users/justastalacka/zoho docs/4000u scaffolding projects ... element 3.pdf·bs 1139-2-2:2009 metal...

1
1 2 3910 2 WT-42208 1 WT-42203 1 WT-42201 2 WT-42201 2 WT-42203 3.2 3.3 .4 1 WT-42208 1 WT-42203 1 WT-42201 1 WT-42208 200 200 400 (MAX.) 4 No. BAND AND PLATE FIXED TO WALL USING M12 EXCALIBUR BOLTS. MIN 100mm EMBEDMENT BEAM IS PICKED UP BY THE PUNCHEON TUBE WHICH IS CONNECTED TO THE 2no HORIZONTAL TUBES. CLASS B FITTINGS TO BE USED FOR ALL CONNECTIONS 305mm DEEP STEEL LADDER BEAM 4 No. BAND AND PLATE FIXED TO WALL USING M12 EXCALIBUR BOLTS. MIN 100mm EMBEDMENT SCAFFOLD TUBES PICKING UP THE PUNCHEON. 305mm DEEP STEEL LADDER BEAM RIGHT ANGLE COUPLER 305 200 200 400 (MAX.) 4 No. BAND AND PLATE FIXED TO WALL USING M12 EXCALIBUR BOLTS. MIN 100mm EMBEDMENT BEAM IS PICKED UP BY THE PUNCHEON TUBE WHICH IS CONNECTED TO THE 2no HORIZONTAL TUBES. CLASS B FITTINGS TO BE USED FOR ALL CONNECTIONS 305mm DEEP STEEL LADDER BEAM 4 No. BAND AND PLATE FIXED TO WALL USING M12 EXCALIBUR BOLTS. MIN 100mm EMBEDMENT SCAFFOLD TUBES PICKING UP THE PUNCHEON. 305mm DEEP STEEL LADDER BEAM RIGHT ANGLE COUPLER 305 INDICATES CHECK FITTING TUBE LENGTH CONFIRMED ON SITE. NO MORE THAN 3.0m BETWEEN SUPPORTS Element 3 Plan View SCALE 1:75 Section View 1-1 SCALE 1:50 Section View 2-2 SCALE 1:50 INDICATES A SHEAR TIE. BAND AND PLATE FITTINGS BOLTED TO THE WALL PICKING UP THE BEAMS INDICATES 305mm DEEP STEEL LADDER BEAM. TRANSOMS SPACED AT 600mm CENTERS TRIPLE HANDRAILS TO BE PROVIDED Key Plan LOWER BEAMS TO BE PICKED UP BY TIES ABOVE. SEE TIE DETAIL FOR CLARITY LOWER BEAMS TO BE PICKED UP BY TIES ABOVE. SEE TIE DETAIL FOR CLARITY Tie Detail Scale 1:25 TRANSOMS TO BE SPACED @ 600mm CENTERS. ALL BEAMS ARE TO BE BRACED / RESTRAINED IN ACCORDANCE WITH THE FOLLOWING RECOMMENDATIONS; 1. TOP CHORD RESTRAINT / LACE TUBES 1000mm MAX CENTRES. 2. BOTTOM CHORD RESTRAINT / LACE TUBES 2000mm MAX CENTRES. 3. PLAN BRACING ON / ADJACENT TOP CHORD (COMPRESSION CHORD) MAXIMUM OF 1000mm NODE CENTRES. 4. KNEE BRACING AT NODES AT 2000mm CENTRES MAX. Tie Detail 2 Scale 1:50 NOTES: This drawing is confidential and is the exclusive property of Imperium Engineering Ltd. No unauthorised use, copy or disclosure is to be made and is to be returned upon request. Hire Only - All plant supplied on the basis is subject to our conditions of hire or sale as applicable. The customer should check that we have correctly interpreted his / her requirements and that all loadings, dimensions, details, erection and striking sequences, etc, are correct and practicable. The customer is to ensure that the ground, structure and / or base provided for our scaffold is adequate to support the loads applied without settlement, including the provision for any necessary spreaders. Drawing Notes: READ ALL NOTES ON DRAWING. ALL bracing / restraints are to be installed as per drawing. All design and erection of scaffolds are to conform with the following British Standards and Codes Of Practices where applicable: · BS EN 39:2001 Loose steel tubes for tube and coupler scaffolds - Technical delivery conditions · BS 1139-1-2:1990 Metal Scaffolding - Part 1: Tubes - Section 1.2 Specification for aluminium tube · BS 1139-2-2:2009 Metal Scaffolding - Part 2: Couplers - Section 2.2: Aluminium couplers and special couplers in steel - Requirements and test methods · BS 2482:2009 Specification for timber scaffold boards · BS EN 12811-1:2003 Temporary works equipment - Part 1: Scaffolds - Performance requirements and general design · BS EN 12812:2008 Falsework - Performance Requirements and General Design · BS EN 1991-1-1:2002 Eurocode 1: Actions on Structure - Part 1-1: General Actions - Densities, Self-weight, Imposed Loads for Buildings · BS EN 1991-1-3:2003 Eurocode 1: Actions on Structure - Part 1-3: General Actions - Snow Actions · BS EN 1991-1-4:2005 Eurocode 1: Actions on Structure - Part 1-4: General Actions - Wind Actions · BS EN 1993-1-1:2005 Eurocode 3: Design of steel structures - Part 1-1: General rules and rules for buildings · TG20:13 Design Guide - Technical Guidance on the use of BS EN 12811-1 · TG04:11 Anchorage Systems · SG04:15 Preventing Falls in Scaffolding · SG25:10 Access and Egress from Scaffolds · CG06:09 Scaffold Design LOAD BEARING COUPLERS MUST BE USED ON ALL TIE RELATED COMPONENTS UNLESS OTHER WISE SHOWN / STATED Unless stated otherwise genuine products / components are to be used to ensure that structural performance can be guaranteed. No alteration in or which may effect the loading is to be made without reference to Imperium Engineering Design Office. Dimensions: All dimensions are in mm and centre to centre unless otherwise stated. Written dimensions will take precedence over scaled dimensions. [email protected] www.imperiumengineering.co.uk IMPERIUM ENGINEERING LIMITED 20-22 Wenlock Road N1 7GU, London Tel. 020 3441 7606 DESIGNED BY CLIENT: PROJECT: TITLE: xxxxx WORKING DRAWING THIS DRAWING CAN BE USED FOR CONSTRUCTION. xxxx-xx-02-00x DATE DRAWN BY DRAWING No REV CALCULATIONS No xxxx-xx-01 DATE OF ISSUE COMMENTS CHECKED BY NOTES: DATE xxx, xxx, SCALE 1:xx @ A3 Scaffold is designed for a live load of: xx kN/m 2 on a single working lift; xx kN/m 2 on an additional lift for access; xx kN/m 2 on 2 lifts of inside boards. Issued for approval P1 xxxx xxxx xx/xx/xxxx xx/xx/xxxx xxxx Issued for construction 00 xxxx xxxx xx/xx/xxxx xx/xx/xxxx

