upload file 22

Upload: mitali-gore

Post on 14-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Upload File 22

    1/12

    HAIHE RIVER, TIANJIN, CHINA

    E S

    EXECUTIVE SUMMARY

  • 7/30/2019 Upload File 22

    2/12

  • 7/30/2019 Upload File 22

    3/12

    E-1

    SITE ASSESSMENT,MARKET ANALYSIS,GAP ASSESSMENT &CONCEPT PLAN FOR MEGA INDUSTRIAL PARK AT AURANGABAD

    FINAL CONCEPT MASTER PLAN FOR DIGHI PORT INDUSTRIAL AREA

    Chapter ES: EXECUTIVE SUMMARY

    ES.1 Plan Purpose and Scope

    The Delhi-Mumbai Industrial Corridor Development Corporation (DMICDC) plans to develop several

    100-square kilometres to 200-square-kilometre investment regions/industrial areas. One of theinvestment regions identified is in the Dighi Port Industrial Area (Dighi Port IA or DPIA). New and

    innovative, world-class Greenfield townshipsnew citieswill be developed within this investment

    region.

    The objectives for the project have been evolving based on frequent discussions and consultations;

    Maharashtra Industrial Development Corporation (MIDC) intends to create a huge industrial area in

    Raigad that would drive the development of a larger investment region . Supportive residential,

    commercial, and institutional uses are to be provided based on industry-driven demand and

    integrated into a comprehensive concept master plan that includes a strategy, framework, and

    concept plan. The Delhi Mumbai Industrial Corridor Development Corporations (DMICDC) global

    vision is to create and market Greenfield integrated industrial townships that would be eventually

    recognized as world-class citieswithin this larger industrial area at Dighi Port (Raigad).

    In this report AECOM has provided the overall framework and recommendations for the Dighi Port

    IA based on the previously completed baseline analysis and the approved area delineation for this

    project. This report includes overall recommendations for achieving sustainability and responding to

    environmental sensitivity; land use programming for industrial and nonindustrial uses at the site; a

    check for compliance with Maharashtra Industrial Development Corporation (MIDC) objectives;

    conceptual master planning; a discussion of subsequent detailed demand and recommendations for

    transportation and infrastructure; and recommendations for Rehabilitation and Resettlement (R&R)

    and environmental mitigation.

    All the assessments and recommendations come together in a comprehensive programme

    translated into a concept master plan. The plan does all of the following:

    broadly describes land use areas;

    provides details of saleable versus non-saleable land; and offers recommendations for industryclusters, residential communities complete with commercial mixed use and institutional support, andspecific densities; and

    estimates the population and employment generated by the Dighi Port IA.

    The concept master plan also follows a three-phase programme of 10-year periods 20122022,

    20222032, and 20322042beginning at 2012 to correspond with the beginning of Indias 12th

    Plan period. These phases are fixed following the fixed periods, however, these provides flexibility

    to the implementing agency or development company, to develop portions of these phases as they

    see fit or depending on resources.

    Finally, AECOMs expertise is applied further in this report through recommendations for sustainable

    development and industrial programming with sensitivity to air quality concerns; details about

    infrastructure demand and provisions; transport demand analysis and suggestions for upgrading

    and new programmes; and recommendations for socially sensitive programmes and environmental

    management programmes.

    All of these topics are captured in this report as summarised below.

    ES.2 Development Strategy and Vision

    ES.2.1 Overall Strategy and Vision

    Urbanisation is creating tremendous pressures on the environment, the worlds economies, and our

    social organisations. For the first time in history, more than half of the worlds population now lives in

    urban areas, many without adequate clean water, sanitation, housing, or health facilities. The rapid

    and continuing urbanisation has created congestion, pollution, energy consumption, and waste. In

    short, existing urban development cannot provide a sustainable quality of life for our communities.

    In India, there is a trend towards the simultaneous development of several new towns and cities with

    the objective of providing more service related jobs owing to a growing and fast industrializing

    population. Competition is stiff and only the innovative cities are able to compete domestically and

    globally.

    Globally, new urban patterns are emerging for the 21st century based on a strategy of sustainable,

    smart growth. These new global cities are economic regions that are interconnected on a world

    scale and follow the principles of sustainable development. Smart growth principles, good growth,

    or sustainable developmentwhatever the terminology, the goal is the same: to preserve and

    enhance the quality of life for the citizens of a given region. Smart growth achieves this goal by

    promoting a sense of community in new and expanding regions while protecting the integrity and

    vitality of existing communities, thereby strengthening the region as a whole. The following concepts

    of good growth have been widely accepted to encourage more livable communities and with the

    scale of our Dighi Port IA, being larger than some cities in the world, it makes sense to apply some

    of these good growth principles:

    Ensure regional distribution of employment in new urban centres.

    Create integrated communities places to work, live, play, learn and celebrate life.

    Provide a variety of transportation choices and transit-oriented development patterns.

    Provide a mix of land uses.

    Provide a mix of demand driven and zoned industrial clusters.

