site is required to provide an MSDS to the

HSO or Site Manager.

4.3 PHYSICAL HAZARD EVALUATION

Potential safety hazards specific to this site are shown in Table 4-4. Refer to Appendix C for

Ii ~~more detailed information concerning safety hazards and controls.

I:\EIELASONK78201\WIA\EILHSP2.DOC 4-1DRAFT REVO010/29/96 5:23 PM.

Page 29: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

4.4 BIOLOGICAL HAZARDS AND CONTROLS

The wildlife of northwest Alaska presents a potential haza rd to project personnel. All

personnel must be aware of the potential hazard and avoid potentially dangerous encounters

with wildlife. The wildlife most likely to present a danger to project personnel are bears

(black and brown bears), moose, and insects.

iluz. Bears present a potential hazard at, and near, Eielson AFB. Black and brown bears are

found within the surrounding area in low densities. Black and brown bears are also high-

order carnivores, but will typically avoid human contact unless provoked, surprised, or if

humans approach cubs. Bears are attracted to areas of human habitation by the presence of

foodstuffs in garbage and may become unafraid of human contact. Field personnel will avoid

contact with bears. If a black or brown bear is sighted, efforts will be made to avoid

provoking or surprising the bear. No field team member will approach a bear or its cub for

any reason.

Moose. Moose are common to the area. Whbile they generally shy away from contact with

humans, moose can be extremely dangerous when threatened. Due to their large size, moose

can seriously injure humans by trampling or stomping a person. Contact with moose is to be

avoided during activities in the field.

Insecs. Biting insects are a serious health hazard in northwest Alaska during the summer

months. The wet coastal areas surrounding the station are breeding grounds for extremely

high populations of mosquitoes and biting flies. Each team member will be issued a head net

to keep insects away from the face and head. Long pants, long-sleeved shints, and gloves are

also effective in preventing insect bites. As with sunscreen, the use of insect repellent

chemicals is essential to the health and safety of field personnel; however, care must be used

to prevent contamination of samples with repellent/propellant chemicals. The chemical

content of all insect repellents used must be presented to the HSO for recording.

1:\EIELSON\OSK78201W~hIFEMLRSP2.DOC 4-2DR~AFT REV 010/29/96 5:23 PM

Page 30: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

1 ~4.5 HEAT AND COLD STRESS

The Jacobs EH&S Manual, SOPs 7.1 and 7.2, outline exposure control methods for working

in extreme temperatures. The guidance contained in these SOPs is summarized in Appendix

I ~~C. SOPs 7.1 and 7.2 should be consulted for details. Table 4-5 summarizes symptoms and

treatment procedures for heat and cold stress.

4.6 CONFINED SPACE HAZARD

The fieldwork (trenching) to be conducted may include confined space entry. At this time, no

one is authorized to enter excavations greater than 4 feet deep. If entry is necessary, then

compliance with the Jacobs SOP 8.6 is required, and the HSO should notify the HSM.

4.7 ERGONOMIC HAZARDS

t ~~Cumulative trauma disorders (CTDs) occur most frequently as a result of strain from

performing the same task on a continuous basis. The primary risk factors for CTI~s are as

£ ~~~follows:

* repetitive motion;

* excessive force; and

* awkward position.

I ~~~Other risk factors include the following:

I ~~~* working with vibrating tools;

a working in a cold environment; and

t ~~~* being in poor physical condition.

Take the following actions to prevent CTI~s at this worksite:

e Find ways to reduce repetitive motion.

* Find ways to reduce excessive force.

I.\EIELMSON0K78201\WTA'EIELSI'2.DOC 4-3DRAFT REV 0I ~~~~~10(29196 5:23 PM

Page 31: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Neutralize awkward postures that may cause strain and tension by placing the body in a

more natural position.

* Consider using power tools instead of hand tools.

* Choose tools with soft-cover grips.

* Select tools with handles designed to keep your wrist in a neutral position.

* Wear gloves that fit correctly. Gloves that are too large or thick may cause you to use

excessive force. Gloves that are too tight may restrict circulation.

Any employee exhibiting symptoms of CTDs, including a prickling or tingling sensation in

the fingers or pain, loss of sensation, or weakness in a part of the body, should contact the

HSM promptly.

4.8 POTENTIAL INFECTIOUS WASTES OR SEWAGE

The following information concerning potential infectious wastes and sewage was obtained

from National Learning Corporation Passbook for Sewage Plant Operator, and Effluent

Contaminants and the Receiving Streams, Daniel W. Smith.

Potential sources of infectious wastes or sewage exist in the removal of the cesspools at STl1 8.

Sewage consists of water plus solids that are dissolved or carried in suspension water. The

solids in sewage may be divided into two general groups depending on their composition or

their physical condition.

Qrganbc solids. These are generally of animal or vegetable origins including the waste

products of animal and vegetable life, dead animal matter, and plant tissue or organisms, but

may contain synthetic organic compounds. They are substances that contain carbon,

hydrogen, and oxygen, some of which may be combined with nitrogen, sulfur, or phosphorus.

They are subject to decay or decomposition through the activity of bacteria and other living

organisms.

1:\EIELSON\05K1820I\WA'hEEELHSI'2.DOC 4-4DRAFT REV 010/29/96 5:23 PM

Page 32: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Insorgank..salids. These are those substances that are inert and not subject to decay. Inorganic

solids are frequently designated as mineral substances and include sand, gravel, silt, and the

mineral salts in a water supply.

Dissolvedgases. Dissolved gases in sewage can vary in concentration level. Some of these

gases include dissolved oxygen, carbon dioxide, nitrogen, hydrogen sulfide, and certain

inorganic sulfur compounds. These gases, although small in amount, still pose a hazard to

employees in the removal of the cesspools. Appropriate direct reading instruments will be

L ~~~used to detect the presence of these gases so appropriate measures can be taken.

Biological composition of sewage. Sewage also contains countless numbers of livingorganisms, most of them too small in size to be visible. These small living organisms may be

considered one of two types: bacteria and other more complex living organisms.

L ~~~Bacteria are living organisms that consist of a single cell and require food, oxygen, and water

f ~~~to survive. Parasitic bacteria need a host to survive and generally do not develop outside the

body of the host. Saprophytic bacteria feed on dead organic matter, thus decomposing

organic solids provide their needed nourishment. There are many species of this bacteria,

each of which plays a specific role in the breakdown of the organic solids of sewage. Each

species tends to die away following completion of its role in the decomposition process.

Other living organisms could include worms or insects in various forms of development.

These organisms generally do not pose any hazard to employees.

Viruses are an additional form of life found in sew age that is of interest to employees. Some,

such as the Hepatitis virus, originate in the intestines of humans and are carried with intestinal

wastes to the sewage. Each employee involved in the removal action of the cesspools will be

afforded the opportunity to obtain a vaccination against this virus.

Certain chemical changes in sewage composition occur through the decomposition process.

During the decomposition process, intermediate products are formed and could include

IAFMESON\05K78201\WP\EIELHSP2.DOC 4-5DRAFT REVO010/29/96 5:23 PM

Page 33: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

inorganic acids, gases such as hydrogen sulfide, methane, carbon dioxide, and in many

instances, very foul smelling gases resulting from the chemical changes in organic sulfur

compounds. These intermediate products could be present in the leach fields or beneath the

cesspools, therefore entry into any excavation is prohibited.

I \EIELSON\05K7820I\WIhEIELLHSP2.DOC 4-6DRAFT' REV 010/29196 5:23 PM

Page 34: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

cn 20~~~~~~~0

cn 0~~~~~~~~~0.5~~~~~~~~~~~~~~~s.0) ~ ~ ~ ~ ~

-on

L.S~~~~~~~~~~~0

.0~~~~~~~~~~~C

ta

0.*0 U

or 0

Co~~~~~~~~~~~~~~~~~~~~~~~~~~~b

0 -

0.0. r~ 8) A

- ) C

Page 35: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

44~~~~~~~~~~~~~~~ 0

94~~~~~~~~~~~~~~~~~~~~~~~

0~~~~~~~~~

0~~~~~~~

- 0 0~~~~~~~~~~~~c

.2~~~~~~~~~~~~~~~~~~~~1

.0 S~~~~~~~~~~~~~r

4) F! ~~~~~~~ ~~~:f:~~~~-:~~~ F-~ ~ ~ ~

Page 36: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE 4-2Suspected Contaminants at Each Site

Suspected Contaminants ST18

Gasoline (GRO) XDiesel Fuel (DRO) XHeavy Metals XLead X

- ~~~~~~~~~~~Benzene XToluene XXylenes XTrichloroethene (TCE) X

IT Ethylbenzene XPesticides X

DRO = diesel-range organicGRO = gasoline-range organic

I:\EILSON\05K78201\WIhEWflHSP2.DOC 4-9t~~~~DR~ E

10i29/96 5:23 PM

Page 37: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

6, E

E

C,

r6 Ut U 0

o . = ".S E > *>

~~ ~ 0 >z : 2>tEo ~~d o u ~~ 04 to toC

0 4) H ~ ~ ~~~~~~~~ 4e rQt~dU ~~~~ b 'U

~~~~~~~~ -~~~~~~~~~~~~a

00 2 2 2rt O~~d e~~oo0 0 *.0 (U6 U~~~~~~ -A > 4) > 0bCa to

U 11• < <- g~~~~~ g d.

0 0 0 ' 0 0

-~ ~~~~ 0=

C C C C Cto to to t o ot

CoC

PC.- 0~~~~~

N ~ ~ ~ ~ ~ ~ 4r

0 >1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~lc~~ r. lz 1~~ IF- Ix I lq~~~~ I -Ir

Page 38: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

ro r~~Z

CL ~~~~~~~~~~~~~~~~~~~~~~C,

0 a~~~~~~~~~

-O o - 0

Ct0 r MI - OD )

5.~a.CA 2Z0E> c2."a '_ AC ,A

EL Cd~~~~~~~~~~~~~~~~~~~~~~~~~~~Ci. a a C E

L -~~~~~~~~~~~~~~~~~~~~~~~0a* ~~~~ 0~ e

9 cc o 0r c' >' GW

C34 A

a S~~ S '

o 0 o r~~~~~~~a 7

Q~~ -Z

T 0

0 It 11~~u~~~~~~~~~~C

0 U 1_

r r~~~~~~~~~~~~~~~

E~~~~~~~~,C

- - - 4) 4) 4)~~~~l 0 E:0E

E 1~~~~~~~~~~~~~~~4,~~~~~E0 0

C% - -- _~~~~~~~~~~~~~~O _ S

-a P-H ~~~~~~~~~~~~~~~i~~~lS.S C)M

U - S 0 0.. 6~~~~~~~~~000Co ~ *o

a ,~~~~~~~ H ~ ~ ~ ~ ~ ~o 0 MoC0OMMM aw

1~ ____ ___ ___ ~ ii*1~ ill~ ;o000CEs IIii

Page 39: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE 4-4Physical Hazards and Controls

HAZARD ENGINEERING ORADNIINTSTRATIVE CONTROLS

Flying debris or objects. Provide shielding and PPE. An emergency eye washand shower must be available at work location.Restrict access to areas where such conditions mayoccur.

Noise levels greater than 85 decibels or when Hearing protection and sound-level monitoring arevoices must be raised to be heard in normal required.conversation at three feet apart

Steep terrain or unstable surface Brace and shore equipment.Flammable or explosive gases and vapors Provide 20-pound A:B:C: fire extinguishers or

equivalent plus ventilation. Stop work whenreadings are greater than 10 percent of the LEL andnotify the HSQ or HSM.

Static electricity No spark sources within 50 feet of an excavation,heavy equipment. Bonding and grounding requiredwhen filling or removing flammable liquids from

_____________________________________________________________ containers such as tanks.Gas cylinders Make certain that gas cylinders are properly

anchored, chained, and capped. Keep cylinders

away from ignition sources and protected from directsunlight.

High pressure hose rupture Check that fittings and pressurized lines are in goodrepair before using. Secure all lines to prevent1whipping.

Electrical shock Make certain that equipment is properly grounded.and use a GFCI receptacle. Do not modify electricalwiring unless qualified to do so. Follow

_________________________________lockoutltagout procedures discussed in Appendix C.Overhead electrical wires Heavy equipment must remain at least 15 feet from

overhead powerline of 50 kV or less. For each kVover 50, increase distance 1/2 foot. Follow JacobsSOP 7.7 (Jacobs, most recent version).

Muddy, wet, or slippery work areas Use wood pallets or similar devices in muddy workareas. Avoid these areas whenever possible.

Back injury Use proper lifting techniques. Use mechanicallifting aids whenever possible.

Protruding objects Flag and/or pad visible objects. Bend down orremove all protruding spikes, nails, and other sharpobjects that may cause injury.

Suspended loads Do not work under suspended loads. -Barrica~de

accessible areas under the swing radius of the load.

I:EIEL5ON05K782O\W1P\EILH5P2.D0C 4-12DRAFT REVO010/29/96 5:23 PM

Page 40: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE 4-4

Physical Hazards and Controls

HAZARD ENGINEERING OR ADMINISTT#ATIVE CONTROLS

Heavy equipment A back-up alarm is required for heavy equipment.Observer must remain in contact with operator andsignal when back-up is safe. All personnel mustremain outside the equipment's turning radius.Make equipment operators aware of your presence.Inform operators at the beginning of the day if youmust work in their vicinity.

Fire protection Keep fire extinguishers in the clear but nearoperations (See Appendix C). Do not tamper withextinguishers. Maintain all fire fighting equipment inoperating condition. In case of fire, turn on an alarmat once, then use the correct type of extinguisher.Use equipment correctly.

Flamimable and combustible liquids (e.g., fuel Use only approved (NEPA or UL) containers,

for portable generator) cabinets, and portable tanks for storage anddispensing. Keep flammable liquids in closedcontainers when they are not in use. Label all

containers as to contents and directions for safe use.Refer to the MSDS for specific information on any

chemicals brought to this site. Bonding (i.e.,attachment to an independently grounded object) andgrounding are required during container filling and

____ ____ ___ ____ ___ ____ ___ ____ ___ em ptying.

Working from elevated surfaces or platforms All platforms and elevated surfaces will beconstructed in accordance with OSHA requirements.

b ~~~~~~~~~~~~~~Employee shall use fall protection when working

from unprotected elevations greater than 6 feet.

Welding Move welding activities downwind from explosive_____ _____ ____ _____ ____ _____ ____ atmospheres. Use PPE as specified.

Trenches and excavations If you must enter a trench or excavation, make surethe trench/excavation meets OSHA standards beforeyou enter. All excavations 5 feet deep or more mustbe sloped' or shored. Excavations 4 feet deep ormore must have a ladder every 25 feet. If you workI ~ ~~~~~~~~~~~~~near a trench/excavation, remain 2 feet from theedge at all times. To enter a trench or excavation,you must have a permit, and confined space entryprocedures may also be necessary. Refer toAppendix C (see subsections titled Excavation andTrenching Safety; Confined Space Entry Procedures;and Work Permits) for detailed requirements. Acompetent person must inspect the trench/excavation

_______________________________________________________ daily.

I.EIELON\O5K782Ol\WP~EiELH1Sl nC 4-13DRAFT REVO0

10/29/%6 5.23 PM

Page 41: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

TABLE 4-4Physical Hazards and Controls

HAZARD ENGINEERING OR ADMIINISTRATIVE CONTROLS

Traffic Some of the work will be adjacent to or across

roadways. Trenches or excavations must bebarricaded and/or covered, if necessary. Trafficcontrol must be established whenever any portion ofthe roadway is blocked.

Inclement weather Stop work during inclement weather. Notify HSO

__________________ ~~~and Site Superintendent.

Working alone Do not work alone. The buddy system will be

enforced.

Confined space entry Follow guidance and procedures presented in____ ____ ____ ____ ____ ____ ____ ___ A ppendix C .

Buried or unidentified drums When a buried drum or one of unknown identity is

found on site, stop all work and notify the HSQ andHSM.

Sunburn Wear long-sleeved shirts or use sunscreen (SPF 20

UVA and UVB) and provide a shady area.

Heat stress Use WBGT monitoring guidelines. Check_________________________________employee's pulse and temperature. See Section 4.5.

Falls All work above 6 feet in elevation requires fallprotection. Refer to Jacobs Corporate SafetyManual for additional information (Appendix C; see

_____________________________________________________________ Section on Fall Protection).

Cold Stress Provide warming areas for breaks. See Secin45

HSM = project Health and Safety ManagerHSO = site Health and Safety Officer

kV = kilowattLEL = lower explosive limit

MSDS = material safety data sheetsNFPA = National Fire Protection AssociationOSHA = Occupational Safety and Health Administration

PPE = personal protective equipmentSOP = Standard Operating ProcedureSPF = sun protection factorUL = Underwriters Laboratories

UVA = ultraviolet - type AUVB = ultraviolet - type B

WBGT = Wet Bulb Globe Temperature

I:\EIELON\05K78201\WIThEELHSP2.DOC 4144DRAFT REV 010/29/96 5 23 PMI

Page 42: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I

Cu cuc SU >.,� �.

U3�t ��

cud

a - U

cC

cu� a 0�u-

E CuCuUCu� *tozt.i � -� >�4J� d.�e

.�0.-P ________________ ____________

4)

- COU '/-I.0

Li .�-0U -c...�.E>.

I2 Cu

�0 'C U

Cs .0

C

F.2 Cu

� 2

.�

- Lx..

Cu0ri00

� 0.

b

___________ �0-

I

Page 43: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

1I

I

I

iI

I:\EI~~~~~~~tSON\O5K782Ol\WP~~~~~~~~~~~~~~~~~~EIELHSP2 DCC 4-16~~~~~~~~~~~~~~~~

DRAFT REV 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

10/29/96 5:23 PM~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 44: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

5.0 PERSONAL PROTECTIVE EQUIPMENT

PPE ensembles for waste site activities are defined by the U.S. Environmental Protection

Agency (EPA) and OSHA. Table 5-1 summarizes the PPE ensembles that are required for

this project by work task. PPE levels may be upgraded or downgraded based on the results of

direct-reading air monitoring equipment. Table 5-2 summarizes conditions that require an

upgrade or that may indicate that a downgrade is possible. PPE will be inspected and tested

- ~~as required in Jacobs' SOPs. Respirators will be inspected after each use, or monthly,

- ~~whichever is more frequent. Refer to Jacobs' EH&S SOP 4.4 for respiration inspection

- ~~~pr ocedures (Jacobs undated a). Self-contained breathing apparatus (SCBA) equipment will be

L ~~~tested following procedures in Jacobs' EH&S SOP 4.5 (Jacobs undated a).

5.1 LEVEL D PROTECTION

The Level D ensemble consists of a basic work uniform and common construction-related

PPE that includes a hard hat, steel-toed safety boots, and safety glasses with side shields.

I' ~ ~Other PPE, such as leather or cotton gloves, are added as necessary. Level D+ adds a limited

amount of chemical protection for the skin. Over the work uniform, chemical-resistant

I ~~~overshoes or boots, a Tyvek suit, and chemical-resistant gloves are added.

t ~5.2 LEVEL C AND B PROTECTION

The Level C ensemble adds an air-purifying respirator and specialized whole-body clothing

such as a coated Tyvek suit and two pairs of chemical-resistant gloves. The ankles, wrists,

and seams may be taped. Level B replaces the air purifying respirator with one that provides

a supplied air source: either an airline/Cascade System or a SCBA.

5.3 SAFETY EQUIPMENT AND MATERIALS

The HSO is responsible for arranging for health and safety equipment to be available onsite.

Personnel must store all safety equipment materials in a clean, dry place and out of direct

- l~~~.\EIELSON\05K78201\WVhIPELSP2.DOC 5-1DRAFT REV 010/29/96 5:23 PM

Page 45: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

sunlight. All contaminated safety materials that cannot be decontaminated must be disposed

of as hazardous waste.

5.4 LIMITATIONS

All personnel will be responsible for complying with the following work practices:

*Suspend field operations if any unforeseen hazards become apparent in the field thatrequire greater precautions other than those specified in the HSP.

*Meet the "buddy system' (working in teams of two people) requirements of 29 CFR1910.120(d)(3) at all times.

*Implement dust- or vapor-suppression methods to minimize unwanted emissions.

*Position all personnel upwind of sampling and excavating locations.

*Do not eat, drink, or smoke in exclusion zones or contamination reduction zones whereaccess is restricted.

*Establish areas for eating, drinking, and smoking in the support area. Drinking water,juices, and cups are to be supplied in the support area.

* Perform work during daylight hours. (Night work requires modification to this HSP.)

* Ensure that a copy of the HSP is available in the control zone or the vehicle designated foremergencies.

5.5 COMMUNICATION

The following sections describe how on- and offsite communications will be handled, health

and safety concerns will be communicated, and hazard communications will be handled.

5.5.1 Site Communication

Onsite communications shall consist of the following:

* line of sight;

* agreed-on hand signals or two-way radio; and

* air horn if verbal communication is limited.

Offsite communications will be accomplished using two-way radio or telephone.

I\EIELSON\05K78201\W~hIELSP2 DOC 5-2DRAFT REVOU10/29196 5:23 PM

Page 46: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

5.5.2 Communication of Health and Safety Concerns

If health and safety concerns arise during field activities, the following steps should be taken:

*Health and safety concerns in the field shall be brought to the attention of the HSO and/orSite Manager.

*Health and safety concerns in the field that the HSO and/or Site Manager are unable toaddress satisfactorily shall be brought to the attention of the HSM.

T, ~ ~ *In the event of an accidental incident or emergency, notify' responsible personnel listed inLL ~~~Section 7.6.

5.5.3 Hazard Communication

r ~~~To satisfy the training and hazard communication requirements of 29 CFR 1910.120, fieldteam members shall be provided a copy of this HSP and agree to abide by it by signing the

sign off sheet in Appendix A. A Hazard Communication Form shall also be signed by fieldL ~~team members (Appendix G.) MSDS for hazardous chemicals brought onto the site, such as

sample preservatives, will be available through the HSO.

I !~~~1\EIELON\05K78201\WhIREMLHSP2.DOC 5-3DRAfT REVO010/29/96 5:23 PM

Page 47: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

2 8 72 M8'22

- ooO0.C c2~C A ~ j>sa 00 o M~ S0 a0 0

CL 0 ~ n.~00 CO - *

CO ' C 416 0 ra c j O 0

Se, 15(10 C- ~~~~~~~~~~~~~~~~t - EC

~~~ ~~~~~ ~~~~ t~~~Oo' 0flel CleE

z0,~~~~~~~~~~~~~~~~~0

-~~~~~~~ ~~~a C E0 M

&00 in~0

LD~ ~ ~ C a 3 00

0~~~~~~~~~~~c : >

- I-

- C0

O' 0

I-a C 0)0

M I~e

EL ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~0.u> iCuci4

a ~~~~~~~~a> so S a

XO 0 MOsE Moto -~~~~

0 s~280 ii28

jC Ji s 0C

C 0 0 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~C

0 _ _ _ _ __ 1V to *j 0 IMCO-8 0

C + E +~~~~~~~~~~~~~w~~. C C M

0 0 co I 0 C C~~~~~~~~~~

0 0~~~~~~~~~~~~

Page 48: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

5. ~~~~~~~~~~~~~~~~~~~~0 0

N N(U (D

-o02

c .C 'CI0 )02

c ot

0 c CC

F -~~~~~~~~~~~~~~~~~

6 ~~~~~~~~0a. ~~~~~~~~~)0p .3~~~~~~~~~~~~~

C.- 0

* ~~~~~~~~~C CQ

NE zS CUL)0EAcmm

000 -6~

0

-8 a~~~~~~2 2u

o ~~~~~~m 0

C

o C~~~~~o

C -~~~~~~C

o ~~~~~~~m 0

> N

0)

a 02 VV *t.

Page 49: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

I

II

II

IAEIELSON\05K78201\W~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~hEIELHSP2 DCC 56~~~~~~~~~~~~~~~~~~~~~~

DRAFT REV 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

10/29/96 5:23PM 1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 50: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

6.0 SITE SAFETY WORK PLAN

This section describes basic safe-work practices for activities at this site.

6.1 SITE WORK ACTIVITIES

Site Work Activities are described in Section 1.3, Description of Field Activities, of this HISP.

P 6.1.1 Site Clearing and Preparation

p ~~~Jacobs will ensure that all necessary permits are obtained before conducting any site work.

Initial site preparation includes establishing work zones as specified in Section 6.4, Work

Zones.

r, ~~Before beginning site work, materials that present tripping hazards will be removed or

flagged. Ignition sources will be identified and eliminated.

Before beginning any excavation, Jacobs will review station as-built plans with the AFCEE

p ~~~representative and a technical representative of the Eielson AFB maintenance section toL ~~~identify potential utility line locations. All identified utility line and subsurface pipe locations

P ~~~will be clearly marked before beginning fieldwork.

P ~~6.1.2 Warning Signs and Barricades

The Site Manager and HSO are responsible for limiting access to the work location(s) by

h ~~~posting appropriate warning signs or caution tape. Caution tape or barricades will be used so

that site egress is not restricted, and site access for emergency vehicles is not limited.

6.1.3 Material Storage and Handling

The following measures will be taken to prevent injuries and property damage from material

j ~~~storage and handling:

I I~~~:\EIELON\05K1820l\WpME1E1JSP2.DOC 6-1DRAFT REV010/29t96 5:23 PM

Page 51: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Organize site operations to minimize the amount of equipment, drum, or containermovement.

* Do not lift or lower materials from higher than shoulder level. Use ladders to reach highplaces.

* Implement safe lifting practices, including keeping the load positioned close to the body,using the legs to lift and lower, avoiding twisting at the waist, and using material handlingequipment whenever available.

* Store materials in a safe and secure position.

6.1.4 Hazardous Waste Storage and Handling

All personnel will be responsible for complying with the following work practices:

• All personnel will position themselves upwind of hazardous waste handling locations.

* Use -only drums and containers during the project that meet the appropriate U.S.Department of Transportation (DOT), OSHA, and EPA regulations for the wastes thatthey contain.

* Consider all unlabeled drums and containers to contain hazardous substances and handlethem accordingly until the contents are positively identified and labeled.

* Prohibit eating, drinking, or smoking in exclusion zones or contamination reductionzones.

* Store chemicals brought onsite in properly labeled containers; store chemicals where theyare not likely to be accidentally disturbed.

* Ensure adequate ventilation when handling or storing hazardous materials.

• Verify' that flammable or combustible materials are stored away from ignition sources, andthat an appropriate fire extinguisher or fire suppression system is available.

* Wear appropriate PPE as specified in Section 5.0 of this HSP.

* Comply with the Jacobs SOP 10.0, Labeling, Packaging, and Shipping of HazardousMaterials (EH&S Manual) (Jacobs undated a).

6.2 SITE ENTRY PROCEDURES

Procedures for site entry include the following:

* The Site Manager and HSO shall limit site access by posting warning signs or cautiontape.

* Site visitors shall be restricted as clarified in Section 6.5 of this HSP.

I \EIELON\05K78201\WP\IEHSMP2.noC 6-2DRAFT RLEV 010129/96 5:23 PM

Page 52: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* The HSO shall restrict site entry to authorized individuals who meet the training andmedical surveillance requirements specified in this HSP.

* The HSO shall assign responsibility for maintaining a site entry log that documents whichpersonnel are onsite.

* As personnel enter the exclusion zone through the access control point, the HSO shallensure that each employee will be working with a buddy.

6.3 AIR MONITORING

Air monitoring will be conducted to prevent exposure to dust or hazarqdous chemicals, as

described in the following sections.

6.3.1 Environmental Monitoring

L Air -monitoring is required when disturbing soil, opening the tanks, and entering tanks or

excavations. Air monitoring during these intrusive activities shall be performed with a

I. ~~screening or direct-reading instrument such as the organic vapor analyzer (OVA) 128 or

photoionization detector (PID), a combustible gas indicator (CGI), an oxygen (02) analyzer,

and colorimetric tubes for benzene. Instruments will be calibrated before and after use,

following manufacturer's instructions. The monitoring frequency and action levels are shown

in Table 6-1. Appendix H contains forms for recording air monitoring results and calibration

data.

F ~~6.3.2 Personal Exposure Monitoring

If elevated levels of specific substances are detected using the colorimetric tubes or other

instruments listed in Table 6-1, the HSM shall be notified so that he can determine whether

personal monitoring will be perfol-med.