Upload: others

Post on 17-Apr-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Users/justastalacka/Zoho Docs/4000u Scaffolding Projects ... element 3.pdf·BS 1139-2-2:2009 Metal Scaffolding - Part 2: Couplers - Section 2.2: Aluminium couplers and special couplers

1

2

3910

2WT-42208

1WT-42203

1WT-42201

2WT-422012

WT-42203 3.23.33.4

1WT-42208

1WT-42203

1WT-422011

WT-42208

200 200400 (MAX.)

4 No. BAND AND PLATEFIXED TO WALL USING

M12 EXCALIBUR BOLTS.MIN 100mm EMBEDMENT

BEAM IS PICKED UP BY THE PUNCHEONTUBE WHICH IS CONNECTED TO THE

2no HORIZONTAL TUBES. CLASS BFITTINGS TO BE USED FOR ALL

CONNECTIONS

305mm DEEP STEELLADDER BEAM

4 No. BAND AND PLATEFIXED TO WALL USINGM12 EXCALIBUR BOLTS.MIN 100mm EMBEDMENT

SCAFFOLD TUBESPICKING UP THEPUNCHEON.

305mm DEEP STEELLADDER BEAM

RIGHT ANGLE COUPLER

305

200 200400 (MAX.)

4 No. BAND AND PLATEFIXED TO WALL USING

M12 EXCALIBUR BOLTS.MIN 100mm EMBEDMENT

BEAM IS PICKED UP BY THE PUNCHEONTUBE WHICH IS CONNECTED TO THE

2no HORIZONTAL TUBES. CLASS BFITTINGS TO BE USED FOR ALL

CONNECTIONS

305mm DEEP STEELLADDER BEAM

4 No. BAND ANDPLATE FIXED TOWALL USING M12EXCALIBUR BOLTS.MIN 100mmEMBEDMENT

SCAFFOLD TUBESPICKING UP THEPUNCHEON.

305mm DEEP STEELLADDER BEAM

RIGHT ANGLE COUPLER

305

INDICATES CHECKFITTING

TUBE LENGTHCONFIRMED ON SITE.NO MORE THAN 3.0mBETWEEN SUPPORTS

Element 3 Plan ViewSCALE 1:75

Section View 1-1SCALE 1:50

Section View 2-2SCALE 1:50

INDICATES A SHEAR TIE. BAND ANDPLATE FITTINGS BOLTED TO THE WALLPICKING UP THE BEAMS

INDICATES 305mm DEEP STEELLADDER BEAM.

