Informatik 7 Rechnernetze und Kommunikationssysteme Using Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015

Upload: others

Post on 04-Apr-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Informatik 7

Rechnernetze und

Kommunikationssysteme

Using Optimization in Smart Grid Applications

Dr.-Ing. Abdalkarim Awad

04.11.2015

Page 2: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Why Optimization

Smart Grid allows better coordination between the different entities

Optimization can be used to find the best strategy, size of different components,…

We are not going to focus on the optimization algorithms rather than on how to use them

There are a lot of tools that can be used

We are going to use some tools to solve the problems.

Dr.-Ing. Abdalkarim Awad 1

Page 3: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Several tools

ADMB

CONDOR

Joptimizer

NLOPT

Dr.-Ing. Abdalkarim Awad 2

Page 4: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

R

Nlopt

+

3

Page 5: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

What is Optimization?

Optimization is the mathematical discipline which is concerned with finding the maxima and minima of functions, possibly subject to constraints.

Dr.-Ing. Abdalkarim Awad

Page 6: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

What do we optimize?

A real function of n variables

with or without constraints

),,,( 21 nxxxf

Dr.-Ing. Abdalkarim Awad

Page 7: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Unconstrained optimization

22 2),(min yxyxf

Dr.-Ing. Abdalkarim Awad

Page 8: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Optimization with constraints

2

2),(min

1,52

2),(min

0

2),(min

22

22

22

or

or

yx

yxyxf

yx

yxyxf

x

yxyxf

Dr.-Ing. Abdalkarim Awad

Page 9: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Nloptr Package

We are going to use a package called nloptr to solve non-linear optimization problems.

Dr.-Ing. Abdalkarim Awad 8

Page 10: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Example1

GA GB

Max=120 Mvar

LB=300LA=300

Euro/hr 0.00149PG11.83PG616.9)(PGC

Euro/hr 0.00334PG11.69PG 399.8)(PGC

2

BBBB

2

AAAA

AB

Dr.-Ing. Abdalkarim Awad 9

Page 11: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Example1

Total Hourly Cost :

Bus A Bus B

300.0 MWMW

199.6 MWMW 400.4 MWMW

300.0 MWMW

8459 $/hr

Area Lambda : 13.02

AGC ON AGC ON

Dr.-Ing. Abdalkarim Awad 10

Page 12: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Generator cost curves

PGA+PGB=600

Euro/hr 0.00149PG11.83PG616.9)(PGC

Euro/hr 0.00334PG11.69PG 399.8)(PGC

2

BBBB

2

AAAA

Dr.-Ing. Abdalkarim Awad 11

Page 13: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Generator cost curves

How much each generator should produce to cover the 600MW demand

The Problem can be written as:

MINIMIZE (CA(PGA)+CB(PGB))

Subject to

PGA+PGB=600

PGA>=0

PGB>=0

Dr.-Ing. Abdalkarim Awad 12

Page 14: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Code

Dr.-Ing. Abdalkarim Awad 13

Page 15: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Code

Dr.-Ing. Abdalkarim Awad 14

Page 16: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Run

Dr.-Ing. Abdalkarim Awad 15

Page 17: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Example2

Add constraints to generator 2

0<PGB<250

What is the total costs now?

Dr.-Ing. Abdalkarim Awad 16

Page 18: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Example3

Max=50 MvarZ=0.1j

GA GBLB=300 MW

LA=300 MW

AB

Write R script to find P1 and P2 that minimizes the operation

costs and takes into considerations line limitations

Dr.-Ing. Abdalkarim Awad 17

Page 19: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Including power Flow

2

1

1010

1010

3

3

PB

PA

N

k

kiiki BP1

))((

P1=(B12)(θ1-θ2)

P1=(B12)θ1-B12(θ2)

P2=B21(θ2- θ1)

P2=-B21(θ1)+(B21)(θ2)

Z=0.1j y=-10jB=-10

Dr.-Ing. Abdalkarim Awad 18

Page 20: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

2

1

1010

1010

3

3

PB

PA

PB-3=-(10)θ2

PB-3+(10)(θ2)=0

Solve with respect

to bus #1. i.e θ1=0

(Slack bus)

Dr.-Ing. Abdalkarim Awad 19

P12=B12*(θ1-θ2)

|P12|=|10(θ1-θ2)|<0.5

-0.5<10*θ2<0.5

-0.05<θ2<0.05

Page 21: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Example 4

20

P1 P2

BUS2

BUS3

500 MW

Dr.- Ing. Abdalkarim Awad

100MW

L1=50

Page 22: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Generator cost curves