    Provide a jobs-housing balance.

    Offer a mix of housing choices and opportunities including for Economically Weaker Sections (EWS).

    Take advantage of compact development patterns.

    Use existing assetseconomic, social, and environmental.

    Preserve open space, farmland, and natural beauty through conservation of natural resources.

    Encourage distinctive, attractive communities with quality design for people.

    Provide integrated and innovative or state-of-the-art infrastructure systems that improve overallefficiency.

  • 7/30/2019 Upload File 22

    4/12

    E-2

    CHAPTER 0:EXECUTIVE SUMMARY

    Design smart-intelligent cities with integrated communication systems and technologies to help controland manage services and systems (e.g., energy, transportation).

    Create walkable, comfortable, pedestrian-oriented places.

    DMICMCs vision is to strengthen the Indian economy by creating state-of-the-art infrastructure and

    a globally competitive environment that activates local commerce, increases foreign investment, and

    promotes sustainable development through several large-scale developments. AECOMs concept

    master plan and program is a direct translation of this vision.

    ES.2.2 Economic Development Strategy

    The Dighi Port Industrial Area (Dighi Port IA) will be an important industrial, commercial town and

    logistics node within the state of Maharashtra, the entire Delhi Mumbai Industrial Corridor. The

    following development strategies have been identified:

    Build on Maharashtras strengths in industry.

    Attract foreign and domestic investment for economic development.

    Balance growth in the service sector.

    Generate export revenues and substitute for manufactured imports.

    Link industrial development with commercial, residential, and social development.

    Provide a program for smart phased development with positive economic returns.

    ES.2.3 Economic Vision

    The broad vision for the Dighi Port IA is to become an industrial and engineering mega-scale green

    city with the following principles:

    Global port and trading hub

    Eco-Industrial Parks and innovative industrial clusters.

    Heavy manufacturing and engineering duo

    Environmentally green technology industrial city.

    Export center free trad`e/special economic zone

    State-of-the-art logistics and IT systems

    AECOM has aligned the vision for the Dighi Port IA with DMICMCs vision and strategies.

    Raigad has significant potential for growth in a number of existing and upcoming manufacturing

    sectors. Raigad District is already an established location for heavy industries- chemicals and

    chemical products, basic metals and alloy industries and rubber, plastics, petroleum and coal

    products. Raigad will be the distinct manufacturing hub for heavy industries merged with

    technologies and innovative systems eco-industrial park systems and green industries. It will be

    the innovative green city within the state.

    Raigads non-central location for the Dighi Port IA places it at a focal point for leapfrogging

    Maharashtras production and manufacturing of heavy industries, engineering and ports/logistics

    related. Proximity to Mumbai and Pune given transport extensions places it at an advantage in

    terms of regional and domestic consumer markets from Mumbai and Pune

    The Dighi Port IA will spur demand for a wide array of spin-off businesses and will offer the full array

    of services required and facilities to support a mega-scale industrial area and the communities

    located within it. As such, the Dighi Port IA is expected to generate huge employment and to add

    value and exports to the Raigad District and Maharashtra as a whole.

    ES.3 Concept Plan Framework and Guiding Principles

    The master plan for the Dighi Port IA envisions an integrated new sustainable township in the

    western Maharashtra region, Raigad District will set precedents for domino effect of smart growth

    developments in India including those in Aurangabad, Nashik and Dhule. Seven key planning

    principles have been established to achieve this overall vision as well as within the context of the

    District:

    Compact DevelopmentDevelop a series of high-tech transit-oriented centres, introducing a new

    city center for Raigad, while also allowing for growth towards existing city centers. But also within

    Dighi Port IA have smaller city pockets having their own commercial center and supportive

    residential communities.

    Livable CommunitiesCreate a high-quality environment in which people can work and live with

    minimal commute but available transits.

    ConnectivityEstablish a well-connected system of transportation services integrating the districts

    of industries with housing in the existing cities of Raigad.At the convergence of Dighi Port IAs two

    highways NH 17 and the main alignment a new bus terminal / multi-modal terminal (not far from

    the proposed rail station) will be created to ensure seamless commute.

    IdentityEstablish an identity by defining distinct districts across the Dighi Port IA, a distinct

    character and marketing point from the recommended industries mix, with a vibrant centre and a

    range of densities and built forms expressing the unique cultural heritage.

    SustainabilitySet a precedent for sustainable development by protecting the ecological

    landscape, promoting clean industries, promoting the use of industry management systems (eco-

    industrial park), using renewable energy and encouraging sustainable social development.

    Natural HeritageRespect and respond to the unique natural heritage of the area through the

    creation of a robust open space framework. The open space framework sets-apar t the development

    of a compact and dense development with humane open space pockets.

    Pedestrian-Oriented DevelopmentPromote a walkable community with a clear hierarchy of

    streets. Roads with sidewalks and dedicated bicycle lanes reduce induced traffic and improve the

    scale for pedestrians. They provide direct, safe, and attractive routes for pedestrians and cyclists aswell as other vehicles.

