unit safety case - home - the aloft group · 2015. 8. 19. · skpi management of judicial...

17
Unit Safety Case IAA and Aloft Safety Seminar and Bowtie Training Workshop Jean-Michel DE REDE Senior Safety Expert 2015-09-28

Upload: others

Post on 07-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Unit Safety Case

    IAA and Aloft

    Safety Seminar and Bowtie Training Workshop

    Jean-Michel DE REDE

    Senior Safety Expert

    2015-09-28

  • status report or snapshot picture

    how the system works

    strengths and weaknesses

    highlighting risk

    a Safety Management tool

    Unit Safety Case

    Unit Risk Survey

  • ATC H,P,E,

    airspace

    / SMS QMS

    Safety Culture

    EQUIPMENT

    PROCEDURES PEOPLE

    External l

    - ANSP - Users

    - Suppliers

    - ext services - FAB

  • Arg-0 The level of preparedness for the provision of ATS by the “UNIT” is

    adequate and managed so as to continuously improve its safety levels

    Criteria adequate = ? improve safety levels = ? Environment of ops

    traffic, geographical constraints, adjacent units, weather etc…)

    Arg-1 Safety Culture

    Arg-2 SMS

    Arg-3 ATM System

  • Arg1.1 Safety Culture

    has been measured

    Arg1.2 Safety Culture

    level is maintained or improved

    Results

    of Safety

    Culture

    Measurement

    List initiatives

    Arg1.3 Changes affecting

    Safety Culture Level are assessed

    Staff morale

    indicators

    Industrial action

    Organizational

    changes

    having positive

    or negative impact

    External

    influences

    Arg-1 Safety Culture supports the ops

  • Arg2 Safety Management has the elements and

    properties to supports its functions

    Arg 2.1 SMS functions

    and performance

    Arg 2.2 SMS

    maintenance

    Arg 2.3 SMS degraded

    modes

    Arg 2.4 Changes to SMS

  • Arg 2.1.1 SMS capability

    to REACT

    Arg 2.1.2 SMS capability to

    PREVENT

    Arg 2.1.3 SMS capability to

    PREDICT

    Arg 2.1.4 SMS capability to

    IMPROVE

    Arg 2.1.5 SMS environment

    of operations

    Evidence

    refer to SMM, related

    procedures and products

    Arg 2.1 SMS functions and performance

    Reporting (mandatory and voluntary), investigations

    Surveys

    Safety Assessments

    SKPI

    Management of Judicial Authorities

  • Arg3 ATM System has the elements and

    properties for the services to be provided

    Arg3.1 Human

    component

    Arg3.2 ATC Procedures

    component

    Arg3.3 Equipment

    component

    Arg3.4 Airspace & Flight

    Procedures component (design and management)

    Arg3.5 Support/External

    services and Interfaces component

  • recruitment selection training maintenance termination

    State of the art methods

    Basic aptitudes

    English proficiency

    Educational level

    Attitude

    Attractive market offer

    High number of candidates

    Sound recruitment policy “RIGHT”

    PEOPLE

    RIGHT NUMBERS AT ALL TIMES

    RIGHT AGE PYRAMID

    Efficient training

    Adequate objectives (initial and updates)

    Competent trainers

    Efficient training equipment

    Unbiased examinations (failure rates)

    RIGHT PEOPLE FOR THE JOB

    RIGHT NUMBERS Efficient

    monitoring

    Adequate objectives (refresher courses)

    Efficient training

    Efficient measurement

    Social/psychological monitoring

    RIGHT PEOPLE FOR THE JOB VERIFIED

    NO UNQUALIFIED or , BURNT OUT STAFF IN OPS

    Career opportunities

    Derivation training

    Career development

    Other measures

    Arg-3.1 Human Component

  • Arg 3.2 ATC Procedures component

    Arg 3.2.1 ATC Procedures

    have been developed

    Arg 3.2.2 ATC Procedures are maintained

    Arg 3.2.3 Need for & Changes to

    the ATC Procedures are assessed

    OPS Manual,

    LOAs, Maps,

    contingency…

    complete, correct

    accessible, usable,

    known, validate…

    SMS, surveys

    S.A. reports

    Staff feedback,

    surveys,

    doc management

  • Arg 3.3 Equipment component

    Arg 3.3.1 SUR

    Arg 3.3.2 COM

    (voice only?)

    Arg 3.3.3 NAV

    Arg 3.3.4 Building

    Arg 3.3.5 Support systems

    Arg 3.3.6 ATM HMI

    & support functions

    Arg 3.3.7 (TBC)

    (e.g.: FDP)

  • Arg 3.3.1.1 Surveillance function provides the required functionalities

    with the required performances for the service to be provided

    Arg 3.3.1.2 Surveillance function is maintained

    so as to achieve the required level of availability

    Arg3.3.1.3 Surveillance function degraded modes of operations have been identified and assessed for their impact on operations and mitigations put in place as required

    Arg 3.3.1.4 Changes to SUR function

    are identified and assessed

    Arg 3.3.1 SUR

    Mapping: fct,/req./perf.

    Standards (ICAO)

    Current characteristics

    Required sep. minima

    Procedures

    Records

    Staff competence

    and availability

    Degraded Modes

    associated procedures,

    roles & resp.

    limitations…

    SMS procedures

    scope, risk assessment

    migration plan

    existing S.C.

  • Arg 3.3.4.1 Building provides the required

    functionalities with the required performances for the service

    to be provided

    Arg 3.3.4.2 Building is maintained so as to achieve the required

    level of availability

    Arg 3.3.4.3 Building degraded modes of operations have been identified assessed for their impact on operations and mitigations

    put in place as required

    Arg 3.3.4.4 Changes to the building are

    identified and assessed

    Mapping

    functionalities/requirements

    Arg 3.3.4 Building

    Mapping: fct,/req./perf.

    Standards (Natl’ laws)

    Current characteristics

    Procedures

    Records

    Staff competence

    and availability

    Degraded Modes

    associated procedures,

    roles & resp.

    limitations…

    SMS procedures

    scope, risk assessment

    migration plan

    existing S.C.

  • Arg 3.5 External services

    component

    Arg 3.5.1 All external services

    identified

    Arg 3.5.2 SLAs with all

    external services

    Arg 3.5.3 Procedures for intervention of

    external services personnel

    Contracts are

    in place & in line

    with risk

    List of ext. services

    complete and

    correct

    Procedures

    in place and used

  • enter your presentation title 17

    For each task

    Provide reference to evidence

    Highlight points that are supportive to safety

    List points that are missing or should/could be improved

    Needs to be updated

  • enter your presentation title 20

    The link to Bow-tie

    USC

    the overall picture

    in a given context

    highlight where to spend more time going into the details

    supports defining priorities

    supports decision making

    can be connected to other tools… bow-tie.

  • Any question …

    Jean-Michel DE REDE

    Senior Safety Expert

    [email protected]