- ~~~If personal monitoring is performed, it shall be in accordance with the NIOSH standard

- ~~~sampling and analytical methods or other equivalent methods. These methods specify quality

assurance procedures for calibration, sample media, collection parameters, sampling, and

I:\EIELSON\05K78201\WFThEELHSP2.DOC 6-3DRAFT REV 0

F ~~~~~10/29/96 5:23 PM

Page 53: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

analysis of samples. Samples shall be analyzed by a laboratory accredited by the American

Industrial Hygiene Association (AIHA).

Personal air monitoring shall be documented and maintained in an employee's personnel file

and in the site project files. Employees that are monitored shall receive a copy of the

sampling results. The air monitoring record form is included in Appendix H.

6.4 WORK ZONES

Clearly delineated work zones help ensure that (1) site personnel are adequately protected

from existing hazards, (2) specific activities and hazards are confined to the appropriate areas,

and (3) personnel may be accurately and quickly located and evacuated during an emergency.

Personnel will comply with Jacobs' SOP 7.3, Work Zones, in establishing and maintaining

such zones.

6.5 VISITORS

Visitors must check in with the HSO before gaining entry to the site. Visitors to this site are

required to read and understand this HSP, and to verify training and participation in a medical

surveillance program. Forms in Appendices A and I must be signed by each visitor.

After these forms are signed and the visitor is wearing the required PPE, the visitor may enter

the exclusion zone. However, in most cases visitors will be limited to the control zone or

support zone. Visitors will be escorted by a site representative.

6.6 DECONTAMINATION PROCEDURES

The following sections describe decontamination procedures for personnel and equipment.

6.6.1 Personnel

Personnel decontamination procedures will depend on the level of PPE worn in the field.

1AE1E1S0N\05K78201\WPT=ELSP2.D0C 6-4DRAH REVO010/29/96 5:23 PM

Page 54: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Level D and D+ Personal Protective Equipment. Figure 6-1 outlines a typical Level D and

D+ decontamination layout, including the following:

* Wash and rinse gloves and boots with soap and water.

* Remove and dispose of gloves and coveralls.

* Wash hands and face with soap and water.

Level B and C Peroa PoetvEqipmen. A decontamination schematic of levels B and

C PPE is provided in Figure 6-2; procedural details are described in Table 6-2.

6.6.2 Samples and Equipment

The7 HSO or Site Manager shall verify that pieces of equipment going offsite are properly

decontaminated according to the procedures outlined below. Decontamination must be

documented in the field logbook that is a part of the permanent project file.

*Sampling Equipment. Follow the detailed procedures in Appendix J.

*Samples. Wipe exterior of sample containers to remove visible contamination.

He1kyy.Equipmn~n. Scrape off dirt. Steam clean at the decontamination pad beforea ~ ~~~moving to another site.

*ehicles. Vehicles driven within the boundaries of the sites must be washed and theinterior vacuumied before returning the vehicle to the office, rental agency, or to anyperson not named in this HSP. A commercial car wash is adequate for this purpose.Vehicles driven in the exclusion zone, extended into a part of the exclusion zone, or usedto transport contaminated personnel or supplies must be steam cleaned inside and outsideat the decontamination pad before going to another site. Vehicles do not have to bedecontaminated between boreholes.

6.7 DISPOSAL OF WASTE MATERIALS GENERATED ONSITE

Any site-derived waste materials shall be contained in separate 85-gallon drums. All PPE

shall be contained in plastic bags and labeled with the site location. All containers will be

inventoried and moved to the temporary staging area designated by the Eielson AFB point of

contact (POC).

I:\fLSON4\05K7820o\IMwMfihJsP2DOC65DRAFT REV 0

10/29f96 5:23 PM

Page 55: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Hazardous waste containers shall be transported by a registered hauler to the Defense

Reutilization and Marketing Office (DRMO) at Elmendorf AFB for proper disposal. Solid

trash and PPE that has been contaminated shall be characterized and disposed of as hazardous

waste if necessary. Before leaving Eielson AFB3, a load inspection of all shipments shall be

conducted by a responsible party designated by the COR. A Load Inspection Report

(checklist) shall be submitted to the COR.

Solid trash, i.e., disposable PPE, and items used in the work zones that are not contaminated

at concentrations sufficient to be classified as hazardous waste shall be contained and

disposed of as industrial solid waste with other trash generated at Eielson AFB.

1AEIELSON\05K78201\WAWEIELBSP2.DIC 6-6DRAFT REVO0

10/29/96 5:23 PM

Page 56: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

'4 0 .~~ ~~~0 0 U)

Ca. ~~~~cC. C. a0 0~~~ 0

r~~~~~~~

CIL ~ a a. L x

0) E ~ ~ ~ 0

~~(O~ (MI 4) aaa

4) c x

0 =4)( 0 4

ZC aE a) I a .CS ) 0)C 0ua

0 co 2 , 0 , ID~ CL an~~2X~g O~a)~~0U E E* )= D 4)4

m E w c 0 4) V cm ~IL acE . '- . SS tw< nwcm

U) 0 IM > c s2c

0)~~~~~~~~~~~rv

U) nc~~II - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __~~~3 _ _ _ _ _ _ _j

0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0o ~ ~ ~ ~ ' 4)~~~~0) IDC a ~

a .- -~~~~~1: --

n C)~~aClC'&0 C 0

CL = 4)~~~~~~~~)U)C 4) E no-f ' WM0

0. 0 ti AO . m(0 4~R m E womE mE

C Ec a M n a .0 O L E000 o O 0Os.

LU a. *1 C I f toa u . i iN

V AA 0a A V -A A Al 0 A 4 A V A 0

0~~~~~ w~~~~

C~~~~0CC

41 1.. (0 OiL.~~~~~~~~0

C m m4) E EL E6~~~t C

>0 I-~~~~~~~ It~E~~~~~

mc

04) Z -~~~~~~~~~~~~~o )_jE 0 E0=

Page 57: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Q~~~~~ -0

0 )0 0

2 a5oto ~~~~~~0 >0

0) E 2 0 L0) ~ ~C 0 M( 0

0. 8~~~~ 0 a

U 3 0~~~~~ n A c a _.2 acc n~. - o0 .2 .0 a .0 i CLM a0~ C 0 . 00 6

> '& 'a m M R~~~~~~~~~~~~~~~~~~~~~~~~~~~~t 4

U) M5 'CV 0 - *a a~~~~~~c SDMa. CL .*9 3w 6 . 2 m 6 0 6D 0 ar M

~~ wE~ c2 ' o c ~ (

a. 0EC0 00)0 00 C C

a Z~~ c Eta 0C>Ii ~ St~U£E O.2 30 wr

0 w~~0 030) co 'a a a0

'a V C~~~~~~~~~~~~aCy 00--0 _ *0 E .2 00

0 9 'a~~~tL 0 a) M Mo c 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~amm= 0 0~0

o )00 M > ~.0 .3w 03 0 00G a~ 0w COwa 0D VI . -

a 0 0 ~ M0 000)e - C o r0. > 0 O.-rc _8 o

CL 00 0)% 6oE ai- *-'.

0) C a~E = a)C a C C) SE 0 0a) -'~2 a 0 0M MEn 5.

C - - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~ -~ -- 0Mo0 M 0ScN . Onco'a o a 0

0) ~ ~ ~~~ =~ 3 (0 MN Z5Ecoud)) a M mm!a &

-.o 9 - 0 0 1.0% a 1 aX1

* 4 0L 0 *1ij oZo0 ~~~~~iM fl E.OW 4.~0~a 0)0 >U

wo R C, M ~0 0

MU-a 0 D a

0~~~~~~~~~~0

0> 20 &0 a0a M ~ ~~~0 oM

0 0 a >

'O M > ~~~0 co 3:o C~~mE - c..a

- 'E > wc-0 -0 >W On~~~0 m2 0& E a)E o.

- (~ ~~N M) t C CD

Page 58: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

2~~~~~~~~~~~~~~~~~~~~~

DECONTAMINATION zCAI SOLUTION

-~~~~ W rLJ~~~ W TE0 XW~~~~~~~~~~-

0 ~~~DECONTAMINATE ©REMOVE BOOTS © 3

1? ~~~~~~~~OUTER GARMENTS GLVE AD UTER

EQUIPMENT (FOR DISPOSAL ORDROP OFFSITE

REMOVE ~~~~DECONTAMINATION)BOTTUCOVERS

AD OTRGLOVES

P Nb~~~~~~~~~~~ NboL ~~~~PLASTIC I CAN CAN

SHEET (32 GALLON) (32 GALLON) /

H //~~~~~~~~~~~~~~~~~~~AHFC

WSHOE OFACIE

20 PIEG L WINDLANDAHANDSDECONTAMINTDIRECTIONIMUNSAYTE

U ______________________~~~6 -

Page 59: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

REDRESS: BOOT COVERS ANDOUTER GLOVES

0~~~~~~CAR TR D GE ~Uz

SOLUTION TANK(LEVEL 8) -

ZI SOUTONl:

BOT ANDANEOTE

Q~~~~~RMV DECONTAMINATI EOV ON)SBOOOT COVER

ANDE OUERGLVE OUTER _

SHIPEET GA(32MALLON (32R GIPOALLON)RDROP OFFSITE~~~~~~~~~~~~~~~~~

MOVE DECONTAMINATION)/

COVERS~~~~~~~EMV

RESPIRATOR20 DEG. WIND AND INNER> D~~IRECTION GLOVES

20 1G. ~~~~~~~~~~WASH FACE*AND HANDS

ONSITE SOE

//O~FFSI TE

NOT TO SCALE

FIGURE 6-2TYPICAL LEVEL B AND C

DECONTAMINATION MINIMUM LAYOUT

6-10

Page 60: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

7.0 EMERGENCY RESPONSE/CONTINGENCY PLAN

The following sections describe pre-emergency planning, emergency equipment and supplies,

emergency procedures, emergency response and accident follow-up, evacuation information,

contacts, postincident notifications, record keeping, and vehicle accident procedures.

7.1 EMERGENCY RESPONSE BRIEFING

Before beginning activities at the site, the HSO will brief personnel on the emergency

practices and procedures described in this section.

7.2 EMERGENCY PROCEDURES

These sections describe procedures for performing emergency plannmng, providing emergency

equipment and supplies, handling emergency medical treatment, and providing for fire

protection and for PPE and other equipment failure.

7.2.1 Pre-Emnergency Planning

The HSO or Site Manager performs the applicable emergency planning tasks before starting

field activities and coordinates emergency response with the facility and local emergency

service providers as appropriate. The HSO or Site Manager is responsible for the following:

evaluating and documenting capabilities of local emergency response teams, if any;

*verifying local emergency contacts, hospital routes, evacuation routes, and assemblypoints;

*notifying appropriate emergency responders listed in Section 7.6 before site mobilization;

*confirming and posting emergency telephone numbers and the route to the hospital;

*posting a site map marked with the location of emergency equipment and supplies;

*driving and verifying the route to the hospital and ensuring that employees drive the routeto the hospital;

LIAEELSOMAO5K7820OI\WE~ELHSP2 DOC 7-1DRAFF REvO010/29/96 5 23 PM

Page 61: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* designating one vehicle as the emergency vehicle; placing a copy of this HSP (includingthe hospital directions and map) inside; keeping the keys in the ignition during fieldactivities;

*inventorying and checking site emergency equipment and supplies;*establishing emergency signals, evacuation routes, and onsite and offsite assembly points;

*reviewing emergency procedures for personnel injury;

*reviewing names of onsite personnel trained in first aid and CPR;

* reviewing emergency response and postemergency notification procedures;

*rehearsing the emergency response plan once, before site activities begin;

*showing field team members where emergency response equipment is located in thesupport area;

*briefing new workers on the emergency response plan; and3

*referring employees to Figure 7-1, which shows a typical emergency response operationsflow~'diagram.

7.2.2 Emergency Equipment and Supplies

The following emergency equipment and supplies will be kept onsite:

* 20-pound A:B:C fire extinguisher (or equivalent);

* industrial first aid kit (10O-unit minimum);

*one-way breathing shield for CPR;

*stretcher or blanket;

*water and electrolyte replenishers (e.g., Gatoradea);

*two-way radio(s) or cellular phone;

*tympanic (ear) thermometer (optional);

*digital pulse meter (optional);

*air horn (optional);

*wind direction indicator;

*portable pressurized eyewash shower and deluge shower; and

*sorbent material or spill containment supplies.

I:EIELSON\05K78201\%WPflEIEH P2.DOC 7-2DRAFT REV 010/29/96 5:23 PM

Page 62: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

7.2.3 Emergency Medical Treatment

If a medical emergency occurs, the HSO, or Site Manager shall assume charge until an

ambulance arrives, or until the injured person is admitted to the emergency room.

I.Site personnel will prevent fuirther injury by taking the following actions:

* If certified, initiate first aid and CPR if needed. Refer to Section 7.3.1 for information onexposure to bloodborne pathogens.

* Call ambulance and hospital as appropriate. Arrange with Eielson AFB Security Policefor entry of emergency vehicles.

* Determine whether decontamination will make injury worse. If yes, seek medicaltreatment immediately.

* Make certain the injured person is accompanied to the emergency room by at least onefield team member with the same employer.

t ~~~Hospital emergency personnel will be provided with a copy of the HSP. An Authorization for

Medical Treatment Form (Appendix K) shall be taken with the injured employee to the

medical facility. The top portion of the form is to be completed by the HSO or Site Manager,

and the bottom portion is to be completed by the doctor at the medical facility. The

completed form shall be forwarded to the HSM.

7.2.4 Fire

On notification of a fire onsite, all site personnel will assemble at the decontamination line.

The fire department will be alerted, and all personnel will move to a safe distance from the

involved area.

A ~~7.2.5 Personal Protective Equipment Failure

F ~~~If any site worker experiences a failure or alteration of PPE, that person and his or her buddy

will immediately leave the exclusion zone through the decontamination line. Reentry will not

be permitted until the equipment has been repaired or replaced.

S IAE[EL\EHSON\05K78201\WPF\EJLHSP2.DOC 7-3DRAFT REVO0

10729/96 5:23 PM

Page 63: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

7.2.6 Other Equipment Failure

If any other equipment onsite fails to operate properly, notify the HSO, who will determine

the effect of this failure on continuing operations onsite. If the failure affects the safety of

personnel or prevents completion of the work plan tasks, all personnel will leave the exclusion

zone until the situation is evaluated and appropriate actions are taken.

7.3 EMERGENCY RESPONSE AND ACCIDENT FOLLOW-UP

As soon as possible following an accident or emergency, the HSO or Site Manager, or

designee, is to directly notify the HSM and the PjM, who will notify AFCEE. Refer to SOP

9.1 in the EH&S Manual (Jacobs undated a).

The HSO or Site Manager should be prepared to provide the following information:

* HSO name;

* Site Manager's name;

* station name and project number;

* exact location of incident;

* name and employer of victim(s);

* nature and extent of injuries;

*whether victim(s) was(were) transported offsite for medical treatment; and

*telephone number where the HSO can be contacted during the next 24 hours.

Refer to Appendix K for details of all other requirements of SOP 9. 1, Accident Investigation

and Notification (Jacobs undated a).

7.3.1 Exposure to Bloodborne Pathogens

The following procedures will be followed if a potential exposure to bloodbome pathogens

occurs:

!A\EIELSON\05K7820l\WFhEIELHSP2.DOC 7-4DRAFT REV 010/29/96 5:23 PM

Page 64: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

*A Hepatitis B vaccination must be offered to all employees who have occupationalexposure to blood or other potentially infectious materials.

*TeHSM or Site Manager must be notified immediately during the work shift when a firstaid incident occurs.

*The HSM or Site Manager shall follow the required procedures for reporting to the PHSMas listed above.

*The report shall include the names of all first aid providers who rendered assistance,regardless of whether PPE was used, and shall describe the first aid incident, includingtime, date, and type of PPE used.

*The description must include a determination if, in addition to the presence of blood orL ~~~other potentially infectious material, an "exposure incident" (as defined by 29 CFRf ~~~1910.1030) occurred. This determination is necessary to ensure that the proper

postexposure evaluation, prophylaxis, and follow-up procedures required by SOP 7.6,L ~~~~Bloodbome Pathogens, are made available immediately when there has been an "exposure

incident."

*The report shall be recorded on the First Aid Register (Appendix K).

p * ~~~A one-way mouth shield must be included in or with all field first aid kits for use in CPRapplication to prevent transmission of body fluid between victim and rescuer.

For additional information, refer to SOP 7.6 in the Jacobs EH&S Manual (Jacobs undated a).

7.3.2 Evacuation

71 ~~~If an evacuation is necessary, the steps below shall be followed:

* Personnel are to leave the work location (upwind) and gather at a designated assemblypoint (if safe) after detecting the emergency signal for evacuation.

* If an emergency situation is of concern to local station personnel, notify' the HSO, whowill notify the local station contact(s) of the emergency.

* If appropriate and safe, the HSO and a "buddy" are to remain at or near the location afterthe location has been evacuated to assist local responders and advise them of the natureand location of the incident.

* The HSO or a designee is to account for field team members at the assembly point.

* The HSO or Site Manager is to complete an incident report as soon as possible after theoccurrence.

I:\EILSON\05K78201\WIPhEILHSP2.DOC 7-5DRAFT RE VO

10/29/96 5:23 PM

Page 65: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Evacuation routes and assembly points will be documented by the HSO or Site Manager

during the employee health and safety briefing and daily tailgate meetings.

7.4 EARTHQUAKE

Employees should plan for earthquakes by taking the following precautions:

* Avoid storing items overhead.

* Secure shelves and cabinets.

* Use storage shelves with raised edges or other restraints.

7.5 UNCONTROLLED RELEASES

Refer to the most current edition of the DOT 1987 Emergency Response Guidebook (DOT

P 5800.5), and to the Jacobs Environmental Cleanup Plan for this project.

The following are potential spill sources during field operations: hydraulic oil from vehicles,

contaminated soils from excavations, decontamination liquids, and residual fuiels from ASTs

or fuel lines. Containerizing materials as soon as possible will reduce the potential for spills.

Handling of waste materials and containers will be in accordance with the Environmental

Cleanup Plan developed for the Eielson AFB Remedial Actions.

If spills occur, notify the HSO and Site Manager immediately. The HSO or Site Manager will

be responsible for ensuring that necessary notifications are given to the HSM, the AFCEE

Technical Manager and the Eielson AFB POC.

The Eielson AFB POC, AFCEE Technical Manager and the field team will determine the

strategy for notifying regulatory agencies.

7.6 EMERGENCY RESPONSE CONTACTS

This section lists the emergency contacts and describes the location of the nearest emergency

medical facility.

I:TEILSON\05K78201\TA'EIELHSP2.DOC 7-6DRAFT REV 010/29/96 5:23 PM

Page 66: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

1 ~~7.6.1 Contacts for Emergencies

Contacts to notify in an emergency are as follows:

r Contact ~~~~~~~Telephone

Fire Department 911Police Department: 911Eielson Fire Department: 377-4156Ambulance Service: 377-2296USAF Clinic: (907) 377-2259

I ~~~Poison Control Center: (800) 458-5842CHEMTREC: (800) 424-9300Jacobs Emergency Medical Consultant: (513) 421-3063

Dr. Zavon

N=-I.2'The above telephone numbers will be verified.

7.6.2 Hospital Location and Information

[ ~~~The nearest medical facility is the USAF Clinic (Building 3349). Any serious injuries will be

stabilized and the employee will be transported by ambulance to the USAF Clinic.

- Telephone Number: (907) 377-2259

- Route to Clinic: Refer to Figure 7-2

- Distance: Approximately 1.5 miles.

Ii ~7.7 VEHICLE ACCIDENT PROCEDURE

If a vehicle accident occurs, take the following steps:

1. Stop immediately.

2. Take steps to prevent another accident (safety cones, reflectors, flares, etc.).

3. Call a doctor or ambulance if necessary:

Paramedics: 91 1; and

I ~~~~~USAF Clinic: (907) 377-22594. Notify police at 91 1.

I ~~~I:\EIELON\05K78201\WIhEEELHSP2.DOC 7-7DRAFT REV 010/29/96 5:23 PM

Page 67: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

5. DO NOT sign any papers or make any statement as to who was at fault (except to yoursupervisor or a federal government investigator).

6. Notify or page the HSO within 24 hours, who will contact the HSM.

7. Complete the required forms, listed below, and submit them to the HSM as soon aspossible.

- Operator's Report of Motor Vehicle Accident with Privacy Act (required) (AppendixK);

- Investigative Report of Motor Vehicle Accident (required). Must be signed bysupervisor (Appendix K);

- Statement of Witness (required from each witness, if any) (Appendix K);

- invoices, which include towing charges, if any, and estimates as requested; and

- information exchanged about all involved drivers.

10. Submit any other forms or documents (policy reports, third party claims, etc.) to the HSM.

1 1. If damages occurred when vehicle was unattended (hit and run, etc.) or if incident did notinvolve another vehicle and there is no personal property damage or injuries, the driver ofthe vehicle must complete all forms.

For additional information, refer to SOP 9.1 in the EH&S Manual (Jacobs undated a).

L

I EIELSON05K78201WhIMELHSMP2DOC 7-8DRAFt REV C)10/29/96 5.23 PM

Page 68: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AOUTSANIDESUCIEST

ALLOCATE PERSONNEL ANDL ~~~~~~~~~~~EQUIPMENT RESOURCES

FOR RESPONSE

SREAN SES SURVEY AND ASSESS :XSIG

r

EXTRCT EONAIAEESNE PUULHZR HAZARD

REPLACE OR REJUVENATEDAMAGED OR EXHAUSTED

EQUIPMENT

DOCUMENT THE

INCIDENT

REVIEW AND REVISE SIT;E SAFTY

AND CONTINGENCY PLIANS

FIGURE 7-1EMERGENCY RESPONSE OPERATIONS

EIELSON LANDFILL, REMEDIAL ACTIONj ~~~~~~~~~~~~~~~7-9

Page 69: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

IA\EILSON\05K78201\WIhEIELHSP2.DOC 7-10DRAFT REV 010/29/96 5:23 PM

Page 70: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

- - . -*- ri. 1 ' P -- -- ' err , k rn t q t -i t - a e r J ' .2 1 C" .1

0-H U

ID 11 F

0 Q ~~m

C)~~C

C/) C4~~~~~~~~~~~~~~~

< CA~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~'

OZC)~~~~~~~~~~~~C

Ii~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i

em I~~~~~~~~~~~~~~~~~~C

zp~~~

-< V Zii1P1

m 41~~~~~~~~

Page 71: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I'

(intentionally blank)r

MM ELOW\O5K782O1\WPTEIELHSP2.DOC 7-12DRAFT REV 0VW10A 3.28 PM

Page 72: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

8.0 RECORD KEEPING

OSHA and the Jacobs team record keeping requirements will be met. Jacobs team personnel

are also required to maintain logs and daily reports (e.g., training logs, calibration logs, and

daily tailgate information). The following forms are provided as attachments to this HSP and

shall be maintained as documentation for demonstrating adherence to the HSP. (Refer also to

the Jacobs SOP 9.1 and the EH&S Manual (Jacobs updated a].)

*Appendix A Employee Sign Off;

*Appendix D Site Tailgate Meeting and Exclusion Zone Entry Log;

*Appendix U Hazard Communication Forms;

*Appendix H4 Health and Safety Forms, including the following:

-Employee Physiological Monitoring Record for Heat Stress;

-Health and Safety Exposure Monitoring Log;

-Field Calibration Log; and

-Air Monitoring Record Form;

*Appendix I Visitor's Log Safety Meeting Form; and

*Appendix K Accident Investigation and Notification.

IE1ELSON\O5K78201\WPFELELHSP2 DOC 8-1DRAFT REVO010/29/96 5.23 PM

Page 73: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)I

II1

I

I

i

I

II

I

I \EIELSON\05K78201\W~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~hEIEUISP2 nec 8-2~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

DR~~~~~~~~~~~~~~~~~fl REV C~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

10/29/96 523 PM~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 74: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

9.0 SITE POSTINGS

The HSM or Site Manager shall arrange to have all health and safety and human resources

posters and information conspicuously posted in a central location at the Jacobs field office,

including the following:

* Jacobs forms, including First Aid Register (Appendix K) and emergency phone numbers

(Section 7.6).

* OSHA forms and postings, including the following:

- OSHA 200 Log (see Appendix K);

- OSHA Safety and Health Poster;

- Access to Medical and Exposure Records;

- Forklift Operating Instructions;

- OSHA permits as applicable (excavations, scaffold erections, etc.); and

- Figure 7-2 Route to Hospital

- Applicable Alaska specific OSHA forms.

* Human Resources forms and postings, including the following:

- Notice of Workers' Compensation Insurance Provider;

- Payroll Date Notification;

- Equal Employment Opportunity Is the Law;

- Industrial Welfare Commission Order Regulating Wages;

- Notice to Employees: Unemployment and Disability Poster;

- Discrimination in Employment Is Prohibited by Law;

- Notice: Employee Polygraph Protection Act; and

- Any other locally required postings.

IA\EIELSON\05K78201\W1P0EELHSP2 DOC 9-1DRAFT REV10/29196 5:23 PM

Page 75: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Ii

II

IIII

I

I

I:\EIELSON\05K78201\WP\EIELHSP2 Dcc 9-2 1~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~DRAFT REV 0~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

10t29/96 5:23 PM~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 76: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

10.0 PLAY APPROVAL

This HSP has been written for use by the Jacobs team and any others who are authorized by

the HSM or Site Manager to have access to the Eielson AFB Remedial Action sites to conduct

fieldwork in accordance with this HSP. This HSP is written for the specific site conditions,

purposes, dates, and personnel specified and must be amended if these operations or

conditions change.

Concurrence By: Date:

Jacobs Project Manage

Concurrence By: Date:

danSafety Manager

Plan Approved By: Date:

Terry M. Briggs, PhD, CIHProgram Health and Safety ManagerJacobs Engineering Group Inc.

I \EEaSON\057t20IXWP~EtaIs2 DOC 10-IDRAFT REV 08O1094 3.28 P7

Page 77: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)I

'III

I

II

i1

II

I

I:AEIELSON\05K75201\IMEAE PIEDfOnC 10-2DRAFT REV 010/29/96 5:23 PM

Page 78: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

11.0 REFERENCES

Effluent Contaminants and the Receiving Streams, Daniel W. Smith, Dept. of CivilEngineering, University of Alberta Canada, 1985.

Jacobs Engineering Group Inc. Undated a. Corporate Health and Safety Manual forEnvironmental Programs.

Jacobs Engineering Group Inc. Undated b. Corporate Safety Manual.

National Learning Corporation Passbook for Sewage Plant Operators, 1989.

U.S. Air Force. 1993 (September). Handbook for the Installation Restoration Program (IRP)Remedial Investigations and Feasibility Studies (RI/FS).

U.S. Army Corps of Engineers (COE). 1992 (October). Safety and Health RequirementsManual. EM 385-1-1.

U.S. Code of Federal Regulations (CFR) Title 29, Parts 1900 to 1910.999.

U.S. Department of Health and Human Services (DHHS). 1985 (October). OccupationalSafety and Health Guidance Manual for Hazardous Waste Site Activities. Prepared byNational Institute for Occupational Safety and Health (NIOSH), and U.S.Environmental Protection Agency (EPA), Washington, D.C.

U.S. Department of Transportation. 1987 (September). 1987 Emergency ResponseGuidebook DOT P 5800.5.

I-\EIELSON\O5K782Ol\WAETELHSP2 DOCC1-DRAFT REVO010/29196 5 23 PM

Page 79: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(intentionally blank)

I

i

III

If

I

Page 80: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX A

EMPLOYEE SIGN OFF

DraftI GA1IENA~05K19l01\WPOGALHSP2 DOC 629/96 Recycled

Page 81: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX A

Employee Signoff

In accordance with 29 CFR 1910.120. the individuals listed below have read. understand.

and agree to abide by the provisions of this project specific Health and Safety Plan (HSP)

for the site designated below. These individuals acknowledge they have been advised of

the hazards present for the work being performed.

sflE: PROJECT NUMBER:

EMPLOEENAME /EMPLOYER EMPLOYEE SIGNATRE / DATE

A-1

Page 82: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX B

GENERIC CHEMICAL HAZARD PROFILES

Draft

I\GALLNA\O5K79101\WPhGALHIr'DOC 6,29/96 Recycted

Page 83: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Generic Chemical Hazard Profiles

The following information is intended to be generic to provide a brief overview. Detailed

information relevant to hazards associated with specific chemical substances ofpotential concern at this site are provided in Appendix G of this HSP.

Calibration Gases

Common pressurized gases used to calibrate air monitoring instrumentation includeheptane. hexane, hydrogen, hydrogen sulfide, oxygen, and pentane. Under ambient

conditions, these gases are flammable. The cylinders are pressurized; they can

become mini-torpedoes if the valve stem is severed from the cylinder. Handle themcarefully.

The primary routes of entry into the body are inhalation and skin absorption, so these

substances should be handled in a well ventilated area. Symptoms of exposure includelightheadiedness. nausea. headache, numb extremities, dermatitis, loss of appetite.chemical pneumonia. and giddiness. Exposure to elevated levels of such gases candamage the skin, eyes, and respiratory system, and can cause death.

Corrosives

Corrosives include acids, bases/caustics, and inorganic halogen salts. Some of themore common acids include acetic, citric, hydrochloric. hydroftuoric, nitric, perchloric.phosphoric, picric, and sulfuric acids. Some of the more common caustics include

ammonia, ammonium hydroxide, potassium hydroxide, sodium hydroxide, and sodium

hypochlorite. Inorganic halogen salts are compounds containing halogens (chlorine.bromine, fluorine) such as sodium chloride, potassium bromate, and sodium fluoride,which are corrosive to metals and finishes, but are relatively insignificant health threats.

For the most part, corrosives are nonflammable, although the liquid forms are

moderately to highly volatile. Perchloric acid (perchlorates) and picric acid when drycan be explosive.

The primary routes of entry into the body are via inhalation, ingestion, and skin contact.

Symptoms of exposure include tissue burns, nose and throat inflammation, and

pulmonary edema. Corrosives can cause extensive damage to the respiratory system.skin, and eyes.

Landfill Gases

Landfills in the past were often uncontrolled: almost any and every type of wastematerial could have been deposited at such sites. When organic and inorganic matterdegrades and decomposes. gases are generated. typically including, though not limitedto ammonia, carbon dioxide, carbon disulfide. hydrogen chloride, hydrogen fluoride.hydrogen cyanide. hydrogen sulfide, methane, vinyl chloride, vinyl fluoride, andvinylidline chloride. T hese gases are flammable and extremely volatile. Some, such ashydrogen sulfide. are heavier than air and settle in low-lying places.

Page 84: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFC..JO45K69M, M 1

The primary routes of entry into the body are via inhalation and skin absorp'tion:Symptoms of exposure include lightheadtedness, giddiness, nausea. headache, numbextremities, dermatitis, loss of appetite. chemical pneumonia, and tremors. Exposure toelevated levels of these gases can damage the skin, eyes, and respiratory system, andcan lead to death.

Metals

Metals commonly associated with batteries, paints, plating operations, and petroleum-based products include lead, arsenic, cadmium (a probable human carcinogen),chromium (a probable human carcinogen), copper, nickel, silver, tin, and zinccompounds. Petroleum-based products such as lubricants, and especially leadedgasolines, contain organic lead compounds such as tetraethyl and tetramethyl lead, aswell as assorted inorganic metals mentioned above and others such as antimony,barium, beryllium, cobalt, magnesium, manganese, and vanadium. Explosive powdersused in ordnances contain aluminum as well.

Metals pose a health hazard in their solid form, especially as airborne dusts. Theprimary routes of entry into the body are via inhalation, ingestion, and skin contact. 'Organic compounds such as tributyttin may penetrate the skin without producingappreciable local injury. Symptoms of exposure include eye, skin, and upperrespiratory system irritation; headaches; insomnia; metallic taste in the mouth;lassitude; pallor; anorexia; constipation: abdominal pain: anemia; and tremors. Heavymetals can cause damage to the central nervous system, kidneys, respiratory system,and liver. Cancers of the lungs and bones are associated with metal intoxication.

Petroleumn-B1aued Hydrocarbons

Lubricants, oils, fuels, and gasoline contain petroleum-based hydrocarbons such asbenzene and its derivatives, naphthas, toluene, xylenes, and coal tar pitch volatiles.Coal tar pitch volatiles are also known as polycyclic hydrocarbons (PCHs) orpolynuclear aromatics (PNAs). Benzene and PNAs are known carcinogens. Petroleum-based hydrocarbon materials also generally contain metal contaminants; refer to themetals profile. Lubricants and waste oils are slightly to highly volatile and flammable.Fuels and gasoline are extremely volatile and flammable.

The primary routes of entry into the body are via ingestion and skin contact or dermalabsorption. Inhalation of the more volatile constituents, such as toluene, xylenes,naphthas, and benzene (a known human carcinogen) and its derivatives, can be toxic.Acute symptoms of exposure include eye, skin, and upper respiratory system irritation,giddiness, confusion, headache, nausea, staggered gait, and fatigue. High level andchronic exposure can cause damage to the liver, kidneys, and bone marrow, and cancause skin cancer and leukemia.

AFOEK\M="0 PP-AP

Page 85: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

"C.a~so5QecIM2 0002

Solvents (Halogenated)

Halogenated solvents are hydrocarbon compounds that also have nalogen moleculessuch as chlorine, bromine, and fluorine. Generally, halogenated solvents aremoderately to highly volatile and are non-combustible, Data are available mostly forchlorinated solvents, so this profile will be slanted toward chlorinated solvents: however,the information mentioned below pertains to halogenated compounds in general. Thetoxicity of halogens typically ranks as follows: fiuorinated>brominated>chlorinated.

Some of the more common chlorinated solvent wastes include carbon tetrachloride*,chloroforrmr, methylene chlorclde*. methyl chloroform (1,1,1 -trichloroethane),tetrachloircethene, and trichiorethene (TCE). Substances followed by an asterisk(*are probable human carcinogens.

Primary routes of entry into the body are inhalation, dermal absorption. and ingestion.Symptoms of acute exposure include eye, skin, and upper respiratory irritation: flushedface and neck; vertigo, headache, lassitude, dizziness, fatigue, nausea, vomiting,disorientation, confusion, and poor equilibrium. High level or chronic exposures cancause damage to the skin, eyes, liver, kidneys, central nervous system, respiratorysystem. and heart.

Solvents (Nonhalogenated) and Paints

Some of the more common constituents of nonhalogenated solvents and paint wastesinclude acetone, methyl ethyl ketone (MEK), toluene, xylenes, alkyl acetates, acrylates,and alcohols. These substances are slightly to highly volatile and are moderately tohighly flammable.

Primary routes of entr into the body are via inhalation, ingestion, and dermalabsorption. Symptoms of exposure include irritation of the eyes, skin, or upperrespiratory system, headaches, drowsiness, dlermatitis, dizziness, confusion, giddiness,and euphoria. Higher levels of exposure can cause narcosis and damage to thekidneys and blood.

Page 86: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFC.J04.5K6990 1 .42 000

(intentionaily blank)I

I

I

I

AOCEIJ.C0001AOPP APP

Page 87: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX C

PHYSICAL (SAFETY), HAZARDS, AND CONTROLS

Draftl.GALENA\05K79101\WP'GALRiSP2.DOC 6/29/96 Recycled

Page 88: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX C

PHYSICAL (SAFETY) HAZARDS AND CONTROLS

Possible physical hazards associated xith field activities at the site may include any ofthe hazards discussed below. The controls specified shall be implemented during siteoperations. For additional information, refer to the Corporate Health and Safety Manualfor Environmental Field Programs (known as the EH&S) and the Corporate SafetyMVanual.

Excavation and Trenching Safety

.An excavation is a man-made depression or cavity in the earth. A trench is a man-made

excavation that is deeper than it is wide but is generally no wider than 15 feet.Excavations deeper than 4 feet are required to be shored, sloped, sheeted, braced, orotherwise supported.

Cave-ins develop very suddenly and without warning. Individuals can survive amaximum of three minutes without breathing, there is not much time to locate, dig out.and resuscitate a buried worker. Never get into an unprotected trench even if you believeit will be for only a few minutes. The action of your jumping into the trench may beenough to disturb the earth.

The following basic guidelines must be followed for work near or in an excavation:

* Locate underground utilities before doing any digging. Do not dig where it is knownthat utilities are located unless the owners have been notified and the utilities havebeen shut down, isolated, or marked to prevent their accidental disruption.

* [fthe excavation is deeper than 20 feet, shoring plans must be designed and approved

by a registered civil engineer before digging.

* Inspect the area for hazards caused by moving ground.

* Do not enter the excavation each day until it has been inspected by a competentperson.

* Inspect the excavation after every rainstorm, earthquake, or other hazard-increasingevent.

* Locate spoil pile at least 3) feet from the edge of the excavation.

H A-MAKNAK HSPLWtC-AkPEND DOC C-1

Page 89: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* inspect the face. banks. and top of the excavation daily when workers are exposed to

failing or rolling material.

* In trenches 4-feet deep or more. provide quick exit facilities (a ladder) every 25 feet

or provide at least two exits for shorter trenches.

* Install crossings with standard guard rails and toeboards if overhead travel is

necessary.

* Use additional bracing when vibration from vehicular traffic, heavy equipment. or

external loads are a hazard.

* Erect barriers around excavations in remote work locations. Cover all wells. pits.

shafts, and caissons. Backfill temporary wells, pits. and shafts when work is

completed.

*Do not excavate beneath the level of adjacent foundations, retaining walls, or other

structures until a qualified person has determined that the work will not be

hazardous. Support undermined sidewalks and utilities.

*Shore. brace, or underpin structures when their stability is threatened. Inspect the

structures daily.

*Guard shafts more than 4-feet square with a lagging system made from proportionally

larger materials as determined by a registered safety engineer.

Vapor explosions, especially in confined spaces, can be fatal. Workers must be aware of

this danger and guard against carelessness at all times. Because the vapors of petroleum

products and gases such as hydrogen sulfide are heavier than air, their explosivity and

flammability hazard is increased. Vapors tend to concentrate near the ground. in low-

lying areas, and are not readily mixed or diluted with ambient air. When monitoring the

lower explosive limit (LEL), take measurements at ground level as the excavation isentered.

To prevent explosion and fire hazards, each team member must make sure that no spark

sources, such as lighters, matches, unapproved flashlights, are brought into the exclusion

zone. The Site Health and Safety Coordinator (SHSC) or the Project Health and SafetyI

Manager (PHSM) must inspect the exclusion zone for spark sources including wiring,

motors. etc., and must enforce the requirements for fire prevention, including intrinsically

safe electrical equipment, spark arresters on vehicles, and exclusion of unauthorized

personnel. Continuous explosimeter and oxygen (02) monitoring must be performed

during drilling, digging, and excavation activities.

H'AMAAKNAXHSPLAN\CAPEND DC: C -2

Page 90: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Fall Protection

Fall protection includes safety belts or harnesses. lanyards. and lifelines. The following

general provisions must be complied with:

* Employers shall provide employees with the necessary fall protection equipment and

with instructions and training for its use.

* At the time of hire and during safety meetings, each employee shall be made aware of

his/her obligation to use fail protection and associated equipment when the task

dictates. This policy will be strictly adhered to, and any employee not using safety

belts/harnesses and lanyards when required will be subject to immediate removal

from the project. Polic y statement to this effect shall be posted throughout the job

site.

* Fall protection shall be used only for employees' safeguarding. When any of these are

actually subject to in-service loading (as distinguished from static-load testing), they

shall be removed from service immediately and shall not be used again for employee

safeguarding.

* Fall protection equipment and associated hardware shall be inspected after each use

for wear and possible damage caused by use. Additionally, lifelines. safety

belts/harnesses, and lanyards and associated hardware kept in storage shall be

inspected periodically to ensure they have not been subject to damage, deterioration

caused by storage conditions, or other factors that may reduce their strength. An

inspection report shall be maintained on each fall protection equipment item to show

the date inspected, the condition of the equipment, the serial number for each safety

belt, the date the equipment was purchased, and the date the equipment was initially

put into service.

Safety Belts/Harnesses and Lanvards

The following are the requirements for using safety belts or harness and lanyards:

* Employees shall be secured by a safety belt/harness and lanyard if they are working at

heights of 6 feet or more above a surface and are not protected by fixed scaffolding,

guardrails, or safety nets.

* Special consideration should be given to the use of harnesses (in lieu of safety belts)

in conditions where a fail is likely and where extraction of a fallen worker could not

be immediate. Harnesses will provide better protection for the worker when a fall is

arrested and will allow additional "hang time' without the increased chance of

suffocation caused by waist (or body) belts.

H ,AMA",kKIiSPLAMC.APENDl DOC C-3

Page 91: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

•Body belts should not be used as the primary fail protection in high-risk fall areas and

must not be used without a shock absorber. Body belts should only be used for

positioning and where fall hazards are minimal: they must never be used when

immediate rescue is a problem.

•Safety belt/harness and lanyards shall be a minimum of 1/2-inch nylon or equivalent.

with maximum length allowing a fall of no greater than 6 feet. The lanyard shall have

a breaking strength of 5.400 pounds. All lanyvards used with safety belts must be

equipped with shock absorbers.

•All safety belts/harnesses and lanyard hardware shall be drop-forged or pressed steel.

cadmium plated. Surfaces shall be smooth and free of sharp edges.

•All safety belt and lanyard hardware, except rivets, shall be capable of withstanding a

tensile loading of 4.000 pounds without cracking, breaking, or becoming permanently

deformed.

L~ifelines

The following are the requirements for using lifelines:

* Lifelines shall be secured above the point of operation to an anchorage or structure

capable of supporting a minimum dead weight of 5,400 pounds.

* Lifelines used in areas where the lifeline may be subjected to cutting or abrasion shall

be a minimum of 7/8-inch wire-core manila rope. For all other lifeline applications, a

minimum of 3/4-inch manila rope or equivalent, with a minimum breaking strength of

5,400 pounds shall be used.

Hleat and Cold Stress

Heat and cold stress can be a hazanrd encountered during field work. Heat stress is

exacerbated when personal protective equipment is used. Physiological monitoring will

be conducted as described whenever ambient temperatures or wet bulb globe temperature

(WGBT) readings are greater than 86 degrees Fahrenheit (0 F). If PPE is worn,

monitoring will be initiated at 750 F (ambient or WBGT). Cold stress may require that

fieldwork be discontinued. Windchill factors and ambient temperatures must be

considered. Temperatures may be moderated by providing temporary shelters

(enclosures) and portable heaters. Additional guidance is given in SOP 7.1 of the JacobsEH&S Manual.

Workers Without Sermiermeable Clothing

H AMAXNAKRSPL&MAP .AEND DOC C-4

Page 92: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Workers w~ho are not required to w~ear semipermeable clothing such as Tvvek suits should

follow the W%'BGT guidelines outlined in the follow~ing table:

N AMAILNAXEkSPLAKC.APEND DOC C-5

Page 93: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

WORK-REST REGIMEN

Wet Bulb Globe Temperature in Which Various Workloads Are Performed

WORK-REST REGIMEN LIGHT 2 MODERATE 3 HEAVY 4

Continuous work permitted 860 F (3O.0' C) 80' F (26.7' C) 770 F (25.00 C)

75% work25% rest, each hour 3 70 F (3O0.60 C) 820 F (28.00 C) 730 F (25.90 C) *50% work

50% rest, each hour 890 F (3 1.40 C) 350 F (29.40 C) 8200F (27.90 C)

25% work *75% rest. each hour 900 F (32.20 C) 380 F (31.10 C) 860OF (30.00 C)

IAdapted from "Permissible Heat Exposure Threshold Limit Values" inThreshold Limit Values and Biological Exposure Indices for 1993-1994.American Conference of Governmental Industrial Hygienists. Cincinnati,Ohio. 1990. page 83.

2 Light work (up to 200 thousand [K] calories per hour [callhr] or 800 Britishthermal units per hour [Btu/hr]): e.g., sitting or standing to control machines,performing light hand or arn work.

3 Moderate work (200 to 300 Kcallhr or 300 to 1,400 Btu/hr): e.g., walkingabout with moderate lifting and pushing.

4 Heavy work (350 to 500 Kcal/hr or 1,400 to 2,000 Btu/hr): e.g., pick andshovel working.

C = degrees CelsiusF = degrees Fahrenheit

Workers with Semipermeable Clothing

Workers who are required to wear semipermeable clothing should use physiologicalmonitoring to determine the length of permitted work activities. The frequency ofmonitoring is based on the adjusted air temperature (ta adj.) as illustrated below.Calculate the ta adj. by using this equation: ta adj ' F = ta.0 F + (1 3 x percent sunshine).Measure air temperature (ta) with a standard mercury-in-glass thermometer, with the bulbshielded from radiant heat. Estimate percent sunshine by judging what percent of thetime the sun is not covered by clouds that are thick enough to produce a shadow (100percent sunshine = no cloud cover and a sharp, distinct shadow; 0 percent sunshine =no

shadows).

H AMAXNAKIISPLANC-APENDDOC C-6

Page 94: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

4DJRSTED TENIPER.ATLRE NORMAL VWORK ENSEMBLE IMIPERMIEABLE ENSEMBLE

900 F i32.2' C) or above \fter each 45 minutes of work After each 15~ minutes of work

37 5'- 90 F (30 80-32 2' C) \fter each 60 minutes of work After each 30 minutes of work

82.50- 87 5' F (28 to-30 8' C) After eacn 90 minutes of work Xfter each 60 minutes of work

-75'. 82 5' F (25.3'-28 I' C) \fter eacin 2 0 minutes of work After eacn 90 minutes of work

~2 5'- 77 5' F (22.50-25 3' C) -\fter each 1 50 minutes of work After each 120 minutes of work

Source: L; S. Department of Health and Human Services. Occupational Sa/ety and Health Guidance

Manual for Hazardous Waste Site Activities 1985 (October). Prepared by National Institute for

Occupational Safety and Health (NLOSH-). Occupational Safety and Health Administration

(OSH-A). U.S Coast Guard, and U.S Environmental Protection Agency (EPA) pages 8-22.

The actual length of the work-rest cycle is based on the results of physiological

monitoring, including pulse and body temperature. Body temperature can be taken with

an oral or tympanic (ear) thermometer. The tympanic thermometer is recommended

because the instrument gives an accurate result in less than one second.

Pulse Rate Criteria

Take resting radial (wrist) pulse at start of work day; record it. Measure radial pulse rate

for 3 0 seconds as each rest period begins. The pulse rate should not exceed I110 beats per

minute (bpm), or 20 bpm higher than the resting pulse rate. If the pulse rate exceeds this

criterion, reduce the workload and/or shorten the work cycle by one third, and observe for

signs of heat stress. No team member shall return to work until his or her pulse rate has

returned to less than 1 10 bpm. or 20 bpm above resting pulse.

Oral Tempierature

Use a tympanic thermometer (one second in the ear) or clinical thermometer (three

minutes under the tongue) or similar device to measure the body temperature at the end of

the work period (before drinking). The action required depends on the worker'stemperature, as follows:

* If body temperature exceeds 99.60 F (37.60 C), shorten the next work cycle by onethird without changing the rest period.

* If body temperature still exceeds 99.60 F (37.6' C) at the beginning of the next rest

period. shorten the following work cycle by one third.

* Do not permit a worker to wear a semipermeable garment when his or her body

temperature exceeds 100.60 F (-38.1'- C).

KAMM.NAKJESPLANCtAPEND DOC ~ C-7

Page 95: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Phvtooeca moitrig hitl be documented usn the formpoie nApni H.

Symptoms and Treatment of Heat and Cold Stress

Table C-I presents symptoms and treatment of heat and cold stress.

Noise

The main sources of noise for this project are industrial operations, vehicles, concrete

cutters. generators. Hearing protection must be worn in areas where noise levels are at

the permissible exposure limit (PEL) of 85 decibels (dBA) or greater. Hearing protection1

is required when, at 3 feet apart in normal conversation, voices must be raised to be

heard. A Type II sound-level hieter should be used to measure site noise to verify sound

levels and determine the need for hearing protection. Hearing protection should bespecified by the PHSM or SHSC based on measured levels at the~site.

Precariously Positioned Objects

Field personnel shall become familiar with the general area and the potential physical

hazards associated with debris or objects (e.g., drums, boards) that may be piled or

scattered around the site. If objects are stacked in an unsafe manner, the PHSM shallnotify the client site contact. Field activities shall not begin until station personnelremove or safely restack the objects.

Utility Lines

Utility lines both aboveground and belowground may pose a hazard to team members

during field activities. Personnel must maintain a safe clearance (at least 15 feet) from

overhead utility lines at all times. The locations of utility lines must be determinedbefore excavating, digging, or drilling. No drilling or excavating is to take place without

locating and identifying underground utility lines. Jacobs' SOP 7.7 (EH&S Manual)

shall be strictly followed,.

Walking and Working in Open Terrain

Field personnel shall become familiar with the general terrain of the site and potential

physical hazards (evaporation ponds. uneven terrain, etc.) that would be associated with

accidental slips, trips, and/or falls.

H:AMAKNAXKHSPLNC-APEND DOC C-8

Page 96: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Table C-I S~mptoms and Treatment of Head and Cold Stress

H AM4XNAK1iSPLA~C-APEND DOC C-9

Page 97: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

•The period immediately after medium and heavy rainfall is particularly susceptible to

earth movement and slides, so be attentive to the area immediately in front of you. It

is possible that wells, pits. holes. or similar hazards may be partially covered or

visually obstructed. '* Be cautious around soil or terrain that may have been recently disturbed, relocated.

or otherwise made less stable. -* Avoid the top edges of drop-off areas. whether they have been disturbed or not.

* Travel on open terrain in the company of another person.

Confined Space Entry Procedures

Jacobs' SOP 8.6 (Corp~orate Safety Manual) shall be followed. This procedure is

summarized below:

* Properly fill out, date. post. and sign a confined space/vessel entry permit beforeentering a confined space. This permit is valid only for one shift for the specifiedwork location and period indicated on the permit.

* Monitor air continuously with an oxygen meter, explosimeter, and hydrogen sulfideand/or carbon monoxide meter during entry. Before entering the confined space.

lower the measuring probe or the meter into the space to monitor the concentrations

from top to bottom of the confined space. If the meter readout cannot be seen from

the top of the confined space. use an instrument that is capable of sounding an alarm 1at concentration(s) considered hazardous.

* At least three people are required during confined space entry:

- the person entering the confined space;

- a stand-by attendant who is observing the person in the confined space at all

times;

- a person the attendant can notify if an emergency occurs. This person must be

close enough to hear the attendant calling for assistance.

* if the PHSM or SHSC determines that the confined space requires venting, blow airinto the space.

H AMAKNAXXHSPLANC-APENDl DOC 0.10

Page 98: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* If required to w~ear a lifeline and safety harness (five-point-attached at the back) to

enter the confined space. attach the lifeline to a tripod or similar method for removal

of personnel in case of an emergency.

* Obtain additional lighting if conditions require it.

* Determine that any necessary electrical connections are in proper working order and

properly grounded* Physically blank or lock out of service all piping and electrical systems associated

with a confined space (e.g., tank or vessel).

Tagging Defective Tools, Materials, or Equipment

Do not use defective tools, materials, and equipment that could affect personnel safety or

the environment. When a defective tool, material, or piece of equipment is found. take it

out of service immediately by tagging. destroying, or removing it from the project.

Danger tags shall be dated, sequentially numbered, and signed by the supervisor. A

defective equipment log shall be maintained.

Housekeeping

Jacobs' management will strictly enforce housekeeping. Poor housekeeping is a sign of

a poorly managed project and is the root of many safety problems. Safely store all

material, scrap, tools and toolboxes, and other equipment in a neat and orderly fashion.

Remove trash and scrap from the work area on a regular basis (i.e.. at least daily before

the end of each work shift) and never allow it to accumulate, especially in walkways.

under stairs. at the bases and landings of stairs and ladders, and near flammable

substances.

Housekeeping will receive a major emphasis during daily and weekly contractor

inspections. If the contractor determines that housekeeping has become a problem, the

contractor reserves the right to stop work and require a cleanup before work resumes.