    ES.4 Summary of Existing Conditions and Recommendations

    ES.4.1 Macroeconomic Conditions

    Raigad forms part of an identified region of western Maharashtra. The 10 districts of Western

    Maharashtra constitutes 29% of the States total land area and 46% of the s tates total population.

    western Maharashtra typically have higher densities and better literacy rates than districts

  • 7/30/2019 Upload File 22

    5/12

    E-3

    SITE ASSESSMENT,MARKET ANALYSIS,GAP ASSESSMENT &CONCEPT PLAN FOR MEGA INDUSTRIAL PARK AT AURANGABAD

    FINAL CONCEPT MASTER PLAN FOR DIGHI PORT INDUSTRIAL AREA

    elsewhere in the state, reflecting the higher level of urbanisation and faster urbanization rate. The

    states urban population is relatively large at 41 million and is expected to grow even more with the

    planned new investment regions such as the proposed Dighi Port IA.

    With Maharashtra already recognised as Indias industrial powerhouse, it is expected that western

    Maharashtra and its districts will remain strong drivers of industrial development, especially

    automobile production, information technology, engineering, food, paper, and textiles. However,

    there remains stiff competition from neighbouring statesUttar Pradesh, Andhra Pradesh, Gujarat,

    and Tamil Nadu. Several districts have shown huge potential, and as a result have become

    attractive investment destinations; this trend is expected to continue, with these districts attractingthe highest amounts of foreign direct investment in India. Within Maharashtra, Raigad currently

    possesses a notable presence in engineering and heavy industry manufacturing sectors, particularly

    metals and alloys, chemicals and related products and, rubbers, plastics, petroleum and coal.

    Raigad is, however, looking at the same industries but its light to medium counterparts. Apart from

    this there is the potential to introduce some specialty/light industrial manufacturing, including

    electrical food and beverages which are resource-based industries that have increased demand

    with the increase in consumers and consumptions.

    The proposed Dighi Port IA is well positioned to leverage its competitive advantages to promote

    economic development with the focus of increasing industrial activity and employment, urbanisation,

    the creation of new satellite cities, and increased public-private investments.

    ES.4.2 Market Conditions

    Maharashtras share of the service sector is increasing, but manufacturing remains a strong source

    of employment. Gross state domestic product (GSDP) has more than doubled in 10 years,

    consistently contributing about 13%14% to Indias national income, with the industrial sector

    accounting for approximately 30% of GDSP and services accounting for more than 50%.

    Although the share of Maharashtras GSDP from the industrial sector is less than the share from

    services, in relative terms industry grew at approximately 12% per year. A strong industrial

    promotion and development policy should consider opportunities for development in the service

    sector; pairing industrial growth with implicit growth affects the service sectors while continuing to

    improve capabilities and capacities. Exports should be kept steadfast. For Raigad the target should

    be state-of-the-art high efficiency systems applied to traditional engineering and heavy industries

    that could both result in high-value exports and less pollutive industries while also encouraging high-

    value services. The Dighi Port IA should be programmed to be very attractive to domestic and

    foreign investors where these are accompanied by attractive incentives.

    Historically, Raigads competitive industry advantage has been in rubber, plastic, petroleum and

    coal products, chemicals, and machinery and equipment; however, other resource-based industries

    (e.g., food processing) are also emerging as strong industries. The Dighi Port IA will capitalise on

    Maharashtras strengths and capacities, improving skills and job options to keep the state strong in

    manufacturing. AECOM assumes that the proposed Dighi Port IA will capture about 50% of the

    Raigad Districts new industrial employment. With improved infrastructure and completion of a

    targeted stimulus plan, Raigad districts industrial output has a potential to grow 33 times in the next

    three decades, with the districts share of Maharashtras industrial output increasing to 13.3% and

    valued at 8,374 billion Indian rupees (INR).

    ES.4.3 Population and Land Use

    Raigads urban population is expected to grow from 700 thousand to over 3.5 million over 30 years.

    The Dighi Port IA will be a major urban centre, and total population in the Raigad District will reach

    7.2 million by 2042. Projected industrial activities at the Dighi Port IA are expected to generate

    367,430 direct industrial jobs (57% of the districts total industrial jobs created in 30 years) and close

    to a million jobs in total. These numbers have already excluded heavily polluting industries. Therewill be three major industrial clustersthe Engineering Cluster, Heavy Industry Cluster and Food

    Park/Food Processing Parkfor a total industrial land demand of 12,020 hectares (ha).

    Because in Raigad, there are few established cities with existing ample residential developments,

    it is estimated that there will be an 83% jobs/housing balance, or 83% of the working population of

    the Dighi Port IA will live on-site. At the structure plan level approximately 6,800 hectares has been

    estimated for pure nonindustrial uses, specifically residential, commercial, civic, and mixed use

    including internal roads and open space.

    Approximately 52% of the total land demand of 13,240 hectares has been estimated as pure

    saleable land. Provisions have been made for ample master plan/regional-level roads, open space,

    and utilities.

