• Induced Transformation: the City Hall intends to exert more power to induce the transformation process. The transformation occurs more rapidly, according to the specific guidelines
• Encouraged Transformation: the traditional mechanisms of urban operations can be applied on. Changes occur in the medium and long term according to general guidelines
.
Transformation Areas
Corredor EstadoRodoanelTrecho Oeste
RodoanelTrecho Sul
RodoanelTrecho Leste
RodoanelTrecho Norte
Jacu ‐ PêssegoTrecho existente
Fonte- CET
East Ring Road and Avenue Jacu-Pêssego
Jacu ‐ PêssegoTrecho entregue em 2010
1 Stadium for the World Cup2 Convention Center
3 Tech University4 Technological Park
5 Linear Park
Itaquera Technological Park
N
Anchor Projects: Downtown Requalific
AnhangabaúAnhangabaAnhangabaúú ParqueDom Pedro II
ParqueParqueDom Pedro IIDom Pedro II
Nova LuzNova LuzNova Luz
BOM RETIROBOM RETIROBOM RETIRO
SANTA CECÍLIASANTA CECSANTA CECÍÍLIALIA
CONSOLAÇÃOCONSOLACONSOLAÇÇÃOÃO
PARIPARIPARI
BRÁSBRBRÁÁSS
MOÓCAMOMOÓÓCACA
CAMBUCICAMBUCICAMBUCI
REPÚBLICAREPREPÚÚBLICABLICA
BELA VISTABELA VISTABELA VISTA
SÉSSÉÉ
SÉ
URBAN OPERATION CENTRO
Transform a degraded area into a lively mixed used neighborhood with more housing and employment and with high quality public spaces
Project Nova Luz
Master plan:
Infrastructures
Public spaces and green areas
Areas for private real state development
Developed by the public sector interacting with owners, investors and people which live and work in the area
Area to be transformed
Urbanistic Concession
Public bid
The company or the consortium of companies which becomes the concessionary:
implements the master plan
build the infrastructures
can develop the private real estate projects in the designated areas
has the right to expropriate to implement the master plan
Urbanistic Concession
PERIMETER
Perímetro da Operação Urbana Centro
Perímetro da Concessão Urbanística Nova Luz
Linha Metrô
Linha Metrô (2014)
Linha CPTM
Expresso Tiradentes
Expresso Aeroporto
Cenarios: Current and FutureCurrent Future
Population Constructed Area [m2]
Constructed Area [m2]
Population
RESIDENCIAL 11.679 535.735 879.745 20.657
NON RESIDENCIA
L23.374 682.231 1.131.277 42.758
TOTAL 1.216.056 2.011.022
Climate Change PolicyCity of São Paulo: Carbon Emissions (2005)[ Gg CO2 eq ]
Waste Disposal(3,696)23%
Energy Use(11,986)77%
Others(59)0%
Source: Municipal Emission Inventory, 2005
Power Demand11%
Fossil Fuel77%
Climate Change PolicyBandeirantes and São JoãoLandfills transformed in biogas power plants
• Control of greenhouse gas emissionsAmong the five largest world projectsApproved by UN with Clean Development Mechanism - CDM
• 20% reduction of greenhouse gas emissions(less 3,2 million ton of the CO2 eq)
• Generated power is sufficient for 600.00 people city
• Carbon Credits are used to improve landfills nearby areas
Climate Change PolicyApproved in June 2009• First climate change law in the country
• Created the Municipal Committee for Climate ChangeTo support the implementation of the law. Society and government represented
• Policy AreasTransportationEnergyWaste managementHealthConstructionLand management
Promoting Promoting social social
equilibriumequilibrium
Promoting Promoting environmental environmental
qualityquality
Promoting Promoting mobilitymobility
PromotingPromotingurban urban
developmentdevelopment
São PauloSão PauloWorld CityWorld City
Public policies in course
Air Air
Water
Preserving and Expanding Green AreasPreserving and Expanding Green Areas
Eco‐Economics
Landscape
Clean City
Clean City
Until 2012
Approx. 49 Mi m2
Approx. 60 Mi m2
Present
Approx. 16 Mi m2
Until 2025
* Only municipal green areas
• Implementation and expansion of “100 Municipal Parks”
Municipal Parks
•Implemented (2005-2007)
•In Progress
•Project
•Existing
Qty Status Area (m2) Part. Acréscimo
33 EXISTING 15.561.363 31,8%
10 IMPLEMENTED 398.717 0,8% 3%
26 IN PROGRESS 2.654.188 5,4% 17%
31 PROJECT 30.268.548 61,9% 195%
100 TOTAL 48.882.816 100,0%
Preserving and Expanding Green AreasPreserving and Expanding Green Areas
Promoting Environmental Quality
Parque Água Vermelha
• Implementation of Linear Park
Before After
Preserving and Expanding Green AreasPreserving and Expanding Green Areas
After
Before
25 de Março Street.Downtown
17.05.07
08.08.07
Clean City Law: Transformation of the Landscape
Promoting Social Equilibrium•• PrioritizationPrioritization
ÁÁreas de Vulnerabilidade Social, reas de Vulnerabilidade Social, segundo IPVS 2000segundo IPVS 2000
MMéédia de Anos de Estudo da dia de Anos de Estudo da PopulaPopulaçção de 10 Anos e Mais 2000ão de 10 Anos e Mais 2000 Mortalidade Neonatal 2007Mortalidade Neonatal 2007 Taxas de Desemprego da Taxas de Desemprego da
PopulaPopulaçção de 16 Anos ão de 16 Anos -- 2004/20052004/2005
Areas with superposition of problems
Priorization
Promoting Social EquilibriumSlum Urbanization Slum Urbanization ProgrammeProgramme
Urban Land RegularizationUrban Land Regularization
Economic Activity RegularizationEconomic Activity Regularization
Child, Youth and Adult SchoolingChild, Youth and Adult Schooling
HealthHealth
SafetySafety
Housing Policies• INTERVENTIONS - 2005 to 2012• 174,000 dwellings in precarious settlements
being upgraded
• 21,300 new housing units
• 12,000 families receiving social rent
• 1,200 families in Social Partnership Aid
• 280 Tenement houses
• 1,200 letters of credit (cdhu)
• 53 buildings being expropriated in downtown area
Promoting Social EquilibriumSlum Urbanization ProgrammeSlum Urbanization Programme
Guidelines:• Minimum number of resettlement
• Priority to the elimination of risk areas
• Construction of new social housing units
• Construction of water and sewage networks
• Improving precarious access
• Enhancing the quality and quantity of leisure facilities
• Partnerships with other Municipal Secretariats, State and Federal Government and plot-owners
Paraisópolis•3 communities: Paraisópolis, Jardim Colombo e Porto Seguro•Area: 100 ha•60,000 inhabitants•2nd largest slum•3,168 new housing units•3 Phases of investments in progress € 237,8 Million58% municipal government 23% state government 19% federal government
1st Phase = € 15.7 Million2nd Phase = € 140.0 Million 3rd Phase = € 82.1 Million
Slum Urbanization Programme
Cantinho do Céu•Project start date: 2008•Project end date: 2010 (1st Phase )•Geographic area: 200 hectares•Benefited families : 9,800 families•Landscape area: 30 hectares (park)
Slum Urbanization Programme
Source: Metro
Subway network rapid expansionModernization of railways seeking subway performance
Railway-Subway network
Our City is already part of great worldOur City is already part of great world--wide circuitswide circuits
São Paulo, World City