Illumination

Adequate lighting is extremely important for the safe execution of work. The minimum

illumination intensity shall be 5 foot-candles in all active work areas and accessways. In

specified areas outlined in the OSHA standard. 29 CFR 1926.56, the required intensity

ranges as high as 20 foot-candles. Lighting intensity will be surveyed during the regular

contractor job site inspections.

H IAMAKNAK HSPLA~rCEADDO C-1Il

Page 99: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

1LI

i

xi

I

Li

III

H AMAKNAJC IISPLANYC4PEND DCC (J4 2~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 100: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Slip, Trip, and Fall Hazards

Falls as a result of slipping or tripping are the most common formn of injury on

construction sites. These injuries are a result of poor housekeeping. lack of attention todetail, or carelessness.

Clean up or eliminate slipping hazards such as grease. oil, water, ice. snow. or otherliquids or eliminated on wkalkways, ladders, scaffolds, or other accesswavs or workingareas. If slipping hazards cannot be eliminated completely, barricade the area and postapplicable hazard notices.

Keep the construction site. especially roadways. accessways, aisles, stairways, scaffolds.and ladders, clean and clear of hoses, extension cords, welding leads, and otherobstructions that may cause tripping or other accident hazads. If tripping hazards cannotbe eliminated completely, the barricade the area and post applicable hazard notices.

Fire Protection and Prevention

Take all necessary and appropriate precautions to prevent fires. Ensure that sufficientwater and firefighting equipment is available at all times to control fires as specifiedbelow. Equip all heavy equipment with 5-pound dry-chemical fire extinguishers ratedA:B:C. Locate a 10-pound dry-chemical fire extinguisher rated A:B:C in all trailers inaccordance with the National Fire Protection Association (NFPA) 10 Standard. Provide a20-pound fire extinguisher rated A:B:C within 50 feet. but no closer than 25 feet, of allfueling operations and flammable storage areas.

Mount all fire extinguishers on walls or stands with a red background. Mount fireextinguishers with the top greater than 3 feet or less than 5 feet above the floor. Keepaccess routes to fire extinguishers clear at all times. All fire extinguishers shall beinspected monthly, annually, and every six years in accordance with the NFPA 10Standard on fire extinguisher inspections.

Open burning of trash and debris is not permitted. If there is a danger of accidental fire,e.g., during cutting or welding operations, designate a person as fire watch, solely to thiseffort during that operation; the designee shall continue this duty for 30 minutes after theoperation is completed.

internal combustion engines are not permitted to be operated in buildings unlessauthorized by the contractor. Turn off engines during refueling. Carefully monitorstorage of flammable fuels. All fuel storage areas and storage tanks must have writtenapproval by the contractor. Mark and label fuel tanks to meet the requirements of OSHA29 CFR 1926.59. The PHSM must inspect all heating devices and their locations beforeuse. Fueling areas and tanks shall comply with all applicable NiFPA and OSHArequirements.

H AMAJ,-bAK HSPLANC-APEND DOC C-13

Page 101: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Store flammable or combustible liquid in compliance with NFPA 30 and

OSHA 1926.152. All fuel cans, such as 5-gallon gas cans, shall be free of deformities

and constructed of metal, with self-closing lids and flame arresters. Label fuel cans with -

their contents. Fuel all equipment through funnels or spouts to prevent spills.

Material Handling and Storage

Store all new material on dunnage. Store and secure all matenial. as necessary, to prevent

blowing, falling, sliding, or collapsing. Debris and scrap material need not be stored on

dunnage if the material will not be moved with rigging and can be maintained in a stable

manner. Jacobs and all subcontractors shall ensure that material is stored properly to

prevent scattering or lost equipment.

Keep walkways and aisles clear at all times, and keep laydlown areas neat and orderly.

Store material on level ground, and identify the boundaries of laydlown areas. Do not

store material within 6 feet of hoistways or floor openings, or within 10 feet of roof

edges. Wedge poles. pipe, and other stock that may roll to prevent spreading and rolling.

Remove nails from lumber that is to be reused. Bend back nails in scrap lumber that will

not be rehandled.

Do not lean material, tools, or equipment against other objects or wails unless they are

secured from movement. Use proper lifting techniques and gloves to move material by

hand. Label safe working load limits on all temporary elevated floors or platforms and do

not exceed these limits.

Tools

Keep all tools in good condition and store them properly. Do not alter tools; use them

only for their intended purposes. Do not remove guards from tools, and ensure all nip

points, open drums, and fly wheels are guarded. Inspect all tools before use, paying

special attention to power cords and the condition of teeth. If a power cord has been

repaired more than once, tag the tool defective, and do not use it until a new power cord

is installed. Submit drawings of job-built jigs and tools to the contractor. Owners'

manuals shall be available to the contractor upon request, and subcontractor personnel

shall be trained in the safe operation of all tools used.

Power tools shall be equipped with constant pressure switches that will shut the tool off

when the swntch is released. All power tools and electrical equipment shall be double

insulated or be equipped with ground plugs.

H AMAKNAK HSPLAC-APEND DOC C-I14

Page 102: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Employees using powder-actuated tools shall be certified and have on their person a card

stating' such. The loads for powder-actuated tools shall be kept in a locked red box

labeled "EXPLOSIVES." kxhich shall be kept in a locked area with restricted access.

Secure all bench-mounted and floor-mounted tools. Set up and operate bench-mounted

grinders in accordance with 29 CFR 1926.303). Tools equipped with handles shall have

the handles installed. Replace cracked, splintered, or taped wooden handles. Cheater

bars are not permitted. Determine that impact tools are free of mushroomed heads and

cracks before use. Workbenches and sawhorses shall be provided when needed.

Torch/Plasma Arc Cutting, Welding, and Open Flame Requirements

The Site Manager shall identify the need to conduct cutting, burning, or open flame work.

When the need has been identified, the contractor supervisor shall complete

CuttingJWelding/Open Flame Permit and submit it to the Site Manager for review.

At a minimum, Fire prevention equipment shall consist of one 10-pound. dry-chemical

extinguisher rated A:B:C. A live water line meeting the requirements of OSHA

29 CFR 1926.150 or a water pump extinguisher may be used as a supplement to the dry

chemical extinguisher. Barricade and post the work area; inspect the equipment and

identify the exits.

Post the approved permit in the work area. Inspect adjoining work areas and notify

workers in the immediate vicinity.

After completing the above requirements and the precautionary items addressed in the

.permit. begin work. If the permit is issued for more than one day, the subcontractor

supervisor shall complete a daily safety checklist.

After completing the work, return the permit and checklist to the contractor Site Manager.

Torch/plasma arc cutting or welding on galvanized steel, stainless steel, or nonferrous

metals is not be permitted unless half-face or fuall-face air purifying respirators with high-

efficiency particulate air (HEPA) cartridges or equivalent engineering controls (local

exhaust with HEPA filtration) are provided. Full-face respirators with HEPA cartridges

are required during torch cutting on radiologically contaminated metals and metal with

lead or cadmium-bearing coatings.

Do not use torch/plasma arc cutting on wood, synthetic materials, rubber-lined pipe and

vessels, or on any process piping, tanks. vessels or equipment containing significant

radioactive material product residues unless approved by the contractor.

Control any torch/plasmra arc-cutting operation that may expose workers to contaminants

in excess of the action level, without regard to the use of respirators. by using local

H vAKkKAKI-ISPLANT~AFEND DOzC C-I5

Page 103: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

exhaust \entilation in conjunction with a high-efficiency particulate collection s~,stem. If

gaseous or vapor exposure Limits are exceeded. use respirators with appropriate

cartridges.

Secure compressed gas cylinders in an upright position at all times. Break down burning

rigs at the end of each shift. Store fuel gas hoses in a ventilated area (never in gang

boxes). Do not take compressed fuel gas cylinders into confined spaces. Store all other *rigs in accordance with OSHA standards. Remove empty cylinders at the end of each

shift. Equip burning rigs with backflow preventers at the torch end of each hose.

If there is the potential for accidental fire during burning or welding operations. establish

a fire watch who shall continue the watch until 30 minutes after the work has been

completed. When there is possibility of injury during burning or welding operations.

install overhead burning signs and welding blinds. Ensure that a 10-pound dry-chemical

fire extinguisher rated A:B:C is readily available when operating a burning or welding

rig.

'Fully install welding leads, including lugs, on the welder and lead connections, at all

times. Remove damaged leads and dry-rotted fuel hoses from service.

The subcontractor shall notify the contractor if any welding or burning is to be done from

a suspended platform. The subcontractor shall be required to comply with contractor

requirements during such operations. Requirements may include the use of multiple fire

watches, covering flammnable/combustible materials below the work platform, or other

safety measures.

Lockout/Tagout/ry of Energy Sources

The subcontractor is required to follow the lockout/tagout/try procedures described in this

section during all operations where stored energy such as mechanical energy, electricity,

steam, or material in pipelines may be present.

Lockout procedures provide a method for equipment status control to protect personnel

from injury or exposure to hazardous materials, protect equipment from damage, prevent

unauthorized environmental discharge, and maintain the operability of station systems.

The procedure verifies that equipment and/or facilities are dc-energized, inoperable, and

safe to repair, alter, clean, inspect, or disassemble, and that no injury or property damage

occurs as a result of inadvertent operation.

Definitions

Affected Employee An employee who performs his or her duties in an areawhere the energy control. lockout/tagout procedure is

implemented. An affected employee does not perform

H AMALQNAKiHSPLAN\CAPENfl DOC C- 16

Page 104: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

servicinQ or maintenance on the locked out equipment. 'but

may operate the equipment during routine operations. Theaffected employee is nor responsible for implementing thisprocedure.

Authorized Employee A subcontractor or contractor employee who servicesandlor maintains locked out machines and equipment orwho locks out machines and equipment for administrative

reasons. The authorized employee initiates and implements

the lockout/tagout activities.

Competent Person A subcontractor or contractor employee who is capable. bytraining and experience, of identifying existing and

predictable hazards in the surroundings or workingconditions and is authorized to take prompt. correctivemeasures to eliminate them.

Energy Source Any source that generates, or conduit that carries. electricalor potential energy; hydraulic, pneumatic. hazardous liquidor gases, or steam pressure; vacuum, high temperature;cryogenic temperature; stored mechanical or electricalenergy, or any other hazardous source that could cause

harm to personnel, equipment, or the environment.

Energy Isolating Device A mechanical device that prevents energization ofequipment or the transmission or release of energy. Thisincludes, but is not limited to, a manually operatedelectrical circuit breaker: a disconnect with a manuallyoperated switch. skip blind, blind flange, block valve: or asimilar device with visible indication of integrity of the

energy-isolating barrier. (Push buttons, selector switches,control devices, and check valves are not energy-isolatingdevices.)

Incident Report A written account concerning operational. safety. orenvironmental practices that are not in accordance withJacobs' procedures.

Lockout/Tagout The placement of a single lockout device and lockout tagon the energy-isolating device of a piece of equipment inaccordance with an established procedure. so that theenergy-isolating device and the controlled equipmentcannot be operated until the lockout device is removed.

Lockout Device A device used with a positive means, such as a lock, to hold

H AMAXNAK JISPLA~[C-APEND DOC C-1 7

Page 105: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

arn enerizy-isoiatinQ device in the safe position. therebypreventing the energizing of equipment and thetransmission or release of energy. When used with a lock.hasps. chains, valve handle covers, and other devices maybe treated as lockout devices. The lockout device shall bestandardized for the application and able to withstand theenvironment to which it will be exposed. considering time.weather conditions. and chemical environment. It shall besubstantial enough to prevent removal without excessiveforce or unusual techniques such as the use of bolt cutters

or metal cutting tools. The locks used for and during alockout shall be uniquely numbered and keyed with a five-tumbler design and have the authorized employee's lockouttag affixed.

NOTE: Locks that are keyed alike shall not be used forjlockout/tagout. Lockout/tagout locks shall not be usedfor any other purpose.

Lockout Tag The tag shall be standardized (i.e., color, shape, size, andlettering format), made of a material that will withstand all

environmental conditions, and shall be substantial enoughto prevent inadvertent or accidental removal. The tag shallbe printed with the words "Danger, Do Not Operate." andshall be attached to the lockout device with a nylon cabletie that is self-locking, not reusable, and has a minimumunlocking strength of 50 pounds. The tag shall indicate:

* authorized employee'sprnenaendsgtu;* date of lockout-, rne nm n sgaue* subcontractor performing the lockout; and* brief but complete description of the energy source or

sources being locked out (i.e., lockout electricaldisconnect for Pump 1).

Lockoutfl'agout/Try The form that must be completed by the authorizedPermit employee and signed by a lockout supervisor and Site

Manag er before obtaining lockout devices and lockout tags.

Multiple The placement of lockout devices and lockout tags on anLockout/Tagout energy-isolating device or piece of equipment by two or

more controlling parties (i.e., the authorized employee andthe competent person), so that the energy-isolating device

HAmALNAK J{SPLASC CAPEND.DOC C-18

Page 106: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

and the equipment controlled cannot be operated until ailllockout dev ices and tags have been removed.

No Fault Lockout A form that must be completed by anyone requesting

Removal Form removal' of a Lockout/Tagout when the authorizedLockoutvTagout employee is offsite due to illness, injury,or personal emergency. The requestor must obtain written

contractor management approval of the requested NoFault lockout removal form.

Try The physical verification that all breakers, valves, or otherdevices are correctly locked and tagged and that all energy

sources have been isolated after a lockout device has beenapplied. Verification is trying to operate the system toensure that the intended components are dc-energized andisolated. The 'try" test shall include an attempt to activatethe systemn with lockout devices in place. if possible.

Resosblte

The authorized employee shall be responsible for:

* identifying energy-isolating devices requiring lockout/tagout;

* initiating the LockoutiTagout Permit:

* Filling out the required information on the lockout tag;

* applying the first lockout device and tag to all energy-isolating devices requiring

lockout/tagout;

* witnessing a "try;" and

* removing the applied lockout device and tag from all energy-isolating devices that

were locked out, after completion of the work, and removing all other lockout

devices and tags after verifying that the system is repaired and safe to energize.

The competent person shall be responsible for:

* verifying that the energy-isolating devices requiring lockout/tagout have been

identified during a multiple lockoutltagout;

H AMAXNAX JISPLAN C.A.PEND DOC C-1 9

Page 107: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* applvina the lockout device and tag to all energy-isolating devices during a multiple

oc kout/tagout:

* performing a "try;" and

* after completing the work, removing the lockout device and tag from all energy-isolating devices that were locked out during a multiple lockoutltagout. only afterverifying the system is ready to energize.

The Site Manager shall be responsible for:

* coordinating between the contractor and subcontractors to verify a safe

lockout/tagout, anid

* reviewing the Lockout/Tagout Permit, relevant Task-Specific Safety Assessments(TaSSAs) or Safe Work Plans, maintenance work orders, testing plans. and/orprocedures before allowing a lockout/tagout to proceed.

All subcontractor personnel that will perform lockout/tagouts; shall attend the contractor'straining, which is available upon request. The training is approximately four hours.

Prevarin2 for Shutdown3

The authorized employee shall determine all necessary lockout points and complete the

LockoutlTagout/Try Permit before the contractor will issue lockout devices and tags.

The Site Manager will review the permit, TaSSA or Safe Work Plan, and test plans or

procedures before lockout conditions are permitted.

The authorized employee shall keep a copy of the original permit at all times during thelockout period. The contractor will retain the original permit.

The authorized employee shall complete the lockout tags and sign for the lockout devicesin the contractor's Lockout./Tagout Log Book.

The lockout device shall be under the exclusive control of the authorized employee or

employees performing the work.

The authorized employee shall notify all affected employees of an energy lockout beforeapplying the lockout.

Aoa)[ving and "Trying' Lockout/Tagout Device

H ~AMAJONAX ESPLAWC-APlNfl DOC C-20

Page 108: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Before applying a lockouvtagout. the machine or equipment shall be shut down using

normal operating procedures.

If lockout'tagout is required to perform maintenance on a piece of equipment that is in a

pipelin& containing hazardous or nonhazardous materials, the pipeline and equipment

shall be valved off: the lockout devices and tags applied: and the pipeline drained before'

beginning work. Equivalent isolation procedures such as the use of blind flanges or

double block and bleed systems may be used, subject to contractor approval.

The authorized employee shall to the following:

* De-energize the appropriate energy sources.

* Place individual lockout devices and lockout tags at all energy sources that could

possibly energize the system.

* Verify the lockout by 'trying' the system.

If more than one subcontractor is involved in a lockout, the authonized employees of

other subcontractors shall attach their locks and tags to the energy-isolating and/or

lockout device.

When maintenance and/or construction is required on an existing electrical distribution

system for the water treatment plants or other facilities or equipment, the authonized

employee shall receive technical assistance from the site electrical subcontractor before

installing or removing a lockout. The site electrical subcontractor shall be considered a

".competent person" to determine and advise the status and the effect of the lockout on

interconnected systems. Before performing "hands on" testing or work relative to an

electrical distribution system lockout, the site electrical subcontractor shall prepare a

TaSSA.

When electrical work is actively under construction, repair, or maintenance by an

electrical subcontractor, the electrical Subcontractor performing the work shall be

considered the "authorized employee" and the "competent person."

Removing Lockout Devices and Taizs

Before energy is reinstated, the authorized employee shall do the following:

* Immediately notify all affected employees before removing locks and tags and

energizing equipment.

* Inspect the area to verify that nonessential items (tools, etc.) have been removed.

H AMAKNAKMSPI.ANtCAPENDtDOC C-21

Page 109: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Inspect the equipment to verifv that all components (machine guards. safety devices.etc.) are in place and capable of operating properly.

* Check the area to verify that all affected employees are safely positioned or out ofthe area.

* Remove lockout devices and tags from each energy-isolating device.

NOTE: Lockout devices and tags shall be removed ONLY by the person whoapplied them, except as noted herein.

* Replace equipment/system tags or labels that were removed or disturbed during the

lockout.

* Return all lockout devices and tags along with the copy of the Lockout Permit to thecontractor.

* Notify all affected employees that the energy lockout has been terminated.j

When the above steps have been completed, the authorized employee shall energize the

appropriate energy sources.I

Multiple LockoutlTagoutI

A multiple lockout/tagout shall be used under the following circumstances:

* Hazardous materials could be introduced into the system accidentally. Thisdetermination, will be made on a case-by-case basis by a competent person.

* A complicated situation exists where more than one energy source is to be locked out(e.g., a piping system including pumps, valves, pneumatic and electricalinstrumentation, all of which require separate lockout devices and/or energy-isolatingdevices).

* When the contractor directs it.

When a multiple lockout/tagout is required, a lock and tag shall be placed on the energy-isolating device by a competent person who shall do as follows:

* Obtain lock and lockout tag after completing a lockoutltagout permit.

* Verify independently, by a hands-on physical check, that the authorized employee,has placed lockout devices and tags at all points that could possibly energize the

system.

H: AMAKNAKXHSPLQAC-APEND DOC C-22

Page 110: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Place individual lockout devices and lockout tags at the points that have been

verified for the lockout.

• Veri'v the lockout by 'trying" the system.

• Remove lockout devices and tags in accordance with the procedure above, but only

after verifying that maintenance or repair is complete and the system is safe to

energize.

Tagout Only

If a lockout device cannot be installed on an energy or potential hazard source, a lockout

tag shall be used and considered a valid lockout. The lockout tag shall be countersignedby the contractor who may require additional safeguards as deemed necessary on a case-

by-case basis.

Testing During Lockout

When a system must be tested during a lockout, the authorized employee shall take the

following steps:

* Notify the contractor, who will then issue a testing tag.

* Make an entry on the log/permit.

* Complete the information required on the testing tag.

* Remove the original lockout tag and replace with the testing tag.

* Notify affected employees that the system will be energized for testing.

* Remove the lockout devices.

* Energize and proceed with testing.

* Dc-energize all systems after testing.

* Reapply lockoutltagout devices as required using the original lockout tag or by

acquiring another lockout tag from the contractor.

Unauthorized Removal of LockoutlTauout Device

H AMAKNAK JiSPLP C.APEND DMC C-23

Page 111: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Akn employee v~ho removes another employee's lockout/tagout device (except as

authorized below) shall be subject to disciplinary action. Disciplinary action may include

dismissal.

In the case of a single or multiple lockout, if the authorized employee or competent

person is not available to remove the tockout/tagout device, the subcontractor must obtainwritten contractor management authorization for removal. A no-fault rem~ovai form shall

be used whenever the authorized employee is unavailable to remove the' lockout. Thissection only applies under the following circumstances:

* The authorized employee is offisite due to an illness/injury.

* The authorized employee is offsite due to a personal emergency.

This section does not apply in the following instances:

* The employee is terminated.

* The employee knew he or she would be offisite and was aware of the need to removethe lockout'.

All sections of the no-fault removal form must be completed before removing thelockout.

If a key is lost or misplaced, the above requirements shall apply. The lock will be

destroyed so that it cannot be used in future lockouts.

If a lockout device is found unlocked and unattended, any employee shall immediately

report the finding to the contractor.

Lockout/Taizout During Shift Change

Affected employees shall be advised of all lockouts at shift turnover.

During shift or personnel changes, the following shall apply to verify con tinuity of

lockout or tagout protection when continued maintenance, repair, or testing will beperformed on equipment.

The offgoing authorized employee and the oncoming employee who will replace the

authorized employee must meet and confer on the operation. This meeting shall include,but not be limited to:

* the fuill scope of the work being performed;

H:,AMAKNAK\,HSPLAN\C-APEND DC: C-24

Page 112: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

• a walk-through of the equipment or system being worked on and status of work

progress: and

• the location of all lockout and tagout devices under the authorized employee's

control.

After this orientation, the offgoing authorized employee shall turn over the lockout device

key or keys to the oncoming employee who shall then be the authorized employee.

Both employees shall fill out the permit with name, time, and date, indicating that the

original authorized employee is turning over custody and control of lockout devices to the

new oncoming authorized employee.

A new lockout tag shall be attached to the lockout device by the oncoming authonized

employee and the old tag returned to the contractor.

If a multiple lockout will be removed during a back shift, (i.e., a work shift other than the

day shift), the competent person and/or authorized employee or employees shall designate

alternates and the above procedure is to be followed.

If two noncontiguous shifts occur, the authorized employee shall turn over his key to the

Site Manager, who shall assume key responsibility.

If multiple keys will be turned over during a shift change, a shift lockout box may i be

used. After all keys are placed in the box, a lock and tag shall be placed on the box hasp

by the Site Manager after completing a Lockout/Tagout Permit, and the box shall be

controlled by the Site Manager. When using a shift lockout box, the Site Manager shall

become the authorized employee without changing each individual tag in the field. The

single lockout box tag shall govern.

Periodic Inspection

Lockout/tagout holders s hall inspect the energy isolation devices once each shift to verify'

that the locks and tags are in good order.

Shift/crew supervisors shall inspect energy isolation devices once each day to verify' that

the procedure is being followed and shall interview personnel working under the lockout

to confirm their familiarity with the procedure and the related responsibilities. This

inspection shall be documented in the subcontractor's daily log.

Electrical

Work on energized circuits will not be permitted at the site.

H nAj~,NAj('JispLAJVC.APEND DOC: C-25

Page 113: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Ground fault circuit interrupters (GFCIs) will be required at all times. Lighting must be

hooked up to a GFCL unless the electrical connections are different from all other

electrical hookups and cannot be mistakenly exchanged.

Electrical panels. boxes. etc.. with open knockouts through which no service has been

installed must be covered. Electrical cords and equipment shall not be hung or tied to

steel or hung with wire unless a nonconductive material is used to insulate the cord from ~

the metal. Plastic-coated wire shall not be used to hang electrical cords. All lights must

be equipped with protective, nonconductive covers, and all light bulbs in light stringers

must be shatterproof. Cords that pass through doorways or holes or are exposed to

vehicle traffic shall be protected from damage. Flexible electrical cords shall not be

spliced or have insulation repaired with tape. Only SO-type cords or equivalent shall be

used for light stningers.

Label all breaker boxes, electrical receptacles, and feed lines to identify the 'from" and

"to" circuits. Provide all breaker boxes and disconnects with unobstructed access 36

inches in front of the unit. Label all 480-volt lines labeled clearly. When passing cordsover or through walkways, string electrical cords at least 7 feet above the walking

surface. The subcontractor shall comply with codes in the current NFPA and NationalElectric Codes (NEC).

Ladders

Inspect all ladders before use and store them on dunnage or ladder racks. Do not leavetools and materials on top platforms of unattended ladders. Never store material on]ladders. Label all ladders with legible manufacturer's instructions and warning labels.Do not paint ladders except for identification marks.

Use only type IA ladders that are wooden or have fiberglass siderails with metal rungs.

Keep the bases and landings of all ladders clear of obstacles. Do not use stepladders as

straight ladders, or separate extension ladders for use. Be sure that all ladders areequipped with skid-resistant feet. If a ladder is used in a doorway, the doorway must bebarricaded. Do not use ladders in lieu of elevated work platforms.

Never carry material when climbing ladders, or throw tools or equipment to or from

personnel on ladders. Always use handlines to hoist material. Do not climb to the topstep or top platform of any ladder. When in use, hold or secure ladders by tying them off.When working on ladders do not straddle the ladder or overreach so that the body is no

longer between the siderails.

Job-built ladders shall be inspected by a competent person and shall meet the OSHAstandard. In addition, all job-built lad'ders shall have a furring strip attached over thefiller block and rung.

WAMAKNAX4{SPLANC.APENfl DO: C -26

Page 114: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Scaffolding

Scaffolding shall be erected and used according to the most stringent interpretation of the

applicable safety regulations. Only heavy-duty (75 pounds per square foot [pst])

scaffolds will be permitted. A competent person shall erect and inspect all scaffolding.

Samples of the Stationary Scaffolding Inspection Checklist and Roiling Tower Inspection

Checklist are provided. All scaffolding shall be built as completely as possible. This

means all decks must be complete (e.g., if a handrail can be installed, it must be installed.

and the scaffold must have ladder access and gates).

If a chain or slide bar is used as a gate, a landing between the ladder and the gate shall be

erected so that personnel can leave the ladder safely before unchaining the gate or moving

the slide bar. All scaffolds shall be equipped with handrails (if possible), regardless, of

the height of the scaffold. If personnel are required to work under or pass under a

scaffold, the area between the guardrail and toeboard shall be screened with No. 18-gauge

0.5-inch mesh wire or equivalent.

Use aluminum scaffold boards whenever possible. Do not notch or nail scaffold boards,

or use them as bearers or on the ground as walkways. Cleat and tie scaffold boards with

No. 9-gauge wire to prevent displacement. Place scaffold boards together tightly, with a

maximum space of 0.25 inch between the planking and toeboard. Crawling boards and

chicken ladders are prohibited.

The subcontractor shall submit to the contractor a tagging and inspection system for

scaffolds and other elevated work platforms. This system shall include the method of

determining if scaffolding is under construction or unsafe, requires a safety harness, or is

approved for use. It shall also include the date on which the scaffolding was last

inspected and the name of the inspector. The subcontractor may elect to use the

contractor's procedure, Scaffold Inspection Tagging, by indicating this intention in

writing to the contractor. A copy of the procedure will then be provided by the

contractor. All scaffolds shall be equipped with legs and base plates and shall be placed

on mud sills.

Pants from scaffolds made by different manufacturers shall not be interchanged. Welded

frame scaffolding shall not be repaired or altered. Anti-sway bans shall be installed on

all rolling scaffolds; only welded frame scaffolds may be used as rolling scaffolds. Do

not ride on rolling scaffolds.

All scaffolds must be plumb and tied off every 15 feet or three times the minimum base

dimension, whichever is the most conservative. Place scaffolding without handrails no

more than 4 inches from a wall. Submit drawings of all two-point suspended scaffolds

and needle beam scaffolds to the contractor before erecting such scaffolding.

H ~AMAKNAK ISPLAN'C-APEND DOC C-27

Page 115: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

All scaffolding higher than 50 feet. as measured from the base plate. shall be designed by

a registered professional engineer. Such designs shall be submitted to the contractor for

review and approval.

Power-Driven Staging and Platforms

All equipment discussed in this section must be inspected by before initial use and by the

subcontractor prior to every use. In addition, a documented inspection by a competent

person must be conducted quarterly.

All operators of power-driven staging and platforms shall be trained in their use, and the

training records shall be submitted to the contractor. Owners' manuals and drawings of

connection methods for all such equipment shall also be submitted to the contractor. A

copy of the owner's manual shall also be kept on each platform. All power-driven staging

and platforms shall be placarded properly. and controls shall be labeled clearly.

Operators shall use a checksheet during pre-operational inspections and shall verify the

inspection by signing the sheet. The subcontractor shall keep these checksheets on file.All manufacturer's recommendations for inspections and operation shall be followed.The contractor will provide a checksheet if requested.

Keep all handrails and complete midrails in goad repair. Always use secondary lifelineson power staging and tie off all personnel on power platforms.

Do not use power platforms to hoist material; do not exit platforms unless the platform is

on the ground. If welding or cutting operations are performed on a power platform, 6

protect the loadlines and lifelines.

Manbaskets

Do not use manbaskets except when the total exposure of performing the task by anothermethod would be more hazardous. The contractor will inspect manbaskets before initialuse, and the subcontractor will inspect them before each use. Test lifts and crane

requirements will be enforced strictly. Manbasket design shall be approved by thecontractor.

Employees shall complete and sign a checklist during pre-lift meetings, and personnel

entering the basket as well as the crane operator shall read safety instructions. Copies of

this checklist may be obtained from the contractor.

All manbaskets shall be equipped with overhead protection. When cutting or welding is

being done from a manbasket, protect the rigging. During welding, install a

H 1AMAKNAKJi5PLAN\C.APEND.D0C C-28S

Page 116: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

nionconductive Link on the load line. U:se only rigging that has never been used for any

other purpose with the manbasket.

Signs, Barricades, Guardrails, Handrails. Covers, Stairs, Decks, and Ramps

All signs shall be colored properly and labeled as prescribed by the OSHA standard.

Signs shall be constructed of metal. fiberglass. or plastic and shall be removed promptly

when no longer needed.

The types of barricades permitted on the project include rope, tape, and hard barricades.

The color of the barricades shall coincide with the OSHA color classifications. Attach

signs or tags at 20-foot intervals if hazard information is not provided on a barricade. If

hazard information is not printed on barricades at doorways, attach signs or tags to the

doorways. Rope, tape. chain, and similar barriers used to designate the boundaries of

posted radiological areas shall be yellow and magenta. Construction fences are physical

barriers and need not be yellow and magenta.

Install tape barricades at a height of 42 inches and at a distance of 5 feet from the hazard.

If a hazard is more than 10 feet high, install the barricade 1 foot farther away for each

additional 5 feet of hazard height. Hard barricades may be adjacent to hazards unless the

hazard is elevated. Hard barricades shall be 42 inches high, include midrails, and be

capable of withstanding a 200-pound force in any direction. If work is taking place

beneath a barricaded area, equip hard barricades with toeboards. If the area below is a

walkway or passageway, screen or block the area between the barricade midrail and

toeboard. Barricade all areas where there is a potential for falling objects.

Use turnbuckles when a barricade is constructed of wire rope.

Erect guardrails whenever a walking surface changes elevation by more than 2 feet. Tape

barricades may be used for this purpose, but such a barricade must be 5 feet from the

change in elevation. Mark all changes in elevation with some kind of warning such as

yellow and black tape or fluorescent orange paint. Ensure that handrails have smooth

surfaces or are taped to prevent splinters. Guard all wail openings. When a door opens

onto a platform. the width of the door shall not reduce the effective width of the platform

to less than 20 inches.

Construct rnms and risers on all stairs in accordance with OSHA regulations. Ramps shall

have a maximum angle of 7 degrees.

Firmly anchor stairs leading to office and warehouse trailers and equip them with

handrails. Risers, including the top and bottom steps, shall be of equal height.

H'AM"kNA.K.iSPLAV.A.PED DOC ~ C-29

Page 117: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Floor hole covers shall be labeled "\VAR.NLNG - TEMPORARY HOLE COVER - DO

NOT REMOVE OR STORE MATERIAL." Hole covers shall be cleated and constructed

of 0.75-inch plywood with supports 1 8 inches on center or less.

Cranes

Before they may be used. all cranes shall be inspected by the contractor according to theMobile Crane Safety Inspection Report in Appendix H that outlines requirements withrespect to American National Standards Institute (ANSI) standards, OSHA regulations.

and the Department of Energy Hoisting and Rigging Program Mfanual(Ref. 6). Copies of this manual are available upon request.

Cranes that do not pass inspection will not be permitted to operate until all faults are

corrected. All cranes must have annual inspections by independent contractors and mustbe accompanied by a signed copy of the Annual Inspection Checklist. Operators shall

complete a pre-operation checklist before each shift. This checklist shall be maintainedby the operator and made available to the contractor on request. The operator shall

comply with the manufacturer's specifications and limitations on the operation of anycrane. Rated load capacities, warnings, and other instructions shall be legible andconspicuously posted on all cranes. No modifications shall be made to a crane withoutwritten approval from the manufacturer. Such approval must be submitted to thecontractor.

Set up all cranes shall be within I degree of level. Unless otherwise approved by thecontractor, make all lifts on hilly extended outriggers, and always use outrigger pads.

These pads shall be constructed of hardwood and sized to extend past the outrigger feet.The crane shall be standing on a firm. uniform supporting surface with outriggers fully

extended and tires raised free of the supporting surface. If the crane is set on a rubber

base, perform picks performed as specified by the manufacturer's load chart.

For pick and carry operations, the boom must be centered over the front of the crane with

the swing brake locked or the mechanical swing lock engaged. Minimumn boom pointheight shall be used and:loads shall be carried close to ground surface. Do not performon-tire operation with the jib erected. Conduct pick and carry operations according tomanufacturer's recommended load charts and tire pressures.

All picks that exceed 75 percent of the capacity of a crane (the configuration and the chartrated capacity in that configuration), all tandem picks, and all picks adjacent to powerlines or over critical process piping require critical lift plans. These plans shall, at aminimum, detail the load to be lifted, the maximum load radius and boom angle, thepicking points, the capacity of the rigging, and the rigging configuration. All critical liftsmust be approved by the Contractor Hoisting and Rigging Committee.

H AMAXNALI4SPLAN\C-APEND DOC~ C-30

Page 118: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

The weights of all loads must be knowni or a load-indicatin2 device must be used. Onily

qualified operators shall operate cranes. The subcontractor shall submit to the contractor

an operator's qualification certificate specific to the equipment to be used. Operators

shall be provided with rigging and crane handbooks. All cranes shall be equipped with

tw~o-anti-blockingz devices. All cranes equipped with outriggers shall be marked

indicating full extension. and telescoping boom cranes shall have markings on the boom

indicating the lengzth of boom extended. Each crane shall have a 10-pound dry-chemical

fire extinguisher rated A:B:C.

All lattice boom cranes with structural damage to cords and/or lacings shall be from

service. All structural repairs to damaged booms shall be approved by the crane

manufacturer and shall be performed in accordance with specifications and procedures

prescribed by the crane manufacturer. Following all repairs to a boom, the crane shall be

load-tested before initial use. Test loads shall not exceed 1 10 percent of the rated load at

any working radius. Testing shall be in accordance with Society of Automotive

Engineers (SAE) recommended practice. Crane Load Stability Test Code J765 (April

1961).

Wire rope inspections shall be made per the Department of Energy Hoisting and Rigging

Program MVanual (Ref. 6) and records shall be maintained by the operator and made

available to the contractor upon request.

Cranes shall be operated only by the following qualified/competent personnel:

designated operators. trainees under the direct supervision of a qualified trainer,

maintenance and test personnel when necessary in the performance of their duties, and

crane-qualified inspectors.

Crane operators shall be in visual or radio contact with a qualified flag person before and

during every lift. If visual or radio contact is interrupted for any reason, the operator shall

stop the lift until full contact is restored.

The crane shall be capable. within manufacturer specifications, of fulfilling all

requirements of the work without endangering personnel or equipment.

The operator shall check the load line brake and the crane for stability when the load is

only inches from the ground before proceeding with any lift.

The operator shall be responsible for the equipment and load during a lift or pick. The

operator shall not attempt any lift might compromise the safety of the operation. The

operator shall ensure that proper rigging techniques are used prior to lift. A suspended

load shall never be left unattended. Cranes shall be operated smoothly, avoiding sudden

stops and starts. The hoist line shall be vertical at all times. Personnel shall not stand or

pass under suspended loads. Personnel shall not be allowed to ride the hook or load. The

boom hoist drum pawl shall be engaged at all times except when lowering the boom.

M AMAKNAK HSPLA.VC.APEND DC. C-31I

Page 119: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Operators shall ensure that all frequent and periodic inspections are current before

operating the crane.

Safety latches on hooks shall be serviceable, and two pairs of orange gloves shall be kept

on each crane for use by flagmen.

An operator shall not leave the control station of a crane during a lift or pick except underthe followin2z conditions:

* when the load is lowered or raised to a safe landing area with no tension on the loadline;

*after placing all brakes, pawls, switches, and clutches in a safe position-,

* after turning the crane over to another qualified operator; and

* after supporting the load by other means, such as cribbing, manufacturer sleds or

frames, suspended rigging, or another crane.

Do not get on or off a crane while it is in motion. Adjustments, repairs, or lubrication arenot permitted on moving equipment unless it is required by manufacturer

recornmendations.

Tag lines are required on all loads. Use as many tag lines as necessary to adequatelycontrol the load during the lift and while landing.

Unless installed by the manufacturer, do not place tool boxes, oil cans, choker racks.water coolers, or other items within the swing radius of the counterweight. The oiler

shall stand clear of the swing radius and assist the operator in keeping other employeesoutside the swing radius. Barricade the swing radius of the rotating counterweight with acomplete 'no entry" barricade.

Keep the crane load charts and the operators manual for that particular craneconfiguration in the cab. of each crane along with rated load capacities, recommendedoperating speeds, special hazard warnings, or instructions.

If a rental or subcontractor crane is to be used and the load chart is 85 percent capacity,

the reduce the capacity to 75 percent. This is done by establishing 100 percent capability

of the crane and reducing the weight by 25 percent. For hoisting of personnel. 50 percentmaximum is allowed.

The superintendent of the crane operator shall do the following:

* Ensure that the qualified operator is fit for duty.

* AMAJUNAAK\HSPLA\C-APEND DOC C-3 2

Page 120: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Check the area \~ith the operator for any unusual conditions that could interfere v~ith

the Lift or pick.

* Conduct a safetx' briefin2 session concerning the lift or pick.

* Tell the operator to stop the lift if there are any questions or concerns and contact the

foreman immediately.

*•Check the mechanical and operating condition of the crane with the operator.

* Assist the operator as needed for difficult or critical lifts.

* Make sure the counterweight is barricaded.

* Coordinate the lift with the operator and the flagmen of the crew using the crane.

The foreman of the crew using the crane shall ensure that the area is checked for any

unusual conditions and take action as needed to ensure a safe lift. The foreman shall give

a lift-safety briefing session to the crew and shall include the operator in lift instructions.

One or more flagmen. who are specifically trained and qualified in accordance with

contractor hoisting, rigging, and operating procedures shall be assigned, as needed, to

provide all signals to the crane operator and coordinate signals and other means of

communication between multiple flagmen and the operator. Any deviations for work

activities shall be approved by the contractor.

All riggers/signalmen shall be trained properly, qualified, and provided with a rigging

handbook. Training records shall be submitted to the contractor. Flagmen shall be

identified with an orange vest. They shall do the following:

* Clear the lift path before signaling the operator to start the lift.

* Be present during thq entire lift until replaced by another qualified flagman.

* Constantly be aware of the location of the load in relation to line of travel and

potential interferences.

* Watch for unauthorized personnel in the lift area or within the swing radius of the

crane counterweight.

Flagmen shall do the following:

* Assist the operator in checking for interferences within the swing radius of the

counterweight.

H W%IAXNAKHSP1-AtC-APEND DOC C-33

Page 121: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* Assist the operator in checking the boom location in relation to other interferences.obstructions, or power lines.

* Be in full view of the operator or in direct communication by radio or other approved

sound-powered phones.

* Give clear hand or voice directions.

* Coordinate responsibility with other flagmen if more than one is needed for the lift.

* Stop the lift if any unusual condition or event occurs that could jeopardize the safecompletion of the lift.

No one shall be allowed to stand or pass under a suspended load.

if an onsite crane is involved in an accident or incident, do no move the equipment,rigging, and load (except for life-saving activities) until after a contractor investigation

has been completed.

Crane Inspection

Applicable ANSI B330-series inspections (daily, monthly, quarterly, semiannual, annual,and special) shall be completed before operating any crane. All inspections shall be

completed by a qualified inspector following manufacturer's recommendations andspecifications.

Crane inspections shall include, at a minimum, all control mechanisms for maladjustmentinterfering with proper operation, excessive wear of components, and contamination bylubricants; all safety devices for malfunction; hydraulic, air, oil, and coolant systems forleaks; proper operation of electrical systems and condition of wiring; crane hooks for

deformations or cracks; rope reeving in compliance with crane manufacturer's

recommendations; and wire rope condition. Kinking, crushing, birdicaging, unstranding,corrosion, broken wires,.-broken strands. excessive wear, reduction of rope diameter, orimproperly applied end connections are factors that determine whether further use of ropewould constitute a safety hazard.

Keep completed daily, monthly, and annual inspection forms available in a weather-proofcontainer on the crane at all times. Maintain copies of all completed forms for everycrane.

Mast or Tower Crane

H.'AMAAKNA'HSPLAN\c.APEND::M c-34

Page 122: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

A special safety harness continuousLy attached to a lifeline shall be provided and used by

all personnel climbing to the crane cab. Only one person is permitted in the cab of the

mast crane. Exceptions shall be approv ed by the contractor.

Lift loads only w ith the load line. Put the boom in a fixed position before raising the load

line.

The operator shall shut down the crane if the wind velocity reaches the maximum

recommended by the manufacturer, as measured by the anemometer mounted on the

crane.

IMovement of Cranes (Under Their Own Power)

The superintendent of the crane operator shall assign a qualified crew to the crane and

ensure the proper operating and mechanical condition of the crane.

The superintendent shall ensure the proper loading and securing of the crane on the

lowboy; provide a qualified flagman for signaling in close quarters, such as turns, gates.

intersections, congested areas, overtaking traffic: and ride as escort with the responsible

supervisor in the escort vehicle immediately in front of the tractor to assist the supervisor

in watching for anticipated obstructions, interferences, arnd road problems.

The foreman of the electrical escort (where electrical escort is required) shall ensure that a

fully qualified electrical lineman escort is assigned and shall instruict the assigned

lineman fully as to his position in the caravan (number two - directly behind the patrol).

The lineman's responsibilities include observing all potential electrical or overhead line

interferences, relaying such information to the escort superintendent before questionable

conditions become a problem. and observing "on foot" the interferences at gates.

congested turns, and other constricted areas.

A superintendent or safety supervisor shall be responsible for each crane movement and

shall personally direct planning of the movement with consideration to routing, turns.

speeds, stops, terrain, 'weather conditions, and traffic. The safety supervisor or

superintendent shall inspect and approve the positioning and securing of the crane on the

lowboy before movement begins; halt the movement operation if any quiestion arises

concerning safe movement of the crane; and ensure that proper permits are completed

before going into controlled areas.

The foreman of the crane operator shall also ensure the proper operating and mechanical

condition of the crane, know the hazards on the travel route, include in the safety briefings

for the operator and flagmen that one or more flagmen shall escort the crane when en

route over congested roads, and minimize the need for travel during heavy traffic periods.

An escort vehicle equipped with yellow caution lights may be used when traveling long

distances or when the boom or any of its attachments extends more than 20 feet in front

of the crane. The foreman shall ensure that travel speed is commensurate with traffic and

H'AMAKNAK~iSPLAN\C.AEND DOC C-35

Page 123: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

road conditions. that a qualified electrical lineman esc~ is available if the crane is to

come within 2-0 feet of any power lines and that all cranes are equipped with a horn signal

system (i.e.. one blast to 'move forward, two blasts to stop. and three blasts to back up).

The flagman shall be qualified and competent. maintain a position in full view of the

operator and use proper hand signals. wear a high-visibility vest and hig-h-visibility

gloves, and watch for any unusual condition or event that could interfere with the safe

movement of the crane.

The safety supervisor shall direct planning of the move personally; consider routing,