    Table ES-1 Land Use Summ ary

    Dighi IR Summary of Land Use Mix Phase 1 Phase 2 Phase 3 %

    2011-2022 2023-2032 2033-2042

    Population (3 years ahead) 382,912 1,001,920 1,984,000

    % of Total 19% 51% 100%

    Land Area Distribution

    Sale-able Land Area (Ha.)

    R1. Low Density Residential 180 470 940 4%

    R2. Medium Density Residential 240 620 1,230 5%

    R3. High Density Residential 50 130 250 1%

    R4. Industrial Housing Residential 60 150 300 1%

    Mixed Use (Resi w/ Commercial) 100 280 560 2%

    Civic Facilities (Prototype Level) 110 300 590 2%

    Civic Facilities (District Level) 70 230 430 2%

    C1. Office, R&D Park 20 70 180 1%

    C2. Commercial Districts (CBD/Gov't Ctr) 20 50 100 0.4%

    C3. Shopping Center Retail 4 15 40 0.2%

    Subtotal Sale-able Non-Industrial Land Area 850 2,320 4,620 18%

  • 7/30/2019 Upload File 22

    6/12

    E-4

    CHAPTER 0:EXECUTIVE SUMMARY

    Plus: Sale-able Industrial Land Area 1,970 4,720 8,440 34%

    Total Sale-able Land Area 2,820 7,040 13,000 52%

    Non-Sale-able Land Area (Ha.)

    Non-Industrial Internal Roads & Open Space 360 990 1,980 8%

    Industrial Internal Roads & Open Space 850 2,020 3,610 14%

    Plus: Developed Open Space (1) 600 1,490 2,760 11%

    Plus: Masterplan Roads and Utilities 800 1,980 3,670 15%

    Total Non-Sale-able Land Area 2,610 6,480 12,000 48%

    Total Land Area (Ha.) 5,400 13,500 25,000 100%

    Source: AECOM

    ES.4.4 Concept Master Plan

    The Dighi Port IA will be developed as a new industrial and integrated township enclave, according

    to a comprehensive land use framework following international standards. The Dighi Port IA will

    offer ample real estate, parks and open space, public transportation, pedestrian and bicycle trails,

    and other amenities. This new industrial area will extend from the new Dighi Port IA from the east to

    the west crossing NH 17. Located in Dighi Port IA, just 1015 kilometres (km) from Roha and about

    15-20 kilometres from Panvel, it is located along Indapur, Mangaon, Ville villages. The industrial

    location is strategically positioned and directly connected to the major state highway NH 17, and

    the Konkan rail network. The area will provide direct connections through the east of the Dighi Port

    IA to the port and northwards to Mumbai. Additional lateral roads and new bypasses are proposed

    along the entire site. Because of the industrial areas connectivity, visibility, and strategic location,

    the area will provide an ideal site for investment and employment growth for years to come.

    The Dighi Port IA will be the major industrial employment centre serving the region. Wide-ranging

    industrial and employment uses are envisioned: manufacturing and processing, warehousing and

    distribution, agricultural support, research and development, commercial and business district that

    support local industries, social amenities and convenience services for the worker population.

    Because the needs of different types of industries will vary, the industrial districts of the Dighi Port IA

    will be organised to allow compatible and mutually supporting industries and businesses to locate

    near one another, while providing adequate buffers to separate industries that should be located

    away from one another and from residential neighbourhoods.

    The layout of the Dighi Port IA is envisioned as an industrial corridor with a hierarchy of mixed-use

    centres supporting the major industrial employment sectors, connected through a multimodal

    transportation system. The major land uses along the corridor, as shown in Figure 4-19 in Chapter

    IV, Dighi Port Industrial Area Master Plan Concept, consist of a variety of industrial clusters.

    Housing for the workforce will be provided primarily by new residential communities equipped with

    the necessary civic facilities within the new city of Raigad adjacent to the identified new industrial

    clusters. However, smaller, mixed-use centres are positioned within the industrial corridor to provide

    both residential and commercial support for the major industrial uses along the employment

    corridor.

    The new mixed-use centres are organised in a hierarchy of sizes and intensities, from

    neighbourhood centres to district centres and a major communitywide centre. The communitywide,

    mixed-use city centre is conceived as the downtown for the community in the area of Indapur. This

    centre will have the highest density and intensity of uses and will be a major transport hub. It will

    include shopping, offices, services, civic functions, housing, and other uses serving the entire

    community.

    The proposed framework of high-intensity, compact development will preserve green buffers

    between the urban areas central to Dighi Greenfield Integrated Industrial Township. The

    development pattern will promote higher residential densities in and around activity centres and

    Raigads new residential neighbourhoods, balanced with generous publicly accessible green spaces

    to promote a healthy community and support a modern transportation system, including public

    transit.