TRANSOMS SPACED AT 600mmCENTERS

TRIPLE HANDRAILS TO BE PROVIDED

Key Plan

LOWER BEAMS TO BE PICKED UP BYTIES ABOVE. SEE TIE DETAIL FORCLARITY

LOWER BEAMS TO BE PICKED UP BYTIES ABOVE. SEE TIE DETAIL FORCLARITY

Tie DetailScale 1:25

TRANSOMS TO BE SPACED @ 600mmCENTERS.

ALL BEAMS ARE TO BE BRACED / RESTRAINED IN ACCORDANCEWITH THE FOLLOWING RECOMMENDATIONS;

1. TOP CHORD RESTRAINT / LACE TUBES 1000mm MAXCENTRES.

2. BOTTOM CHORD RESTRAINT / LACE TUBES 2000mm MAXCENTRES.

3. PLAN BRACING ON / ADJACENT TOP CHORD (COMPRESSIONCHORD) MAXIMUM OF 1000mm NODE CENTRES.

4. KNEE BRACING AT NODES AT 2000mm CENTRES MAX.

Tie Detail 2Scale 1:50

NOTES:This drawing is confidential and is the exclusive property of Imperium Engineering Ltd.No unauthorised use, copy or disclosure is to be made and is to be returned upon request.Hire Only - All plant supplied on the basis is subject to our conditions of hire or sale asapplicable.

The customer should check that we have correctly interpreted his / her requirements andthat all loadings, dimensions, details, erection and striking sequences, etc, are correct andpracticable.

The customer is to ensure that the ground, structure and / or base provided for our scaffoldis adequate to support the loads applied without settlement, including the provision for anynecessary spreaders.

Drawing Notes:READ ALL NOTES ON DRAWING.

ALL bracing / restraints are to be installed as per drawing.

All design and erection of scaffolds are to conform with the following British Standards andCodes Of Practices where applicable:· BS EN 39:2001 Loose steel tubes for tube and coupler scaffolds - Technical delivery

conditions· BS 1139-1-2:1990 Metal Scaffolding - Part 1: Tubes - Section 1.2 Specification for

aluminium tube· BS 1139-2-2:2009 Metal Scaffolding - Part 2: Couplers - Section 2.2: Aluminium

couplers and special couplers in steel - Requirements and test methods· BS 2482:2009 Specification for timber scaffold boards· BS EN 12811-1:2003 Temporary works equipment - Part 1: Scaffolds - Performance

requirements and general design· BS EN 12812:2008 Falsework - Performance Requirements and General Design· BS EN 1991-1-1:2002 Eurocode 1: Actions on Structure - Part 1-1: General Actions -

Densities, Self-weight, Imposed Loads for Buildings· BS EN 1991-1-3:2003 Eurocode 1: Actions on Structure - Part 1-3: General Actions -

Snow Actions· BS EN 1991-1-4:2005 Eurocode 1: Actions on Structure - Part 1-4: General Actions -

Wind Actions· BS EN 1993-1-1:2005 Eurocode 3: Design of steel structures - Part 1-1: General rules

and rules for buildings· TG20:13 Design Guide - Technical Guidance on the use of BS EN 12811-1· TG04:11 Anchorage Systems· SG04:15 Preventing Falls in Scaffolding· SG25:10 Access and Egress from Scaffolds· CG06:09 Scaffold Design

LOAD BEARING COUPLERS MUST BE USED ON ALL TIE RELATED COMPONENTSUNLESS OTHER WISE SHOWN / STATED

Unless stated otherwise genuine products / components are to be used to ensure thatstructural performance can be guaranteed.

No alteration in or which may effect the loading is to be made without reference to ImperiumEngineering Design Office.

Dimensions:All dimensions are in mm and centre to centre unless otherwise stated.Written dimensions will take precedence over scaled dimensions.

[email protected]

IMPERIUM ENGINEERING LIMITED

20-22 Wenlock RoadN1 7GU, LondonTel. 020 3441 7606

DESIGNED BY CLIENT:

PROJECT:

TITLE:

xxxxx

WORKING DRAWINGTHIS DRAWING CAN BE USED FOR CONSTRUCTION.

xxxx-xx-02-00x

DATEDRAWN BY

DRAWING No

REV

CALCULATIONS No xxxx-xx-01DATE OF ISSUE

COMMENTS CHECKED BY

NOTES:

DATE

xxx, xxx,SCALE 1:xx @ A3

Scaffold is designed for a live load of:xx kN/m2 on a single working lift;xx kN/m2 on an additional lift for access;xx kN/m2 on 2 lifts of inside boards.

Issued for approvalP1 xxxx xxxx xx/xx/xxxxxx/xx/xxxx

xxxx