turns, speeds. stops. terrain, and weather conditions: and ensure compliance with the planI

for movement.

Critical Lifts

The superintendent of the crane operator shall prepare a critical lift plan for each critical

lift. The following information shall be included:

* reason for the necessity of the critical lift:* type of crane;* crane location;• loadlocation;* boom angle;

•radius;I* weight of total load (weighing may be necessary);

* dimensions of load;* attachment points for rigging;* obstructions in path of load;* rigging hardware and configuration;* crane operator qualifications;* crane load chart (or copy thereof); and

* other equipment or cranes involved.

The Contractor Hoisting, and Rigging Committee shall approve all critical lifts. If any

deviation from crane manufacturer recommendations is anticipated. approval shall be

secured from the manufacturer and included far evaluation.

Critical lifts are lifts that require exceptional care because of size, weight (any lift with a

total weight in excess of 75 percent of the crane's load chart), close-tolerance installation,

high susceptibility to damage, use of two cranes, or other unusual factors. An example of

a critical lift is one in which a collision, upset, or drop could result in the following:

* an unacceptable delay to the schedule or another significant program impact due to

damage.

H.AMAY,?AKJ4SPLAtNCAEN.DK~ C-36

Page 124: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* a significant release of radioactive material or other hazardous maternal:

* an una cceptable risk of injury or a significant adverse health impact: and

* undetectable damage that would jeopardize future operations or the safety of a

facility.

Crane Work Near Overhead Power Lines

When planning crane placements, make every effort to select locations that are least

likely to allow any part of the crane or load to come within 15 feet of a power line by

rotation, boom extension/elevation, or crane movement.

When frequent. repetitive crane work is to be performed near overhead power lines.

consider having the lines relocated or dc-energized.

When the job requires that a crane or the load come within 10 feet of an overhead power

line, prepare a written plan. De-energize and ground all power lines whenever possible.

The minimum clearance to any power line rated at 50 kV or below shall be 10 feet. For

lines rated over 50 kV, rninimunm clearance shall be as required per OSHA 29 CFR

1926.5 50.

A written plan shall be developed to specify job details and special safety measures

provided to ensure worker safety. The plan shall be approved by the contractor. who

shall review the measures taken to make the job safe (e.g., special tools, equipment.

grounding). Written plans shall include unexpected situations (e.g., equipment drawing

arcs, emergency responses, electrical shocks, the need to dc-energize the line quickly) and

instructions for handling them.

The following shall be considered before starting work within 10 feet of overhead

energized power lines:

a allow daylight work only;* allow no work on a rainy or foggy day;* place a rubber blanket on the line;

* provide lineman's gloves and boots for operators and other exposed persons (riggers.

etc.);* provide rubber boots for operators;* place rubber blanket on the operator's seat;* insulate the crane boom;* provide insulated tag lines;

* ground cranes per OSH-A 29 CFR 1926.550;

H ~ANMA-JAKISPLAMC.A.PND DOC C-3 7

Page 125: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* allow no one on a rig but the operator:

* post a special signalman to maintain line clearance: and '* provide detailed drawings and controls to ensure that equipment does not '.iolate

minimum clearances.

Do not operate cranes and other heavy equipment within 3) feet of power poles or guy

wires supportin2 these poles. Flag or load guy wires within the swing radius of the crane

with yellow tape.

Crane Work Over critical Pininig

A written plan is required for work over critical piping systems. .The contractor shall have ultimate authority over operational facilities, and shall also be

responsible for designating which service piping shall be treated as critical piping.

Riggingj

All rigger's signal men shall be trained properly and provided with a rigging handbook.

Documentation of training shall be provided to the contractor. All rigging shall be

performed in accordance with the Department of Energy Hoisting and Rigging Program

Manual (Ref. 6). which will be available from the contractor on request. Major rigging

operations must be planned and supervised by competent personnel to ensure that the best

methods and most suitable equipment are employed.

The contractor shall have the authority to cancel hoisting and rigging operations based on

consideration of weather, condition of lifting hardware, electrical line clearances, or any

other factor that, in the judgment of the contractor, may adversely affect the successful

conclusion of the lift. All rigging must be protected from flame cutting and electric

welding operations and from contact with solvents and chemicals.

Equipment Insretin n Tstn

When specially fabricated devices are required for hoisting and rigging operations (e.g.,lifting beams, material baskets, and spreader beams), the design and calculations for thedevice shall be reviewed and approved by the contractor.

All rigging shall be inspected by a competent person before each use and marked as

inspected at least annually. All rigging shall be labeled clearly with its capacity. All

rigging shall be stored in a rigging loft )r an equivalent area where it will not be exposed

to the elements.

H4XNAAKESPLANC.APEN DOC C-38

Page 126: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Job-built rigging and hoisting equipment shall be tested onsite at 12$ percent capacity.

and such tests shall be observed and documented by the contractor. In addition. drawings

of such rigging showing weld details and load capacities shall be submitted to the

contractor and approved before the rigging is used.

Hoisting and rigging equipment for material handling shall be inspected visually before

use on each shift. and as necessary during its use to ensure that it is safe. Hoisting and

rigging equipment shall be load-tested at least annually by a competent person, who, by

training and experience, is capable of recognizing defects and taking the appropriateaction to correct or eliminate them. Inspections shall be documented and made availableto the contractor.

Safe Workin2 Loads

Do not load hoisting and rigging equipment in excess of its recommended safe workingload, as prescribed in Tables H-i through H-20 of OSHA 29 CFR 1926. Subpart H.(1926.25 1. Rigging Equipment for Mfaterial Handling). Maik special hoisting devices,slings, chokers, hooks, clamps, or other lifting accessories to indicate the safe workingloads and proof test thern before initial use to 125 percent of their rated load.

Determine the load weight before it is rigged. Account for the gross load, which is thesum of the weight of the rigging, block, hooks, lifting beam, stowed or erected jibs,

headache ball, other elements of rigging or equipment and the load, when determining

hoisting equipment. Safe working loads of hoisting equipment apply only to freelysuspended loads on plumb hoist lines. If the hoist line is not plumb, additional side loads

will compromise the stability and introduce stresses that exceed equipment designs.R~apid swinging of loads also adds additional stresses and minimizes stability. The loadmust always be directly below the boom point or upper load block.

The center of gravity must be below the hook and below the lowest point of attachment to

ensure stability. Use softeners to protect slings at sharp corners. Avoid sharp bends,pinching, and crushing. Do not bend the eye section of wire rope slings around corners.

Alloy Steel Chains

Do not use chains for lifting except as part of a chainfall or come-along device.

Wire Roves

Keep wire ropes in good repair and without deformities. Wire ropes with visual signs ofkinking, crushing, unstrantding, birdcaging, main strand displacement, core protrusion.loss of rope diameter, unevenness of outer strands, corrosion, heat damage, abrasion,broken wires or strands and cracked, worn, or deformed end attachments should beconsidered in evaluation of sling replacement. Do not use wire rope if in one rope laythere are 1 0 randomly distributed broken wires or Five broken wires in one strand.

HNAMAXNAKJISPiLAN'C.APEND DOC C-39

Page 127: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Use Tables H-3 through H-14 of OSHA 29 CFR 1926. Subpart H. (1926.25 1. Rigging

Equipment for Materials Handling) to determine the safe working loads of various sizes

and classifications of improved plow steel wire rope and wire rope slings with various

types of terminals. For sizes. classifications, and grades not included in these tables.

follow the safe working load recommended by the manufacturer for specific. identifiable

products. provided that a safety factor of not less than 5 is maintained. Blunt wire rope

with protruding ends of strands in splices on slings and cover bridles. Wire rope

application use limitations shall be in accordance with 29 CFR 1926.25 l (c)(4). When U-

bolt wire rope clips are used to form eyes, use Table H-20 of OSHA 29 CFR 1926,

Subpart H. (1926.251, Rigging Equipment for Materials Handling) to determine the

number and spacing of clips. Always use a minimum of three clips. More clips may beneeded when large-dimension wire is used.

Carefully maintain synthetic slings. Immediately remove any synthetic sling with the red

warning line exposed, regardless of the extent of the exposure and the use of the sling.

Slings should not be dragged from beneath loads. Knotted and kinked slings are

considered permanently damaged; remove them from the site. When estimating sling

capacity using multi-legged slings, consider only two of the legs to carry the full load.

Remove all loose pieces of material from the load before moving. Wear gloves whenhandling wire rope. Keep hands free from pinch points as slack is taken up. Control the

load at all times. Keep body parts out of pinch points. Use tag lines.

Tables H-i5 through H-IS of OSHA 29 CER 1926, Subpart H, (1926.251, Rigging

Equipment for Materials Handling), shall apply when using natural or synthetic fiber

rope slings.

Make all splices in rope slings in accordance with fiber rope manufacturer's

recommendations and 29 CFR 1926.25 1(d)(2).

Identify synthetic webbing (nylon, polyester. and polypropylene) by the name of the

manufacturer, the rated capacities for the type of hitch, and the type of material.

Remove synthetic web slings from operation immediately if there are signs of acid or

caustic bums, melting or charring of any part of the sling surface, snags, punctures, tears

or cuts, broken or worn stitches, distortion of fittings, discoloration or rotting, or red

warning line showing.

Shackles. Hooks. and Bolts

H 1AMAKNAK.HSPLANC.APEND DOC C-40

Page 128: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Use table H-19 of OSHA 29 CFR 1926. Subpant H. (1926.251. Rigging Equipmerntb'/r

Materials Handling) to determine the safe working loads of %various sizes of shackles.

Use only one eye-hook and do not hook back to the load line in either mechanical rigging

or hand rigging. Use only one eye of a sling in a hook. Use a shackle to hold two or

more eves. The pin of the shackle should be placed in the hook with the eyes of chokers

bearing on the shank.

Use only shouldered eyeboits. except where it is not possible because of the

configuration of the item to which the eyebolt is attached. Do not use unshouldered

eyebolts when the load is to be lifted at an angle because they are subjected to bending,

and the load they can safely carry is severely reduced. Eyebolts should never be welded.

Shouldered eyebolts must be installed with the shoulder at a right angle to the axis of the

hole and in contact with the working surface to keep bending to a minimum: the loads

should be applied to the plane of the eye. The tapped hole for screwed eyebolts shall

have a minimum depth of one and one-half times the bolt diameter. Nev er insert the

point of a hook in an eyebolt; a shackle must be used instead. A sling must not be reeved

through pairs of eyebolts. One single leg should be attached to each eyebolt.

Follow the manufacturer's recommendations to determine the safe working loads of the

various sizes and types of specific and identifiable hooks. Do not use anry hooks for

which applicable manufacturer's recommendations are not available.

Shackles and hooks shall be constructed of forged alloy steel with the identifiable load

rating and manufacturer on the shackle or hook. All hooks except for sorting hooks and

sliding choker hooks shall be equipped with a safety latch.

Knots

Knots shall not be tied in rigging for any purpose, and all rigging shall be used only for

its intended purpose. Rigging used to hoist manbaskets shall be identified as such and

shall not be used for any other purpose.

Weather Conditions

Do not carry out a rigging or hoisting operation when weather conditions could cause the

operation to be hazardous to personnel or property. The size and shape of loads must be

examined to determine if a hazard exists during high winds. Wind loading may not

exceed equipment capacity. When wind speeds reach 25 to 30 mph, or when visibility is

impaired by darkness, snow, fog, or rain, the operation shall be suspended.

When the temperature is below freezing, caution must be used to ensure that no part of

the hoisting equipment is shock loaded, because steel fracture can result. Stress factors

that reduce rigging capacity and safe working load must be considered when using slings

at angles or when slings are choked.

H nAtAJNAKflSPLAN\C.APEfD DOC C-41

Page 129: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Motor Vehicles and Heavy Equipment

Drivers and/or operators of vehicles and heavy equipment must have the appropriate statelicense certifying their qualifications to drive or operate each piece of equipment orvehicle. WVhen state certification is not available for a piece of heavy equipment. the

subcontractor shall submit to the contractor a certificate of operator qualification for eachoperator, listing each piece of heavy equipment that the operator is qualified to operate.

Drivers are responsible for the safety of all passengers and the stability of materials beinghauled. Personnel shall not mount or dismount moving vehicles. Personnel shall not

ride in the bed of any vehicle. Every passenger in a motor vehicle shall have a safe placeto ride. The use of seat belts is mandatory when operating or riding in vehicles.

Do not leave unattended vehicles and heavy equipment running. If the operator is to getout of or off of the equipment, it must be shut down properly.

All blades and buckets shall be lowered when the operator leaves the cab unlessphysically locked or properly blocked.I

Heavy equipment shall be maintained in proper operating condition at all times. All

machines shall be equipped with roll-over protective structure CROPS) cabs. Operatorsshall be trained in the proper method of working on slopes.

Label all heavy equipment with ROPS cabs as required by 29 CFR 1926. 1000. Seat beltsshall be installed and used in all equipment with ROPS attachments except forcompactors and rubber-tired skid steer equipment. All heavy equipment shall beequipped with functioning back-up alarm systems that are clearly audible aboveI

surrounding noise.A

All equipment and tools shall be subject to an inspection, conducted by the contractor. onarrival at the site and before being placed into service. Operators shall perform daily

inspections of machinery and equipment. Records of these inspections shall be made andkept by the subcontractor. These records shall be available to the contractor on request.Defective equipment that could endanger personnel or the environment shall be taggeddefective, and repaired immediately or removed from service. All machinery shall be

subject to inspection by the contractor's Safety Department. Owners' manuals shall bemade readily available on contractor request.

Oils or other fluids (except water) that leak onto the ground shall be cleaned up by thesubcontractor, and the contaminated soil shall be disposed of in accordance with theEnvironmental Cleanup Plan.

H AMAKNAKI4SPLANC-APENDDOC C-42

Page 130: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

All equipment is designed for a particular function and shall be operated according to the

manufacturer's recommendations and within the manufacturer's limitations. For liftingoperations with equipment other than cranes. prior written approval must be obtainedfrom the contractor.,

Enforcing Permit Requirements,

Failure to obtain a permit. or noncompliance with the conditions required by theapproved permit, may result in an operational suspension of the activity until an approvedpermit is issued and/or a CAS-21I Safety Violation Notice is completed.

Traffic Control

The subcontractor shall be responsible for orderly traffic control on the job site. Alltraffic control measures on public roadways shall be in accordance with TransportationDepartment regulations for use of flagmen. construction barriers, and appropriate distancerequirements. The subcontractor shall provide traffic signs and/or signalmen where andwhen necessary to protect personnel and/or the general public.

N AMAXNAXRHSPLAN'C-APENfl DOC C-43

Page 131: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Th

APPENDIX D

b ~~~~~SITE TMILGATE MEETING AND EXCLUSION ZONE ENTRY LOG

r~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~rfI'~ ~ ~ ~ ~ ~~iALN\S71IW\AHP2DC6-16Rcce

Page 132: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

At'~4tJ~5K599Q M2 OCCZ

SITE TAILGATE MEETING and EXCLUSION ZONE ENTRY LOG

Facility:Date:

-. ~~~Client: 'Time: Project Nummer:* ~~~~Specific Location:

Type of Work:Chemicals Brought to Site:

MSDSs Available: Yes No

HEALTH AND SAFETY TOPICS PRESENTED

Protective Clothing/Equipm~ent:U~ ~~~CeiclHzrs

Chemical Hazards:

Emergency Procedures: Aoplv First Aid and notify Health and Safety immediately

HosoitailClinic:

I ~~~~Special Equipment:

Evacuation Route:

ATTENDEESEnteredExclusion

p ~~~~Zone? Cf/N) NAME (Printed) SS#' COMPANY SIGNATURE

MEETING CONDUCTED BY:

3 ~~~~NAME (printed)

(signature)

AFCEEly2=lNOPAM D-1

Page 133: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L

L

APPENDIX E

CODE OF SAFE PRACTICES

DraftI\GALENA\05K791 01I\WPCALHSfl DOC 6/219/96 Recycied

Page 134: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

CODE OF SAFE PRACTICES

A. Following is the basic Code of Safe Practices that applies at all times to all workbeing conducted on this Project.

1. These safety rules are not inclusive, and all Federal and State safety£ ~~~~~~~~~regulations shall also be applicable.

2. Where a conflict exists between a Federal, State, and/cr other applicablesafety rule, the more restrictive requirement shall be in force on the jobsite.

B. This is a recommended format. It Is general in nature and intended as a basisfor the preparation of a code of safe practices by the contractor that fits his/heroperation more exactly. As a minimum performance standard, it shall beadopted and enforced by each contractor performing construction work on thisp rolect.

1. Hard hats shall be worn at all times in construction areas.

2. Sleeved shirts shall be worn at all times.

3. Long pants shall be worn at all times.

4. Leather shoes shall be worn at all times; no tennis or running shoes willbe allowed.

5. Adequate eye protection shall be worn when cutting, grinding, sawing orconducting any other activtlty that poses a potential eye hazard.

6. Safety belts with lanyards shall be used at unprotected heights of morethan 6'-0"; this includes working an a ladder when more than 6'-0" abovethe ground or floor.

7. Hearing protection shall be worn when employees are exposed to noiselevels requiring hearing protection as defined by Federal or State healthanid safety standards.

8. illegal drugs, alcohol, fire arms, or other dangerous substances shall notbe allowed on the job site.

9. Good housekeeping practices shall be maintained continually.

II ~~~~~~10. Any time work is performed overhead, the contractor conducting suchwork shall erect a barnicade.

a. The barricade shall consist of caurtion or danger barricade tapeand appropriate warning signs.

b. AJI barricades shall be removed when not in use.

Page 135: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

C. Contractor employees shall be required to honor the Darricadeserected by other contractors on the job site.

ii. All persons shall follow these sate practices rules, render every possibleaid to sale operations and report all unsafe conditions or practices to thesupervisor.

12. ~'nremen shall ensure that employees observe and obey every applicableCompany, State, or Federal regulation and order as is necessary to thesate conduct of the work, and shall take such action as is necessary toobtain compliance.

13. All employees shall be given frequent accident prevention instruction.Instruction shall be given at least every five work days.

14. Anyone known to be under the influence of drugs or an intoxicatingsubstance that impairs the employees ability to safely perform theassigned duties shall not be allowed on the lob while in that condition.

15. Horseplay, scuffling, and other acts which tend to have an adverseinfluence on the safety or well-being of the employees shall beprohibited.

16. Work shall be well planned and supervised to prevent injuries in thehandling of materials and in working together with equipment.

17. No employee shall knowingly be permitted or required to work whileNas/her ability cor alertness is so impaired by fatigue. illness, or othercauses that the employee or others might be exposed to injuryunnecessarily.

18. Employees shall not enter manholes, underground vaults, chambers,tanks, silos, or other similar spaces unless it has been determined that it

19. Employees shall be instructed to ensure that all guards and otherprotective devices are proper and adlusted and shall report deficienciespromptly to the supervisor.

20. Electric cords shall not be exposed to potential damage from vehicles.

21. In locations where the use of a portable power tool is difficult, the toolshall be supported by means of a rope or similar support of adequate

22. Only trained and authorized persons shall operate machinery orequipment.

23. Loose or frayed clothing, loose or hanging long hair, dangling ties, fingerrings, etc., shall not be worn around moving machinery or other areaswhere they may become entangled.

ArFCfEVn2M0C#P AP

Page 136: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

ACKNOWLEDGMENT OF RECEIPT AND

REVIEW OF CODE OF SAFE PRACTICES

TO ALL EMPLOYEES:

I ~~~ATTACHED IS A COPY OF THE CODE OF SAFE PRACTICES. THESE GUIDELINESARE PROVIDED FOR YOUR SAFETY.

IT IS THE RESPONSIBILI1Y OF ________________TOPROVIDE AND

(name of contractor)

REVIEW THIS CODE WITH EACH EMPLOYEE. IT IS THE EMPLOYEE'SI R~~~FESPONSIBILI[TY TO READ AND COMPLY WITH- THIS CODE.

THE ATTACHED COPY OF THE CODE OF SAFE PRACTiCES IS FOR YOU TO KEEP.L ~~PLEASE SIGN AND DATE BELOW AND RETURN ONLY THIS PAGE TO

Li (~~~~~~name)

I HAVE READ AND UNDERSTAND THE CODE OF SAFE PRACTICES.

Date Employee

Social Security Number Signature

AFCE\M200I1OPP APP

Page 137: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFC.JO4-OK69sO,M2n 2

24. Machinery shalt not be serviced. repaired. or adlusted while in operation.nor shall oiling of moving parts be attempted. except on equipment thatis designed or fitted with safeguards to protect the person performing thework.

25. Where appropriate. lock-out procedures shall be used.

26. Employees shall not work under vehicles supported by lacks or chainhoists without protective blocking that will prevent injury if jacks or hoistsshould fail.

27. Air hoses shall not be disconnected compressors until the hose line hasbeen bled.

28. Excavating, trenching, and shoring operations shall be supervised by a"competent person" (refer to OSHA and/or Jacobs during all stages offield activity).

29. All excavations shall be inspected visually before backfilling to ensurethat it is safe to backfill.

30. Excavating equipment shall not be operated near tops of cuts, banks, orcliffs if employees are working below.

31. Tractors, bulldozers, scrapers, and canryalls shall not operate wherethere is a possibility of overturning in dangerous areas like edges ofdeep fills, cut banks, and steep slopes.

32. When loading where there is a probability of dangerous slides ormovement of matbrial, the wheels or treads of laading equipment, otherthan that riding on rails, should be turned in the direction which willfacilitate escape in case of danger, except in a situation where thisposition of, the wheels or treads would cause a greater operationalhazard.

33. Workers shall not handle or tamper with any electric equipment in amanner not within the scope of their duties, unless they have receivedinstructions from a qualified, licensed electrician.

34. All injuries shall be reported promptly to the foreman and the PrimeContractor so that arrangements can be made for medical or first aid

35. No burning, welding, or other source of ignition shall be applied to anyenclosed tank or vessel, even if there are some openings, until it has firstbeen determined that no possibility of explosion exists and authority forthe work is obtained from the foreman or superintendent.

AFCEEVA2001~QPP.APP

Page 138: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

6

t

*1t

Ft

I,L

ri

APPENDIX FI

MATERIAL SAFETY DATA SHEET (MSDS) INFORMATION

I1�

Ii

FL

1I

Draft

GAi24A\O5K79lOThWP�GALHSP2.DOC 6129/96 Recycled

Page 139: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Occupational Health Guideline forEthyl Benzene

INTRODUCTION Recommended medical surveillanceThi gudeineis ntnde a a oure f iforaton or The following medical procedures should be madeemhoyes.guiemln erisitne phsicansouceo indu ormat yion for available to each employee who is exposed to ethylemplyca.empoyer, phsicansindutril hyienits. benzene at potentially hazardous levels:and other occupational health professionals who may I nta eia cn~g mlye hudb

have a need for such information. It does not attempt topreentalldaa; athr, t resntsperinnt nfonaton screened for history of certain medical conditionsarsnd l data;i rmathr, itpeet etnn nomto (listed below) which might place the employee atand data in summary (arm. ~~increased risk from ethyl benzene exposure.

SUBSTANCE IDENTIFICATION -Chronic respiratory discase: In Persons with im-.putred pulmonary function, especially those with ob-IFormulaEC,,HC.HJ, strzuctveazirwav diseases, the brahn o ty ben-

- Synnyms Phaniethnc; thvibnzolzene rngh caue exaerbaion o symtomsdue to atsAppearance anda odor: loes liqudwd t n .o irritant properties or psychic reflex bronchospasm.

L. ratzc ~odo. -Kidney disease: Although ethyl benzene is notknown as a kidney toxin in humans. the importance ofPERMISSIBLE EXPOSURE LIMIT (PEL) this organ in the elimination of toxic substan~ces justifies

The current OSHA standard for ethyl benzene is 10 special consideration in those with possible impairmentparts of ethyl benzene per million p'arts of air (,ppm) of renal function.averaged over an eight-hour work shift Th~is may also -Liver disease: Although ehl benzene is notbe expressed as 435 milligrams; of ethyl benizene per known as a liver toxin in humans, the irnpor'ace of thiscubic meter of air (mg/mi). organ in the biotransformation and detoxification of

foreign substances should be considered before expos-HEALTH HAZARD INFORMATION ing persons with impaired liver function.

* Routes of exposure ~ ~ ~ ~ ~ ~ Ski disease: Ethyl benzene is a defatting agent andRoute of ep asuec tebdif nal.is can cause dermatitis on prolonged exposure. PersonsEthyl benzene can afc h oyi ti nae.i with pre-existing skin disorders may be more suscepti-swallowed, or comes in contacet with the eyes or skin. blt to the effects of this agent.* Effeca of overexpiosure 2 eidcMdclEaiain n mlyedviI. shont-term &-ipourc Ethyl benzene causes irritation .Prodic Mhediaboelse coamnditowny empuloyee deferrd-oof the eyes nose. throat. and skin. With exposure to ofingther meiaboexamisdcnditions hudb rfre ohigh concentratons. irritating effects are mare pro- furtermedical eoxiconationnounced. and a person may begin to feel weak, dizzy, Suirofxjlordrowsy, and become unczonscious. Ethyl benzene is praimarily La irritant of skin and. to2. Long-term Erpostuere Prolonged or repeated ethyl some degree of eyes and upper respiratory tract. Sys-.benzene exposure of the skin may casue skin rash. temic absorption causes depression of the central ner-3. Reporrnng Signs and SymptonmrAphysician should be vous system with narcosis at very high concentrations.

o~riacte ifanyoe deelos an sip orsympoms Aspiration of small amounts causes extensive edema andand suspects that they aire aused by exposure to ethyl hemorrhage of lung tissue- It is readily metabolized andbenzene. excreted chiefly as nmandelic acid in the urine.

These recommendations reflect good industrial hygiene and medical surveillance oractices and their irnolemenlatgon willassist in achieving an effective occijatnonai meantt program. However, they may not tie sufficient to acnieve compliancewith all requirements ol OSHA regulations.

U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES U.S. DEPARTMENT OF LABORPublic Healm, Service Zentnr for Oiseaae Convoi Oecuoatuonag Salaty and Meantri Aormrusiiauo,,Nationtal institute icr occwoataonai Saety and mesait

Sfiptemiser ilsn

Page 140: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

CHEMICAL AND PHYSICAL PROPERTIES by NIO0SH uncer 42 CFR Part S4or ctner z~recrt-reading devices calibrated to measure et"nyl benzenie

Physical diii ~~~~~~~~may be used. An analytical method for etnyl benzene is

M olecular weight: 106 in the .VIOSH Manual of Artaivilcal Melhods.Th E.

2. Boiling point (760 mm Hg): 136 C (277 F) Vol. 2. 1977, available from the Governm~ent Printing

3. Specific gravity (water = 1): 0.865 Office. Washington. D.C. :-0402 (GPO No. 017.033.

4. Vapor density (air = I at boiling point of ethyl 00260.6) Ibenzene): 3.66

5. Melting point: - 95 C (- 139 F)

6. Vapor pressure at 20 C (68 F>: 7.1 mm Hg EPRTR7. Solubility in water. g/l00 g water at 20 C (68 F):

0.08,5Eapoatin rte butl aetae =1:Les thn I G~ood industrial hygiene practices recommend that

8. Eapoatin rte (uty actat = 1: Lss han engineering controls be used to reduce environmental

*Reactivity concentrations to the permissible exposure level. How-

l. Conditions contributing to instability: Heat ever, there arc some exceptions where respirators may

2. Incompatibilities: Contact with strong oxidizing be used to control exposure. Respirators may be used

agents may cause fires and explosions, when engineening and work practice controls are not

3. Hazardous decomposition ;-tducts: Toxic ga~ses technically feasible. when such controls are in the

and vaoors (such as carbon monoxide) may be releasedin a fire involvig ethyl benzene.process of being installed, or when they fail and need to r

in a fir involvig ethyl enzene.be supplemented. Respirators may also be used for

Specbialit peatosNneoperations which require entry into tanks or closed

1.Flammaboint: 15C(9' clsdcp essels. and in emergency situations. If the use of

2. Autoignition temperature: 432 C (8IC respirators is necessary, the only respirators perimitted

3. Flammable limits in air. % by volume: Lower: ID:~ are those that have been approved by the Mine Safety

Upper: 6.7 ~~~~~~~~~and Health Administration (formerly Mining Enforce-

4. Extinguishant: Dry chemical. foam. or carbon mrent and Safety Administration) or by the National

dioxide Institute for Occupational Safety and Health.

Warning properties a In addition to respirator selection, a complete respira-

I. Odor Threshold: According to the Department of tory protection program should be instituted which 4

Transportation's CHRIS Hazzardous Chemical Data.. includes regular training, maintenance, inspection.

ethyl benzene has an odor threshold of 140 ppm. cleaning, and evaluation.L

2. Eye Irritation Level: According to the AIHA

Hygienic Guide. "the vapor caused a noticeable eye PERSONAL PROTECTIVE EQUIPMENTirritation in humans at concentrations of 200 ppmn.

3. Evaluation of Warning Properties: Through its Employees should be provided with and required to

Odor and irmant effects. ethyl benzine can be detected use impervious clothing. gloves, face shields (eight-inch

at a concentration less than twice the permissible expo- minimum), and other appropriate protective clothing

sure limit. Therefore, for the purposes of this guideline, necessary to prevent repeated or prolonged sk~in contacet

ethyl benzene is treated as a material with adequate with liquid ethyl benzene.

warning properties. * Clothing wet with liquid ethyl benzene should be

placed in closed containers for storage until it can be

MONITORING AND MEASUREMENT discarded or until provision is made for the removal of

PROCEDURES ethyl benzene from the clothing. If the clothing is to bejlaundered or otherwise cleawed to remove the ethyl 1

*General benzene. the person performing the operation should be

Measurements to determine employee exposure are best informed of ethyl benzcne's hazardous proper~ties.

taken so that the average eight-hour exposure is based eNon-impervious clothing which becomes contumi

on a single eight-hour sample or on two four-hoursamles Seera shrttim inervl smpes (up to 30 naiad with liquid ethyl benzene should be removed

minutes) may also be used to determine the average preomptl andm nth rewothng.ni heehlbcn

exposure level. Air samples should be taken in the rmvdfo h ltig

employee's breathing zoneC (air that would most nearly *Any clothing which becomes wet with liq~ud ethyl

represent iut inhald by theneuz should be removed immediately and not

* Method emlye.rewomn until the ethyl benzene is removed fro te

Sampling and analyses may be performed by collection :lothing.

of ethyl benzene vapors using an adsorption tube with * Employees should be provided with and required to

subsequent desorption with carbon disulfide and gas use splash-proof safety goggles where liquid ethyl ben-

chromatographic analysis. Also, detector tubes certified zene may contact the eyes.

2 Et~ivi BenzeneSptmers7

Page 141: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

7 ~SANITATION EMERGENCY FIRST AID PROCEDURES

Skin that becomes contaminated with liquid ethyl In the event of an emflrgzeflcy institute fin:t aid proce-

bbenzene should be promptly washed or showered with dures and send for first aid or mnedical assistance.

-7 ~~soap or otild detergent and water to remove any ethyl * Eye Exposurebenlene. ~~~~~~~~~~If ethyl benzene gets into the eyes, wash eyes immedi-benzene. ~~~~~~~~~~~ately with large amounts of water, lizfurg the lower and

COMMON OPERATIONS AND CONTROLS upper lids occasionally. Get medical attention as soonAS'possible. Contact lenses should not be worn when

T'he following list includes some common operations in woknwihtsceial7' ~~which exposure to ethyl benzene may occur and control *Skin Exposure

method whic may b effetive i eachcase:If ethyl benzene gets on the skin, promptly flush themethos whih ma be efectie ineach ase:contaminated skin with water. If ethyl benzene soaks

Operation Controls through the clothing, remove the clothing immediatelyand flush the skin with water. When there is sktin

b L~~~I beration during Local exhauist irrtation. get medical attention.manufacture of styrene ventilation - Brearthing

p ~~~~monomer Ira person breathes in large amounts of ethlv benzene.

L Use curing spray Local exhaust ~~~move the exposed person to fresh air a t once. IfUse curing spray Localexhaust breathing has stopped. ;perform ar::flcial respiration.

aoonication of vinyl resin ventilation: personal Keep the affected person v. arn ana at rest. Get medicalP ~~~surface coating protective ecuipmerlt attention as soon as possible.

Liberation during Local exhaust *Swrallowitig

manufacture of paints, ventilation: general If ethyl benzene has been swallowed, do not induce

varnisnes, and am~er dilution ventilation vomiting. Get medical attention immediately.L ~~~~surface coatings * Rascue

Move the affected person from the hazardous exposure.

Use in manufacture and General dilution If the exposed pcnson has been overccmrc. notify some-

ii ~~~application of rubber ventilation; local one else and put into effect the established emergencyV ~~~~adhesives exhaust ventilation: rescue procedures. Do not become a casualty. Under.

personal protective stand the facility's emergency rescue procedures andequipment bnow the locations of rescue equipment before the need

Use dunring Local exhaustars.electroplating of ventilation for open-SPLEAND IPO Laluminum on copper or surlace tanks POEUEsteel POEUE

I beration during oven Local exhaust *s Persons not wearing protective equipment and cloth-baking an drying f ventilaion for vens ifl should be restricted from areas of spills or leaks until

suracen catddringso etlto o vn cleanup has been completed.surface coatings I, ~~~~~~If ethyl benzene is spilled or leaked, the following

Liberation during Ldcal exhaust steps should be taken:application of surface ventilation 1. Remove al ignition sources.coatings by dipping, 2. Ventilate area of spill or leak.flow coatings. and roller 3. For small quantities, absorb on paper towels. Evapo-

coating rate in a safe place (such Ls a fume- hood). Allowsufficient time for evaporating vapors to completely

Liberation during use as General dilution clear the hood ductwork. Burn the paper in a suitable

an intermediate in dye ventilation location away from combustible materials. Large quan-

manufacture ~~~~~~~~~tidies can be collected and atomized in a suitable corn-

Use as a heat-transfer General dilution bustioni chamber. Combustion may be improved bymedium: use as a ventilation: personal muxizg with a more flammable liquid. Ethyl benienedielectric protectie equipment should not be allowed to enter a confined space- such as

a sewer, because of the possibility of an explosion.Liberation during General dilution I* Waste disposal methods:production of ventilation Ethyl benzene may be disposed of:acetoPherlone oy 1. By absorbing it in vermiculite, dry santd. earth Or-oxidation o1 ethyl similar material and disposing in a secured sarut

benzene landfill.

Page 142: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

* LUutkie'"CZ. 1 inlO Ž:su.n'

2.y9 atoiiSnaii be oosincLcr Absorption of Ethyibenzenec :n Man. S rirun JcurMal of

Combustion may be improved by mixing with a more [ndustrnet Medicine. 24.330-332. 1961.

flammable liquid. . Grant. W. M.: raxicoio0l of the Eye (2nd ed.), C. C.

s Thomas. Springfield. Illinois. 19714.

REFERENCES * lntemnationai Labour Oiffice: EA~cycoeaia of Occu pa.uional Health and Saetny, McGraw-Hill. New York.

*American Conference of Governmeflth Industrial 1971.

Hygienhist: "Ethyl Benzene," DocumeflLtatfl of the Patty, F. A. (ed.): T-oxicolov', Vol. 11 of Industimal

Threshold Limit Values for Substancus in Workroom Air Hygiene and Toxicoiouy (2nd ed. rev.). Interscience.

(3rd ed.. 2nd printing), Cincinnati. 1914. New York. 1963.

American Industrial Hygiene Association: 'Ethyl * Union Carbide Corporation. Industrial Medicine and

Benene" Hgieic uid Seies Deroi, Mchian. Toxicology Departmemt: Tozicaiogy Studies - Ethyl

1en5n.' HyincBieSre.Dtot ihgn enzene. New York. 1967.

* Browning, E.: Toxicity and Metabolism of Industrial * Wolf. M. A.. et al.: "Toxicological Studies of Certain

Solyents, Elsevier. New York, 1965. Aklylated Benzenes and Bentene." AMA Archives of

* Depariment of Transportation: CHRIS Hazardous Industrial Health. 14:4, pp. 387.399.1956.

Chemical Data. C0-446.2. U.S. Government PrintingOffice. Washington. January 1914.

RESPIRATORY PROTECTION FOR ETHYL BENZENE

Condition Minimum Respiratory Protection'Required Above 100 ppmn

Vapor Concentration

1000 ppmn or less A chemical cartrndge respirator with a full facepiece and an organic vaporcartridge(s).

2000 ppm or less A gas mask with a chin-style or a front. or back-mounted organic vapor canister.

Any supplied-air respirator with a lull facepiece. helmet, or rood.

Any self-contained breathing apparatus with a full facepiece.

Greater than 2000 ppmn or Self-contained breathing apparatus with a full facepiece operated in pressure-

entry and escape from demand or other positive pressure made.

unknown concentrations

A acmbination respirator which includes a Type C Supplied-air respirator. with a

full facepiece operated in pressure-demland or other positive pressure or contilu-

cus-flow mode and an auxiliary self-contained breathing apparatus operated in

pressure-demand or other positive pressure mode.

Fire Fgtn Self-contained breathing apparatus with a full facepiece operated in pressure-

Fighting ~~demand or other positive pressure mode.

Escape Any gas mask providing protection against organic vapors.

Anty escape self-contained breathing appratu5.

'Only NIOSH-approved or MSI-A-approved equipment should be used.

4 Ethyl Benizenie Septemfber 1913

Page 143: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

MATEMAL SAFETY DATA SHEET p�

t� E X A N SREVISION CF

II

*1'

.� OFFICE REQUEST ...

ORDER NO:PROD NO: 04295110

*1'

VAN WATERS & ROGERS INC. itOC NORTON BLDG. SEATTLE. WA 92104-1564

----------------------------------- EMERGENCY ASSISTANCEp

FOR EMERGENCY ASSISTANCE INVOLVING CHEMICALS CALL CHEMTREC- (900) 4�4-9300.

--------------------------------- FOR PRODUCT AND SALES INFORMATION.....................

CONTACT YOUR LOCAL VAN WATERS & ROGERS BRANCH OFFICE

------------------------------------- PRODUCT IDENTIFICATION

PRODUCT NAME: HEXANE CAB NO. 110-54-3COMMON NArIES/SYNONYMS: N-HEXANE; VW&R CODE: TI&69C CME�C I AL HEXANE� P ETROLSUM SOLVENT

DATE ISSUED: 12/66ORMULA: C& H14�AZARD RATING (NFPA 325M) SUPERCEDES: 02/96

:EALTH: HAZARD RATING SCALE:FIRE: 3 OMINIMAL 3SERIOUSFEACTIVITY: 0 1-SLIGHT 4SEVERESPECIAL: NONE �MODERATE

--------------------------------------- HAZARDOUS INGREDIENTS

EXPOSURE LIMITS. PPMOSHA ACGIH OTHERCOMPONENT CAB NO. % PEL TLV LIMIT HAZARD

r HEXANE 110-54-3 >99 500 50 too FLAMMABLEp (EXXON)

THIS PRODUCT IS A MIXTURE OF ISOMERS CONTAINING APPROXIMATELY:N-HEXAI.JE. CAB NO. 110-54-3 (50 lASS %OTHER SATURATEDHYDROCARBONS CAB NO. UNDEFINED >50 MASS 7.

L------------------------------------------- PHYSICAL PROPERTIES----------------------

�OILLNG POINT, CEO F: 149157 VAPOR PRESSURE. MM HG/25 DEC C: 190MELT:NG POINT. DEC F: C 0 (POUR POINT) VAPOR DENSITY (AIR-i): 2.9SPEC:F1C GRAVITY (WATERI): 0.69 WATER SOLUBILITY. 7.: (0.1AFREARANCE AND ODOR: CLEAR. EVAPORATION RATE (SUTYL ACETATE-i): 15.9COLORLESS� MILD HYDROCARBON ODOR

-----------------------------------------FIRST AID MEASURES

IF INHALED: REMOVE TO FRESH AIR. GIVE ARTIFICIAL RESPIRATION IF NOTBREATHING. CET IMMEDIATE MEDICAL ATTENTION.

IN CASE OF EYE CONTACT: IMMEDIATELY FLUSH EYES WITH LOTS OF RUNNINGATER FOR 15 MINUTES. LIFTING THE UPPER AND LOWER EYELIDS OCCASIONALLY.ST IMMEDIATE MEDICAL ATTENTION.

PROD: 04295110 09:59:49 09 DEC 1999 CUST: INVOICE:

Page 144: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

P1668 ~~MATERIAL SAFETY DATA EHEET2

H E XANE REVISION CF. 07-2i-e7------------------------------- --------------------------------

IN CASE OF SWIN CONTACT: IMMEDIATELY WASH SKIN WITH LOTS OF SOAP ANDtWATER. REMOVE CONTAMiNATED CLOTHING AND SHOES; WASH SEFORE REUSE. GET

-,EDUAL ATTENTION IF IRRITATION PERSISTS AFTER WASHING.

IF SWALLCWED: DC NOT INDUCE VOMITING. GET IMMEDIATE MEDICAL ATTENTION.

--------------------- HEALTH HAZARD INFORMATION---------------------------

PRIMARY ROUTES OF EXPOSURE: INHALATION, SKIN OR EYE CONTACT.

SIGNS AND SYMPTOMS OF EXPOSUREI NHALAT ION: PROLONGED OR REPEATED EXPOSURE OR BREATHING VERY HIGH

CONCENTRATION'S MAY CAUSE DIZZINESS4 UNCONSCIOUSNESS, AND NUM2NESS OFEXTREMITIES. VAPORS MAY IRRITATE THE RESPIRATORY TRACT, MAY CAUSEHEADACHES, ilAY BE ANESTHETIC. OR MAY HAVE OTHER CENTRAL NERVOUS SYSTEMEFFECTS.

EYE CONTACT: LIQUID AND MIST MAY IRRITATE THE EYES.

SKIN' CONTACT: BRIEF CONTACT MAY DRY THE SKIN. PROLONGED OR RE-

PEATED CONTACT MAY IRRITATE THE SKIN. CAUSING DERMATITIS.

SWALLOWED: SWALLOWING THE LIGUID MAY RESULT IN VOMITING. IFVOMI77NG OCCURS SPONTANEOUSLY, DO NOT ALLOW VO11ITUS TO EE DREATHED INTOTHE LUNGS AS EVEN A SMALL QUANTITY IN THE LUNGS MAY RESULT N CHEMICALPNEUMONIITIS AND PULMIONARY EIDEMA/HEMORRHAGE. AND POSSIBLY DEATH.

CHRONIC EFFECTS OF EXPOSURE: OVEREXPOSURE CAN CAUSE POSSIBLY IRREVER-SIBLE NERVE DAMAGE. INDIVIDUALS EXPOSED REPEATEDLY TO HIGH VAPORCONCE'NTRZATIONS ( 1, 000-1. 5OO PPM) OF N-HEXANE OVER A PERIOD OF SEVERALnCNI;.S EXHI~21TED PERIPHERAL POLYNEUROPATHY, A NERVOUS SYSTEM DISgoRDER.PROLO.NGED OR REPEATED SKIN CONTACT MAY LEAD TO DERMATITIS.

MEDICAL CONDITION'S GENERALLY AGGRAVATED BY EXPOSURE: NONE KNOWN.

---------------------------- TOXICITY DATA---------------------------------

ORAI RAT LD50 > 5 G/A

DERMAL: RABBI1T LD5O > 3. 16 G/KG

INHALATION: HUMAN TCLO = 5,000 PPM/10 MIN.

CARCINOCGENICITY: THIS MATERIAL IS NOT CONSIDERED 7O BE A CARCINOGENGY THEIJATIONAL TOXICOLOGY PROGRAM, THE INTERNATIONAL AGENCY FORRESEAR~CH ON CANCER, OR THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

OTHER DATA: NONE

------------------------ PERSONAL PROTECTION --------------

YENTILATION: LOCAL MECHANICAL EXHAUST VENTILATION CAPABLE OF MAIN-

TAINING EMISSIONS AT THE POINT CF USE BE LOW THE PEL.

RESFIRATORY PROTECTION: WEAR A NIOSH-APPROVED SELF-CONTAINED BREATHINGAPPARATUS IN THE PRESSURE DEMAND MODE, OR A SUPPLIED-AIR RESPIRATOR IFUSE CONDITIONS GENERATE VAPORS CR MISTS. A CANNISTER RESPIRATOR MAY BEINEFFECTIVE SINCE THIS PRODUCT HAS POOR WARNING PROPERTIES.

EYE PROTECTION: CHEMICAL GOGGLES UNLESS A FULL FACEPIECE RESPIRATOR ISALSO WORN. IT IS GENERALLY RECOGNIZED THAT CONTACT LENSES SHOULD NOT BEWOR~N WHh.N WORKING WITH CHEMICALS BECAUSE CONTACT LENSES MAY CONTRIBUTETO THE SEVERITY OF AN EYE INJURY.

PROTECTIVE CLOTHING: LONG-SLEEVED SHIRT. TROUSERS. SAFETY SHOES, NEO-PRENE OR POLYURETHANE GLOVES, AND RUBBER APRON.

OTHER PROTECTIVE MEASURES: AN EYEWASH AND SAFETY SHOWER SHOULD BENEARBY AND READY FOR USE.

PROD. 04295110 09:52:49 09 DEC 1998 CUST: INVOICE:

Page 145: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Pi~~~e~~ M-ATERIAL SAFETY DATA SHEET pGHEX ANE REVISION OF: 07-21-87-------------------------------------------------------------------------

*----------- IRE AND EXPLOSION INFORMATION -----------

F LASH POINT, DEG F: -Il FLAMMABLE LIMITS IN AIR, Y.M'ETHOD USED: TOOC LOWER: I UPPER: 7. 8EXTINGUIS.HING' MEDIA: USE DRY CHEMICAL OR C02. WATER MAY BE iN-E=FFEC I VE.

SPECIAL FIRE FIGHTING PROCEDURES: FIRE FIGHTERS SHOULD WEAR SELF-CONTAINED SPREATHING APPARATUS AND FULL PROTECTIVE CLOTHING. USE WATERL ~ SPRAY TO COOL NEARBY CONTAINERS AND STRUCTURES EXPOSED TO FIRE.

UNUSUAL FIRE AND EXPLOSION HAZARDS: EXTINGUISH ALL NEARBY SOURCES OFI GNITION. EXPLOSIVE VAPOR MIXTURES MAY FORM.

UNUSUAL FIRE AND EXPLOSION HAZARDS: AVOID ACCUMULATION OF WATER BECAUSETHIS PRODUCT WILL FLOAT ON WATER AND MAY REIGNITE ON THE SURFACE OF THEWATER.

L------------------------HARDURECITY---------------------------HZROS EATVY

STABILITY: STABLE POLYMERIZATION: WILL NOT OCCURCONDITIONS T0 AVOID: OPEN FLAMES, WELDING ARCS, OR OTHER HIGH TEll-L PFERATURE SOURCES WHICH MAY CAUSE EXPLOSION.

MATERIALS TO AVOID: OXIDIZING AGENTS.

P4AZA;:OUS DECOMPOSITION PRODUCTS: MAY LIBERATE CARBON MONOXIDE, CARSONDIOXID;E, AND UNIDENTIFIED ORGANIC COMPOUNDS IN BLACK SMOKE.--------------------- SPILL, LEAK. AND DISPOSAL PROCEDURES----------

A:TDNr TO TARE FOR SPILLS OR LEAKS: WEAR PROTECTIVE EQUIPMENT INCLUDINGCRUBBER 2OOTS. RU33ER GLOVES, RUBBER APRON, AND A SELF-CONTAINEDEREATHI1NG A=PP;A-AUS INs THE PRESSURE DEMAND MODE OR A SUPPLIED-AIR PES-'IRATOR. IF TH-E'SPILL OR LEAK IS SMALL, A PULL FACEPIECE AIR-PURIFYING;ARTRIDGE RESPIRATCR EQUIPPED FOR ORGANIC VAPORS MAY BE SATISFACTORY._N ANY EVENT, ALWAYS WEAR EYE PROTECTION. EXTINGUISH ALL IGNITIONSOURCES AND ENSURE THAT ALL HANDLING EQUIPMENT IS ELECTRICALLY GROUNDED.p ~FOR EMIAIL SPILLS OR DRIPS. MOP CR WIPE UP AND DISPOSE OF IN DOT-APPROVEDWASTE CONTAINERS. FOR LARGE SPILLS. CONTAIN BY DIKING WITH SOIL ORL ~ OTHER NOCN-COMBUS71IBLE A3SCRSENT MATERIALS AND THEN PUMP INTO DiOT-A;PRWYED WASTE CCNTAINE;SJ OR. ABSORB WITH NON-COMBUSTIBLE SORB~4ENT-MATER'IAL, PLACE RESIDUE IN DOT-APPROVED WASTE CONTAINERS. KEEP CUT OFSEWEEDSTORM SRAINS. =URFACE WATERS, AND SOIL.COMPLY WITH ALL AP:PLICABLE GOVERNMENTAL REGULATIONS ON SPILL REPORTING,AND HANDLING~ AND DISPOSAL OF WASTE.DISPOSAL METHODS: DISPOSE OF CONTAMINATED) PRODUCT AND MATERIALS USEDIi IlN CLEANING UP SPILLS OR LEAKS IN A MANNER APPROVED FOR THI-S MATERIAL.CONSULT APPROPRIATE FED)ERAL, STATE AND LOCAL REGULATORY AGENCIES TOASCERTAIN PROPER DISPDSAL PROCEDURES.NOTE: EMPTY' CONTAINERS. CAN HAVE RESIDUES. CASES AND MISTS AND ARESUBJECT TO PROPER WASTE DISPOSAL, AS ABOVE.

------------------------------ SPECIAL PRECAUTIONS --------------HANDLINOC AND STORAGE PRECAUTIONS: KEEP AWAY FROM HEAT, SPARKS, ANDFLAMES. STORE IN A COOL. DRY. WELL-VENTILATED PLACE AWAY FROM INCOM-PATIBLUE MATERIALS. VENT CONTAINER FREQUENTLY, AND MORE OFTEN IN WARM -WEATHER, TO RELIEVE PRESSURE. ELECTRICALLY GROUND ALL EQUIPMENT L4HENHANDLING THIS PRODUCT AND USE ONLY NON-SPARKING TOOLS. KEEP CONTAINERTIGHTLY CLOSED WHEN NOT IN USE. DO NOT USE PRESSURE TO EMPTY CONTAINER.WASH THOROUGHLY AFTER HANDLING. DO NOT GET IN EYES. ON SKIN. OR ONCLOTHING.

REPAIR AND MAINTENANCE PRECAUTIONS: DO NOT CUT. GRIND, WELD, OR DRILLON OR NEAR THIS CONTAINER.

nTHER PRECAUTIONS: CONTAINERS, EVEN THOSE THAT HAVE BEEN EMPTIED. WILLETAIN PRODUCT RESIDUE AND VAPORS. ALWAYS OBEY HAZARD WARNINGS ANDANDLE EMPTY C:NTAINERS AS IF THEY WERE FULL.

PROD. C4295t10 O09:!9:46 09 DEC i999 CUST: INVOICE:

Page 146: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

; , 6 t Cm :lA1LflIPL =ArM. * IMI 4I 4 -

HEXANE REVISION OF:07-2 1 -a 7 j

------------ -- FOR ADDITIONAL INFORMATION--------- ----

CONTACT DOUGLAS EISNER, TECHNICAL DIRECTOR, VAN WATERS & ROGERS INC.DURING BUSINESS HOURS. PACIFIC TIME (206)447-5911 -

---------------- NOTCO T I CE------------ -- --

*.VAN WATERS I. ROGERS INC. ('VW&R') EXPRESSLY DISCLAIMS ALL EXPRESS

OR IMPLIED WARRENTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULARPURPOSE. WITH RESPECT TO THE PRODUCT OR INFORMATION PROVIDED HEREIN.

**

ALL INFORMATION APPEARING HEREIN IS BASED UPON DATA 03TAINED FROM THE

MANUFACTURER AND/OR RECOGNIZED TECHNICAL SOURCES. WHILE THE INFORMA-

TION IS BELIEVED TO BE ACCURATE. VWLR MAKES NO REPRESENTATIONS AS TO

ITS ACCURACY OR SUFFICIENCY. CONDITIONS OF USE ARE BEYOND VWLR'S CON-

TROL AND THEREFORE USERS ARE RESPONSIBLE TO VERIFY THIS DATA UNDER

THEIR OWN OPERATING CONDITIONS TO DETERMINE WHETHER THE PRODUCT IS

SUITABLE FOR THEIR PARTICULAR PURPOSES AND THEY ASSUME ALL RISKS OF

THEIR USE. HANDLING. AND DISPOSAL OF THE PRODUCT. OR FROM THE PUBLICA-

TION OR USE OF. ORt RELIANCE UPON. INFORMATION CONTAINED HEREIN. THIS

INFORMATION RELATE'S ONLY TO THE PRODUCT DESIGNATED HEREIN. AND DOES NOTRELATE TO ITS USE IN COMBINATION WITH ANY DTHER MATERIAL OR IN ANY OTHER

PROCESS.

-- ------------------------- REVISION-----------------

12/86:. CORRECTED NFPA SIGNAL AND REFERENCE. REVISED COMPOSITIONDESCRIPTION. CORRECTED VAPOR PRESSURE. EXPANDED INHALATION AND

SWALLZWING HAZARDS. REVISED ANIMAL TOXICITY DATA. EXPANDED PERSONALPROTECTION. FIRE FIGHTING INFORMATION, SPILL AND LEAK PROCED-ZURES. AND

HANDLING ADVICE.

E ND O F MS DS_

PROD: 04295110 09:59:49 09 DEC 1999 CUST: INVOICE:

Page 147: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

OCCUPATIONAL SAFETY AND HEALTH GUIDELINE FOR

INORG.ANIC LEAD

INTRODUCTION Waring propertiesEvnluadionof waflin9PW0PcrnUc formrspirator selection: Based

L "~~~Inorganic lead' is defined as lead oxides. metallic lead, and on lack of information on odor theshold and eye irritation lev-

lead salts (including oruznic saLts such as lead soaps but ex- els. inorganic lead should be treated as a chemical with poor

cluding lead arsenaut). This guideline summ~arizes pertinent warning properties.

S ~~~information about inorganic lead for workers. employers, and

occupational safety and health professionals who may need EX O U ELMT

such information to conduct effective occupational safety and EXOU ELMThealh prgram. Reomanndat~flSmay e suerse ~'The current Occupational Safety and Health Administrationl

d~eveliotiments in these fields: therefore. readers axt: advised toretrd hes reommndaion asgenrziguidelines. kOSHA) permissible exposure limit tPEL) for inorganic lead

is 50 micrograms of lead per cubic meter of air (wgimril as a

time-weighted avenage (TW/A) concentration over an S-hour

SUBSTANCE IDENTIFICATION workshift. If a worker is exposed to lead for more than S hoursin any workday. the PEL. as a TWA for that day. shall be

*Formula: Pb reduced according to the following. formula: maximum per-

Synonyms: C.!. pigment metal 4. C.!. 17575. KS-4. lead missible limiut (in *mg/n) = 400 divided by hours worked in

flake, lead S2 the day. The National Institute for Occupational Safety and

*Identifiers: CkS 7±39.92-i: RTECS OF7525000 DOT 1794 Health (NIOSH) recommended exposure limit IREL.) is l00

*Appearance and odor: Bluish-white. silvery, or gray odor- Mig/rn as a TWA for up to a 10-hour workshift. 40-hr. work-

I:solid week. The American Conference of Governmental Industrial

less ~~~~~~~~~~~~~Hygienists (ACGIH) threshold limit value tTLV1) is 0.15

CHEMICAL AND PHYSICAL PROPERTIES mgrn3 (1504119) as aTWA for anormal -hour wrkday andCHEMICAL AND PHYSICAL PROPERTIES a 40-hour workweek (Table U).

*Physical data I. Molecular ~~~~~~~Table 1.-Occupational exposure limits

1. olcuarweight: 207'1 for inorganic lead

2. Boiling point (at 7760 mmifg): 1.740"C (3.164¶F) ______________________

P ~~~~3. Specific gravity (waier - 1): 11.34 Exposure units

4.Melting point: 3217.V'C (621.5¶)

5. Insoluble in water OSAPLTA50

*Reactivity NIOS RLTW 0

I. Incompatibilities: Lead reacts vigorously with oxidizing ACorn TiLV' TWA ISO

materials. Contact with hydrogen peroxide or active metals * Air level to be maintained such that worker blood lead re-

such as sodium or potassium may cause fires or explosions, mains ( 60 jMi] 100g.

2. Hazardous decomposition products: Toxic fumnes (e.g., lead

oxide) may be released in a fire involving inorganic lead. HE LH AZ R INO M T N

* Flammability Had r ooie o r rpieRueAT HAZApsRDe NO M TOj ~~~~1. Extinguishant: Dry sn.dydlmto r rpie *Rnso pSf

2. Caution: Ledi obsil npwe omwe xoe Inorganic lead may cause advente health effect followingto heat or flamc ~ ~~~~~~~exposure via inal~ation or ingestion.

U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES

Public Health Service Centers for Disease ControlNational institute for Occuoatiorial Safety arid Health

Division of Standlards Development and Technology Transfer