  • 7/30/2019 Upload File 22

    7/12

    E-5

    SITE ASSESSMENT,MARKET ANALYSIS,GAP ASSESSMENT &CONCEPT PLAN FOR MEGA INDUSTRIAL PARK AT AURANGABAD

    FINAL CONCEPT MASTER PLAN FOR DIGHI PORT INDUSTRIAL AREA

    Figure ES-1: Land Use

    Source; AECOM

  • 7/30/2019 Upload File 22

    8/12

    E-6

    CHAPTER 0:EXECUTIVE SUMMARY

    To implement the Dighi Port IA, the vision will require a policy, regulatory, and administrative

    structure that assures orderly and comprehensive master planning and development of the new city

    according to these world-class standards and guidelines. Many of these standards will build on the

    Urban Development Plan Formulation and Implementation (UDPFI) Guidelines. Additional

    implementation guidance will be necessary.

    The master plan discussed in this report should be adopted as the guideline for developing the

    entire Dighi Port IA in a phased manner. It will be important to develop the Dighi Port IA according to

    a master plan that specifies phasing, with infrastructure developed concurrently with thedevelopment of buildings and neighbourhoods that rely on that infrastructure to function properly. An

    infrastructure and transport master plan component of the overall master plan for the Dighi Port IA

    will assure that necessary infrastructure is identified, funded, and provided as development occurs.

    ES.4.5 Sustainability

    Development of the Dighi Port IA presents an opportunity to demonstrate that sustainability can be

    coupled with improved quality of life and new business opportunities. The Dighi Port IA is intended

    to be a pioneer and showcase of sustainability, not only in Maharashtra, but throughout India.

    Three sets of guidelines have been identified in order to achieve this. The first guideline focuses on

    overall development strategy towards site selection and design. Second is on the residential and

    commercial districts and the third refers to the industrial component of Dighi Port IA.

    ES.4.6 Transportation

    Dighi is well connected by both road and rail services. Dighi is served by NH-17 and by State

    Highways 92, 95, 96, 97 and 98 (SH-92, SH-95, SH-96, SH-97 and SH-98) NH-17 connects Dighi to

    Mumbai in the north and Goa in the south correspondingly, it also connects Dighi with other major

    port cities of southern India and NH-17 is the major link that takes traffic from all major ports that lie

    on the west coast. The State Highways also connect Dighi Port IA with the western parts of

    Maharashtra via NH-17.

    Dighi Port IA is connected by the Konkan railway and the nearest railway lines are Indapur and

    Mangaon. The Roha-Pen link which is solely for goods movement is also near Dighi Port IA. In

    terms of air connectivity, Dighi Port IA is not well connected; the nearest airports are in Mumbai and

    Pune.

    AECOM has recommended a conceptual transportation system evaluating internal circulation,

    external access, and internal road layouts at the district level. The road circulation proposedprovides for safe, convenient, and efficient movement of people and goods integrated into a

    motorised and non-motorised transport system following a hierarchy of road networks.

    Public transport will include both a bus and mass rapid rail system serving commuters and the

    maximum extent of the Dighi Port IA. The mass rapid rail transit system has three corridors The first

    corridor starts from the south-western end of the Dighi Port IA moving northwards and passing the

    creek portion and crosses the Konkan corridor and moves further east to the residential corridor.

    Second corridor starts from the Agardanda and crosses the Konkan railway corridor and moves to

    the east. It moves along a straight route and serves the western and eastern peripheries. The third

    corridor starts at the termination point of the proposed first corridor and moves on the westward

    direction and runs northwards parallel to both the Konkan railway and proposed first corridor and

    move northwards and runs parallel corridor 2 on the north section of Dighi Port IA.

    Traffic flow/demand has been estimated following assumptions wherein the entire Dighi Port IA was

    divided into 140 smaller zones based on land uses. OriginDestination (OD) analyses were

    prepared between zones using population, employment, and trip rate data. Based on the analyses,

    a modal split of 70% public transport and 30% private transport is recommended. A network plan

    has also been proposed based on estimated trip density.

    Based on the traffic analysis, the major roads at the central portion of Dighi Port IA NH-17 will

    attract the highest traffic because of the concentration of residential use and industrial areas

    planned along this link.

    AECOM has recommended an Intelligent Transportation System programme to build intelligence

    into the transportation system as traffic increases over time and encourage use of public transport.

    The Indapur-Mangaon stretch of the Konkan railway corridor passes through the Dighi Port IA. A

    railway line that connects Dighi Port with the Konkan railway corridor is proposed. This line will be

    mainly for carrying freight traffic and will have railway siding facilities that connect Dighi Port IA with

    the central, northern and southern hinterland of Maharashtra.

    ES.4.7 Physical Infrastructure

    As summarised below, the proposed design strategy for Dighi Port IA includes systems for water

    supply and distribution, wastewater management, flood and stormwater management, solid waste

    management and disposal, power transmission and distribution, and telecommunications.

    Water Supply and Distribution

    Per capita water demand, industrial water demand, sewage generated and treated, wastewater

    generation, percentage of total water demand, demand for nonpotable water by nonindustrial uses,

    and water demand for open spaces and roads were calculated. Freshwater requirements by 2042

    are estimated at 505 million litres per day (MLD), which will be subsidised using treated wastewater.