C1(P1) = 400 + 9 x P1 + 0.0015 x (P1)2

100 MW ≤ P1 ≤ 600 MW

C3(P2) = 100 + 8 x P2 + 0.0048 x (P2)2

50 MW ≤ P2 ≤ 400 MW

Minimize (C1(P1)+C3(P2))

Dr.- Ing. Abdalkarim Awad 21

Page 23: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Optimization Problem

Minimize (C1(P1)+C2(P2))

Subject to:

100 MW ≤ P1 ≤ 600 MW

50 MW ≤ P2 ≤ 400 MW

Dr.- Ing. Abdalkarim Awad 22

Page 24: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Solution

9 + 2*0.0015 x (P1)=λ

8+ 2*0.0048 x (P2) =λ

P1+P2=500+50-100=450

P1=263.5

P2=186.5

Minimum Cost = 4634.60

Dr.- Ing. Abdalkarim Awad 23

Do they satisfy all constraints?

Page 25: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

24

P1 P2

BUS2

BUS3

BUS1

y12=-10j

y13=-10jy23=-10j

L3=500= 5 pu

P13<200=2 pu

SB=100 MVA

100MW= 1 pu

P13=221.2MW

P12=42.3

P23=178.8

P1=263.5MW 186.5MWL1=50= 0.5 pu

Page 26: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Including power Flow

Dr.- Ing. Abdalkarim Awad 25

3

2

1

32213231

23232121

13121312

3

2

1

BBBB

BBBB

BBBB

P

P

P

N

k

kiiki BP1

))((

P1=(B12)(θ1-θ2)+B13(θ1-θ3

P1=(B12+B13)θ1-B12(θ2)-B13(θ3)

P2=-B21(θ1)+(B21+B23)(θ2)-B23(θ3)

P3=-B31(θ1)-B32(θ2)+(B31+B32)(θ3)

Compare to Y matrix!

Page 27: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Dr.- Ing. Abdalkarim Awad 26

3

2

1

201010

102010

101020

51

5.02

1

P

P

singular P1 P2

BUS2

BUS3

BUS1

y12=-10j

y13=-10jy23=-10j

L3=500= 5 pu

P13<200=2 pu

SB=100 MVA

100MW= 1 pu

L1=50= 0.5 pu

Page 28: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Dr.- Ing. Abdalkarim Awad 27

3

2

2010

1020

4

5.02

P

P13<200 B13(θ1-θ3)<2 (pu) θ3<0.20

(B13=-10)

Solve with respect

to bus #1. i.e θ1=0

(Slack bus)

3

2

1

20100

102010

01020

4

5.02

1

P

P

Page 29: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Optimization Problem

Minimize (C1(P1)+C2(P2)) (in pu)

Subject to:

1 pu ≤ P1 ≤ 6 pu

0.5 pu ≤ P2 ≤ 4 pu

P1+P2=4

Dr.- Ing. Abdalkarim Awad 28

3

2

2010

1020

4

5.02

P

Θ3<0.20

Page 30: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Solution (using R)

Dr.- Ing. Abdalkarim Awad 29

2.0

0

0

3

2

1

P1=200 MW

P2=250 MW

P13=-B13(θ1-θ3)=-10*(0-0.2)=2 pu=200 MW

Costs=4659.95>4634.60 Euro

Page 31: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

30

P1 P2

BUS2

BUS3

BUS1-10j

-10j -10j

5

P13<1.7

1

0.5 pu

Page 32: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Optimization Problem

Minimize (C1(P1)+C2(P2)) (in pu)

Subject to:

1 pu ≤ P1 ≤ 6 pu

0.5 pu ≤ P2 ≤ 4 pu

Dr.- Ing. Abdalkarim Awad 31

P13<170 B13(θ1-θ3)<1.70 θ3<0.17

3

2

2010

1020

4

2

P

Page 33: Using Optimization in Smart Grid ApplicationsUsing Optimization in Smart Grid Applications Dr.-Ing. Abdalkarim Awad 04.11.2015 Why Optimization Smart Grid allows better coordination

Solution (using R)

The total generation cost becomes: 4783.03> 4634.60

Here, we had to sacrifice “cost” for “implementation”.

Dr.- Ing. Abdalkarim Awad 32

P1=110

P2=340

θ2=-0.06

θ3=0.17