~~~~O

Page 148: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

a Summary of toxicology *Prepiacement mredical evaluation

1.Effects on aninmais: In rats or mice, chronic oral Priorto placing a worker in a~ob witna 2 Dteni:ai for exoosure

dmntrtion or subcutaneous or inurapentoneal injection of to inorganic lead, the physician snouid CY3Ju2LC alto document

lead subacetate. lead acetate, or lead phosphate produced the worker s baseline health status with thorouan rmezicail. en.

cancer of the kidneys. Intravenous or intrpentonead injecton virarimental. ano =cupational histonies. a prnysicai examina.

of lead nitrate, lead acetate, or lead chloride to pregunr miuce, tioni. and physiologic and laboratory rests approprnate for the

,rats, or hamsters caused increased fetal mortality and anticipated occupational risks. These snouid concentrate on .

malfonrations of the postenior exti-erutics and urogenuital and the function and integrity of the kidneys and -,ie hernatoposet.

intestinal tracts in the offspring. ic (blood ccii forming), nervous. gastroinieszinal, and2. Effect.s on nunans: Inihalation or ingestion of inorganic lead reproductive systems.

has ausd prphralneuopahy wth araysi ofthemusles A preplacement medical evaluation is recommended in order i

of the wrists and ankles. encephalopathy, anemnia (due to todetct andassespreexsting or concurrent conditions which

decreased red blood cell life and impaired herne synthesis). may be aggravated or result in increased nisk when a worker

proximal kidney tubule damage, decreased kidney function. is exposed to inorganic lead at or below the NIOSH REL.and chronic kidney disease. Lead can accumulate in the softissues and bones: with the highest accumulation in the liver Thecaruingr physician should considerthe probable frequen-

and kidneys, and elimination is slaw. Lead can penetrate the cy. intensity, arid duration of exposure. as well as the nature

placental barrier, resulting in neurologic disorders in infants, and degre of the condition, in placing sucn a worker. Such

* Signs and symptoms of exposure conditions, which should nor be regarded as absolute contrain-1. Shorn-rerm (acute): Exposure to inorganic lead can cause dications to job placement. include preexisring neuromuscu-

decreasd appeicte. insomnia. headache, muscle and joint pain. lar disease. In addition to the medical interview and physical

colic, and constipation, examination, the physician should consider obtaining addition-

2. Lon g-,erlM (chmonsc;: Exposure to inorganic lead can cause al baseline electrophysiologic and elecircriomyrapnic studies

weakness, weight loss, nausea, vomiting. constifpatiofl. blue and an assessment of femtliuy, using s~anceard:zed methods and

or blue-black dot-like pigmentation on the gums C"lead line"), evaluation criteria. The physician should also obtain baseline

severe headache and abdomninal cramps. delirium, convulsions. values for the complete blood count inciuding the reticulocyteand coma. ~~~~~~~~~~~~~count and for those tests which characterize prior internal ex-

posurc (e.g.. blood lead level) and the effects of prior exposures

RECOMMENDED MEDICAL PRACTICES (e.g. erythrocyte zinc protoporphyrin and delta-

*Medical surveillance programamolviiccddeyrgne)Workers with potential exposures to chemical hazards; should *Periodic medical screening and/or biologic monitoring

be monitored in a systematic program of medical surveillance Occupational health interviews and physical examinations I

intended to prevent or control occuipational injury and disease. should be performsd at regular intervals. Additional examina-

The program should include educaition of employers and work- dions may be necessary should a wiorker deveiop symptoms that

ens about work-related hazards, placement of workers in jobs may be attnibuted to exposure to inorganc lead. The interviews.

that do not jeopardize their safety and health. earliest possi- examinations, and appropriate medical screening and/or bio-

ble detection of adverse health effects. and referrra of workers logic monitoring tests should be directed at identifying an cx-

for diagnostic confirmation and treatment. The occurrence of cessive decrease or adverse trend in the physiologic function

diseaset(a '"sentinel health evnt.' SHE) or otherwork-tciated of the kidneys and the hematopoietic (blood cell forming).adverse health effects snould prompt immediate enaluation of nervous. gastrointestinal. and reproductive systems as comn-

primary preventive measures (e.g., indusmiali hygpene moitomtr- pared to the baseline status of the individual worker or toex-

ing. engineering controls, and personal protec=v equipment)- pectie values for a switable reterence population. The fbillowing

A miectical surveillance program is intended to supplement, nti mem should be used and interpreted according to standardized

replace. such measures. epidemiologic procedume and evaluation criteria: a comiplete

A medical surveillance program should inld ytms:ci blood count with rediculocyte count and those tests which

lecrion and epidemiologic analysis of relevant erwiruirnmental caracterize prior internal exposure (e.g.. blood lead level) and

and biologic monitoring, medical screening, morbidity, and teefcso xoue eg.eyhvyezn rtprh

mortality data. This anialysis may prmvide information about inandewmoevincc Idehrens)

the relatedness of adverse health effects Ind ocuptonal ex- *Medical prmcdc.s recmmewded at the time of job tran-

posure that cannot be discerned from results in individual fer or terminationworkers. Sensitivity. specificity, and predictive values of bio- The medical. enivironmrental, and occupational history inter-

logic monitoring and medical screening test should be evalu- views, the physical examination, and selected physiologic and

ated on an industry-wide basis prior to application in any give laboratory tust which were conducted at the time of placeliivt

worker group. Intrinsic to a surveillance program is the dis- should be repeated at the time of job transfer or tenrminationi.

sermniarion of summary data to those who rieed to krow, in- Anzy changes in the worker's health starus should be comparedcluding employers. occupational health profesuionals. to those expected boraI suitable reference population- Because

potentially exposed workers, and meulatnry and public health occupational exposure to inorganic lead may cause adverse

agencies,' reproductive effect and diseases of proionged induction-i

2 Inorganic Land

Page 149: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

yond tenmmtinLon ot empLoyment, mec storatC or use 01 procucis ror znewlng SfclC~d be :rcroaii-

V * ~~~Sentinel health events ed in work areas.

I. Acute SHE's include: Acute renal failure. Workers who handle inorganic lead should wash their faces.2. Delayed-onset or reproductive SH-I's include: lnflamrna- hands, and forearm thorougnly with soap and water before

tory and toxic neuropathy and chronic renal failure. eating, smoking, or using toilet facilities.

MONITORING AND MEASUREMENT COMMON OPERATIONS AND CONTROLSPROCEDURES

* TWA exposun evaluation ~~~~~Common operatuIons in which exposure to inlorganic lead mayTWA exposure evaluation ~~~~occuir and conurol methods which mary be effective In each case

Measurements to deterrrune worker exposure to inorgaic lead, aelsd nTbe2should be taken so that the TWA exposure is based on a single aelse nTbe2

entire workshift sample or an appropriate number of consecu- Table 2.-Oper-ationls and methods of*9 av~~t~e samples collected during the entire workshift. Under cer- cnrlfriogncla

tmin conditions, it may be appropriate to collect several cnrlfriognclashort-term interval samnples (up to 30 mtinutes each) to deter- Operations Controls

mine the average exposure level. Air samples should be taken During primairy (ore) and Process enclosure, local cx-in the worker sbrtathinz zone (air that most nearly represents secondary (scrap) smelting haust ventilation, dust con.that inhaled by the worker). of lead: duningthc mnanufac- trol. personal protective*Method tufe of storage batteries: equipment

Sampling and analysis may be performed by collecting mor- during typecasting andganic lecad with cellulose membrane filters followed by acid remelting of type meta in

digestion and analysis by atomic absorption. A detailed samn- printingfl~~~~ pling and analytical method for inorganic lead may be found

in the WIOSH Manual of Anal.%'tCal MfethodS (method nurm- During soldering in the Poesecoue oa xber 1082). fabrication of metal articles haust ventilation. personal

PERSONAL PROTECTIVE EQUIPMENT protective equipmentDuring melting and pouning tLocal exhaust ventilation.

Chem-ical protective clothing tCPC) should be selected after of lead and alloys containing personal protective equip-P ~~~~utilizing available performance, data. consulting with the lead: during welIding, burn- ment

manufacturer, and then evaluating the clothing under actual use ing. and cutting of metalconditions. structures containing lead or

Workers should be provided with and required to use aC. painted with lead containinggloves, face shields (8-inch minimum) and other appropriate surface coatingsprotective clothing necessary to prevent skin contact with in- Drn h s fla nde Lclehutvniain

organic lead. ~~~~~~~~~~manufacure of surface coat- personal protective equip-

Workers should be provided with and requirtc to use oust-proof trigs, including paints and mentsafety goggles where inoilafic lead may come in contact w ith varnishes: during the

B ~~~~the eyes. manufacture of ceramics& ~~~~~~~~~~~~~~~~~~~~~and glassSANITATION

L ~~~~Clothingt which is contaminated with inorganic lead should be EMERGENCY FIRST AID PROCEDURESremoved immiediately and placed in closed containers forstorage until it can be discarded or until provision is made for In the event of an emergency, remove the victim from furtherthe removal of inorganic lead from the clothing. If the cloth- exposuit. send for medical assistance, and initiate emergen-ing is to be laundered or cleaned, the person performing the cy procedures.operation should be informed of inorganic lead's hazardous * Eye exposmar

properties. ~~~~~~~~~~~~Where there is any possibility of a worker's eves being exposedChane an shoer oomsshoud beproidedwithsepaate to inorganic lead, an eve-wash fountain should be providedChane an shoer oomsshoud beproidedwithsepaate within the immediate work area for emergency use.

locker facilities for street and work clothes.Skintha becmescontaminated with' inraic lad should be If inorganic lead ueus intothe eyes. flush them immediately with

Skin that becomes inorganic ~~~~large amounts o1 water for 15 minutes. lifting the lower and up-promptly washed with soap and watert per lids occasionally. Get medical attention as soonl as possi-

The storage. preparation, dispensing, or consumption of food ble. Conisa lenses should not be worn when working with thisor beverages, the siorage or application of cosmetics, the compound.

j m~~~~~~~~~~~~~~~~~~~~~Iorgan - .a.

Page 150: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

n~~l~ ~~*'~ vrxer S aouir> :o Perform tze "crK IrflI wearing a rescira.21a0 noreanic ~tad. factlities for quicxi crenicning of the Doav ior, the reewar training ot personnel, 'it testing, peniocic en.should be ;rovided within dhe immediate work area for emer- vironmental monitoring. maintenance. inspecIion andgencY use. clearung. The implementation of an adequate reprtr pro.,,=u ion progpan. including Selection of the corr= reIf inoruantic lead gets on the skin, wash it immiediately with soapraorand water. If inorganic lead penetrates the clothing, remove thle requires that a knowledgeable person be in charge of the pro-.clothing immediately an wasn the sWin with soap and water. gnun and thut the program be evnluated regularly.Get medical attention promptly. Only respirators that have been approved by the Maine Safery

Rescue and Health Adnriruswataon (MSHA, formerly Minting Entoree-I f a worker has been incapacitated, moae the affected worker ment and Safety Administatnuon) and by NIOSH should be,from the hazardous exposure. Put into effect the established used. Remember! Akr-purifying respirators will not pmo-emertency rescue procedures. Do not become a casualty. Un- teat fromn oygen-defildenz atmosphera.dersiand the facility's emergency rescue procedures and know For each level of respirator protection, only those rsiratorsthe locations of rescue equipment before the need anses. that have the minimum required protection factor and men

other use remnrcuions ame listed. All respiratons that have higherSPILLS AND LEAKS Protecaion factors may also be used.Workers not wearing prmtecve equipment and clothing should BIBLIOGRAPHYbe restricted from areas of spills or leaks until cleanup has been A eia ofrneo oenetlIdsracompleted. *A eia ofrneo oenetlIdsra

Hygienists: "Lead," Docummnzrnwon of rthe Threshold Linit IIf inorganiciLeadis spilled or leaked,.the following stps should Values antid Biolouical Exposure Indiices (5th ed.), Cincintuw.be taken: .196Remove a21 ignition sources. a American Conference of Governmental Industrial2.Ventilate area ot spill or leak. Hygienists: 77M~i Thrthold Limtit Iilues and BiologicalaEr3.For small quantities of liquidis containing inorganic lead. ab- P~ur Indices finr 1987.88. Cincinnati, 1987.sorb on paper towels and place in an appropriate container. * American Industinui Hygiene Association: "Lead and Its In-

-Larze quantities of liquids containing inoreanic tad may be organic Comnpounds" (rev. 1964), Hlygienic Guide Serits.absorbed in vermiculite, dry sand, earth, or asimrular materi- Dtot 94al and placed in an appropriate Icontainer. * American Lung Association of San Diego and Imperial5. If in solid form, inorganic lead may be collected and placed Counties: "Taking the Occupational History," Annals of in- 1in an appropriate container, erenal Medicine. 99:641-651. November 1983.6. Inorganic lead may be collected by vacuuming with an ap- COlao. G. D.,ald Claytonl.F E. (ds.): Tazicobogy, Vol. ILApropriate system. Of~zhWYindIunclyienean~d 1axoioy(3rdrvv ed.),Iohnj

Alley & Sons, Inc.. New York. 1981.WASTE REMOVAL AND DISPOSAL Code Of Fedtenal Reguiawions. U.S. Department of Labor. ccupatiOnal Safety and Health Amtrnusuatjon, 29 CFR l91QI134,U.S. Environmental Protection Agency. Department of Trans- 1910.1025. OSHA 2206, revised July 1, 1986.coonation. anu;or staie and local regulations shall be followed * Code of Federal' Regulations, U.S. Depantment of Trmnspor-io assure thit rcmovul. transport. and disposal are in accord- tation. 49 CFR 172.101. Transportation 49. revised October!.,arnce '~ith cmsijiri rcculations. 1982.Goldman. R.H.. and Peters. JM.: "The Occupational andIRESPIRATORY PROTECTION Envirornmental Heath History."Journal of he Anwincan Med-

It must be scre~ssd chat the use or respirators is the least icad Association. 246:2831-2836. 1981.prefrredmc~h of ontrllin worer eposue an shold * Halperin. WE., Razclitfe, I.. Frazier. T.M.. Arilson. L.,preferredmav e uod asteol as of controling wreexoueadsoul Beker. S.P.. and Shulte, P.A.: "Medical Screening in thenot nrmaly be sed s theonlymean ofkpac:preventingpls, orat f ccpaioaminimizing exposure during routine operations. However. Merdpicie: Propose Princples; Jo19l8fO6upzothere are some exceptions for which respirators may be used Meine28):4-S.196

to controltexpoture: when engineering and work practice con- Hakno.IL;"umnr Function Testing in thetros re ottechnically feasible, when engineering controls cenn fWres udlns for Instrumentaton. Per-

are in the process oi being installed, or during emergencies and .e 81)18.02 96certain maintenance operations including those requiring Cin. Hawley, 08.19.: 1986.ne Cetca icinryWlconfined-space entry (Table 3) *Hwe.00:T.Cnese hmclDcinr 1ted.), Litton Educational Publishing. Inc.. New York. 1981.In addition to respirator selection, a complete respiratory pro- * International Agency for Research on Cancer: h1IC Mono.tection program should be insuanited which assa minimumn corn- graphs on rthe Carcmnogenic Risk of Oiemicais to Humlans,plies with the requirements found in the OSHA Safety and Some Memais and metalici Cpmounolrid Vol. 23 Lyo.v France.Health Standards 29 CFR 1910.134. A respiratory protecetion 1980

4 Inorganic Lead 18

Page 151: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

t.VQ yuTCr .ampting )trajegy Martual. w-.. u~epanmrrent or Lewis, R 1. (edS.). C.ncxinnari. Aprijl 1985.I ~~~~~Health. Educarion, and Welfase. Public Hextt Service. Center * proctor. N.H.. ano Hughes. I.?.: Chemical Hazard: offor Disease Controi. National Insuirutefor Occupaunonl Saferv Workplace. I.E. Lippincon Company. Philadelphia.[ 197and Health. DHEW (NIOSH) Publication No. 77-7.Cni- *Rom. WV N. (ed.l: Ennmnarmenliad and Occupational Afe

nau. 1777. ~~~~~~~~~~cmin Litrle. Brown and Company, Bosion, 1933.Ltvy, B.S.. and Wegrian. D. H. (eds.): Occa panonal Health: * Rothstein. M.A.: Medical Screening Of Hbrkern. Bureat

Recognizing and Preventing Wirk-Rulazed Disease. Little. National Affairs, 'Aiashington. DC. 1984.I ~~~~~~Brown and Company, Boston, 1983. * Rutstein. D-D.. Mullan, R.J.. Frazer, T.M.. Halpe:a Mark. H. F., Othxner, D.PF., Overberger. C.C.. Scaborg, G.T., W.E.. Melius. J.M.. and Sestito, 1.P.: "Seminej Health EvtGrn'son.-M.. and Eclaoth. D. (eds.): Kirk-COrhmerEncvciope- (Occupational): A Basis for Physician Recognition and PI W~~~~~da of Oterjcal Technorlogy (3 rd ed.). John Wiley & Sons, Inc., lic Health Surrveilancc." Amenican Journai of Public fleaNew York. 1981. 73:1054-1062. 1983.* National Insdmute for Occupational Safery and Health. U.S. * Sax. N.I. (ed.): Dangemu~s Prpemnesofira.d=,WMwer

I ~~~~~~Department of Health. Education, and Welhuu. Public Health (6th ed.). 'An Nostrand Reinhold Company. New York. 19Service, Center for Disease Control: Criteria for a Recoin- *Scientific Assembly on Environmentai and Occupaticmended Satandard.... OccuPational Eripasure to Inorganic Health: -Evaluation of Impairmient/Disability Secondar,Le-ad-Rrvnsed Crierena 1978, DHEW (NICSH) Publication Respiratory Disease." American Review of RespirultTr £No. 784-58. Cincinnati. 1978. eaves, L26:945-951. 1982.

*National Institute for Occupational Safery and Health. U.S. *Scientific Assembly on Environmental and OccupaticDepartment of Health and Human Services. Public Health Health: "Surveillance for Respiratory Hazards in the OccuService. Centers for Diseaise Control: NMOSH!Manual of Aria- tional Sening, American Review of Respiratron DiseaMizcal Methods O3rd ed.. Vol. 2). Eller. P.M. (ed.). OHMS 126:952.956. 1982.(NIOSH) Publication No. 8.4-100. Cincinnati, 1984. *Weast. R C. (ed.): CRC Hanabook of Ch emist r and P;*National Institute for Occupational Safety and Health. U.S. icr (64th ed.), CRC Press. Inc.. Boca Raton. Florida. tc

Department of Health and Human Services. Public Health s Windholz. M. (ed.): The Merck Index (10th ed.). MereService. Centers for Disease Control:Regrstrrof 7thuic Effects Co.. Inc.. Rahway. New Jersey. 1983.

4L

I ~~~~~~~1988 Inor

Page 152: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Tabble 3.-Respirattory Protection for inorganic lead

Condition Minimum respiratory pvw oreConcentration:

Less than or equal to Any supplied air respirator0.5 mg/rn 3

Any air-purifying respirator with a high-efficiency particulate filter

Any self-contained breathing appanztus

Less; than or equal to Any powered air-punfing respirator with a high-efficiency particulate filter1.25 mg/rn'

Any supplied-air respirator operated in a continuous flow mode

Less than or equal to Any air-purnfying full 6acepiece respirator with a high-efficiency particulate filter2.S mg/ml3Any powered air-punifing respirator with a tight-fining facepiece and a high-efficiencyparticulate filter

Any self-contained breathing apparatus with a full facepiece

Any supplied-air respirator with a full facepiece

Any supplied-utrrespirator with atight-fitting facepiece and operated innaconinuous flowmode

Less than or equal to Any supplied-air respirator with a half-mask and operated in a pressur~e-dmand or other50 mg/rnl positive pressure mode

Less than or equal to Any supplied-air respirator with a Mul facepiece and operated in a pressure-demind or[00 mg'mri other positive pressure mode

Plannec or emergency enrur into Any self-contained breathing apparatus with a full facepiece and operated in a pressure.environments containing unknown demand or other positive pressure modemg/mltin o evl Any supplied-air respirator with a full facepiece: and operated in a oressure-clemand or

other positive pressure mode in combination with an auxiliary self-contaned breathingapparatus operated in a pressure-demand or other positive pressure mode

Firefighting Any self-contained breathing apparatus with a full facepiece and operated in a pressure- Idemand or other positive pressure mode

Escape only Any atir-purifying full f6cepiece respirator with a high-efficiency particulate filter

Anty appropinata escape-type self-contained breathing apparatusOnly NIOSX/MSHA-apprcrvea equipment should be used.

tThe respiratory protection listed for any given condition is the minimum required to ma= the NIOSH RELof lW0pgimn3 (TWA).

6 Inorganic Leand 1981

Page 153: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

P1I2,~ MATERIAL SAFETY DATA SHEET P

:SCP;CFYL Al-COHOL ANHYD 99.77. VWR REVISION CF:07-2 1 - 7------------------------------------------------------------------------------------------------------------------------

*.OFFICE REGUEST**

ORDER NO:

PROD NO: 04326859

L ~~VAN WATERS & ROGERS INC. 1600 NORTON BLDG. SEATTLE, WA 98104-1564------------------------------ EMERGENCY ASSISTANCE--------------

FOR EMERGENCY ASSISTANCE INVOLVING CHEMICALS CALL CHEMTPEC(200) 424-9300.

------------------------- FOR PRODUCT AND SALES INFORMATION.....................

CON4TACT YOUR LOCAL VAN WATERS & ROGERS BRANCH OFFICE

----------------------------- PRODUCT IDZENTIFI CATI ON............................

PRODUCT NAME: ISOPROPYL ALCOHOL CAS NO.: 67-63-0COMMON NAMES/SYNONYMS: ISOPROPANOL; VW&R CODE: T12382-PPOFANCL; DIMETHYL CARBINOL; IPA

:CQRMULA: C3 H! a DATE ISSUED: 09/97HAZARD RATING (NFPA 704) SUFERCEDES: 06/86

HEALTH: I HAZARD RATING SCALE:FIRE: 3 OSMINIMAL 3-SERIOUSREACTIV)ITY: 0 lCSLIGHT 4-SEVERE

P ~~~SPECIAL: NONE 2rnIODER ATE

------------------------ HZROSIGEINS--------------------------HAADU NRDET

EXPOSURE LIMITS, PPMOSHA ACGIH OTHER

I' ~~~~COMPONENT 7. PEL TLV LIMIT HAZARDISOPROPYL ALCOHOL >99 400 400 500 FLAM¶MABLE

(ACGIH STEL)

------------------------------- PHYSICAL PROPERTIES-----------------------------

ZOILING POINT, DEC F: 191 VAPOR PRESSURE, MM H40/20 DEG C: 331siLTliJG POINT. DEG F: -127 VAPOR DENSITY (AIR=I): 2.07SPECIFIC GRAVITY (WATER=I): 0.79 WATER SOLUBILITY, 7.: 100APPEARANCE AND ODOR: CLEAR, EVAPORATION RATE (BUTYL ACETATE-i): 3COLORLESS LIQUID; MEDICINAL ALCOHOLIC ODOR

I'--- ----------------------- -- FIRST AID MEASURES---------------IF INHALED: REMOVE TO FRESH AIR. GIVE ARTIFICIAL RESPIRATION IF NOTBREATHING. GET IMMEDIATE MEDICAL ATTENTION.

IN CASE OF EYE CONTACT: IMMEDIATELY FLUSH EYES WITH LOTS OF RUNNINGWATER FOR 15 MINUTES. LIFTIN4G THE UPPER AND LOWER EYELIDS OCCASIONALLY.GET IMMEDIATE MEDICAL ATTENTION.

IN CASE OF SKIN CONTACT: IMMEDIATELY WASH SKIN WITH LOTS OF SOAP ANDWATER. REMOVE CONTAMINATED CLOTHING AND SHOES. WASH BEFORE REUSE. GET'EDICML ATTENTION IF IRRITATION PERSISTS AFTER WASHING.

PROD. 04326S59 09: 59:35 09 DEC 1988 CUST: INVOICE:

Page 154: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

IIATERIAL SAFETY DATA SHEET PC 2

ISOPROYL ALCOHOL. ANHYD 99.77. VWR .REVISION OF-O7-21-ei

IF SWALLOWEU: IF CONSCIOUS, IMMEDIATELY INDUCE VOMITING BY GIVING 2

GLASSES OF WATER AND STICKING A FINGER DOWN THE THROAT. GET IMr-EDIATE

'mEDICAL ATTENTION. Do NOT GIVE AN4YTHING BY MOUTH TO AN UNCONSCIOUS

OR CONVULSING PERSON. KEEP THE VICTIM'S HEAD BELOW HIS HIPS WHILE

VOMITINO SO HE DOES NOT BREATHE THE VOMITUS INTO HIS LUNGS.

------------------------ HEALTH HAZARD INFORMATIIN ------------

PRIMARY ROUTES OF EXPOSURE: SKIN OR EYE CONTACT. INHALATION. SWALLOWED

SIGNS AND SYMPTOMS OF EXPOSUREINHALATION: VAPORS AND MISTS IRRITATE THE NOSE AND THROAT. IN-

HALATION OF HIGHER CONCENTRATIONS MAY CAUSE HEADACHES. VOMITING. AND

COMA. INHALATION' OF VERY HIGH CONCENTRATIONS OR PROLONGED EXPOSURE

MAY CAUSE UNCONSCIOUSNESS OR DEATH.

EYE CONTACT: VAPORS WILL IRRITATE THE EYES. LIQUID AND MIST'S CAN

SEVERELY IRRITATE OR DAMAGE THE EYES AND CAUSE CORNEAL BURNS.

SKIN CONTACT: BRIEF CONTACT MAY DRY THE SKIN. OR CAUSE BURNING OR

STINGING SENSATION. PROLONGED OR REPEATED CONTACT MAY IRRITATE THE

Sli.IN, CAUSING DERMATITIS.

SWALLOWED: SWALLOWING LARGE QUANTITIES CAUSES HEADACHES. NAUSEA,

VOMITING. STOil.ACH CRAMP'S AND DIARREHA, AND PERHAPS UNCONSCIOUSNESS. OR

DEATH.

CHRONIC EFFECTS OF EXPOSURE: PROLONGED OR REPEATED EXPOSURE -TO HIGH

CONCENTRATIONS CAN PRODUCE SEVERE OR FATAL CNS DEPRESSION.

MEDICAL CONDITIONS GENERALLY AGGRAVATED BY EXPOSURE: PERSONS WITH

PF.E-EXISTINIG SKIN DISOFZERS~,EYE PROBLEMS. OR IMPAIRED RESPIRATORY

FUNCTION MAY SE MORE SUSCEPTIBLE TO THE EFFECTS OF THIS SUBSTANCE.

------------------------------- TOXICITY DATA----------------------------

ORAL: RAT LD50 - 5840 MG/KG; HUMAN LETHAL DOSE = 250 ML

DERMAL: RABBIT LOSO0 13 GM/KG

INHALATION: RAT LC50 16.000 PPM/Sl HR

CARCIKOGENIC1TY: THIS MATERIAL is NOT CONSIDERED TO BE A CARCINOGEN

BlY T,-i !NATIONAL T:XICOLOGY PROGRAM. THE INTERNATIONAL AGENCY FOR

RESEARCH ON CANCER, OR THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

OTHER DATA: NONE

-------------------------- PERSONAL PROTECTION ---------------------------

VENTILATION: LOCAL MECHANICAL EXHAUST VENTILATION CAPABLE OF MAIN-

TAINING EMISSIONS AT THE POINT OF USE BELOW THE PEL.

RESPIRATORY PROTECTION: IF USE CONDITIONS GENERATE VAPORS OR MISTS.

WE:AR A NIOSH-APPROVED RESPIRATOR APPROPRIATE FOR THOSE EMISSION LEVELS.

APPROPRIATE RESPIRATORS MAY BE A FULL FACEPIECE OR A HALF MASK AIR-

PURIFYING CARTRIDGE RESPIRATOR EQUIPPED FOR ORGANIC VAPORS/1MISTS. A

SELF-CON4TAINED BREATHING APPARATUS IN THE PRESSURE DEMAND MODE, OR A

SUPPLIED-AIR RESPIRATOR.

EYE: PROTECTION: CHEMICAL GOGGLES UNLESS A FULL FACEPIECE RESPIRATOR IS

ALSO WORN. IT IS GENERALLY RECOGNIZED THAT CONTACT LENSES SHOULD NOT BE

WORN WHEN WORAING WITH CHEMICALS BECAUSE CONTACT LENSES MAY CONTRIBUTE

TO THE SEVERITY OF AN EYE INJURY.

PROTECTIVE CLOTHING: LONG-SLEEVED SHIRT. TROUSERS. SAFETY SHOES, RUDDER

GLOVES, AND RUBBER APRON.

OTHER PROTECTIVE MEASURES: AN EYEWASH AND SAFETY SHOWER SHOULD BE

NEARBY AND READY FOR USE.

PROD: 04326859 09: 5S: 5 09 DEC 19998 CUST: INVOICE:

Page 155: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L P 12n= MATERIAL SAFETY DATA SHEET PC 3ISOPFZ~PYL ALCOHOL ANHYD 0997Y V14R REVISION OF:07 2 .118 7

-------------- FIRE AND EXPLOSION' INFORRTINATI-----------FLASH POINT, DIEG F: 53 FLAMMABLE LIMITS IN AIR, V.K METHOD USED: TCC LOWER: 2 UPPER: 12. 7EXTINGUISHING MEDIA: USE WATER SPRAY, DRY CHEMICAL, C02, OR ALCOH-OLICFOAM1. DO NOT USE A DIRECT WATER STREAM.

SPECIAL FIRE F!CHTING PROCEDURES: FIRE FIGHTERS SHOULD WEAR SELF-CONTAINED 5REATHING APPARATUS AND FULL PROTECTIVE CLOTHING. USE WATERSPRAY TO COOL NEARBY CONTAINERS AND STRUCTURES EXPOSED TO FIRE.

URNUSUAL FIRE AND EXPLOSION HAZARDS: EXTINGUISH ALL NEARBY SOURCES OFG6NITON1 BECAUSE VAPORS MAY BE MOVED BY AIR CURRENTS TO IGNITION

SOURCES DISTANT FROM THE HANDLING POINT.

-------------------------------- HAZARDOUS REACTIVITY--------------------------

STABILITY: STABLE POLYMERIZATION: WILL NOT OCCURL ~ CONDITIONS TO AVOID: HEAT, SPARKS. AND OPEN FLAMES.

n ~ MATERIALS TO AVOID: STRONG OXIDIZERS, ALUMINUM, ACETALDEHYDE, CHLORINE,ETHYLENE7 OXIDE, HYDROGEN-PALLADIUM COMBINATION. H2 02-H2 S04 LCMBINA-TION., HYPCCHLOROUS ACID. ISOCYANATES. NITROFORM. PHOSGENE, OLEUTI,PEPCH4LCRIC ACID, POTASSIUM T-BUTOXIDE, ACIDS, ALKALIS, AMINES. HALOGENS,HA~L'CEN COMPOU_:NDS, ANHYOR IDES. AND ALDEHYDES.

HAZARDOUS DECCPCSITIcN PRODUCTS: MAY LIBERATE CARBON MONOXIDE OR

II ------------------------ SPILL, LEAK, AND DISPOSAL PROCEDURES---------------------

ACT!C!2 TO TAKE FOR SPILLS OR LEAKS: WEAR PROTECTIVE EQUIPMENT INCLUDINGRUIZER 2C0TS, ;Urfl:ER CL2VES. RUBBlER APRON. AND A SELF-CONTAINED'PEA'~hING APPARATUS INa THE PRESSURE DEMAND MODE OR A SUPPLIED-AIR RES-P ~IRATOR. IF THE SPILL OR LEAK IS SMALL, A FULL FACEPIECE AIR-PURIFYINGCARTRiDGE RESPIRATOR EQUIPPED FOR ORGANIC VAPORS MAY BE SATISFACTORY.IN4 ANY EVENT, ALZWAYS W~EAR EYE PROTECTION. EXTINGUISH ALL IGNITIONSOURCES AND ENSkURE THAT ALL HANDLING EQUIPMENT IS ELECTRICALLY GROUNDED.

P ~FOR SMALL SPILLS CR DRIPS, MOP OR WIPE UP AND DISPOSE OF IN DOT-APPRCVEDWA4STE= CONTAI1NERS. FOR LARGE SPILLS. CONTAIN BlY DIKING WITH SOIL OROTHER NOCN-COM2UST:BLE A3SCRDENT MATERIALS AND THEN PUMP I.NTO DOT-A=PPZY.ED WASTE CONTAINERS, OR ASSORJ WITH NON-COMBUSTIBLE SORBENTMATERIAL. PLACE RESID)UE IN DOT-APPROVED WASTE CONTAINERS. KEEP OUT OFSE-WEnS, STORM CRAINS. SURFACE WATERS, AND SOIL.

L ~COMPL Y WITH ALL AFPLICA3LE GOVERNMENTAL REGULATIONS ON SPILL REPORTING,AND HANDLING AND DISPOSAL OF WASiTE.

DISPOSAL ME=1HODS: DISPOSE OF CONTAMINATED PRODUCT AND MATERIALS USEDIN CLFANING- UP SPILLS OR LEAKS IN4 A MANNER APPROVED FOR THIS MATERIAL.CONSULT APPROPRIATE FEDERAL, STATE AND LOCAL REGULATORY AGENCIES TOASCERTAIN PROPER DISPOSAL PROCEDURES.

r N~OTE: -EMPTY CONTAINERS CAN HAVE RESIDUES, GASES AND MISTS AND ARESUBQ)ECT TO PROPER WASTE DISPOSAL, AS ABOVE.-------------------------------- SPECIAL PRECAUTIONS --------------HANDLING AND STORAGE PRECAUTIONS: KEEP AWAY FROM HEAT, SPARKS, ANDIA ~FLArES. STORE IN A COOL, DRY. WELL-VENTILATED PLACE AWAY FROM INCOM-PATIfiLE MATERIALS. VENT CONTAINER FREQUENTLY. AND MORE OFTEN IN WARMWEATHER, TO RELIEVE PRESSURE. ELECTRICALLY GROUND ALL EQUIPMENT WHENHANDLING THIS PRODUCT AND USE ONLY NON-SPARKING TOOLS. KEEP CONTAINERTIGHTLY CLOSED WHEN NOT IN USE. DO NOT USE PRESSURE TO EMPTY CONTAINER.14ASH THOROUGHLY AFTER HANDLING. DO NOT GET IN EYES, ON SKIN, OR ONCLOTHING.

REPAIR AND MAINTENANCE PRECAUTIONS: DO NOT CUT. GRIND. WELD, OR DRILLON OR NEAR THIS CONTAINER.THER PRECAUTIONS: CONTAINERS. EVEN THOSE THAT HAVE BEEN EMPTIED. WILLETAIN PRODUCT RESIDUE AND VAPORS. ALWAYS OBEY HAZARD WARNINGS AND

HANDLE EMPoTY CONTAINERS AS I HYWR UL

PROD: 04326559 09:59:35 09 DEC: 1996 GUST: INVOICE:

Page 156: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

pi238 ~~MATERIAL SAFETY DATA SHEET PO 4

ISOPROPYL ALCOHOL Al~riiD 99.77. VWR REVISION CF:07-2±-e7----------------------------------------------------------------------------

----------------------- FOR ADDITIONAL INFORMATION--------------------------

(CONTACT DOUGLAS EISNER, TECHNICAL DIRECTOR, VAN WATERS & ROGERS INC.DURING BUSINESS HOURS. PACIFIC TIME (206)447-5911

------------------------ NOTICE------------------------------

.iVAN WATERS & ROGERS INC. ("YW&R') EXPRESSLY DISCLAIMS ALL EXPRESSOR IrPLIED WARRANTIES CF MERCHANTABILITY AND FITNESS FOR A PARTICULARPuRPOS~ES WITH RESPECT TO THE PRODUCT OR INFORMATION PROVIDED HEREIN.,**

ALL INFORMATION APPEARING HEREIN IS BASED UPON DATA OBTAINED FROM THEMANUFACTURER AND/CR RECOGNIZED TECHNICAL SOURCES. WHILE THE INFORMA-TION IS BELIEVED TO BE ACCURATE, VWttR MAKES NO REPRESENTATIONS AS ToITS ACCURACY OR SUFFICIENCY. CONDITIONS OF USE ARE BEYOND VWIVR'S CON-TROL AND THEREFORE USERS ARE RESPONSIBLE TO VERIFY THIS DATA UNDERTHEIR CWN OPERATING CONDITIONS TO DETERMINE WHETHER THE PRODUCT ISSUITABLE FOR THEIR PARTICULAR PURPOSES AND THEY ASSUME ALL RISKS OFTHEIR USE. HANDLING. AND DISPOSAL OF THE PRODUCT. OR FROM THE PUBLICA-TION OR USE OF. OR RELIANCE UPON, INFORMATION CONTAINED HEREIN. THISINFORMATION RELATES ONLY TO THE PRODUCT DESIGNATED HEREIN, AND DOES NOTRELATE TO ITS USE IN COMBINATION4 WITH ANY OTHER MATERIAL OR IN ANY OTHERPROCESS.-------------------------- ----- REVISION ---------------------------------

08/27: REPORTED ADDITIONAL PERSONAL EXPOSURE LIMIT.E ND O F M SD S

PROD: 04326859 09:58:35 09 DEC 1988 CUST: INVOICE:

Page 157: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

No. ___________

MATERIAL SAFETY DATA SHEET LQMN~GENIUM PUBLISHING CORPORATIONinso A

lids CATALYN STREET-SCMENEC7ADY, NY 12303-1838 USA

(SIB) 37.8855 GkIU~wsw~wocoo, Data Honsber 1979SECTION 1. MTERIAL IDENTIFICATION.ATERILC NAME: LEAD ?.ZNOTIIZET1M1 flSICSATICNS: Lead (U1) Oxide, P1umoua Oxide, PhO, Lithe::., ?Cassico:,

CASE 001 317 368, GE Kataria D4.C29; EAGLE #2o (ulagePichar), Pl (nL).A2,tTACfl:fl: Material is available fr7Z several. auppliers. incluita:a

Eagla-Pieher Induscrias, Lae. nL Idustrios, :ac.580 Wulnu: Street P.O. Box 700Ctn::tna~i. z'a 45202 Eizhtatovn, N.J. 08520

SECTION II. INGREDIENTS AND HAZ.ARDS IHAZAftO DATAL4d Motnionda >99 8-hr TWLA 0.05 leg/m3a

(as fl)fl ~~~*Culrze: OSI P=t (?ezt--'aaible. Exposure L.Wt) coudmuasz

a- B-hr 7a of 0.2 mg/ms; however, beginning 2124/80,L Y~~~~?t is 0.05 mg/u 3 with &A ::tten level of 0.03 mgt,±:rfhrteaA(Cortzz idusria led ueshave am extended tine t .PrDrtu~p S.0?~~fo mat~zc; e Supplasant shieet.) Blood sampling ULD 430 mgsikgp ~~~~and analysis tumnt be available to every vorkar exposed

"bova the attic: level over 30 days/year. Tomxporyhigh blood lead levens lots recuLirad for vrkara

SECTION 1II. PHYSICAL DATA

Litharga (?.-O) Kasslee: (PSO)Spae±i!-c g"avityT (B20-1) 9.53 8.0Malc!zg point, dag C usWater solubility, g/100 cc- 0.0017 at 20 C 0.0023 a: 22 C

V ~~~~SECTION IV. FIRE AND EXPLOSION DATALe0rj~as ?ot: in Metthod Autaot itlom Test. =FasetiLisIn r

Emtlngunshing Hodax: This is a non-f lascable material; use eztlnguishing socia nUickare appropriate to~ the surrounding fire.