    As such, treated water could account for 45% of total water demand.

    Water Sources

    Kundlika River flowing through the town of Roha has been identified as the water source for DighiPort IA. MIDC has been allocated 138 MLD, of which 45 MLD is the unutilized quantum available

    from the existing reservation. Given the required demand of 102 MLD for Phase 1, only 44% of the

    freshwater demand can be met. MIDC requires 70 MLD which can be sourced from Padwan Dam.

    Two proposed hydropower projects at Kar and Kombhe will provide 200 MLD to meet the partial

    water demand for Phase 2 and 3. Sea water is proposed as a source of water to meet the partial

    water demand in Phase 3; sea water desalination plant was also proposed.

  • 7/30/2019 Upload File 22

    9/12

    E-7

    SITE ASSESSMENT,MARKET ANALYSIS,GAP ASSESSMENT &CONCEPT PLAN FOR MEGA INDUSTRIAL PARK AT AURANGABAD

    FINAL CONCEPT MASTER PLAN FOR DIGHI PORT INDUSTRIAL AREA

    Intake and Raw-Water Transmission Main

    An intake with required capacity is proposed to be constructed on Kundlika River and Padwan Dam

    and raw-water storage equivalent to 1 days water demand for Phase 1 and 3 of the project will be

    created on a 3-ha site for Phase 1 and adjacent, an additional 3-ha site for Phase 3. Additional 3-ha

    will be required for Phase 2.

    Water Treatment Plant

    AECOM has proposed a conventional water treatment plant using a unit process of coagulationfollowed by flocculation, settling, and filtration. There will be a total of three water treatment plants:

    for Phase 1 with a capacity of 126 MLD, for Phase 2 a plant with a capacity of 110 MLD, and for

    Phase 3 with a capacity of 110 MLD. Area required is 2.5 3 hectares for each.

    Desalination Plant

    AECOM recommends a desalination plant with a150 MLD capacity to meet the demand for Phase 2

    and 3. Sea water from the Arabian Sea is the water source and will be treated through available

    desalination technologies.

    Potable Water Distribution Network

    AECOM recommends a twin pipeline water distribution system to meet the demand of 505 MLD.

    The water distribution system will follow a looped system and will be designed using a system of

    continuous pressurisation to provide water 24 hours a day. Water supply will be provided by zones,using suitable district metered areas.

    Wastewater Management System

    Domestic and industrial wastewater generated will be treated separately. The wastewater from

    industries and sewage from the residential areas will be treated in a common effluent treatment

    plant and sewage treatment plant, respectively. AECOM has estimated wastewater and sewage

    generated at the Dighi Port IA to be 461 MLD and 380 MLD, respectively. Approximately 32.5 has.

    of land will be required by Phase 3.

    The projected demand for recycled water in Phase 1 is 136 MLD and because the demand will

    increase over time, a common effluent treatment plant will be constructed in phases. A recycled-

    water system will be designed to meet the demand for recycled water by industries.

    Flood and Stormwater Management System

    The site of the proposed Dighi Port IA experiences significant rainfall and since there are no major

    rivers in the area, and due to insufficient capacities of the drainage system, substantial localized

    flooding is most likely to occur. AECOM has provided an initial flood analysis and prevention

    strategy; this strategy includes an analysis of the frequency of daily rainfall, a flood simulation, and a

    hydraulic design to accommodate the 100-year flood.

    Solid Waste ManagementDisposal and Land Requirements

    AECOM has provided an analysis of waste-generating sources, quantities of waste, and waste

    management activities (storage, collection, segregation, treatment, and final disposal). The solid

    waste management plan for the Dighi Port IA is expected to set a benchmark for management of

    green developments.

    Waste generation has been estimated using factors depending on specific land uses. AECOM

    estimates waste generation in Phase 1, Phase 2, and Phase 3 to be 980 tonnes per day (TPD),

    2,388 TPD, and 4,307 TPD, respectively. A solid waste management programme has beendeveloped in compliance with the Municipal Solid Waste Rules 2000 and the Hazardous Wastes

    Rules 2008. The programme asserts the practice of waste segregation and provision of suitable

    bins/containers. A broad collection of municipal waste system is recommended that uses pneumatic

    automated collection and transportation, door-to-door collection, kerbside collection, block

    collection, and a community bin system; a secondary waste collection and transportation system is

    also suggested. The industrial waste collection and transportation systems will be separate.

    Thermal, biological, and physical techniques were considered for processing of solid waste.

    AECOM recommends the following technologies for the treatment of municipal solid waste: a

    compost plant and landfill (Phase 1), biomethanation plant (Phase 2), and plasma arc gasification

    (Phase 3). AECOM recommends the following technologies for the treatment of industrial waste: a

    landfill and incineration plant (Phase 1) and plasma arc gasification (Phases 2 and 3).

    A total of 62 ha will be required for solid waste management facilities for municipal and industrialwaste. Of this total, 50.8 ha will be required in Phase 1, 5.6 ha in Phase 2, and 5.6 ha in Phase 3.

    Power Transmission and Distribution

    AECOM has provided a realistic forecast of electricity demand for the Dighi Port IA applying a

    flexible and modular approach to the power distribution and transmission system. Power demand

    was estimated based on the different land usesindustrial, residential, commercial, civic, open

    space, roads, and utilities. The load requirements corresponding to each phase are 1,536

    megawatts (MW) (2022), 3,803 MW (2032), and 7,085 MW (2042). AECOM has further estimated

    the power requirements for industrial use at 5,614 MW (maximum) or 5,049 MW (coincident). This

    supports the total land area of 12,020 ha of industrial land and respective industry types. For

    residential use, estimated power requirements by 2042 are 2,669 MW (maximum) and 1,601 MW

    (coincident), accounting for 5,440 ha of residential land. For commercial use, the power

    requirements by 2042 are 335 MW (maximum) and 245 MW (coincident), accounting for 3.869

    million square metres of gross floor area. For civic uses, open space, and roads, the power

    requirements by 2042 are 219 MW (maximum) and 189 MW (coincident), accounting for 6,860 ha.

    The power demand projection is based on a forward-looking estimate of 30 years. The present

    development plan for Maharashtras power system and the national grid in place only support year

    2022 demands. This requirement does not justify setting up a dedicated captive power plant and

    power will draw from the grid. Six major sourcing points have been identified, for 20092010 are

    Chakan (400 kilovolts [kV]) and at Lonikand II (existing 4000 kV), for 2010 2011 are Hinjewadi

  • 7/30/2019 Upload File 22

    10/12

    E-8

    CHAPTER 0:EXECUTIVE SUMMARY

    substation (400 kV), Vile Baghad (220 kV) and at Yeolewadi-VSNL Dighi (220 kV) and at Pune

    substation (765/400kV 2 x 1500 megavolt amperes) proposed for 2012 2014.

    Dighi constitutes about 71% industries and 29% residential and commercial use. Thus, the low-

    tension load requirement is about 30%40% of the load, which can be addressed by renewable

    sources of energy. Buildings will follow Leadership in Energy and Environmental Design (LEED)

    requirements for residential and commercial buildings. Power requirements for the low-tension load

    and other emergency lighting requirements will be resolved through solar power.

    Telecommunications

    AECOM has reviewed the existing telecommunications network with so that the Dighi Port IA can

    provide a reliable, high-quality telecom access network for communication of voice, data, video, and

    other information and explore the opportunity to increase the telecom bandwidth and install a well-

    integrated telecommunications network. AECOM recommends digitalisation of the

    telecommunications network, introducing digital transmission and switching components in the

    network. The final digitalisation of the subscriber lines is expected to open up future possibilities to

    connect a wide variety of digital equipment and subscribers premises such as data terminals,

    telefax, and teletex.

    The optical fibre communication system will be advanced to an integrated services digital network

    (ISDN). By using sophisticated coding techniques, bit rates in access of 2 megabits per second

    (Mbps) can be carried on copper, opening up the possibility of delivering other future services.

    Higher bandwidth will be provided given specific requirements to address future demand. A high-capacity fibre backbone network provided underground along state and national highways will be

    integrated with the transmission lines. Telecom modernisation will be provided for Internet use and

    faster broadband, expanding the reach of public telephones, and concentrating infrastructure for

    shared connectivity. Telecom demand for the Dighi Port IA has been estimated based on the

    proposed gross floor area. The projected demands for telecom capacity for 20332042 are 3,170

    STM-1 for industrial use and 1,632 STM-1 for residential and commercial uses. AECOM

    recommends installing optical fibre cable (OFC) and optical power ground wire (OPGW) (24 F/48 F)

    underground along the roads. It should be noted that all telecom operators that have licenses for

    Maharashtra have the right to provide telecom services in the Dighi Port IA.

    ES.5 Block Cost Estimates and Cash Flow

    AECOM has worked out the financial cash flow using MIDCs land acquisition costs and the block

    cost estimates prepared in-house for trunk infrastructure and internal infrastructure. Estimated land

    acquisition costs come to INR 7,500 crores. Based on estimates, total capital expenditures for

    infrastructure for Phase 1 (2022) are INR 4,043 crores; for Phase 2 (2032), INR 7,083 crores; and

    for Phase 3 (2042), INR 15,637 crores. Phase 3 has the highest capital expenditure requirement.

    AECOMs block cost estimates fo r capital expenditures across all three phases is INR 26,762

    crores.

    The overall strategy is for the majority of the land acquisition and internal infrastructure to be

    implemented by the Government and for the majority of the infrastructure to be implemented

    through public-private-participation (PPP).