Lead oxide cmn be en oxidizing gagnt f or combustible eater"al flen hot.tahe.ation of loaed-cnuta-iai- dust is hazardous; firafightars need self-contai~ned

breathimg apparatus when ttis m~aterial is inYolned in a fire situation.

SECTION V. REACTIVITY DATAThis material ia stable for storage at roam temperature Las ptwe saterial in sees* cantoainers. When heated sand cooled in air, It can undergo transitions botween trystalfform (such ae litharre andZAsteat)r and Interchange between cartan antde form

(such as Th20;' 12304s ISIDlSomle ±nceoweet bibitias: Chlcrtuatod rubber plus PWhO ean react violently if heated.Limhafla amm gycerol mixture (a waUl-Ima cammet) can burn in fluorinza and ezplndeby izpact af tar contact vich prerhloric acid fumes. WbO powder can explode whensized wi th f Itely divideda&ltoa or zirconi;. Reaction can be vigoroms. with e"1itsboron, siliavin, I.±uania, aatsi acerylidas, atd other mea~tael.Ls

GENIUMPUBUSHI t

Page 158: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

S EZT 7N V mEALTI. HAZARD INFORMATION TL.V 0.05 mg/rn2 (See Sect. ~Inges~zci aria tSalin. of rTherO dus are tZe main sources of toxic hazard. Leand ±s &c'.~a:±e :1.sn. Oer trad f t±:e a very smail rate of 4itake can reach at:xie level. I=ceusive 9 lad1evels in the blood (see Suvpiemed)i require removaj.I. e ur tolad. A level of 0.1 :g Pb/liter of urine isgeralexedd1J~ead ;o~lsoning cases. Lead poisoning can produce s toms such as headache, nausea,crazvts. :±:z:,.ess weakness. ±nsoza, diarrhea, an ass of appetite. Keavy acuteextosura can result ±n stupor, ccma, and death.rFxst A::: Ielov lf± eneosuretWoricers vth excessive nxposur-,_ who experi enethe symptoms of lead poisoning, shouldreceive medical care and guidance promptly. Detailed biological specimen testing amdevalua:±:n of possiblhe exposure conditicns a r required to diagnose lead poihcning.

racuptred.i a_ nd c selaa therapy and/or restriction from exposure to lead may be!:e and Skin Contact: Plush with plenty of r-Img water to remove dust; get medicalc.ip 1:rr::ia:ton persists. Wash all exposed skin vall with soap and water.inhalarxer.: '~awe from exposure. Get medical help..- e~est::%: tnac:e :;hvsie'-a, :ro:v.- Castric lavage may be reauired.

SsT:CTCN VII. SPILL, LEAK, AND DISPOSAL PROCEDURESCareti-.v- vact.z-_ spilled matrinal for recovery or dipoaAl. vod gosting cZZma-ains : a.2. stages of handl-n, n place in a plsic. bag-line!dr ±gtlycocontainer. 2a; r vet clean-uln methods may be useul in supprassing cu4st an-d canbe used wmrer more effective rheh vAcuuzzgs.DISP~CSA:. Follow Federal, Lonte. and local regulations in disposing of waste material.:eposizn; i?.g n an approved landfill- should be evaluated as a suitable means of dta-posal. Y-1l::atlon of all exhaust ventilation air may be required. '.ith filtrateIdisposal A±±e~d tZ the waste problem.)

SECTION VIII, SPECIAL PROTECTION INFORMATIONPrcnde lca )l iaus: ventlla,:on wtcapture filtratIon to meet raV recuirazents. :s-late ?C '.-set ae. Mio leadwextposure. AA approved air ;,urifying 6 r self-comta:respt:a:cr neeced £f dust conditIons are not Adequately controlled by ventflation(4.4 hr/day max. for negative pressure respirator use). Use appropriate design and.. useieer~rng ;racnl:es to prevent uncontrolled acclu~uat~cn of dust deposIts in ex-haust ':en::Za:ion systems or storage areas. USe engineerin; corttrols as the primaryteans ~or ;rctectaon against lead exposure. Also provide clhothing and equipment.usea safety goggles to prevent Pb oxide dust particles from entering the eyes.?rcvtde c-lean, oody-cqverjng work clothing weekily to workers exposed above P-". (daily±1 exposed 0.2 2g/tJ) and arrange for snca a ndling .Anlanengo clothingcontsamnated vtth lead oxide dust. Use separa'te looser :or wora c.4otciLg and shoverafter work before changing into street clothing. prevent PbO from being carrfld boneCr transported to lunch root, rest room or other plan: areas in workers' hair orclothing!

SECTION IX. SPECIAL PRECAUTIONS AND COMMENTSStore in. tightly closed containers in a elean area. VAwa tram coUbustible materials. Pteac containers from damiage. Keep away from food or feed. Prevendutdsesgcondi:cicj and breathing of dust. Foflow good housekeeping practice azd good hygieampractica. 'Wash thoroughly before eating or snaking af tat handling this materi atoworking in its areas of use or storage. -D o lo aig rnigo oac sin areas of storage or use of Pbo flvetng dikOn rtbac sProvIde annual worker training. For exposures above 8-br TWA of 0.03 mg/u 3 providework-place monitoring, and at least annual medical surveillance, sea±-annuaj, bloodtesting, a-id reeordkeepiag. Zkcassive lead exposure may adversely affect htmnreproducttly functions.

ftk4c..DTA 30JRC!(S) C02t: 2-10,12,20.24-26 A1P1OVALS. ~

- . - a n t e . fl - t - )CZ ~MM ICAL RZV IW .2 7

GFNJv'M PUBBUSHING

Page 159: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

& ~~~~~~~~~~~~~~~~~~~~No. :

GENIUM PUBLISHING CORPORATION

I 14S CATALYN STREETSCHENECTADY, NY ¶2203.1836 UISA

IS 18) 377-8855 D~~~~ate November 1979

OSRA Lead Standard Conplianee Infertmation

Conl 1ance Cates For Nev OSIA Lead Standard:

employer must establish written compliance plan, to im~laeuet engineeri:g, workpractice, and atdzinstrativa controls to reduce and maintain eurployce leadexposures according to thie folloving schedule (current 8.-hr TWA, 0.2 mg/m.3 onthe effzctive data of tha Standard, 2/24/79):

Madnir. Cznelimnce DatesIndustrv 8-rV .0 rct~ 8-hr 72A 0.05 =tt J

Prizmary Lead Smelter 2/8 289Secondary Lead Snelter 2/82 2/4.

1' ~~~~~~~Lead Pigment .:dustry 2/82 2/84Lead-ACid Battery Industry 2/81 2/84Non-Ferrous Foundries 2/80 2/84All Other Industritea 2/80

Medical Removel Prtenetion for Workers:

Employer =ist temporarily remove from a lead-exposure job any yorker with thetestt:g exTperience below; return to work is based on a lover level of Yb 1:blood:

Criteria for Removal freu Work Criterta for ReturnOUBA Standard Fb Work Exmosure lb Blood Leve Pb Blood Level

rffective Period 8-hr 'A. drc/.Plus Test. '.z9lO0 Q Test. '.tI100p2/79 to 2/80 ~0.10 $80 1<60f ~~~~~~2/80 to 2/82. 3o.o5 )I0 1so2/81. to 2/84 "Q.03 to"10*2/84 - ~003 ho"' 140*'Blood sampling and analysis to be made available to every employee exposed

above rtes action levsl'(8-hr TWA 0.03 mg/u3) for over 30 days per year.Blood tests to be sate every siz inntfl or less, depending on previousblood test results. (donthly test for those remined frou Iced-exposure job.)

*wNc cousecurive blood tuess at or below this leyel.

"'Average of 3 blood tests. udlass the last rest result is tA40 iig/10g.

I' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a n ~PdG

Page 160: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

~NTF PREFERRED NAME: 2 D3 .l 8-Tetracn Ioroc Ibenzo-p-ti1ox in

loxii f

*CAS Recistry Number:

NIOSH Regishry Number:

-n C n~~~~~~~~~~C

'"'LN:T :~!56 EQ ICJ E£3 FG LSW

n~Tysical Description: Col cr1 ess crystal s

!,'sellig Point:Z--5-c:Boiling Point: Decomposes at 7009C

D:ensity: Not available Specific Gravity: Not avail able

Fiammability: Not available Stability: Sestv oprollongedexposure to sunlich:.p ~~~Flash Point: Not available

-;ea:::vitY: Not avail abl e

Solubility In: Water. 0.2 ,nct. at 2S*C Acetone: 0.0 mo,/mL at 25WC

DMS0: <0.1 mg/mL at 2r-C Ether: Not available

Ethanol: Slightly soluble Benzene: 0.47 mg/mL at 25WC

Other Physical Data: Soluble in tol uene; solubil ity'at 23WC is 0.68 mg/mL. InP~~ ;erc-iloroethylenet 0.8 rng/mL In chlorobenzsnes 0.53 mg/mt In chloroform.

1.5 mglitL In o-dfchlorobenzene. 0.10 mg/mL. in metJhanol, 0.28 mg/mL. in hexane.

D.O.T. Shipping Name: Poisonous Sol Id, N.0.5.

D.0.T. Identification Number: UN2S11

h D~~~~.0.T:'Rflard Craissifidation: poison B

Other Shipping Regulations: Poison label req-irsd. Passenger aircraftl imit Is SO lbs; cargo ai rcraft l Imit- Is 200 -lbs.

Exceptions: 173.364.. Specific Requirements, 173 .3 6 5'tin Hazardous MaterialsRegulations of th~e Department' of Transpor-tation (1981).

Page 161: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Acute Hazards: Very toxic; i rritant; may be absorbed through the-ski'n.Ingestion of even microgra.' quantities can cause toxiceffects and, possibly# death.

Symptoms: Liver and kidney damage, cnloracene, irritation of eyesand mucous membranes, muscular weakness, loss of appetite,weight loss, sleep disturbances, low blood pressure,abdominal pain.

Exposure Limnits: Not regulated

Skin Contact: Flood allI areas of body that have contacted the substancewith water. Don't wait to remove contaminated clothing; do it undertfie water stream. Use soap to help assure removal . Isolate contami-Inated clothing when removed to prevent Contact by others.

Eye Contact: Remove any contact 'lenses at once. 'Flusn eyes well wi thc::~Ious Quantities of water or normal saline for at least 20-30 minutes.S~eeK mecical attention.

Inhalation: Lesave co-itaminated area immediately; breathe fresh air. Properresotratory protection mlust De supplied to any rescuers. If coughingodifficult breathing or any other Symptoms develop, seek medical att'en-tion at once, even if symptoms develop many flours after exposure.

Ingestion: if convulsions are not present, give a glass or two of wateror milk to dilute the substance. Assure that the person's airway isunobstructed and contact a hospital or poison center immediately foradvice on whether or not to induce vomiting.

Storage Precautions: Store in a locked ref rigeramor.

Spills and Leakage: Dampen spilled material with toluene to avo(Iid dust,then transfer material to a suitable container. Use absorbentpaper dampened with toluene to pick up remaining material. Washsurfaces well with soap and water. Seal all wastes in vapor-tightplastic bags for eventual disposal.

Suggested Gloves: Not available

Uses: None known. This compound occurs as an impurity in Agent Orange,j2.4,54T herbicide and certain other chlorinated phenolic products. Itmaterials.

Additional Reference Sources:chlgrimire6 Dtorims And Olher-yofurarms In the Toa !vrenmpnt, G.

Chouchary, L.. M. Keith and C. Rappe. Eds. (1983), Suttervorth.Cictionary of Organic Compiounds, J. Buckingham#. 5th Ed., p. 5145

(1g82), Chapman and Hall.pas¶1clesll~i Studlnd LSA.gn Wayland J. Hayes. Jr., p. 479-488 (1982).____ill___________________________and____________Wilkins.____________________

Page 162: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Occupational Health Guideline forToluene

INTRODUCTION such as a "pins and needles feeling" or numbness. Veryhigh concentrations may cause unconsciousness and

L ~~~~This guideline is intended as a source of information for death. The liquid splashed in the eye may cause irrita-

employee, employers, physicians. industnial hygienists. tion and temporary damage. Inhalation may also cause

and other occupational health professionals who may difficulty in seeing in bright light. If liquid toluene is

have a need for such information. It does not attempt to splashed in the eyes. it will cause temporary irritation.

present all data: rather, it presents pertinent information 2. Lon g-term Exposure: Repeated or prolonged expo-

and data in summary form. sure to liquid toluene may cause drying and cracking ofthe skin.

SUBSTANCE IDENTIFICATION J~~. Reporting Signs and Symptoms. A physician should becontacted if anyone develops any signs or symptoms

*Formula: C.HCH3 and suspects that they are caused by exposure to

*Synonyms: Toluol: phenylmethane: mnethylbenzene toluene.

b ~ ~ ~ *A~ppearance and odor: Colorless liquid with an aro- * Recommended medical sunveillance

matic odor. like benzene. T'he following medical procedures should be made

U ~~~~~~~~~~~~~~~~~~~available to each employee who is exposed to toluene at

b ~~~~~PERMISSIBLE EXPOSURE LIMIT (PEL) potentially hazardous levels:

p ~~~~The current OSHA standard for toluene is 200 parts of I. Initial.Wedical &zarnnasion:

toluene per million parts of air (ppm) averaged over an -A complete history and physical examination: The

L ~~~~eight-hour work shift, and during any such work shift, purpose is to detect pre-existing conditions that might

300 ppmi toluene may not be exceeded except that a place the exposed employee at increased risk, and to

peak ~ ppm tlueneis pemitte for 0 mintes etablish a baseline for future health monitoring. Exami.

during teeight-hour work shift. N!OSH has recoin- nation of the central nervous system. liver and kidneys

mended that the permissible exposure limit be reduced should be stressed. The skin should be examined for

to 103 ppm toluene averaged over an eight-hour work evidence of chronic disorders.

shif wih aceiingleve of200ppmaveaged over a -Urnalysis; Since proper kidney function is neces-iten-m a eiinut geid Theve NofH Critpaeri Douetfr sary for biologic monitoring, a urinalysis should be

tolen-iue shoud b he onsule forimorea Detailed t iform obtained to include at a minimum specific gravity.Toleneshold e cnsutedformor deaild ifora- albumin, glucose. and a microscopic on centrifuged

L ti~~~~~~~~~~~lL ~~~~~sediment. The urine should be analyzed for hippuric

HEALTH HAZARD INFORMATION acid to obtain a background level.2. Periodic Medical Exammnation: The aforementioned

*Routes of exosr medical examinations should be repeated on an annual

Toluene can sffeet the body if it is inhaled, if it comes in bails. Hippunic acid level in urine may be an indicator of

contact with the eyes or skin. or if it is swallowed. It the level of toluene exposure.

may enter the body through the skin. Summary of toxicology* Effects of overexposure Toluene vapor causes narcosis. Controlled exposure of

1. Short-term Fspasurc Toluene may cause irritation of human subjects to 200 ppmr for S hours produced mild

the eyes. respiratory tract, and skin. It may also cause fatigue, weakness, confusion. Iscrimtation, and parasthe-

L ~~~~~fatigue. weakness. confusion, headache, dizziness, and sia: at 600 ppm for I hours there were also euphoria.

drowsiness. Peculiar skin sensation may be produced headache. dizziness, dilated pupils and nuusea; at SW0

These recominlndatlons reflect good industrial hygiene and medical surveillance practiees and tteie impiementaifon will

assist in achieving an effective occupational healthl program. However, they may not be sufficient to achieve comphiancewisht all requirements of OSHA regulations.

U.S. DEPARTMENT OF HEA&LTH AND HUMAN SERVICES U.S. DEPARTMENT OF LABORPublic Mealtf SrAnte Centers for Cisease Conofl# C CCU~aDioM Safty ands Meahifi AO.fllVW~National InSUtut Ior occuoatiOai Safety man Heartif

Page 163: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

ppm (r S ours Sympoms ere ore pronounced. and ards Institute (ANSIl stares that "the ocor zf :clue,.e is

apmfortef8 ho cuded netrvousnwess, muclr aiue eetable by most people at concentrationis in :-e range

aftr-cfccsiclued eforusnevera days. Severeibute, I d to 15pm. T'he ocor has little value as a warning

and insomnia persistingfoseeadasSerebt f 0o p

reversible liver and kidney injury occurred in a person property."

who was a glue-snifer for 3 years; the chief component Patty points out that olfactory fatigue occurs rapidly

of th inhled olven wastolune (80% VIV); other upon exposure to toluene.

ofteingredentswerenot lis tedon okeuexoe for 2. Eye Irritation Level: Grant states that t:he vapors

manygyeaiens tor nonCft litedI in threrangexpofsedt 300 of toluene cause noticeable sensation of irritation to

ppm.thee wa noclincalor aboratory evidence of human eyes at 30C to 40 ppm in air. but even at 800

altered liver function. Toluene exposure does not resulthappm trntatifonyeis slight.'M

in the heinatOPOietic effects caused by benzene: the ANSI reportsthtifatfloeesmuuse-

roco .i effects previously attributed to toluene are branes. and upper respiratory tract may occur while

judgedx~ bmoercninstgtions to be the result of workers are exposed to low conccntrationls of toluene.

conurrentb exposureeto benveneprtntasacota There is a considerable range of variation (l00 to s00

nantin te comercal tluen use. Mot ofthe ppm) between individuals, some finding any concentra-

toluene absorbed from inhialation is metabolized to tion of toluene objectionable. omril rdso

befizoic acid, conjugated with glycine in the liver to toluene vary in irritant properties."

form niopuric acid, and excreted in the urine: the 3. Evaluation of Warning Properties: Because of its

avCTSCamcarount of hippunic acid excreted in the urine irritant effects, toluene :s judged to have sood warning

by individuals not exposed to toluene is approximately properties.

0.7 to 1.0 gA of urine. The liquid splashed in the eyes of M NTRN N ESRMN

two workers caused transient corneal damage and con- MONIOCDRINE NDMAURMN

junctival irritation: complete recovery occurred within POEUE

48 hours. Repeated or prolonged skin contact with *Eight-Hour Exposure Evaluation

liquid toluene has a defaitting action, causing drying. Measurements to determine employee exposure are best

fissuring, and dermatitis. taken so that the average tight-hour exposure is based

CHEMICAL AND PHYSICAL PROPERTIES an a tingle eight-hour sample or on two four-hoiirAsamples. Several short-time interval samples (up to 30

Physical data ininutes) may also be used to determine the average

1. Molecular weight: 92.1 exposure level. Air samples should be taken in the

2. Boiling point (760 mm Hg): Ill C (231 F) employee's breathing zone (air that would most nearly

3. Specific gravity (water = 1): 0.86 represent that inhaled by the employee).

3.14 -Measurements

to determine employee ceiling exposure

5. Melting point: - 95 C(-1397F) are best taken during periods of rnmrfumu expected

6. Vapor pressure at 20 C (68 F): 22 mm Hg airborne concenltrations of toluene. Each measurement

7. Solubility in water, g/100 g water at 20 C (68 F): should consist of a ten (10) minute sazmple or series of

0.05 consecutive samples totalling ten (10) minutes in the

S. Evaporation rate (butyl acetate = I): 2.24 employee's breathing zone (air that would most nearly

Reactivty represent that inhaled by the employee). A minimum, of

1. Conditions contributing to instialiffity: Containers three (3) measurements should be taken on one work

may burst at elevated temperaturms. shilt and the highest of all meautrements taken is an

2- IncompatibilitiCs- Contact with strong oxidizers estimate of the employee's exposure.

may cause fires and explosions. * Peak Above Ceiling Enaluatioa

3. Hazardous decompOSitiof products: Toxic gases Measurements to determine employee peak exposure

and vapors (such as carbon dioxide and carbon monox- should be taken during periods of maximum expecited

ide) may be released in a fire involving toluene. airborne concestrtson of toluene. Each measurement

4. Special precautions: Toluene will attack some should consist of a 10-minute sample Or a series of

forms of plastics. rubber, and coatings. consecutive samples totalling 10 cminutfl in the employ-

Flammability c~~~~~~~eel breathing zone (air that would most nearly repre-

I. Flash point: 4 C (407F) (closed cup) sent that inhualed by the employee). A min imum of three

2. Autoignition temperature: 480 C (396 F) measurements should be taken on one work shift and

3. Flammable limits in air. %T by volume: Lower: the highest of all measurements taken is an estimate of

1.27; Upper: 7.1 the employee's expostate.

4. Extinguishant: Carbon dioxide, dry chemical. * Method

roam Sampling and analyses may be performed by collection

Warning properties of vapors using an adsorption tube with a subsequent

1. Odor Thresnold: The American National Stand- desorption of toluene with carbon disulfide and gas

Page 164: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L.

- ~~~chromaztOgrapflic analyis. Also, detector tubes certified SANITATION* :~~v SIOSH uncer 42 CFP. Part 84 or other direct-

reading devices calibrated to measure toluene may be *Skin that becomes wet with liquid toluene should be

-' used. A analyticl methodor toluene is in the NVIOSH prmtly washed or showered with soap or mild deter-

Manul ofAnolnco Metods.2nd d..Vol.3, 111. gent and w ater to remove any toluene.

available from the Government Printing Office. Wash- Employees who handle lqi oun hudws

ington. D.C. Z'402 (GPO No.0o1.O033.00261-4). their hands thoroughly with soap or mild detergent andwater before eating or smoking.

L ~~Methods for Set V' (order number PB 262 524).L ~~~~~~~~~~COMMON OPERATIONS AND CONTROLS

RESPIRATORSThe following list includes some common operations in

*Good industrial hygiene practices recommend that which exposure to toluene may occur and control

engineering controls be used to reduce environmental methods which may be effective in each casee:

concentrations to the pernissible exposure level. How- OeainControlsever, there are some exceptions where respirators mayOertobe used to control exposure. Respirators may be used Use as a solvent in Process enclosure:

7 ~~~when engineering and work practice controls are not pharmaceutical, general dilution

technically feasibole, when such controls are in the chemical, rubber, and ventilation: localL ~~~process of being installed, or when they fail and need to plastics industries: as a exhaust ventilation:

be supplemented. Resairators may also be used for thinner for paints, personal orctective

operations which require entry into tanks or closed lacquer. coatings. and equipmentvessels, and in emergency situations. If the use of dyes: as a paintrespirators is necessary, the only respirators permitted remover, insecticides

are those that have been approv'ed by the Mine Safety Use as starting material Process enclosure:

Li ~~~and Health Administration (formerly Mining Enforce- and intermediate in general dilution

ment and Safety Administration) or by the National organic chemical and ventilation: local

Institute for Occupational Safety and Health, chemical synthesis exhaust ventilation:

*In addition to respirator selection, a complete respira. industries personal protective

tory protection program should be instituted which equipment

[1 ~~~includes regular training, maintenance, inspection, Use in manufacture of Process enclosure:ctaxiing, and evaluation, artificial leather: labnic general dilution

and paper coauings: ventilation: local

PERSONAL PROTECTIVE EQUIPMENT photogravure ink exhaust ventilation:p ~~~~~~~~~~~~~~~~~ ~ ~~production: spray personal protective

*Employees should be provided with and required to surface coating; as a equipmentuse impervious clothing, gloves, face shields (eight-inch diluent (cellulose esterminimum), and other appropriate protective clothing lacquers)necessary to prevent repuated or prolonged skin contact uea osiun nPoesecoue

with liquid toluene. . ~~~~~formulation of general dilution

*Any clothing which becomes wet with liquid toluene automotive and aviation ventilation: localshould be removed immediately and not reworn untul fuels exhaust ventilation:the toluene is removed from the clothing.pesn roctv

r ~ ~ ~ *Clothing wet with toluene should be placed in closed peruiorprmen tvcontainers for storage until it can be discarded or untileuimnprovision is made for the removal of toluene from the EMERGENCY FIRST AID PROCEDURES

IP, ~~~clothing. If the clothing is to be laundered or otherwise I h vn fi mrecisiuefrtadpoeb ~~~~cleaned to remove the toluene. the person performing Inutes evdent fofra emergecsitttte aid orrodica

the operation should be informed of toluene's hazardous duye and senuom is i r eia sitne

properties. ~~~~~~~~~It liquid toluene gets into the eyes, wash eyes iinindi-*Employees should be provided with and required to ately with large amnounts of water. ldifdg the lower and

use splash-proof safety goggles where liquid toluene upe lids ocaiou.ll. If irritation is present after

may contact the eyes. washing, get medical atentidot. Contact lenses should

*Where there is any possibility that employees' eyes not be worn when working with this chemical.may be exposed to toluene. in eye-wash fountain should *Skin Exposure

be provided within the immediate work area for emer- If liquid toluene gets on the skit. promptly wast~

gency use. contaminated skin using soap or mild deterrt

Page 165: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

"ater. if liquid toluene soaks through the clothing. These documents are available through tec NIO)SH

cremove the clothing immediately and wash the skin Division of Technical Services. 4676 a-lumbia Park-

using soap or mild detergent and water. if irritanion way, Cincinnati. Ohio 45226.

persists after washing, get medical attention.

E rtathifli REFERENCES

If a person breathes in large amounus of tolu~ene. move Idsra

the exposed person to fresh air at once. If breathing has *American Conference of Governimental Idsra

stopped. perform artificial respiration. Keep the affect- Hygienists: "Toluene. Documentation of the Threshold

ed person warm and at rest. Get medical attention as Limit Values for Substances in Workroom Air (3rd ed.,

soon as possible. 2nd printing), Cincinnati, 1974.

Swallowing *Amenican Industrial1 Hygiene Association: "To-

When toluene has been swallowed, get medical atten- luene." Hygienic Guide Series, Detroit. Michigan. 1957.

dion immediately. Do not attempt to make the exposed e 4menican National Standard Acceptable Concentn-.

pescue voitfiord - roluene: ANSI.Z37.12 1914. American National

- Rescue posure. ~~~~~~~Standards Institute. Inc., New York. 1974.

Move the affected person from the hazardous exposure. Ptoeu ntiue "oune"AI ai

if the exposed person has been overcome, notify some- mrcnPtoemIsiue oun, P ai

one else and put into effect the established emergency cologicalRevievwl. New York. 1960.

rescue procedures. Do not become a casualty. Under- * Christensen. H-. E.. and Lu.ginbyhi. T. L. (eds.):

stand the facility's emergency rescue procedures and .VIOSH Toxic Substances List. 1974 Edition. HEW

'Know the locations of rescue equipment before the need Publication No. 74-134, 1974.

arises. *Dow Chemical Company: Mateinal Safery Data Sheete

SPILL, LEAK, AND DISPOSAL ~ ~ -Toluene. Midland. Michigant. 1972.

SPILL. LEAK, AND DISPOSAL * ~~Grant. W. M.: Toxicolog of the Eye (2nd ed.). C. C.

PROCEDURES Thomas. Springfield. Illinois. 1914.

Persons not wearing protective equipment and cloth- -* [nternational Labour Office: Encyclopedia of Occ'apa-

ing should be restricted from areass of spills or leaks until tional Health and Safety, McGraw-Hill. New York.

cleanup has been completed. 1971.

If toluene is spilled or leaked. the following steps * National Institute for Occupational1 Safety and

should be taken: Health. U.S. Department of Health Education, and

I. Remove all ignition sources- Welfare: Criteia for a Recommended Standard....

2. Ventilate area of spill or leak. Occupational Exposure to roluene. HEW Publication

3. For small quantities, absorb on paper towels. Evapo- No. HSM 73-11023. GPO No. 017-033-=19, U.S.

rate in a safe place (such as a fume hood). Allow Government Printing Office. Wa~shington. D.C.. 1973.

sufficient time for evaporating vapors to completely * "Occupational Exposure to Toluene.' Fedema Regi-

clear the hood ductwork. Burm the paper in a suitable tr 0426429 coe ,95

location away from combustible materials. Large qumn- Patty. F. A. (ed.):. Toxicolorj, Vol. 1I of Industrial

ctides can be reclatimed or collected and atomized in a

suitable combustion chamber. Toluene should not be Hygiene and roziwolooy (2nd ed. rev.), Intersciencc.

allowed to enter a confined space. such as a sewer. New York. 1963.

because of the possibility of an explosion. Sewers de. * Sax. N. I.: Dangerous Pnvopmnies of Thdusurial M~atin~als

signed to preclude the formation of explosive concen- (3rd ed.), Van Nostrand Reinhold. New York. 196S.

trations of toluene vapors are permitted. * Union Carbide Corporation. Industrial Medicine and

Waste disposal method: Toxicology Depantment: Thxicolooy Studies - Tolumne.

Toluene may be disposed of by atomizing in a suitable New York. 1970.

combustion chamber.

ADDITIONAL INFORMATION

To' find additional information on toluene. look up

toluene in the following documents:

* Medical Surveillance for Chemical Hazadis* Respiratory Protection for Chemical Hazads* Personal Protection and Sanitaton for ChemicalHazards

*NIOSH Criteria Document for Toluene (July 1973)

Page 166: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

RESPIRATORY PROTECTION FOR TOLUENE

Condition minimum Respiratory Protection'Required Above 200 ppm

Vapor Concentration

500 ppm or less Any chemical cartnidge respirator with an organic vapor cantridges).

Any supplied-air respirator.

Any self -contained breathing apparatus.

- ~~~1000 ppm or less A chemical cartridge respirator with a lull facepiece and an organic vaporcarthdge(s).

2000 p~rm or less A gas mask with a crin-style or a front. or back-mounted organic vapor canister.

Any supplied-air respirator with a full facepiece. helmet, or hood.

Any self-contained breathing apparatus with a full facecieCe.

Greater than 2000 ppmn or Self-contained breathing apparatus with a full facepiece operated in pressure-

entry and escape from demand or other positive pressure mode.unknown concentrations

A combination respirator which includes a Type C supplied-air respirator with a

) ~~~~~~~~full facepiece operated in pressure-demand or other positive pressure or continu-

ous-f low, mode and an auxiliary self-contained breathing apparatus operated in

pressure-demand or other positive pressure mode.

h ~~~~Fire Fighting Sell-contained breathing apparatus with a full facepiece operated in pressure-

demand or other positive pressure mode.

Escape Any gas mask providing protection against organic vapors.

Any escape self-contained breathing apparatus.

'Only NIOSI--approved or MSHA-approved equipment should be used.

Page 167: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L

OCCUPATIONAL SAFETY AND HEALTH GUIDELINE FOR

TRICHLOROETHYLENE

POTENTIAL HUMAN CARCINOGEN

INTRODUCTION ~~~~~~~~~~~chloride, which catalyzes a violent self-accelerating polymeri-zation reaction. Contact with strong caustics may cause the for-

This guideline: summaruuperunent informationiabout tnchlo- mation of dichloracetylene. a toxic and flammable gas.

roethylene for wocrkers. employers. and occupational safety and 2. Hazardous decom~position products: Toxic vaoor3 and gases

heaith professionals who may need such information to con- (e.g.. phosgene. hydrogen chloride, and carbon monoxide) may

duct effective occupational safety and health programs. Recoin- be released in a fire involving trichloroelthylene.

mendations may be suocrseded by new developments in these o flammabilitv

Fields: therefore. readers art advised to regard these recoin- I. Flash point: '32C (90'F) (closed cup)

rnendations as gzeneral guidelines. 2. Autaagnition temperature: TSS'C (CO¶')3. Flammable limits in air. %o S volume: Lower. 12.5: Uipper.

SUBSTANCE IDENTIFICATION 94. Extinguishant: Alcohol fcam. dry chemical, or carbon

Formula: CHCI3 dioxide

p ~~~~* Structure: CCI, = CHCI 3. Class IC Flammable Liquid (29 CFR 1910.106). Flarinina-

* Synonymis: Acetylene trichloride. ethylene unchlonde. TCE bulity Rating 1. Practically Nonflammable (NFPA)

Identifiers: CAS 79-01-6; RTECS 10(455000: DOT 1710. 'Warming properties

label required: "St. Andrew's Cross (X)" I. Odor threshold: 21.4 ppmAppearance and odor: Colorless liquid with a sweet odor 2. Eye irritation level: 400 ppm

like chloroform ~~~~~~~~~3. Evaluation of warning properties for respirator selection:WAarning properties am not considered in recommending respi-

b ~ ~~~CHEMICAL AND PHYSICAL PROPERTIES rators for use with carcinogenis.

Physical data EXPOSURE LIMITSI. Molecuiar weight: 131.38

Is 2~~~. Boiling point (at 760 mmrHg): a7.1'C (188"n The Occupadional Safety and Health Administratton (OSHA)

3. Specific gravity (water - fl: 1.46 permissible exposure limit (PEL) formtrchloroetihylernt per mil-

4. Vapor density (air = I at boiling point of trichloro- lion parts of air (ppm) as atimne-weighted average (TWA) con-

ethylene): 4.54 centration over an 8-hour workshift: the acceptable ceiling

S. Melting point: -86ACC (.1237) concentration is 200 ppm; and the maximum peak concentra-

6. Vapor pressure at 25VC (77 O): .74.3 mmHg lion above the acceptable ceiling (maximum duration of 5

7. Solubiliry in water. g/ 100 g water at 25?C (777): 0.00011 minutes in any 2-hour period) is 300 ppm. The National In-

g. Evaporation rate (butyl acetate - I) 642 stiutwe for Occupational Safety and Health (NIOSH) recomn-

9. Saturation concentration in air (approximate) at 25 C mends that trichloroethyletne be controlled and handled as a

(77w): 10.1% (101I000 ppim) potnndia human carcinogen in the workplace and that exposune

10. Ionization potential: 9.47 eV be mintimizedi to the lowest feasible limit. The American Con-

Reactivity ference of Governmental Industrial Hygienists (ACGIH)

I. Incompatibilitics: Trichorothylefltffy 'tctviolently with threshold limit auke (TLVO) is 50 ppm (ZM mgnn) asa TWA

chemically active meals such as barium, lithium, sodium, for a normal 8-hour workday and a 40-hour workweek: themagnesium. and titantium. Aluminum may react with the free ACDIH short-terin exposure limit (STEL) is 200 ppm (1.0W.

hydrogen chloride in trichloroetrylcrit to product aluminum mg/rn') (Table 1).

U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICESPublic Health Service Centerst for Disease ControlNational Institute for Occupational Safety and Health

Division of Standards Development and Technology Transfer

Page 168: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Table 1.-Occupational exposure limits RECOMMENDED MEDICAL PRAC7tCESfor trichioroethvlene M Aedical surseillance program

Exposure limits Workers with potenitia expoSures 10 Cflt!"ICaI1 nzarcs sholuld

ppm mgm-9 be monitored in a systematic program of mencic.l ~ur'elilance

OSH-A PEL TW)A 100 - intended to prevent or control occuoalionai is udsae

AcCep-uoie cviin2 - The program should include educationol emricxcr: arid work-

Maximum ce:n:fl ens about work-related hazards. plamcmnt i .orl~crs ini jobs

t5 min in 2 h) 300 - that do not jeopardize their safety and hcslrh. ciriic'I possi-

SIOSH RETACa 25 - blcdctectionofadverse health elffcts. noU rcicrual tiii"rkcrs

ACGIX TLVV 7',A 50 Zfl lor diagnostic confirm-aiion and treatment. Ic kLurrc:ncc of

STEL WO0 1.080 disease ta-sentinel heaith e'ent.' SHElIor oincr'Aork- related

-(Ca): NIOSx eomnstetn saptnilhmncr adverse health effects should prompt inimedijie c'uluatzon ofcinoge. recomenasreaungaapctenialhumflcar- primary preventivecmeasures (e g.. Industria h'ucicnc mionitor-

cinogen. I~~~~~~~~~~~~~nc rgincennog controls and ptcr~uWri proiccti'c cuuipmcntl).

A medical surveillance program is irvcndcd io 'uoplcnicnt. not

HEALTH HAZARD INFORMATION replace. such meias.ures.A medical surveillance pmogram shouild flciutc \"'icrxiic ccl-

Routes of exposure ~~~~~~~~lection and epidemwiolc'nuic \\lsi Ill riclc' nt c. rn'Irincrntal

Trichloroetflyiefle may cause adverse health effects following and biologlic monitoring, medical L~rcen:ne.n mrii and

exposure \'ta inhalation. ingsStionl. or dermul or eye conwtat monraliav uara. This analysis ma-y pm'\ UcQ nirmaitin ibtiutt

Summtrit nf toxicology the reliteoness oit advense health effectN nrlo uccuptiutnul ex-

ffcsuanimals: Acute Innalation of trichloroetnylene by psr htcno ed~cnurmr'ut ,rdsda

mulltiol socctes of animais caused depressed brain function. "-orkcrs. Sensitivity. NpCcificitv. and predmict: ise iucs ot hin-

brain damage. lii'er ania kidney injury, and death due to respira- logic monitoring and mecical screenin! lest, nhould he cvalu-

iorN failure or caruiac arrest. In rats, rabbits. guineca pigs. and aitcd on arn industry-wide basis prior to irplicatuin in any vi'cn

2er'bils. chronic rnhialation of trichloroethylene caused toxic worker group. Intrinsic to a surveillance pror'crm is the dis-

effects on the nerves, increases in liver and kidney weights. and ~ cmitnationl ol'summary data to those " ho need ito know. in-

suppression of vro~tn. Chronic oral administration of trich- cludtlna cmployers. occupanionul hcuith protessionals.

loroetnylene to mice produced cancers of the liver and lungs. pinentially exposed workers, and regulaiorv and public health

And chronic inhalatcionby temnaic mice produced canlcersof the agencies.

lymph sN stem and lungis. *Preplacernetnt medical evaluation

2. Effevs car hu?"ans: A\cute inhalation or ingestion of irichlo- Prior to placing a worker in a job with a potenitial oir exposure

roethylerne nas caused resersiblc penipheral nerve denenera- to trichloroiethylene. the pflvsiciain shouid -.gaiuatc and docu-

lion. imur) to inc liver, and kidneys and to the cardiovascular ment tne worker s baseline nicaih status wirh tlhorouith mcdi-

dnd gastrointestinaisystems. depression ofhe central nervous cal. environmental, and occupational histories, a physical

system, Coma1. and sudden death due to respiratory failure. exumination, and physiolouic and laboratory tests appropri-

cardiac arrnythmta. or liver or kidney failure. Chronic ex- aeC tor the anticipated occupational risks. These should con-

posurcto tnchlortethlivefl has caused darrage to the liver, kid- centratc on the function and Integrity ofthe eves. skin, liver.

nevs. and nervous system. The ingestion of alcohol. caffeine. kidneys, and cardiovascular. nervous, and respiratory systems.

and some prescription drugs has been found to potentiate the Medical surveillance for respiratory disease should be conduct-

effects of trichloroiemrvnyet intoxicatiot.:A dermal response ed by using the principles and methods recommended by

seen as a reddening of the face. neck, back. and shoulders SlIOSH and the American Thoracic Society (ATS).

(degrealer's flush) has occurred in chronically exposed work- Aprlaelntmdclvluioiseomnednodr

en fllowng te igeston o alohol Repate immrsio of to detect and assess preexisting or concurrent conoitiOns which

the hands into liquid irichloroethylene has caused paralysis of may be aggravated or result in increased risk when a worker

the fingers. ~~~~~~~~~~is exposed to trichloroetnylene at or below the SlOSH REL.

Signs and symptoms of exposure The exmining ph 51iciashouidconsiderthe probable frequen-

I. Shoan-:erm lacutel: inhiaiaiion expouretotrichloroettylene cv. intensity, and duration of exposure. as well as the nature

can cause drowsiness. dizziness. headache. blurted vision. in- and degree of the condition, in placing such a worker. Such

coordination, mental connusion. flushed skin. tremors. nausea. conditions, which should not be regtarded as absolute contralf-

vomnitine. tazicue. aria carciac arrhythrruia. lmrriaion of the skin. dications to Job placement. include chronic diseases of the skin

mucous membranes. and eyes can also occur. or liver. The physician should obtain baseline values for liver

.Lainv.,enn (chmonicL: Exposure can cause headache. cougth. fucints.

double ' is ion. impaired coordination and senses of touch and * Periodic medical screening and/or biologic monitoring

smcll. jnxiety, dizziness. giddiness, weakness, tremor, slow- Occupational health interviews and :hysical examinations

nc:;sN ul hcaritdeat. and intolerance to alcohol. Dryness of the should be performed at regular interval S. Additional eflalttna-

41inl. bl:.sters, and dermatitis can also occur. ticns may be necessary should a worker ccveicop symptoms that

Page 169: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

mnay be attributed to exoosure to trichlorcoetntylenet. The inter- SANITATION- ~~~views. examunations, an d appmopnate medical screning and/or otitwchscnaiaedihtrnirtrvnehud

I ~~~biologic monitoring tests should be directed at identifying an be removed immediately and placed in seaied centainers (or

excessive decrease or adverse trend in the integn-ty and phys- storaje until it can be discarded or until provision is made for

iologic funiction of the eyes. skin, liver. kidneys. and cardiovas- termvlorinootyeefo h itie ttecoh

cular. nervous, and respiratory systems as compared to tnc ing is to be laundered or cleaned, the person Pctriorrring the

baseline status of he individual worker or to expected values operation should be informed oftrichlornmth% nrc N hazardous

for a suitable reference population. properties. Reusable clothing and ecqu:pmc:nt should be

The following tests should be used and interpreted accoraing checked for residual contamination beitorc rcuse or storage.

to standardized procedure and evaluation centeria recommend- A change room with showers. wnshing tuciliiws%. and lockers

ed by NIOSH and ATS: standardized questionnaires and tells that permit separation of street iand work dotlihe, should be

of lung function. provided.

aMedical practices recommended at the timetofiob trLhs- Workers should be required to shower followini a wurkshift

fer or termination and prior to purtint on street clothes. Clean wtirk clothes should

The medical, environmental, and occupational history inter- be provided daily'.

views, the physical examination, and selected physiologic and

laboratory rests which were conducted at the time of placement Skin that becomes contaminated with trichlorieth.% lene should

should be repeated at the time of job transfer or terrminaton, epopl ahdwihsa n -tr

Any changes in the wonrker's health status should be compared The storage. preoaraiion. dispensinc. or con'unlpiion .o( food

to [nose exoected for a suitable reference population. Because or beverages. the storage or ioplication oi o~nicctic. the

-. ~~~occupational exposure to trichioroeithyiene may cause diseases )(roage or smokint of tobacco or other smai'inu: naterial,, or

L ~~~~of prolonged induction-latency, the need for medical surveil- the storage or use of products for chewino %hi'uid h, prohibit-

lance may extend well beyond termination of employment. cd in work areas.

* Sentinel health events Wo~rkers who handle trichlorcoethv kne 'hould 'tush thc-ir iiccs.

L I~~~~. Acute SHE's include: Contact and/or allergic dermatitis. hands. and forearms fnoroughk w in stojp jnd wuter Wbere

t- Delayed-onset SHE's include: Toxic hepatitis. cating, smoking, or using toilet facilifie%.

n ~MONITORING AND MEASUREMENT COMMON OPERATIONS AND CONTROLSPROCEDURES Common operations in which exposure toi tricihlorocihylene

TNVA exposure evaluation may occur and control methods which may be vic%;ibci' in. each

Measurements to determine worker exposure to trichloroeth- case are listed in Table 2.