    In the cash flow projection land acquisition costs, capital expenditures for infrastructure, total

    development costs were calculated and adjusted with inflation. Some factors for pre-operation

    expenses, operations and management and marketing expenses figure into the model. The cash

    flow also shows the project phasing is mostly reflective of interconnection of land acquisition, with

    construction and finally land sales. The land sales strategy is that Phase 1 extends from 2012 to

    2022, Phase 2 from 2022 to 2032, and Phase 3 from 2032 to 2042. Land acquisition is assumed to

    be typically three years ahead of each Phase.

    AECOMs cash flow results reveal that approximately 54% of projects will be public/private

    partnerships (PPPs) and the rest will be non-PPP projects. The assumption is that for PPP projects,the private sector will get additional viability gap funding of 20%. The number of and type of PPP

    projects could increase over time; after Phase 2. With projects assumed as PPP, the total capital

    expenditure for infrastructure required for Phase 1goes down to INR 1,885 crores from the previous

    estimate of INR 4,043 crores. This can be fully covered by the Government of India fund of INR

    2,500 crores (equivalent to 69% of the fund available). The cost of Phase 1 land acquisition of INR

    1,001 crores would be funded by the State Government to cover land acquisition and form its

    equity participation in the development of the Dighi Port IA.

    As such, total equity contribution from the Government of India is INR 2,500 crores, equivalent to

    69%, and the Government of Maharashtra (MIDC)l contributing 31% or approximately INR 1,147

    crores (adjusted with inflation). With a debt-equity ratio of 2, the total debt assumed is INR 9,804

    crores.

    The sale of the land will be the primary source of revenue and debt servicing, which will start fromthe 4th year of the project cycle (i.e., 2015) and end by 2023. Based on revenue assumptions,

    approximately 52% of the land is considered purely saleable for industrial, residential, commercial,

    and civic uses. Total saleable land goes up to 74% when sales of land for roads, utilities, and open

    space to the private sector are considered.

    Approximately 21% of saleable land will be disposed of by Phase 1 (2022), 33% by Phase 2 (2032),

    and 46% by Phase 3 (2042). Sales from Phase 1 is expected to generate a cash surplus enough to

    cover additional land acquisition for Phase 2 and Phase 3. The highest closing balance estimated in

    2042 is INR 7,074 crores given the higher land premiums by then. By 2042, there will be a net

    cashflow of INR 4,748 crores. Overall, the project can expect an IRR of 18% over the plan period of

    2012-2042.

    ES.6 Broad Development Model

    AECOM has identified the key players in the planning and approval of the Dighi Port IA. The

    mandate of DMICDC and MIDC was reviewed alongside the actions of other agencies in

    Maharashtra to identify gaps and bottlenecks impeding project implementation. Case studies of

    other development models have been presented to allow an understanding of best practices

    following the concept of a joint stock development company in charge of developing large-scale

    developments.

    The recommendation for the Dighi Port IA is to set up a joint stock mother company composed

    mostly of the Government of India and the Government of Maharashtra, pooling together a revolving

  • 7/30/2019 Upload File 22

    11/12

    E-9

    SITE ASSESSMENT,MARKET ANALYSIS,GAP ASSESSMENT &CONCEPT PLAN FOR MEGA INDUSTRIAL PARK AT AURANGABAD

    FINAL CONCEPT MASTER PLAN FOR DIGHI PORT INDUSTRIAL AREA

    fund. The revolving fund operates under a combined equity/debt/debt service facility used to set up

    several other SPVs following a long list of priority projects. Either this SPV will be an expansion of

    MIDCs existing roles and responsibilities, with MIDC still having a dominant role, or a multiple -

    stakeholder group or new development company will be set up.

    This development company will be composed of several departmentsland development (industrial

    and real estate), civic facilities/institutions, and infrastructurewith revenues derived from land

    sales, construction, and user fees. Apart from having planning and development components, the

    SPV should have regulatory, marketing/public relations, land sales, legal/executive, fund

    management, PPP special project, monitoring, and evaluation functions.

    ES.7 Marketing Strategy

    AECOM recommends a six-stage marketing strategy for the Dighi Port IA:

    Formulate the marketing and public relations team.

    Engage in smart business planning and determine project phasing.

    Practice economic common sense.

    Assess and prepare attractive parcel packages.

    Assemble a technical support team (presales and postsales).

    Obtain policy support at the national and state levels.

    AECOM has provided for a Dighi Port IA marketing framework and programme that identifies key

    items under the following programme:

    What to marketinvolves knowing the product, allowing the formulation of project packages under fourmain categoriesland development, infrastructure, civic/institutional, and special projects.

    Who will marketrecommends having a dedicated marketing group that will focus on key products andkey representatives (stakeholders), understanding the target client groups domestically andinternationally, and creating a tailor-fitted programme that involves participation in conferences, salesexhibitions, and roadshows.

    When to market emphasises the importance of coordinated phasing for land acquisition, landdevelopment, construction, and land sales, and tying in this phasing with the respective budgets andfunds.

  • 7/30/2019 Upload File 22

    12/12

    E-10

    CHAPTER 0:EXECUTIVE SUMMARY