Acene should be taken so that the TWA exposure is based cii

a single entire workshift sample or an appropriate number of Table 2Y.-Operations and methods of

p . ~~~consecutive samples collected during the entire workshift. Un' control for trichloroechylene

der certain conditions. it may be apprOpriate to collect severalshort-term interval samples (up to 30 mninuies eachi to deter- Openations Cnrl

minei'the average exposure level. Air samples should be taken During use as a cleaning Process enclosure, local ex-

in the worker's breathing zone (air that most nearly represents solvent in cold cleaning and haust ventilation, personal

thtinhaled by the worker). vapor degreasingt operations protective equirnent

a MethodSampling and analysis maybe performned bycollecting trichlo- During use as a scouring Process enclosure, local ex-

- ~~~~~roethylene vapors with charcoal adsorption tubes followed by and cleaning agent in textile haust ventilation

descorotion with carbon disulfide and analysis by gas chro- processing: during use in

matouraphy. Detector tubes or other direct-reading devices the extraction and purifies.

calibrated to measure trichloroethylene may also be used if tion of animal and vegetable

available. A detailed sampling and analytical method for oils in food and pharmaceu-

7 ~~~~trichloroethvlene may be found in the NIOSH Mantual of Ma- tical industries: during use

vyri cad Methods (method number S336). in chemical synthesis

PERSONAL PROTECTIVE EOUIPMENT Durinig use in the manufac- Process enclosure, local ex-turn of adhesives. anesthet- haust ventilation

Chemical protective clothing (CPC) should be selected after ics and analgesics. and

utilizing available performance data.a consulting with the cleaning and polishing

manufactumrrand then evaluating the clothing under actual use preparations

conditions.During use as a fumnigant Lxical exhaust ventilatic-

Workers should be provided with and required to use C PC. andinttntorses psnlpoecveegloes.an oterappropriate protective clothing necessary to andinecntfrsds psolpoetvee

plovetskind onther with trichloroethylene. and grains merit

Page 170: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

EMERGENCY FIRST AID PROCEDURES not normally' be used as the only means Of preventing orminimizing exposure during routine operations. Howevtr.

In the event of an emergency. remove the victim from funkier there are somte exetosfor which rsraosmay beused

exposure. Send for medical assistance, and initiate emergent- to control exposure: when engineening and work Practice con-cy procedures. ~~~~~~~~~~trols are not technically feasible, when enginecning controls

Eye expo~~~~~~~~uit ~~are in the process ofbeing installed. orduring emergencies and

Vhcre there is any possibility of a worker's eyes being exoe ceonainedmsaineace opery(ation inldngtoereurn

to irichloroethyleflt. an eye-wash fountain should be provid- cofndsaenty(bl3.

ed within the immediate work area for emergency use. In addition to respirator selection. a complete respiratory pro..

If trichlor'oethvlifl gets into the eyes, flush them immediate' tiniioi programn should be instituted which as a mnwnrrurn corn-

ly with large amounts of water for L5 minutes. lifting the low- plies wuith the requirements found in the OSH-A Safety and

er and uppe r ids occasionally. Get medical attention as soon Health Stand-ardts 29 CFR 1910.134. A respiratory Protecton

as possible. Contact lenses shoculd not be worn when working program should include as a minimmaeautinoth

with this chemical. worker's ability to perftrm the work while wearing a rsiator. the regular training of personnel, fit tasting, peniodic en-

Skin exposure vironmentai monitoring, maintenance, inspection, andwhere mere is any possibility of a worker's body being exposed cleaning. The implementation of an adeoquate respiratory pro-

to trichlorcethyltene. facilities for quick drenching of the boy rcinporm nldn eeto ftecretrsiao

should be vrovioed within the immediate work area for emner- reui resgtatm nwedebepesnb in cuingargeuo of the orce pirao-s

gency, use. eursta nwegal pro ei ,ag ftePogramn and that the program be ev-aiuaw4d regularly.

If trichloroetrnylene gets on the skin. wA-sh it immediately with OnyrsiaoshthvebnapoedyteMneSfy

soap and water ftrichiloroethylene penetrates the clothing, and Health Administration (MSHA. formerly Mining Enforce-

remove ine clothing imnmeciately and wash the skin with soap mn n aeyAmnsrto)adb IS hudb

and wate. Get meical atention pomptly.used. Remember! Air-purifying ruspirutons will not ori-

*Rescue tec: from oxyge-eiietamsph eres.

If a worker has been incapacitated, move the affected worker .gndfcetam

from the hazarcous exposure. Put into effect the established BIBLIOGRAPHYemergency rescue procedures. Do not become a casualty. Un- *A eia ofrneo oenetlIdsra

dersuand the facility's emergency rescue procedures and know Hyg rieaniss ConfeTrenceoldfrt Govenut:and BIologicalE-

the locations of rescue equipment before the need arises.Hyins: LSTheolLmtVausndBlgclExposure Indicesrfor 1987-88. Cincinnati. 1987.

SPILLS AND LEAKS * American Conference of Governmental IndustrialHygienists: "Trichloroethylene: Documentation of the

WAorkers not wearing protective equipment and clothing should Threshold Limirt Vlues and 'Biloiocal Exposure Indices (~th

be restniczd from areas of spills or leaks until cleanup has been ed.). Cincinnati. 19866

completed. I Amerccfn Industrial Hygiene Association: "Trichloroeth-ylene' (rev. 1980). Hyglienic Guide Series. Detroit. 1980.

If trichloroethylerie is spilled or leaked. the following steps * American Lung Association of San Diego and Imperial

should be taken: Counties: "Taking the Occupational History:' Annals ofint.

1. Ventilate area of spill or leak. genaia Medicine. 99:641.651. November 1983.2. or mal qanttie ofliuid couuinjtrihloocilyene *Baskin. A.D. (ed.): Handling Guide for Potentially

absorb on paper towels and place in an appropriaicontainer. Haile os. Illinois. s Maeil9aaemn75dSfty.n.

3. Large quantities of liquids containing trichloroethylenle may Bilis.hllnois, L77.: adoko ecieCeia at

be absorb ed in nnrmicufita. dry sand. earth, or a similar matcri- Breherck L.:Hndbon k ofRacie7hmia9.a*

ai and placed in an appropriate container. *Butrwownin. 5oo.: ITh.i .~y adMtblsofIAj al Sol-

4. Liquids containing trichloroethylenc may be collected by veBonins. E .:eie Publiishi ngdo. Newaols York 1965

vacuuming with an appropriate system. a Clayton. G.D.. aind Clayton. R.E. (dsi.): T7xicology, Vol.- JIB

WASTE REMOVAL AND DISPOSAL ~~~of AThis IndasznialHygieneoan Toaxcoiogy (3 d rey. ed.). JOhinWASTE REMOVAL AND DISPOSAL ~~~Wiley & Sons. Inc.. New York. 1981.

U.S. Environmental Protection Agency. Department of Trans- -Code of federai Revlarino. U.S. Depastment ofLabot. 0C_

portat ion. and/or state and local regulations shall be followed cupancinSI Safkty van Health Administration. 29 CFR 1910. 106

tasuethat removal. transport. and disposal are in accord- 1910-134, 1910.1000. OSHA 2206. revised July I. 1986.

acwihexisting regulations. * Code of federmi Regulations. U.S. Department of TnnsPOI-tation. 49 CFl 172.101. Transportation 49. revised October I.

RESPIRATORY PROTECTON 1982. INWMSiACCCOC* Considine. D.M.(Sd.): VnHspn. cetfcFccoe

It must be stressed ihat the use of respirators is the least din (5th ad.). Van Nostraind Reinhold Company. New York.

Prelerrec method of controlling worker exposure and should 1976.

Page 171: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

*Fukcuda. K.. Ta-kerroto. K.. and Tsurujw. H.: "Inhalation *National Institute ?orOccupatianal S~ifetv Ina Heaihh U.S.

Carcino;Cflicity of T.cricioroetnyliene in Mice anda Rats?' Itt Department of Health. Education. JfnO welfare. t~Iblic: Health

dusrinal Health. 212'43.254. 1983. Serice. Center for Disease Control: Criteria pt~r , Recta;-

*Goldman. R.H.. ana Peters. .M.: The Occupational and mended Standard .... Occupanionul' EipoAUe 'u Tj,'1lo-

-' ~~EnvironmentalHealth Historv? Journal of the .4mencan Med- ruerhv-lene. 01H5W (NIOSHfl Publicaution No HSM 73.1l025.

ical! Association. ~46:1831-2'836. 1981. 1973.

*Haglid. K.G.. Briving. C.. H-ansson. H.A.. Rosengran. L.. *National Institute for Occupational Sifcr%. and Health. U.S.

K(eilstrand. P.. Siavron. 0.. Swedin. U.. and Wronski. A.: Depantmen: of Health. Educatiofl. and YAeltjre. Pubtiw Hcalih

-Trichioroctriylene: LWng-Lastzng Changes in the Brain after Service. Center for Diseane Control: Current lnwcilivcnce

Rehabilitation.' .eurotroircologv. 2:659-673. 1981. Bulletin 2-Trichloroethvlenle? Current ltilliit'tiic Bulletin

*Halperin. W E.. .Raicliffe. I.. Frazier. T.M.. Wilson. L.. Reprinis-Bulletins I Mmri IS. CH EW i NlOS-H) Publication

Becker. S.P.. and Shulie. P.A.;"Medical Screening in Ihe No. 78-127. 1979.

Workplace: Proposed Principles?" Journal of Occupational *National Institute for Occupational Sjlciv and Health. U.S.

Medicine. 28(8V: 547.552. 1986. Depantment of Health. Education. and Weliure.c Pujblic Health

*Hankinson. J.L.: Pulmonary Function Testin in the Service. Center for Disease Control: SPec lu Oc' opazl ... Ha:-

Screening of Workers: Guidelines for Instrumentation. Per- aid Reriew 'ith Ccptuml Rec unuiendan.,n3 -TtIhri{h/ne

formance. and Interpretation?' Journal Of OCCupatio11nal Medi- DHIEW (NIOSH) Publication Nu. iS-130. iY7X.

cirne. 28&10VI1081-10 92. 1986. *National lnstituie for Occupatounul Satid% and Haldth. U.S.

*Henscriler. D.. Romen. \V . Elsasser. H.. Reichert. D.. Eder. Department of Heaith. E.Iucation. and We:itarQ. Public Health

E.. and Radwan. Z.. "Carcinogenicity Study of Trichloroeth- Service. Center for Diseuse Cuntroi. Trichiorocihylene?

viene ov Lone Te-m Inhalation in Thr ee Animal Species."Ar- ,VOSH~lanuuiofAnar flutil Mechil's rtnd d .Vii. 3t.Tay.

chwest Taioiv. 4''2f7-248. 1980. or. D.G. (ed.). 01HEW i SlOSH) Publicaiion No. 77.157-C.

Li * ~~~International Agzency for Research on Cancer: IARC Mono- Cincinnati. 1977.

graphs an the Eivuatiuan of the carcinogenic Risk of C~hemi- a National Institute for Occupat ionul Salci% and Healih, U.S.

ca/s to Humans. Some Halogenated Hvdmocarbons. Vol. -'0. Department of Health and Human Ser' ccs. Public Health

Lyon. France. in,9. Service. Centers for DiseaseControl: Rcw.oin-w l77ic 4tetf~ts

LeUidel. N.A.. Busch. K.A.. and Lynch. J.R.: Occupation- ufCluermcalSubstances iMicruiliche Ediiioni. S%,txt. D.V.. and

of Exposure Sampling Szrotegy Manual. U.S. Department of Lewis. R.i. (eds.). Cincinnati. April i9X5.

P ~~~Health..Educatzol. Ind Weifare. Public Health Service. Center Proctor. N.H.. and Huches. [.P.: Chirnit O Hacursis a/the

Li ~~~for Disease Control. National institute forOccupatiortal Safety 46rkplace. JEB. Lippincott Company. Philitdelphiu. I978

and Health. OHEW (NIOSH) Publication No. 77-173. Cinicin- Romt. W.N. (ed.): Enioronmentul anld Oct upantn'all Medi-

nati. 1977. cine. Little. Brown and Company. Boston. :983.

* Levy. B.S.. and Weeman. D.H. (edsj): Occupational Health: * Rothstein. M.A.: Medical Scre'ening aj Workecrs. Bureau of

Recogn;:rrng aria Preventing Work.Related Disease. Little. National Affairs. Washington. DC. 1984.

Brown and Comnoany. Boston. 1983. *Rutatein. D.D.. Mullan. R.I.. Frazier. T M. Halperin. W E..

*Mark. H.F.. Othmer. O.F.. Overberger. C.G.. Seaborz. 0.7.. Melius. J.M.. anda Sestito. 1.P.: "Sentinei Health Events cOc-

Grayson. M.. and Eckrorn D. (eds.l: Kirk.Oihmer Entytlope- cupationail: A Basis for Physician Recognitin and Public

dia of Chernscal Technology(3rd ed.). John Wiley &Sons. Inc.. Health Surveillance:' .4ierican .Iournui uf Public Hcalth.New York. 1981. ~~~~~~~~~73:1054.1062. 1983.

*Myers. W . Bollinger. N.. Hodous. T.. Leidel N.. * Scientific Asserntoly on Environmental and Occupational

R~abinovitz. S.. and Reed. L.: VlOSH Respirator Decision Health. "Evaluation of Imnpairmnent)/Disability Secondary to

Logic. U.S. Deparnmentof Health and Human Services. Pub- Respiratory Disease? ,mertcan Review atf Respircatry Dis-

lic Health Service. Centers for Disease Control. National In- eases. 126:945.951. 1982.

stitute for Occupational Safety and% Health. Division of *Scientific Assembly on Environmental and Occupational

Standards Development and Technology Transfer. Document Health: "Surveillance for Respiratory Hazaras in the Occupa-

Development Branch. Cincinnati. 1985. tional Setting.' Amencant Review of Respiruatry Diseases.

-National Fire Protection Association: Nauionaiffire Codes' 126:952.956. 1982.

(Vol. 13). Quincy. Massachusetts. 1978.

Page 172: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Table 3.-Respiratory protection for trichloroethvlenle

Condition Minimumn respiratory prctectiort

Any dctectablc; coriccntrjtiofl Any self-contained breathing apparatus with a full facepiece and operated in a pressure-

demand or other positive pressure mode

Any supplied-air respirator with a full bacepzece and operated in a pressure-demand or

other positive pressure mode in combination with an auxiliary self-contained breathing

apparatus operated in a pressure-demand or other positive pressure mode

Plunnetd or cmcrClzCcy entry into Any self-containcd breathing apparatus with a full facepiece and operatied in a pressurt-

cnivironlmtfll% containing unknown demand or other positive pressure mode L

or arny dcictcciolc corlccrltrAtiflfAny buppiied-air respirator with a full facepiece and operated in a pressure-demand or

other positive pressure mode in combination with an auxiliary selfkontained breathing

Apparatus operated in a pressure-demrand or other positive pressure mode

Fi rctichtin Any self-contained breathing apparatus with a full facepicce and operated in a pressure- ]demand or other positive pressure mode

Ew.sapc only Any air-purifying full facepsece respirator (gas mask) with a chin-style or front- or back- jmounted organic vapor canister

Any appropriate escape-type self-contained breathing apparatusI

Only NIOSH/MS~KAdpprovtd equipment should be used.

Page 173: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L

Occupational Health Guideline forXylene

INTRODUCTION *Effects of overexposure1. Short-term Exposure: Xylene vapor may cause irrma.

This guideline is intended assa source of information for uion of the eyes, nose, and throat. At high concentre-employees, employers, physicians. industrial h ygierists. tions, zylene vapor may cause severe breathing difficul-and other occupational health professionals who may ties which may be delayed in onset. At high concentra-have a need for such information. It does not attempt to lions, it may also cause dizziness. staggering, drows:-present all data: rather. it presents pertnment information niess. and unconsciousness. In addition, breathing highand data in summary form. concentrations may cause loss of appetite. nausea. vom.-

L u~~~~~~~~~~~~~~~~~~tng. and abdominal pain. Liquid xvlene may be imrma-L ~~SUBSTANCE IDENTIFICATION ing to the eyes and skin. Exposure' in high concentra-

lions of xylene vapor may cause reversible damage toFormula: C.H.(C~~~~~~a)2 ~the kidneys and liver.

LI ~ ~ *Synonyms: Commercial xylene (xylol) is a mixture. . Lang-ferm Exposure: Repeated or prolonged expo-mostly the meta-isomer. 1) 0-xylene. ortho-xylene. 1.2- sure to xylenec may cause a skin rash. Repeated exposuredimethylbenzene: 2) m-xylene. rnens-xylene. 1,3-dimeth- of the eyes to high concentrations of xylene vapor may

IA ~~~ylbenzene: 2-) p-xylene. para-xylene, 1,4-diinethylben- cause reversible eye damage.zene J. Repomirng Signs and Sympsoms: A physician should beI Appearance and odor: Colorless liquids with aroma- contacted if~ anyone develops any signs or symptoms

L ~~~tic odors (pure p-xyiene is a solid below 12.7 C (55 F)). and suspects that they are caused by exposure to xylene.Recommended medical surveillance

p ~~~PERMISSIBLE EXPOSURE LIMIT (PEL) The following medical procedures should be madeavailable to each employee who is exposed to xylene at

The current OSHA standard for xylene is 100 pants of potentially hazardous levels:xylene per million pants of air (ppm) averaged over an 1. InitiAL edical Examination.'eight-hour work shift. This may also be expressed as 435 -A complete history and physical examination: The

- - ~~milligrams of xylene per cubic meter of air (tingi) purpose is to detect pro-existing conditions that mightNIOSM hass recommended that the permissible expo- place the exposed employee at increased risk, and to

F ~~~sure limit be changed to 100 ppm avenaged over a work establish a baseline for future health monitoring. Exami-shift of up to ten hours per day, forty hours per week. nation of the central nervous system, eyes, gpstrointesti-with an acceptable ceiling level. of 200 ppm averaged nal tract, blood, liver, and kidneys should be stressed.over a IC-minute period. T1he NIOSM Criteria Docu- The skin should be examined for evidence of chronicmen: for Xylene should be consulted for more detailed disorders.information. -A complete blood count: Xylene has been shown

to cause reversible hematopoittic depression in animals.HEALTH HAZARD INFORMATION A complete blood count should be performned. includ-

ing a red cell count. a white cell count, a differentialRoutes of exposure Count Of a Stained smear, as well as hemoglobin and

r ~~~~Xylene can aftecs the body if it is inhaled, if it comes in hematocrit.11 ~~~contact with the eyes or skin. or if it is swallowed. It -Liver function tests: Since liver damage has been

mnay enter the body through the skin, observed in humans exposed to xylene. a profile of liver

These recommendations rellect good industrial hygiene and medical surveillance practica and their implementation willassist in achieving an effective occupational health program. Howevier, they may not be sufficient to achileve complianc

with all requirements of OSHA regulatons.

U.S DEPARTMENT Of HEALTh AND HUMAN SERVICES US. DEPARTMENT OF LABORPublic Healtni SOvCA Centees for Oiseam Con"s 0ousauortai Safety ano HeeMi AdMnhuflbflNaitofis InSutute for OCaifUDOinh Safety and Healift

Page 174: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

function should be obtained by using a medicaily ac- S. Evaporation rate \butyl aceat 1.)07. :) 0.7

ceptable array of biochemical tests. 3)0.7 eatiit

-Urinalysis: Since kidney damnage has been observedoRea tivitytibtn ointbltyEeae

in humans exposed to xylene. a uninalysis should be I.Cndtosrotibtn to busta.it Eeae

obtained to include at a rmxrumum specific gravity! temperatures may cause container obrt

albumin, glucOse. and a microscopic on centrifuged 2. Incompatiblities: Conitact with strong oxidizers

sedimenti. may cause fires and explosions.

2. Periodic Medical E~zamzneuion: The aforementioned 3. Hazardous decomposltion products: Toxic gases

mredical examinations should be repeated on a biannual and vapors (such as carbon monoxide) may ce releasedbasis. ~ ~~~~~~~~~~~~in a fire involving xylene.

bSis. r o txiolg 4. Special precautions: Xylene wiji attack some

Xylene vapor irritates the eyes, mucous membranes. forms of pla~stics, rubber. and coatings.

and skin; at high concentrations it cause narcosis. In * Flammanbility

animals. xylene cause blood changes reflecting mild 1. Flash point: 1) 32 C (90 F) (closed cuph~ 2) 28.9 C

toxicity to the hemiatopoictic system. Repeated expo- (84 F); 3) 27.2 C (S I F)

sure of rabbits to II150 ppm, of a mixture of isomers of 2. Autobignition temperature: 1) 465 C (869 F); 2.)530

xylene for 40 to 55 days caused a reversible decreasei in C (986 F); 3) 530 C (986 F)

red and white cell count and an increase in throimbo- 3. Flammable limits in air. % by volume: Lower: I)

cytes: exposure to 690 ppm for the sameri time period I 0: 2) 1.1: 3) 1. 1; Upper: 1) 6.0:2 ) 7.0: 3)7i0

caused only a slight decrease in the white cell count. 4. Extinguishant: Foam, carbonl dioxiac. dryv chemi-

Three painters working in a confined space of a fuel cal

tank were overcome by xylene vapors estimated to be *warning propertie

l0.00 ppm: they were not found until 18.5 hours after I. Odor Threshold: patty states that :hte.initial odor

entering the tank, and one died from pulmonary edema of 200 ppm has an intensity of approximately 3 and an

shortly thereafter: the other two recovered completely irritation value of I. As in most other instances. olfac'

in 2days bot hadtemprarylieptic mpaiment ory fatigue occurs rapidly and the odor is no longer

(inferred from elevated serum trmunsminaise levels) and dtce tti ocnrto.

one of them had evidence of temporary renal impair- 2. Eye Irritation Level: The AlIHA H4ygienic Guide

ment (increaseld blood urea and reduced ereatinine states that "exposure to vapors at 200 ppm caused eye

clearance). In humans, exposure to undletermnined but irritation in most of the persons tested. Lesions in the

high concentrations caused dizziness. excitement, form of fine vacuoles in the cornea of cats exposed to

drowsiness, incoordinationi and a staggeriing gaitWrk commercial zylene vapors have been observed."

ens exposed to concentrations above 200 ppmrcmpai 3. Other Information: The Handbook of Indus: tal

of anorexia. nausea, vomiting, and abdominal pan rif Organic Chemicals states that xylene "may be irritatingexpoure f hmansto 00 pm casedirriatin ofthe to eyes, nose and throat as exposure exceeds thresholdexposure of humans to 2W ppmt causedgienc Guidrntteathatn00ofpthe sy

eyes, nose, and throat. There are reports of reversible lit.ThHimcGudnoetat2Cpm ass

cornedl vacuolation in workers exposed to xtylene. or to irritation of the nose and throat.

xylne lusother volatile solvents. The liquid is a skin . vlao fWrn Poete:Truhhiryitnt pl cuse rte .dres.nddftig irritant effects. xylene can be detected within three

irritantgad ctcmacauses r the ea formaetiondo defating;s times the permissible exposure limit. For the purposes

prolngedcontct my case te fomatin ofvesiles. of this guideline, therefore. zylene is treated as a materi-

CHEMICAL AND PHYSICAL PROPERTiES al with good warning properties.

Data in the following suction are presented for tylene's MONITORING AND MEASUREMENTthree isomers: 1) ortho. 2) meta. and 3) para. PROCEDURES

*Physical dataEitHorEpseEvlan1. Molecular weight: 106.2 *ibtHu xosr rlsto

2. Boiling point (760 mnm Hg): 1) 144.4 C (292 F); 2) Measurements to determine employee exposure are best

138.9 C (232 F): 3) 138.3 C (281 p) taiken so that the average cight-hour exposure is based

3. Specific gravity (water = 1): 1) 0.83: 2) 0.36: 3) on a single eight-lhour sample or on two (our-hour

0.86 ~~~~~~~~~~~~~samples. Several short-tiine interval samples (up to 30

4. Vapor density (air = I at boiling point of xylene): minutes) may also be used to determine the avenage

3.7 exposure level. Air samples should be taken in the

5. Melting point: 1) -25 C (- 12 F); 2) -48 C (-54 employee's breathing zone (air that would most nearly

F); 3) 13 C(55 F) represent that inhaled by the employee).

6. Vapor pressure at 20 C (63 F): 1) 7 mm Hg; 2) 9 * Ceiling Eyaluatdon

mm Hg; 3) 9mm Hg Measurements to determine employee ceiling exposure

1. Solubility in water, g/IW0 g water at 20 C (68 F): are best taken during periods of maximum expected

I) 0.0003; 2) 0.0003: 3) 0.003 airborne concentrations of itylene. Each measurement

Page 175: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

should consist of a ten (10) minute sample or sende of clothing which becomes contaminated with tyleneconsecutive samples totalling ten (10) minutes in the should be removed promptly and not rewOrn until theemployee's breathing zone (air that would most nearly xylene is removed from the clothing.represent that inhaled by the employee). A minimum of *Employees should be provided with and required tothree (3) measurements should be taken on one work use splash-proof safety goggles where lhquid or solidshift and the highest of all measurements taken is an xylene may contact the eyes.estimate of the employee's exposure.

MethodSampring and analyses may be performed by collection SANITATIONof vapors usin~g an adsorption tube with subsequent * Skin that becomes contaminated with xylene shoulddesorption wilh carbon disulflde and gas chromatogra- be promptly washed or showered with soap or mildphic analysis. Also, detector tubes certified by NIOSH

2 ~~~under 42 CFr Part 84 or other direct-reading devices dEtergyentan watrho remove anyd rsoi xylene. solcalibrated to measure xylene may be used. An analytical Epoeswohnl iudo oi yeesolmethod for xylene is in the NIO0SH Manual ofAnaiyucu/ wash their hands thoroughly with soap or mild deter.Methods. 2nd Ed.. Vol. 3. 1977, available from the gent and water before eating. smoking. or using toiletGovernment Printing Office. Washington. D.C. 20402 facilities.(GPO No 017.0?3-0261*4).

COMMON OPERATIONS AND CONTROLS

RESPIRATORS The following list includes some common operations inwhich exposure to xylene may occur and control meth-

G ood industrial hygiene practices recormmend that ods which may be effective in each case:engineering controls be used to reduce environmentalconcentrations to the permissible exposure level. How- Operation Controlsever, there are some exceptions where respirators may

Li ~~~be used to control exposure. Respirators may be used Use as an intermediate Process enclosure;when engineenring and work practice controls are not during manufacture of local exhausttechnically feasible, when such controls are in the plastics, synthetic ventilation: general

L process of being installed, or when they fail and need to fibers, and mixed/pure mechanical ventilation:be supplemented. Respirators may also be used for isomers personal protectiveoperations which require entry into tanks or closed equipmentvessels, and in emergency situations. If the use of Use as diluent or Process enclosure;respirators is necessary, the only respirators permitted solvent in surface local exaust

aethose that have been approved by the Mine Safety coatings, printing ventilation; general

ment'and Safety Administration) or by the National manufacture of rubber, personal protectiveInstitute for Occupational Safety and Health. dlegreasing agent in equipment*In addition to respirator selection, a complete respira. plastics and electronics

tory protection program should be instituted whIich manufacture: in organicincludes regular training, maintenance. inspection. synthesis reactions and

cleaning, and C~~al~atl~tL manufacture of epoxy

t ~~PERSONAL PROTECTIVE EQUIPMENT rsnUse in formulation of Process enclosure;

P * ~~~Employees should be provided with and required to insecticides local exhaustuse impervious clothing. Sloves, face shields (eight-inch ventilation; generalminimum), and other appropriate protective clothing mechanical ventilation;necessary to prevent repeated or prolonged skin contactpesn roctvwith liquid or solid zylene. eupmersnaprtetv*Clothing contaminated with xylene should be placedeqimn

in closed containers for storage until it can be discairded Use in manufacture of Process enclosure;.or until provision is made for the removal of xylene xylene-tormaldehyde local exhaust

L ~~~~from the clothing. If the clothing is to be laundered or resins: pharmaceuticals, ventilation: generalotherwise cleaned to remove the xylene. the person vitamins, leather, and mechanical ventilation:performing the operation should be informed of xy- as a stenlizing agent for personal protectivelene's hazardous properties. cat-gut and in equipment

*Any clothing which becomes wet with liquid xylene microscopyshould be removed immediately and non-impervious

Page 176: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Operation Controls suitable combustion chamrber. Xylene should not beallowed to enter a confined space. such as a sewer,

Use during blendinlg Of Process enclosure: because of the possibility of ans explosion. Sewers de-

motor and aviatlofl fuels local exhaust signed to preclude the formation of explosive concen.

ventilation; general trations of xylene vapors are permitted.

mechanical ventiladon; 4. 1! the solid form, allow to melt and treat as in (3)

personal protective aoeequipment * Waste disposal method:

Xylene may be disposed of by atomizing in a -suitable

EMERGENCY FIRST AID PROCEDURES combustion chamber.

In the event of an emergency, institute First aid proce- REFERENCES

dures and send for first aid or medical asjisitlflce. *A ei ofrC fGvrmna nuis

Eye EaposurflAeia ofeec fGvrmetlIdsra

if liquid or solid zylene gets into the eyes. wash eyes Hygienists: "Xylene." Documentration of the flreshold

immediately with large amounts of water, lifting the Limit Values for Substances in Workroom Air (3rd ed..

lower and upper lids occasionally. Get medical atten- 2nd printing). Cincinnati, 1974.

tion immediately. Contact lenses should not be worn * American Industrial Hygiene Association: "Xylene."

when working with this chemical. Hygienic Guide Series, Detroit. Michigan. 1971,

*Skin Exposure * American National Standard Acceptable Concentra-

if liquia or solid xylene gets on the skin. promptly wash tin - Xylene: ANSI.Z37.lO419ll, American National

the contaminated skin using soap or mild detergent and Standards Institute. Inc.. New York. 1971.

water. if liquid or solid xylene penetrates through the *Ameiecan Petroleum Institute: 'Xylene.' .4?! Tozico-

clothing, remove the clothing immediately and wash IogicalRevuewm. New York. 1960.

the skin using soap or mild detergent and water. If -Drowning, EL: Toziciry and Metabolism of Industrial

iritation is present after washing, get medical attention. Solvents. Elsevier. N4ew York. '1965.

a Breathing * Christensen. H. L.. and Luginbyhl. T. L (eds.):

ifsa person breathes in large amnounts of xylene. move NviosH Tazic Subsrancus List, 1974 Edition. HEW

the exposed person to fresh air at once. If breathing has Publication No. 74-134, 1974.

stopped. perform ainificial respiration. Keep the affect- * DeichImII. W. B., and Gerarde, H. W.: Taoxicolo Of

ed person warms and at rest. Get medical attention as Dnugs and Chemicals, Academic Press. New York.

soon as possible. 1969.

* Swallowing 6 Dow Chemical Company: Mateinal Safety Data Sheet

When xylene has been swallowed, do not induce vomit- yee ilnd ihgn 91

in g. Get medical attention immiediately. Gerarde. H. W.: Toxicology and Biochemwsry of Apo-

, Rescue ~~~~~~~~~~~~mattc Hydrocarbons. Elsevier, Amnsterdamr. 1960.

Move the affected person from the hazardous exposure. * Gleason. M. N., Gosselin. R. E.. Hodge, H. C.. and

If the exposed person has been overcome, notify some- Smith. R. P.: Clinical Tozkcology of Commercial

one else and put into effect the established emergency P,,ducus3(3r ed.). Williams and Wilkins. Baltimore.

rescue procedures. Do not become a casualty. Under- 1969.

stand the facility's emergency rescue procedures and * Grant. W. M.: Tozticolorj of the Eye (2nd ed.). C. C.

know the locations of rescue equipment before the need Thomas. Springfield. Illinois. 1974.

aries. * Handbook of Organic Industsial Solenna. TechnicalGuide No. 6 (4th ed.), American Mutual Insurance

SPILL~ LEAK, AND DISPOSAL Alliance. Chicago, 1972.

PROCEDURES * Hygienic Information Guide No6 31 - 4/en'1. Corn-

Persns notweaingproectve quimen an clth- monwealth of Pennsylvartia, Department of Environ.-

* Peson no werin prtectve quimen an clth- mental Resources. Bureau of Occupational Health,

ing should be restricted from areas of spills or leakts until 1972.

cleanup has been completed. * National Institute for Occupational Safety and

* If xylene is spilled or leaked. the following steps Health. U.S. Department of Health, Education. and 3

should be taken: Welfare Criteria for a Recommended SwtadaMd..

I.'Remove all ignition sources. Occupational £rposune to Xylente. HEW Publlication No.

2. Ventilate area of spill or leak. (NIOSH) 75-161. GPO No. 017.Q334M75, U.S. Gov-

3. For small quantities, absorb on paper towelL Evapo- eunsent Printing office. Washington. D.C., 1975.

rate in a safe- place (such as a fume hood). Allow * Patty. F. A. (ad.): Toziciiall, VoL. II of Indussnial

sufficient time for evaporating vapors to completely Hygiene and Tozxicuoia (2ad ed. rev.), InterscCtet

clea the hood ductwork. Burn the paper in a suitable NeYok193

location away from combustible materials. Large Vu1in . SaL N. I.: Dan gertusr Awoentin of Indusznial Maternias

lilies, can be reclaimned or collected and atomized in a (3rd edi.) Van Nostrand Reinhold. New York. 1968.

Page 177: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

i

i

L

I-

APPENDIX G

I,

I

I)

f,~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~rf

I 1,,C~~~~lALENA\O5Kf9101\WP~GA1LHSf2.DO 6/29/9 Recycled

Page 178: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

HAZARD COMMUNICATIONAND

RIGHT TO KNOW STANDARDS

Nam e:_ _ _ _ _ __ _ _ _ _ _ S.S. No.: _ _ _ _ _ _ _ _ _ _ _

Company: _ _ _ _ _ _ _ _ _ _ _ _

1. I have been informed about the Hazard Communication Program. Material SafetyData Sheets (MSDS), their use, location and procedures to obtain copies.

2. I have been informed that some of my work may involve exposure to toxicL ~~~~~~substances.

3. 1 have been informed about the right of employees to have access to relevantexposure and medical records, and the procedures for requesting access.

4. I understand that the employer must act upon a request in a reasonable amountot time so as to avoid the interruption of normal work operations, but within 1 5days.

Signature:

Date: __________________________

AFCEE%2D0MC0.AP

Page 179: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX H

H-EALTH- AND SAFETY FORMS

r

Draft

l \GALEJA\05K79101\WC~AI-HSPI DOC 6,29/96 Recycied

Page 180: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

r

71 ~~~~AFCEE.M20001\EP1 WK3 AFC-~J4-05K592-01-0O 4

EMPLOYEE PHYSIOLOGICALMONITORING RECORD FOR HEAT STRESS

Employee Name: _ _ _ _ _ _ _ _ _ _ _ _ Employee SSN: _ _ _ _ _ _ _ _ _ _ _ _ _

Division: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Location: _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _

Date: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Job Num ber: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Start Time: _ _ _ _ _ _ _ _ _ _ Stop Time: _ _ _ _ _ _ _ _ _ _

Health & Safety Officer: ___________Supervisor: ______________

TEMPERATURES HEART RATE

A. INITIAL READING A. INITIAL READINGLi ~~~~~1. Ambient Air Temperature _______ 1. Baseline Heart Rate _______ /min

2. Basline Oral Temperature ______

3. WBGT _ _ _ _ _ _ _ _ _ _ _

B. AFTER FIRST WORK PERIOD B. AFTER FIRST WORK PERIOD1. Ambient Air Temperature _______ 1. Baseline Heart Rate B______ /min2. Basline Oral Temperature ______

3. WBGT _ _ _ _ _ _ _ _ _ _ _

C. AFTER SECOND WORK PERIOD C. AFTER SECOND WORK PERIOD1. Ambient Air Temperature _______ 1. Baseline Heart Rate _______ /mir2. Basline Oral Temperature ______

3. WBGT _ _ _ _ _ _ _ _ _ _ _

0. AFTER THIRD WORK PERIOD D. AFTER THIRD WORK PERIOD1. Ambient Air Temperature 1______ . Baseline Heart Rate B______ /mir2. Basline Oral Temperature ______

3. WBGT _ _ _ _ _ _ _ _ _ _

E. AFTER FOURTH WORK PERIOD E. AFTER FOURTH WORK PERIODI. Ambient Air Temperature ______ 1. Baseline Heart Rate B______ /mir2. Bastine Oral Temperature ______

3. WBGT _ _ _ _ _ _ _ _ _ _

F. AFTER FIFTH WORK PERIOD F. AFTER FIFTH WORK PERIOD1. Ambient Air Temperature _______ 1. Baseline Heart Rate B______ /mir2. Basline Oral Temperature ______

3. W BGT _ _ _ _ _ _ _ _ _ _ _

Page 181: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

ACEE.M20001lidlog ttKf AFC-..-05.os.

HEALTH & SAFETY EXPOSURE MONITORING 'PROJECT #: _ _ _ _ _ _ _ _ _ _ _

PROJECT LOCATION: _____________________

PROJECT ACTIVITY: _ _______

DATE. _______________DRILL. RIG TYPEINO: ______________

LOCATION MONITORED: _________P___EReSONNELAT THIS LOCATiON: ___________

ACIUM1 MONITORED: ____________PERSONNELAEFECTED BY H&S MONITORING ______

TIME BACK- MaNInaOR InERVAL RD PIN %a2 %LB. S2IiRA(24 hc1do* GROUN Om I I -~4 m 1 011111 I OP m TERII

WGFV IN CW~~~~l~~nON ;T ~~ I IAI T04 CURTOi~gMUMENT MODEL III CA GAi op. CEC CIC

F1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

PID ~ ~ ~ ~ ~ ~ I

%LEL~~~~~~~~~~~~~~~~~

Was~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ ~

PAM_ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _

I ~~~~~~~ ~~IEL TEA LEAERIIGNTUR

Page 182: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFEiA20001lAF1J M3

AIR MONITORING RECORD

Employee Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Company Name _ _ _ _ _ _ _ _

L ~~~~Social Security No.: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date Sampled _ _ _ _ __ _ _ _ _

Em ployee No.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Shift: _ _ _ _ _ _ _ _ _

Job Title: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Sam pled By: _ _ _ _ _ _ _ _ _

Calibration Data: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Date of Calibration: _ _ _ _ _ _ _ _ _

4instrument Serial No.: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Flow Rate: _ _ _ _ _ _ _ _ _

______ _____ ______ _____ ______ _____Calibrated By: _ _ _ _ _ _ _ _ _

M odel No.: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _M ethoc: _ _ _ _ _ _ _ _ _

Sample Type/Analyze Collection Media Doscniption of Collector - Mfg., Lots Type of filter, etc.

Personal - T A __Charcoal Tub.e_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

- PeronaSi - Peak P ilter (Remp.) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Area - Filter (TotaL4Blank - ImpingeirBulk _ Passive Dosimeter

-Lab Control _ Sillos, GelSource __Chromoaorb Length of Time on this Job ____________

Does Sample Represent Typical Exposure? _____

] ~~~~~~Describe any personal protection used or tme type of operation (if area monitoning only)

Sampling Data- Temp- Barometer~ Humidity Wind

EOUIPMENT SAMPLE I I ~~~~~FLOW/EQUIPMEN SAPE TM E TOTAL SAMPLE ANALYTICALNO. I NO ON01 OFF TIME VOLUME~ RESULT TWA

DESCRITIVE ATA: ork tak. unsual vents enIern cotol aml itrfrncs ec

7~~~~~~~~~~~~~~~~~~~~~~~~~III____________

Date: Signature:

Page 183: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AscerM�,�sKET vv�a

PERSONAL AIR MONiTORING RECORD

SKETCH OF AIR MONITORING LOCATIONS

'i'i 'I liii Lh I III

I I I I I I h I I I

I I I I I I I I N I I

I I i III' I! I'.I.'�* I

II i I, II I I I��* I

I L I I

Iii

'III II�� II I, I

I i L I

I I i I I I I

I I i I I I I I I I I I

II Ii! ii LII'! I

IlL I III II lit Ii''

Ii III I I liii' I I�J

III II I I'll II! I I

II liii

I! III I II II liii I�

II I II I 1111I I I I

II II II I II I

111111 I Ii

Ii I I II I ill I

Ii I! II� III! 1:1 III' ill

I I I I I I I L I I I C I i t

' I I I I.:* i I I I I I

I I I I I I I I I I L

I I I I I I I I I I I I111111 II II

I' .111 I 'I

WEATHER: - WiND SPEED:

ITEMPERATURE: WIND DIRECliON:

III

Page 184: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L

APPENDIX I

VISITOR'S LOG

u

Draft

I~GALD4A\05K79101\WPhCALHSP2.DOC 6129/96 Recycied

Page 185: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

A FC-JO4 0K 6 9901.-M2.-0002

0

L

I

0 ~~0

(A

0'.4 ~~~~~~~Cr

ccA.

0o

Page 186: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

APPENDIX J

EQUIPMENT DECONTAMINATION PROCEDURES

DraftIOAL.ENA\05K7910OI\WPCGALRiSp200( 6,29/96 Recycled

Page 187: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

A.PPENDIX J

EQUIPMENT DECONTAMINATION PROCEDURES

The following procedures will be used to decontaminate sodl and groundwater sampling

equipment to prevent cross-conltamlinatifon of samples. The following procedures meet

applicable EPA protocols for samnpling equipment decontaumnmafof.

I. FfIELD SETUP

To prevent cross-contamintliffon from decontamination washing and rinsing overspray

during the procedure, the following field setup protocol will be followed:

L

- One 5-foot folding table, covered in sheet plastic draping down onto the

pround to provide a wailking area will be used for washing and rinsing

p~~~~~~~~~~~ciiis

* One 5-foot folding table, covered in sheet plastic draping down onto the

pound to provide a wallking area will be used for air drying and temporary

p ~~~~~~~~~storage activities.

*a A plastic tub can be used for nouphosphate detergent washes.

.. Stiff long-handled, nonmetallic bristle scrub brushes will be used.

.. Stainless steel pans with pfatrule trays will be used for tap water

draining, methanol and hoenn rinsing, and American Society for Tesin

and Materials (ASTM) Typo II water rinsin~g (one each - three total), and

will be used exclusively for each activity.

*- Sdial laboratory rinse bottles will be used for pesticde-grade solvent

*. Stainleds steel spraymr (up to 5-gallon capacity) will be used for tap waler

and ASTM Type II watrn rinsing, and will be used exclusively for eachta-tvt.

L 0~~ ~~~.- Potable water (tap waler) must come from a single source and must be

subjected to periodic quality control (QC) analyses, the single source

location for the potable water will be from the location directed by the site

manger or designee.

EL SAlaLING EQUIPMENT - METAL

All metal sampling equipment, Including stainless steel bailerst, split-spoon samplers.

sample sleeves, hand augers and sample cutting knives used to collect samples for organics

,wYMraarzSIVC"AMI &21M 3

Page 188: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

or metals analysis will be decontaminated according to the following procedure before

each samp~le is taken.

1. Knock off or prescrub with tap water in a pianoi tub.

2. Discard prescrub tap water and replace with clean tap watrn when it

becomes visibly dirty and disclored.

3. Scrub clean with a stiff long-handled, nonmetallic saitb brush and anonphosphate detergent and tap watrn solution (Liquinox or equivalent) ina plastic tub.

4. Replace the nonphosphate detergent and tap whter solution when it

becomes visibly dirty and discolored.

5. Rinse with tap water.

6. Rins with ASTM Type II watrn.

7. Rinse with methanol (methyl alcohol, pesticde-grade or equivalenm).

S. Rions with pesticide-grade hatane.

Place clin sampling equipment in a clean are on the drying table and allow it to air dry.

if the decontaminated sampling equipment will not be used immediatetly, place it in

suitably sized plastic bags. Seal with a uipned, dated custody seal. Label the plastic bags'clean' and store in a contaminant-firee environment.

2.L SAMPLIN~G EQUIPMENT - TEFLON AND OTHfl PLASTICSTeflon bailers or any other plastc equipamui used to roilect samples for organics or

metals analysis will be decontaminated as faollws

1. Scrub with a nonphosphate detergent and tap water solution (Liquinox orequivaluat) in a plastc tub.

2. Replace the nonphosphate detergent and tap watrn soluiton whaa itbecomes dirty and discolored.

3.. Rinse with ta watrS.

4.. Rinse with ASTM Type U1 wars.

5. Rinse with methanol (methyi alcohol, pesticde -rd or equivalemt).

6. Rinse with pesticide -rd hiaen.

~wnnaiinVIWU~MSC Uflin 1-2-

Page 189: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

Place ciean sampling equipment in a ciean are on the drying table and allow it to air dry.F ~ ~~If the decontaminated sampling ecuipment w~ill not be used inunoediateiy, piace it in~suitably sized plastic bags. Seal with a signed. dated custody seal. Label the piastnc bags"clean; and store in a contaminant-free environment.

MV DOCUMENTATINThe following information (at a minimum) must be logged into a field notebook todemonstrate that the decontamination procedure was performed properly.

L. Date

7 ~~~ ~~~2. Site Locmtion

3. Deicontaninmnion procedures and solutions used

T ~~~ ~~4. Type of equipment decontaminated (manufrcturer's name, model, and

serial number as applicable)

L S. Special or unusual conditions or problems (e.g., wind, ambient air

conditions, etc.)

1 ~~~~~~6. Storage location for clean equpmen not irmmediutely used.

V. SAFET CONSMDUATIONS

I. Proper precautions nmust be taken when using solvents. Refer to theapplicable site safety and health procedure betbre using. Make sure thecorrect personal protective equipment is available, and is used whenhandling solvents.

2;' Deconaminate equipment and clean up the site in accordance withapproved project procedures.

3. Dispose of the winte wates, solvents, and PPE in accrdance withapproved project warst management procedures when sampling anddecontamination are complete.

'wrnmrtSVaL4APQ &'nsi J-3-

Page 190: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

r~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~rfr~ ~ ~~~~~~ZLN`0K9~\VGLS2D ,216Rcce

Page 191: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JACOBS ENGINEERING GROUP INC.

(Division)

AUTHORIZATION FOR MEDICAL TREATMENT

TO: Dr.:__________ Address:___________ Date:_____

This form signed by our representative is your authority to render treatment to:

(Employee)

in accordance with the provisions of an under the conditions prescribed by the Workmen'sCompensation Act. Unless the case is an emergency, kindly obtain authorization for

[ ~~~~surgery, radical procedures, or hospitalization from the insurance carrier. Send your bill andrport to us at the address listed below.

(Authorized Representative)

Date of Injury:_________Location: Job No.:______

How Injury Occurred______________________

Please complete and return by mail to the following address to insure prompt payment ofcharges.

Pat Costamagna, Jacobs Engineering Group, 251 South Lake Avenue

Pasadena California 91101 (818) 578-6886

FOR DOCTOR'S USE ONLY

11 ~ ~~~Diagnosis of Injury: ____________________________

Dispositon of Patient:

t _________~~Occupational _____Non-Occupational _____Unable to Determine

____Able to resume regular duties_____Able to resume regular duties next workday_____Able to resume restricted duties with the following

p ~~~~~~~~~~limitations________________________________Unable to return to work, estimated length of

disability:___________________________

Return for follow-up visit on _____________________(Date)

(Doctor's Signature)

Page 192: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

k ~~~~AFCEEM2OO1'E(P1NJ

JACOBS ENGINEERING GROUP INC.EMPLOYEE EXPOSURE/INJURY REPORT

Date:

Employee s Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SSN:

f ~~Gender: M[ ]FE] Age:_ _

Region: _ _ _ _ _ _ _ _ _ _ Home Office Location: _ _ _ _ _ _ _ _ _ _ _ _ _

Project: _ _ _ _ _ _ _ _ _ _ Project Title: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

L ~~~~~Incident:

Type: Possible Exposure ___ Exposure ___ Physical Injury ___

Location:

Date of Incident: __ _ _ _ _ _ _Time of Incident: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

I P U~~~~Lst amount of time lost from work (if any): _ __________________

Date of Reporting Incident: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Person to Whom Incident was Reported: ___________________

Weather Condition During Incident: Temperature _________________

C ~~~~Wind Speed and Direction _ _ _ _ Humidity _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Cloud Cover ______ Clear ____ Precaprtation _____________

Materials Potentially Encountered:

L ~~~~~Chemical (give chemical name or description: liquid, solid, gas, vapor fume, mist):

F

r

Radiological:_________________________________

Page I of 5

Page 193: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFCEEM20D01'EP!NJ

JACOBS ENGINEERING GROUP INC.EMPLOYEE EXPOSURE/INJURY REPORT

Other:

Nature of the Excosure/lniurv:

State the nature of the exposure/injury in detail and list the pants of the body affected.

(attach extra sheets if needed)

Was medical care received? Yes ] No[

If so, w hen? _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

W here? On Site __ _ _ _ _ _ _ _ _ _ _ _ _Off Site _ _ _ _ _ _ _ _ _ _ _ _ _

By Wham? Name of Paramedic: __________ _____________

Name of Physician: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Other: ____________________________________

If "Off Site,' name facility (hospital, clinic, etc.): ____________________

Length of stay at the facility: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Was the Health and Safety Manager contacted? Yes ] No( When? ______

Was the Medical Consultant contacted? Yes[] No

If so, who was the contac t? _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Did the exposurelin jury result in permanent disability? Yes ] No

Psge 2 of 5

Page 194: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFCEE-M2000I'.8(P1NJ

JACOBS ENGINEERING GROUP INC.

EMPLOYEE EXPOSURE/INJURY REPORT

If so. explain:

Has the employee returned to work? Yes[ No

If so, give date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

List the names of other persons affected during this incident:

List the names of persons who witnessed the exposure/injury incident:

Possible cause of the exposure/injury:

What was the name and title of the field team leader or immediate supervisor at the site ofthe incident?

Was the operation being -conducted under an established Safety Plan?

Yes []No ]If yes, attach a copy. If no, explain.

Page acofS

Page 195: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFCEE.M2000VEXPINJ

JACOBS ENGINEERING GROUP INC.EMPLOYEE EXPOSURE/INJURY REPORT

Describe protective equipment and clothing used by the employee:

Other information, comments (attach relative data if necessary):

Did any limitations in safety equipment or protective clothing contribute to affect exposure?If so, explain:

What was the employee doing when the exposure/injury occurred? (Describe briefly as"Site Reconnaissance,' "Site Categorization," "Sampling," etc.)

How did the exposure/injury occur? (Describe fully what factors led up to and/orcontributed to the incident.)

Name of person(s) initiating report, job title, phone number:

Page 4 of 5

Page 196: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFCEEM=10CED(PINJ

JACOBS ENGINEERING GROUP INC.EMPLOYEE EXPOSURE/INJURY REPORT

Employee s Name (Print or type) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Empioyee s Signature Date

What corrective actions(s) or change to the Site Safety Plan, if any, have been or will betaken to avoid recurrence of the exposure or accident?

Additional Comments:

Project Manager/Field Team Leader

(Print or Type)

(Signature) (Date)

Paeg. Sof S

Page 197: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

LI!H'I � I i ''I''

'IF H:,

iiHKK;tja It _

Ii [ Ch�

I FJ I 'I ______________________

I 4.

I I I

ph __________

I * I!

II �I -- a, ______________________

_____________

Is!

F� ________ I I I-- I I

a--, 3 _______ _____

- j 1! i I 'F I

F I1II���.f.=2=j�I I I I I* I �t-�*; I ___

I' --- 9 I I I I ____________

f LI I *-�Inidt '---I -Si 111111*

- Z!1jf --- .iL..... I I

P I� UI�;jj II IIIiIiIhn !

iII:ik '.1

I _ _____ LW I I

4, 1 LI' I __

j I H iii i A

�b Yi�!Iy1nit�HThII I I

kiiiii� �, �,

�KLL 7

2 j�u + u S

-FlUll1 � 7� V� 7

_ _ _ _ "iii;!Li

- - - - - �- -

11.b i i

. . * ,

111i- . I I I

' I f fIIij�I

I I u I I � I

j i l l ''!Iii 1jUL11 F '

� � ds& fiJi v� 'ThT'7VV17-'-4-4

Page 198: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

- � �*� - ii' '.a

�je�I �- - ... !!jZ a

II WIU fuji Ihj 2.,: -. n'� !htw S A

.;.sa. tm � 1:2 10

� j ;1! �tts �III�IC

� £ �

S a: ZIfo ija. ' -Ii- - I :�j�;II ii � * -� '4

I :�I� 1 itj *l j!±

� I ii

IiPf itj;j �!I�j�' t I

pjji Aj i�1 jr'j, Its ' - 'Iii

I " , t 3 1

* :IiIs'a I P

5 iii; � a & tJ ph5 '6jI�I ii

ad' ZJ J&I�it1�1ii 4ItlaIi-- -- o�:a3.R.�*.M

�3q� -. fl lii �; LI IV in-�o...z4A1I;s1 Eflia jaila: a nait$

I !j !1 itt i� �cr8j�o�I �i1I liii Ii '* I

Ii J� Ii1

:�IP� '�i� 41 j11j flj -- BU I �

atfl 2 3H Ia It �d �i

!*f�� � i� p �

J w�*� a. a� � t'�j � I'�31 3!uI*

I(IIj 135L 1 j-- - *1! s�i AI] tIm!. W� JiLl �c< � ;5 11!j ' �J if,-i;r� � rQ--1 � 1 II� � U j

i t.�i4ji I �L1t: z* !'� *

3 � £-

Page 199: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

CDI

LU~~~~~~~~~~~~~C U

0~~~~~~~~~~~~~~

U. -0a

.2 ~~C) C

w0

o U~~~L

- Ca

p~~~~~~~~~~~L

Page 200: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

V ~~~~AFCEE\.M20W1VINVEST

SITE MANAGER'S INVESTIGATION REPORT

Client: __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Project Num ber: _ _ _ _ _ _ _ _ _

Name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Department: _ _ _ _ _ Skill: _ _ _ _ _ _ _

Age: __ _ _ _ _ _ _ _ _ _ _ _ _ Location: __ _ _ _ _ _ Date: _ _ _ _ _ _ _

Site M anager: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Tim e: _ _ _ _ _ _ _ _ _ _

Property Damage: Yes _ _____ No _ _____

W hat Happened: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Nature of Incident: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Injury Potential: Major _____ Serious ____ Minor ____

L ~~~~Why Did This Happen?: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Possibility of Recurrence: Often ____ Seldom ____ Rarely ____

What Corrective Action Has Been/Will Be Taken? ________________

Site Health & Safety Officer: __________Project Manager _________

Report W ritten By: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Date of Report: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Time of Report: _ _ _ _ _ _ _ _ _ _

Page 201: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

AFCEE M20001 WrrN~SS

WITNESS STATEMENTU

-7 ~~~~~~~~~~~DATE.:____________

NAME:_______________ TITLE:_____________

SOCIAL SECURiTY NUMBER:__________

TEMPORARY ADDRESS: _____________PHONE NO:_______

PERMANENT ADDRESS:_____________PHONE NO:______

!L ~~LOCATION AT TIME OF ACCIDENT.: __________________

P ~~~DESCRIBE, TO THE BEST OF YOUR KNOWLEDGE, HOW THE ACCIDENT HAPPENED:

L

Signature

Page 202: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

OR LOSS NOTICE

6CON4ThACI C NAME OR COWPANV FILE NO ESISMA USE0OHL

L ~~~~~~~~~~~~~~~~~~~~LOCATION CODES -

1 ~~~~~~~~~~2 3 4

() NAME ftcsC

CMANY

L. (2) DATE&ITOMEOF LOSS OR ACCIDNT LCTO

TrIME &PLACE I CA.M. P.M.(3) YE~vAR MAKE MODEL. SeAL4. NLaA MOTOR NUMSER LICENSE NO_. YEAR A STATI

T ~ IAUTO USEDIOR OCCUPIED NAME OF OWNER AWIRSI iC HOME ON

BY CLIENT AaRE BUS.

MUST NAEOFOIIRWBUS.SD ~~EW E~fS4GIE REI.ATION TO OWNER (EMPCYIEK. Etc.) WA A sDWT WE' EMSIN OilER HNSARANCEl

DNVEP 10IYES ONOAP OP WKAT PURPOSE WAS AUTO BEING USED AT ThIS OF ACCIDENT

f flU~~~~~~~HRE MAY AUTO - OEE tADWRESS)1 ES~TRATlED COST OF WVAIII

mIF Hanr snecv PRaPERTY STOLEN. I COLLSION aR caeinEMvu~a SnPECF O*MAMGE

1' j O~~~~~~ATE, LOCATION A BADGE NO. OR NAME OF POLIE AUTH1)CUTY TO WHM ACCIDNT WAS NEFORIID

7I 4 OWNER ADORER CHOME HN

DAMAGE TO:!I BSPqOpERTy orinE optivR - SAMESs SABOVEiADRS OPFAtWR Ua~ai I OE H

OF OTHERSasm

AUSEofa LIST DAMAGE, IF AUTO. MAKI YlEAR. LICENSE NUMER YEAR A STAT! E3TIAATED COST OFRPAI

t ~~~~ShEM It WAS OTHER CAR WASWWID NMAS OP COMANY & POLICY NtS~

Necessairy ::YES '-I O(5) PA8IIENGEH11 I

ADDRESS P9CC ~ ~AmS I r, OIENAME ADE PDAdl CAR ICAR EXTENT OFPLWANS

PERSONS _____________

INJURED _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ i

For Your orotectiuckt Calms w reouiret touoyrvg to &Dow Mr mm owm Sectoi SM at me vvwuame Coo. roaoa LA totOWS

its Uriiawulu to ~at (DI rcun t l rsn aya, rtrna~ w, Press, nman, or smaacv. am~ -rut. mm MGMfl to Drnw, Of UsetMtor t?, D&Wygem et a iotU wmao a contraCt 01 nrnswcu sa" or to s "a to b. oressold M u,,sao sw~on of any inza

Everv warson wq~o iflt NWY vroct oelIS secwor it D5ufWabi by smU@Wmr,111 ti m State ~o.l mlt txceem M" "ArYeSoS Dv 10 lnOM eXCeeWIQ OM6 mousand Caluar or My cm~

SUE REVIERSE SIDE FOR ACCIDENT DESCRIPTION AND OTHER inFORMATION

DATE SIGNATURE OF CLIENT ORDAMPE

EtP'J44t Pto o USA

Page 203: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

(6) ~~OCCUPFANTS OF C&E~rs CAR Inm~ss

I HOMENAMES AND I cBusADDRESSES I

OF!

OCCUPANTS!IAND I

WITNESSES OCCUPANTS OF OTHER CAR ADONESI P'4O9E

C HOME

?ESGRIPT1ON~~~~~~~~~~~~~~~~~~~~~0 OE HN

OF*ACCIDENT

(8 XSTA IJJ InI CLEJWS CAR (CDECK WE) USCD AT ThIM OF ACCCEN (DHECK ONE)

ALIT E YES NO Q YES Q NOAUTOM~eI HEL~j*PFUL IN AlMmhC SMSS IwCLac0 PASIN~aG11US11 (HECK WE)SEAT

BELTS EDYES O:1NO EPAN

Comore. U,. foliowmg osagram showg Girectiof R oadwso ucn~l rpofl y~s eqamqceryca fcnat

of Com

INSTRUCTIONS CvSmTAESOICINSAND LOCATIONS OF OBJECTS INVOLVED

(I) Numbe et?, veflels nanshowdwfltI~eoitr~oaysbyno -C -

(2) Uaeeot-dff-eoenowoeatnleach vehhCmbte oSaccoat 40=1100e Ihll an. aclottn

(2) Show n'otorcyces or liceycle by - 0.0 (4) Show oiHeelnan by - 0 ()Shrolwraswo by r

Page 204: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

7L

APPENDIX L

JOB SAFETY.ANALYSES

Draftt ~~~~~~iGALENA\05K7,9101'WPGALHSP2 DOC 6'29/96 Recycled

Page 205: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFET ANALYSIS

S .i~~OB rTM. HIGHi pRESsURE SPRAY UNIT OPERATION

L 'I~~~~. Fire duning fueling operaflon is cFelin oprato wien itak plaehe

immediate vicihuty.

Icr. Extreme caution will be taken while

refueding unit to avoid over filling orspilling of fuel product on ground.

2. Burns 2a. Only trained personnel will operateand provide maintenance to high

pressurt unfts.

2b. Personnel will be made aware of That

spott on engine such as water heater

and exhaust systems.

2c. Pfope hanid protecton will be wornwhile operatinig wand due to

L tem~~~~~~~~~~~~~~~~rperflflS build up.

2d. Direct spray only at surface or abjectto be cleaned. Unit is not intended asa cool down source for individuals.

P ~~~~~~~~~~~~~~~2e. Review MSOS's regarding chemicals

L ~~~~~~~~~~~~~~~~~added to unit to enhance cleaning

ability.

3. lying objects 3m. Due to the high presure output ofunit extremTe caution needs to betaken when cleaning or washing smaland light weight objects. Secure suchitems prior to cleaning effort.

APPLICABLEFPERIVflS1PE CIAI- ERATON z -.=

m ot work 03 utility Cleararnce 0Confined Space 03 Crl¶JaI Ufpa

03 Lgckoutf~ag Out 0Sm~ffo0ifl 03 Excavtion

Page 206: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

joB TmTL: HIGH PRESSURE SPRAY UNIT OPERATION

3. Flying objeCs (continued) 3b. DeC~n are will be clearly identifiedand barnicaded.

3c. At a minimum, Level D4- proteciuon isrequired wearing full face shield andsafety glasses and proper gloves toprotectfrvm heat of wand. Site andtasks specifics may require up-gradIng level of prwtectOfl.

4. Noise 4a. Most units exceed the PEL of 85decibels on the A-weighted scale.Therefore hearing protecton will bewm while working in and aroundare of unit

Hmealt Mandagery Revw Ofta

Was~~~~~~~~~~~~~~~~~~~~~~~_____________________________

Page 207: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I ~~~~~~JOB SAFETY ANALYSIS

.joB Tr.FtL TORCH CUTTIlNG OPERATIONS

1. Frese~lOi~f5 la. SuWjys wibe perfored using9aSDor plo, and LEIJO02 meter before anddwring CQtdng to ensure no flaIMrnabt

T ~~~~~~~~~~~~~~~~or corntustbble vapors are present

lb. Dedicated fire watch w&t at least one-10 pound ty A-B-C, dry powder

fire extinguisher and a 2-way radio

L I~~~~~~~~~~~~~~~c. When possible, remove combustiblematerials to a minimum distance of

p ~ ~~~~~~~~~~~~~~~~~50 awray from azitlng area.

L ~~~~~~~~~~~~~~~~Otherwise, cover and isolatecomnbustible materials or

q und~~~~~~~~~~~~~~wjharactized piping or equipmentwith fire blankets.

Id. Field team members Yi be famillarvMdi and review emergency responfl

-tM

It_ inspectwork areas prior to cuttng andfor 30 minutes after operations havestopped. This inspectonl will inciudeobservation of cylinders and linesuse to deliver cuting gases to tor&h

2.Vapors or fumes generated by cutting 2a. Torch operator will wear respiratory

2.Operations. protecton as deemed appropriate bytoe site Health and Safety Officer.

2.Random personal air monitoringsamples can be obtained to insure

proper respiratory protection progrinmin place.

permit Checkls C3Cnie pce C dcU a

13 LockoutITag Ot C cfodn

min) rlr-rIW7 flW

Page 208: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

_ _ rt .§:~ .ACCES S.i2 ::y"t :i N..:ui-JSA-7

Page 2

JOB SAFETY ANALYSIS

JOB TITLE: TORCH CUTTIG OPERATIONS

3. Torch operator receiving burns 3a. Cutrs wi Wear fire retardant FIPEconssyg of cuting learners -Nomex

hood with hard hat. Appropriate faceshield when APR is not being used.

3b. Fire watch will Carefully watch for hotslag landing on torch cutter andsurrounding area.

3c. Pinst aid kit and emergency eye washsamfion will be located in support zone.

4. Bums from hot stag and metal 4a. Firs watch will be in minimum Level Dprotection to include safety glasseswith side shields.

4b. Fire watch will have leather gloves orappropriate fire retardant hand I

protection.

4c. Fire watch will have available a 3gallon spray canister or otheravailable water source to cool metalbefore handling.

4d. Area of cutfng will be cordoned off byUse of yellow caution tape or othermean to establish an eirlusion zone.

Ae. Torch hoses will be kept out Ofmatauial drop zones and away fromsp-k.

5. Trip hazards 5a. Keep hoses out of walkways.

Heait and Safety Review Date

-projedt Manager Review Date

Page 209: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

.jog -rTtTU SKID STEER LOADER OPERATION

1. Fie poenfl duning fuelbig a.. Fueling operatoil Will take place whenoperatofls s~~~~~enign is cold or when it has

sttfidmgntly cooled dawn-

lb. Fire extinguisher wifi be kept near thefueling sftaton. An additional fireextinguisher may be kept on the unitat the discreton of the SHSO.

JO. Caution will be taken not to overfillunit or spill fuel Produa.

L ~ ~~~~~~~~~~~~~~~2a. Only authorized personnel will

L ~~~~~2. Tipping or ovot-turftfg Of machine operate unit.

2b. Seat belts and factary installedtresaining devices will be used during

opemationl.

2c. Slopes will be negotiated by goingstright up and down.

2d. Severe or sudden turns will be

avoided.

2e. Operate unit on level and solidsurface when possible, otherwiseproceed cmuiousiy.

2?. Do not Overload budcet Keep loadas cloaw to the ground as is possiblewhen moving.

3a. Ground support personnel will yield

3. injury to co-workers doereayequipment operatiOns.

sPUc L.ERJ~ISPECIAL.CONIEA1MS -- :&=~A

Prmit Chock Citca a

(urn NotW&KlbC ulitceEacSS ofnt pc

Page 210: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFET ANALYSIS Pq

JOB TiThE: SKID STEER LOADER OPERATION

3b. Skid steer loader will be provided with

3. Personnel injury (Contd.) back-up alarm.

Sc. Work zone and traffle patterns will beknown by ground support personneL.

Heam and R Date~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Projeci Manager RMOW D"~~~~~~~~~~~~~~~~~~~~~~~~

(win) h~~~~~~~~~~wsp~~~~~~nmuw"" 300~ ~ ~ ~~~~~~~

Page 211: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

409 rTfL± FRONT E.ND LOADER OPERATION

1. Equpment alfuflOflimse ia. Only qualified personnel shall be1. Equipment aftn~d~f~misuauthorized to operate equipmnit.l

lb. Eqwipmenet wIl only be operated inaccordaice with manufactuzrer'sinstructioni.

le. Use of equipment for speoific task willbe discussed in detail during daily

£ ~~~~~~~~~~~~~~~safety meeting.

* ~~~~~~~~~~~~~~~~Id. Daily equipment inspedtion and testswit be performned and documented bythe operator at the start of eacht shift.

T ~~~~~~~~~~~~~~~~~~~if the loader is found to be unsafe, itwill be taken out of service andtagged untit the unsafe condition has

P ~~~~~~~~~~~~~~~been coretedd.LI

le.. Maintenance and repairs wAiI be7 ~~~~~~~~~~~~~~~~performed in accordance with

manufacturr's specifications.

2. Unsafe operation during demolition, 2a. Proposed demolition acdivities will be

hauling and storing determined by field supervisor andthoroughly discusse with theoperator and ground Support

L ~~~~~~~~~~~~~~~~~~personnel during the daily safetymeeting.

2b. Ground support person assistingloader operator wl remain in sight ofoperator and wAII serve as a safety

Ch~

O3 Hot Work 03 Utility Cleaance C3 COnfined space 0 Crtoca Li!Pan

O3 LckoutIrag Out CT Scaffolding 03 Excavation

F ~ ~ ~ npniwepadl~330

Page 212: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETIY ANALYSIS

JOB TiTTh!: FRONT END LOADER OPERATION

2c. Do not overfill bucket during handlingof budlding debris. If possible, use ageneral purpose (44-In- type) bucket

to contain and hold debris.

2d. Traffic patuerns and work area will beknown by all ground supportpersonnel. Barriers and signs will beused to identify work area.

Ze. Use caution not to collapse structures L

on the loader.

3. Unsafe operation on slopes, soft or 3a. Side slopes will be avoided when

unstable ground .possible. Slopes are to be negotiated

by traveling up or down the slope withthe bucket in low position.

3b. Avoid raising and dumping bucket onsteep side slopes.V

4. Injury to operator and supp ort 4a. Operator will access and exit machine

personnel. by means of ladder or step pads andhand holds provided by machine

rmanufacturer.

4b. Ladders and step pads will be keptfree of any debris or buildup of mud.

Ac. Appropriate level of PPE and hearingprotection wI be worn by operatorand ground support personnel as

defined by the HASP.

Ad. operator will wear seat belt or otherapproved mesuaining devices as

required.

4e. Front end loader will have a proper.

woldng, backup alarm, or operatorwill be assisted by a dedicated signa1

person.

(n~ hflpW~t2S¶ ISU

Page 213: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

.joe nTrr FRONT END LOADER OPERATION

A4f. Ground spport personnel w~ill yieldrih-of-wy to front end loader.

Operator to yield to personnel onground who enter the work area.

4g. Ground support personnel will notstand cdose to or work under raisedloader bucket.

S. ire Sa. Engine wAil be shut off during fuelingoperations-

5b. Fire extinguisher will be mounted onI. ~~~~~~~~~~~~~~~~machine and will be inspected and

recharged as necessary.

L S~~~~~~~~~~~~~~~~c. Caution will be used to preventoverfffng of machine and to preventspilling of fuel on ground.

5d. Machine engine comnpaiflent andr ~~~~~~~~~~~~~~~~~~eidaust system wiUl be kept free of oil,

I L ~~~~~~~~~~~~~~~~~fuel, and debris accamulation.

Hoaft and Safety Review Date

Prolect manager Review ot

Page 214: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JSA #12

JOB SAFET ANALYSIS

Joe TITLEL FORK UPT OPERATION

POT ~~~~~~~~IVEVESU

1. Equipment Mall'funti~ofl/lsusU la. Only operators who have beenannually certified to operate fork [llfs,at RPM will be allowed to canito forklift.

lb. Use of equipment for specific task willbe discussed in detail duuing dailysafety meeting.

ic. Fork lifs Will only be operated inaccordance with manufacturertsinstUfliOns.

Id. Duily equwprenet inspectOn and testswill be performed and documented bythe o perator at the start. of each sft.if the fork fift Is found to be unsafe, itwil be taken out of service andtagged until the unsafe condidion hasbeen corrodted.

le. Maintenance and repairs will bepurforTmed in accrdance with

mnuAfl~fC--rets specifications.

2. injury to operation and support 2a. Operator will access and exit machinepersonnel ~~~~~~by means of ladder or step pads andpersonnel ~~~~~~hand holds provided by machine

manufat or.:

2b. Ladders and step pads will be kept

tree of any debris or buildup of mud.

APPLICABLE ER&rTJSPECIIZC -

Pennit CheckCitca if Pa

C3 Hot Work C3 utility clearan~ce C Confined Space CCiia itPa

C3 LocltwUt/TS9 Out 0 Scaffolding C Excavation

Page 215: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JoB TMILL; FORK LIFT OPERATION

2c. Appropriate level of PPE ano hearingr ~~~~~~~~~~~~~~~~protecton to be worn by operator and

ground support personnel as requiredby the HASP.

2d. Operator will wear smut belt or otherapproved restraining device asmequtred.

2e. Fork lift will have a proper, working,backup alarm, or operator will beassisted by a dedicated signal person.

21. Ground support personnel will yieldright-cf-way to fork lift. Operator willyied to persnnel on ground whoenter the work area.

V ~~~~~~~~~~~~~~~~2g. Ground support personnel will noti~d near or work under raised load

P ~~~~~~~~~~~~~~~~~~~on fork Ift.

3. Tipping or overturningoftfork lift Sa. Operator shall not pick loads whichP ~~~~~~~~~~~~~~~~~~~exceed capacity of fork lift.

3b. Keep load as low as possible whiletraveling.

3c. Reduce travel speed before making

3d. Side slopes shaul be avoided. Slopesshall be negotiated with the forks in a

t ~~~~~~~~~~~~~~~~~~~~low position on the uphWl side, i.e..drive forward up and back down.

3g. Operator to stay within roll cage aresof equipment should rmlloverilipaveroccc:.

4. Fire ~~~~~~~~4a. Engine widl be shut off during fuelingooeraticrns.

(WimI r't~yvMfl.*12

Page 216: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFMl ANALYSIS

JOB TrTLL- FORK UFT OPERATION

p IMEASUR~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~i~~~~~~~~~~~~~`---~~~~~~~~~~~_____ EMESRtr~

4b. Fire eflinguisher will be maintained onmachine and will be inspected andrecharged as necessary.

4c.- Caution will be used, to preventoverfilling of machine, and to preventspilling of fuel.

4d4 Machine engine compartmlent andexhaust system will be kept free of oil,fuel, and debris accumulation.

Health anid Safesty Review Date

Project manager Review oate

Page 217: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

4093 TTTLE: Loading & Transporting Debris

1. Injury to co-workern la. Ground support will yield right of wayto all heavy equipment operators.

lb. Work zone and traffic pattems will beknown by ground support personnel.

le. Follow procedures set in J SA-1I 1,Front End loader operation.

2. Tipping truck, over-turning machine 2a. Only authorized personnel will

2b. Seathelts and factory installedrestraining devices will be used duringoperations.

2c. Slopes will be negotiated by goingstuaight up and down.

2d. Severe or sudden tumn will beavoided.

2e. Operate unit orn level and solidsurface when possible. Otherwiseproceed cautiously.

3. Excess dust 3a. Do not exceed 1 0MPH on unpavedroadways.

3b. Use water spray on haul mutes tominimize dust emissions.

3c. Cease operation until dust iscontrolled.

Heaftii and Safety Review Date

Pmjlea manager Review Dals

APPLICABLE PERMITSISEQLAL.ONSDERATLONS

Permit ChecidistI Hot work 0I UtWity ClearanceC Confined Space 0 CriJtia Lif Plan0 LoctoutTag out 0 Scaffolding 0ExcavalIon

Page 218: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JOB MuL EXCAVATOR OPERATION

1. Equipment matfuncton/misuse la. Only qualified personnel shall beauthorized to operate equipment

lb. Equipment will only be operated inaccordanca with the manufa~mresinstructionts.

i c. Use of equipment for specific task willbe discussed in dletail during dailysafety meeting.

id. Daily equipment inspection and testswill be performed and documented bythe operator at the start of each shiftif the excavator is found to be unsafe,it will be taken out of service andtagged until the unsafe condittion hasbeen coirrected.j

le. All mamtntenance and repairs wIl beperformed in, accrdance with thensnufsctureti specifications

2. Injury to operator and support 2a. Opersitor will access and exdt machinepersonnet by means of ladder or step pads and

hand holds provided by themanufacturer.

2b. Ladders and step Fads will be keptfree of any debris or buildup of mud.

2c. Appropriate PPE and hearingprotecton will be worn by operatorand ground support personnel as

required by the HASP.

A UAS'AI.C---ERATVNrrrZj.t.:

Pernnit Checkls(3 Hot work C Utlity Clearance C3 Confined Spac C Critical LIII Plan

C Lock~out/Tag 01u1 C Scaffotding C Excavation

(Wm) h:s'wcUMtWn'4 4 3M1W

Page 219: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

L ~~~~~~JOB SAFET ANALYSIS

.joa rnat EXCAVATOR OPERATION

2d elalrm O peratorYAwe will beltO te

2. ~~~~~~~~~~~~~~~~assisted by a dedicated signal Person.

2f Ground support personnel to sty dearof boom and tail swing radius of theexcvator.

2g. Excavator cab and window will beprovided with guards to protect theoperator from flying or falling debuis.

2h. Do flat operate excavator within 20feset of an energized power tine of 200kV or less. For higher voltages.

T' ~~~~~~~~~~~~~~~consult the SHSO for minimumdistnces.

p ~~~~~~~~~~~~~~2L Use caution when demolishingsbruflnrs near exating utility lines.

3. unsafe operation on slopes, soft or 3a. Slopes will be negotiated by goingunstable ground dftCdiy up or down and using the

bucket and boom to stabilize andF ~~~~~~~~~~~~~~~~~~assist as necessary in the travel ofL~~~~~~~~~~~~~~~~~~teecvtr

3b. Tracks shall be kept perpendicular toexcavation when working on benchedamuss.

3c. Opnrtor to keep boom in lowestpracdcal position when s-wingingemcvator.

3d. Operator will always have a helperwhen excvating.

Li ~~~~4. Use of thumb attchment on bucket 4a. Do not use thumb and bucket tograsp and pick loads huavier thanrecomrmended by the excavator

(wnj flw'p4rnuflW*-I 4 3daB

Page 220: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JOB3 TTLE: EXCAVATOR OPERATION

4b. Before lifting and swinging loads,have load firmly grasped by the thumbto prevetf sudden loss of load.

5. Use of boom-mounted impact hammer, Sa. Review sate operatng procedures asshear, or universal processor provided by the equipment

manuf acturer.

Sb. Operator and all ground supportpersonnel to wear heating protectonIand safety gtassos.

Sc. Ground support personnel to stayclear of flying and falling debris zone.

5d. Inspect tools and hydraulic hosesdaily, or mome often if conditionsdictate. Replace or repair asrequired.

Se. Do not s~wing or travel withi hammerand boom in a high, elevated position-I

6.Fire Ga. Engine will be shut off during fuelingoperations.

fib. Fine extinguishers will be mounted onmachine and will be inspected and Irecharged as necessary.

6c. Caution will be used to prevent over-fling of machine and to preventspilling of fuel on ground.

6d. Machine engine compartment andexhaust system will be kept free of oil,

fuel and debris accumuiation.

Heaflh and Safety Review Date

Project Manage Review Dt

(~mI 1ny~le4 34W

Page 221: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JOB9 TiTLt: CRANE OPERATION; HOISTING AND CLAMSHELL BUCKET

1. Equipment malfunction/misuse la. Only personnel qualified to operatethe specifictype and size of cranebeing used for designated task will beallowed to do so.

lb. Responsibilles for the operation ofthe crane and the communicationsbetween the operator and the rigging

y crew~~~~~~~~~~~~~~a will be discuzssed in detail duringfte daily safety meeting.

p Ic~~~~~~~~~~~~~~l. Daily equipment inspectian and testsL ~~~~~~~~~~~~~~~will be performed and documented by

Mhe operator at the 5tar of each shift.If the crane is found to be unsafe, itwill be taken out of service andtagged utinE the unsafe condition hasbeen corrsetd

id. All maintenance and repair will bepefonrmed in accordance with themanufacturer's specifications.

le. The crane will have with it. and beoperated in accbidance with, thefollowing documents

*A copy of the operating manualdeveoped by the manufacturer forft specific make and model of1' ~~~~~~~~~~~~~~~~~~crane; a copy of the operatingmanual for any crane operatoraids with which the crane isequipped.

APP~IUCABLE P3ERMrBmPECIALZONSIDERATION NS-.-.'--ZSZ>2tt

Permit Checklist0 Hot Work 03 Utility Clearance OConfined SPw 0 Critical Lilt Plan0 Lockout/Tag out 0 Scaffolding 0 Excavation

(flI lbv~WU~I~lsftl SI1dS

Page 222: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

40sTITLE: CRANE oPERLATION; HOISTING AND CLAMSHEJJ. BUCKET

--- DetroVtilVtIESUEtz-..-

The loaud rating chart for theceae, wNSch shall include:

- the crare make and model,seuial number, and year of

manufac.umr:- load ratings for all crane

operating configurations,including optional equipment.

- wire rope type, size, andreeving; line pull, line speed,and drum capadity, and

- operating limits in windy or3cold weather conditions.

*The crane's log bock which shallbe used to record operating hoursanld all crane inspections, tests,maintenance and repair. The logshad be updated daily as thecrane is used and shall be signedby the operator: servicemechanics shall sign the log afterconductng maintenance or repairson the crane.

2. injury to operator arid support 2a. Operator will access and existpersonnel, machine by means of ladder or step

pads and hand holds provided by

machine manufacturer.

2b. Appropriate FF5 and hearingprotection will be worn by operatorand ground support personnel asraquied by theMHSP.

2c. Ground support personnel shall notwork under the crane boom orsuspended loads.

3W~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 223: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JOB Trlt!: CRANE OPERATION; HOISTING AND CLAMISHELL BUCKET

2d The crane tail-swing radius dangerzone will be dleaily marked withwarning tape.

2.. Crane will not be operated within 20feet of an energized power fine of 200WN or less or per OSKA guidelines.The mast stringent rue shalD apply.

21. Crane will not be operated during.4 t~~~~~~~~~~~~~~~~nafae weather conditions such as

high wind or poor operator visibility.

3. Clamshell bucket operation Sa. Warning tape will be used to o hdemarcate the working radius o h

3b. Cars wigl be used in graspingmaterials with the dlarsheil bucket tomiT im ze materials failing from diebucket

p S~~~~~~~~~~~~~~~~c. The bucket size and the load carryingcapacity will be limited to 50% of thecomne's rated load cihar capacity

t ~~~~~~~~~~~~~~~~~~3d. If necessary, a mechanical tagline 'willbe used to control and stabilize thebucket.

Page 224: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFET ANALYSIS

JbB TrnL.E CRANE OPERATION; HOISTING AND CLAMSHELL BUCKET

PO#=~[tE~iVNASRE

4. Fire 4a Engine "'il be Shut off during fuelingoperations.

4b Fire extnguisher wvill be maintained onmachine and will be inspected andrecharged as necessary.

Heattfl ando safety Revew Date

Project Manager Review Date

twn) h-vMW~~~~~~~~~~~~~~~~~~~tWW*Mll; SM~~~~~~~~~~~~~~~~~

Page 225: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

JOB SAFETY ANALYSIS

JOB TTrhLE WORKING MROUND DEBRIS PILES AND ROLLOIFF CONTAINERS

1. supsntri, falling debris, cuts from sharp la. Emfployees will refrain fmom walking orobjeats climbing on debris piles.

lb. Stay a safe distance away fromequipment placing debris in the piles or

IC. Arty mwcgnized Irnstbiit of the piles will

:L be immediately correctad.

r ~~~~~~~~~~~~~~~~~~id. if Possble. employees will refrain fromL handling debris.

la. Leather gloves mult be worn whenV ~~~~~~~~~~~~~~~~~~~~handling debris.

2. Back injuries 2. Evaluate the =az and weight of materaiaLAvoid Ofin items weighing more than SO

2b. Use pmpe lifting techniques ORif with yawrkWlan not your back).

3. FiTs 3& Fire efliguashess shall be stationed neardebris pules and container loading arma.

Sb. Keep flammable and cmrnbutsible liquisout of debris pile areas.

Sc. vi torchworkuf possil. ftorch

Ls reuired. ame must be prewet and acontnuous water spray used. A 30-mnuwte fire wadh must be maintainedaftercuaring has been comoleted.

I ApPUCABLF_ pERMITISECIALCONSIDERATICkN: m .... -7 ~

Penmut Checklitt

Henan safety Review Dt

Project Mananger Review Date

Page 226: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

ISA 121

JOB SAFET ANALYSIS

JOB TITLE: WORKING ON DlUW FILM

?OTENrIAL HAZARD PUEVINTATlV ?GA-SURI

1. Slips. tnps, hilhs. and cuts from .bmp II. Use c=einuis iain when wailc~ or

objn. ~~~~~~~~~crlmig an debris plm.

lb. Avoid wling~ an asai. b j

I.. LaMer gloves mm be worn when handting

Id. k u akn for tails protruding from objnct.

Ua. Smaty Zwms and a fac shield mnz be worm

2. Eye injuries and cum from WWan Wheever saing, T

2b. MAWts anab you ae in a ecmormble.

2c pads &Wm and, capwion etg- scdn

"al be won whenuf

3. Back injurie Ia. Ebdn te sio en md weigb of UNMaIru.Avoid Iifmg itessm waighUg more than SO

3b. Eimnntba yaubhavdtohidfIoutm befone

3c. Urn proper liltingt techniques (lift vinh Your 3-p and not yew back.

APFULCABI..E PEL~dITS/PCAL CONSMEWDATIONS:

Perot QskI

Haltb and Safay Reniew Darn

Proj citgMaer Review V

(wyl) h:wpltCUl~hlc~=S-l Mizuk 9, 1995

Page 227: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I-

IT

* ~~~~~~~~~~~~~~~~~~~~~~~~~~ISA f22

JOB SAETY ANALYSIS

JOB lTMtA: WORKING ON DEBRIS 7111S

POTENIAL'J HAZARD IPREVDITrATWB MEASURE

A. Fire ~~~~~4a. Fir extapishn shal be staxid neardebris piles

4b. Kaq flammable and ccosbuichLa liquids out

4c. Avoid torch wait if pocstil. If torch cumin

L -~~~~~~~~~~~~~~~~~~~~~a debris pits in recpuired. re mmsu beP1u0 aid X cOuduu m =U SPY Uspryedt A304umma fire watch cnsn be maintainedr~~~~~~~~~~~~~~~~~~~~at canat has bamsurmepiued.

4d. If a fire o=n, do not hmnre to call es

fire dqarm~ent

t~ ~ ~~~(t :wV~~ubcja2 ac .19

Page 228: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

.JOE SAFETY7 ANALYSIS

flS T!Tt.E- ACCESS - HiOOK-UP AND -iANSPORliNG RCL-ZFr CNT AINERS CFDE-CRIS

:FO~Ffl~r~HAZA~: - PREVNTATiVE MEASUR

1.injury to c*-orarsflascnorer3 la. Ground supportwid yieia nignt of way toall heavy equipment cuerators

lb. Work zcne and traft pamerns willbeknown by ail ground sucooon ;erscrnneiand in-=oMing trUnDort t mcks.

1c. Grmunc support oersonniel will assist inhocic-ug of rodl-off cnmm=ers avoidingafi ptnon porim aro cnmac: a ruas -forhook-ups.

Id. Prior to hook-up to the transport tmxksground suppofl personnel will insure iload is at a proper mifl heignt ano tmatload is Properly covered.

1le. Ail suppont personnel will avviU diflingon loaded roth-off or gflhig unoer rafoffatcontainer when raising or taweuing load.

it. Hook-up personnel will wear leatherwork gloves.

o.7,;ingtrack. over-wumIingf-ylof 2. Only authorized DOT (CflL) licenseddrivers wtij operate unit.

Zb. Seaxtefts will be required at ail nineswflen mnovuig a vehlicle or miuct

Ze. Severn or sudden turns will be avoided.

2d. Roll-ofs will be locoted on flat and solidsurf~cn or moved to acave inenbioned

anaspriar tolhook-up oifcl,mmer.

Projec Mandagery Review0

AP5pLICABLE PERMITSISPECIAL CCNSIDERATIONS:

Pqnm ChecLML~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Page 229: v CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION ...alaskacollection.library.uaf.edu/eafbsc/cd1/AR419-1.pdf · v ~~354TH CIVIL ENGINEER SQUADRON INSTALLATION RESTORATION L ~~EIELSON

I~~~~~~~~~~~~~~~~~~~~~~~~~'AZJOB SAFET-Y ANALYSIS

JC9 T7Thi AC CES S - HOCK-UP AjND 7RANSPORM ING RCLsC~FF: C:NTAbNERS OF

DEBRIS

7 i ~~~~PUMENTEAL HAZARD PREvSNTATIVE M. EASU RS.

2. ~~~~~~,ru ~~~~3a. Transccrn = wiii have fire1 I ~~~~~~~~~~~~~~~~~~~exbnguis.er in cacs anc in -~Peratile

I ~~~~~~~~~~~~~~~conditon.

3b. Keep ftamrimanle ano =-:otusniieL (~~~~~~~~~~~~~~~~~~~iquids a safe dismanbe from rei~cff

conmmer.

L ~~~GENERAL COMMENTS:

I ~~~~~. Crivers must = onmm remaval of rmn-off box with J'a s srte rrmnager (Bob Menitel orWayne Miller).

* Drivers, upon anv2i a: ee work zone area of RMA will sign in Visitzirs Log Book lccatd inC ~~~~~~Ri~ede resnonse niier mmald on site.

r

4- ~~ ~ ~ ~ 4

H and Safety Review Date'

Proie~ manager Review Date' 1

JAPPUICASLE PSERMITSISPECIAL CONSIDERATICNS:Pe"M Chem=.