Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues Prepared by: J. Daniel Arthur, P.E., SPEC Presented at: Ground Water Protection Council Stray Gas Forum - Cleveland, OH July 24-26, 2012

Upload: phungdang

Post on 31-Mar-2018

223 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Understanding and Assessing Well Integrity Relative to

Wellbore Stray Gas Intrusion Issues Prepared by:

J. Daniel Arthur, P.E., SPEC

Presented at: Ground Water Protection Council Stray Gas Forum - Cleveland, OH

July 24-26, 2012

Page 2: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

General Discussion Items

• Stray Gas and Well Integrity Introduction • Regulatory Considerations • Holistic Well Evaluation Process • Internal Well Integrity

– Build-Up and Leak-Off Testing – Pressure Trend Analysis

• External Well Integrity – Vent Rate Testing and Analysis – Casing and Cementing – Temperature & Noise Logging

• Remedial Action Considerations

July 25, 2012 2 Copyright (c) 2012 ALL Consulting

Page 3: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

WELL INTEGRITY DISCUSSION

July 25, 2012 Copyright (c) 2012 ALL Consulting 3

Photo Source: Energy In Depth, 2012

Page 4: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

What is Stray Gas?

July 25, 2012 Copyright (c) 2012 ALL Consulting 4

Page 5: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Why do Integrity testing? • To assure objectives are achieved

and to avoid unwanted or unauthorized releases/failures.

• Integrity testing serves to confirm that our physical and mechanical systems are functioning as designed.

• Integrity testing and analysis is used in multiple aspects of unconventional operations:

pressure testing before fracturing – injection well integrity – pipelines – casing and cementing for protection of groundwater – assessing possible

behind pipe integrity (e.g., methane intrusion) – impoundments/tanks to avoid releases

5 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 6: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

More than Meets the Eye

6 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 7: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Integrity Testing

• Integrity testing is a daily procedure in the energy industry, including throughout the development of unconventional resources.

• Integrity testing is utilized much more than might be imagined, especially by the public.

• In 2011, well integrity is a major topic of discussion for a variety of reasons: – Macondo Incident in the Gulf – Various pipeline releases – NGO/Public opposition (e.g., Gasland)

7 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 8: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Mechanical Integrity and Unconventionals

Well Integrity Considerations

• Internal Integrity – Tubing and Casing

Integrity – Packers, Plugs, Perfs

• External Integrity – Cement, Mud, Annular

fluids – Gas/Fluid Intrusion

• Via Microannulus • Via Cement Channels • Through Cement Pores • Fracture Systems

Other Integrity Considerations

• Tanks and Trucks • Pipelines • Pumping Equipment • Valves and

Connections • Well Pad, Pits,

Impoundments • Wellheads • Geologic System and

Confinement • Other

Copyright (c) 2012 ALL Consulting 8 July 25, 2012

Page 9: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Well Integrity & Gas Intrusion

• Assessing well integrity specific to stray gas intrusion varies from other well integrity concerns.

• Methods and tools ideal for evaluating the presence and significant movement of annular gas differ from assessing water/liquid migration.

• Bradenhead or annular pressure does not mean gas is the cause. Potential causes of annular pressure are plentiful.

• Assessing wells for stray gas intrusion and movement requires a holistic analysis. Well integrity analysis is one component of the analysis if alleged problems are being investigated. Understanding well integrity is critical.

July 25, 2012 Copyright (c) 2012 ALL Consulting 9

Page 10: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

REGULATORY CONSIDERATIONS

July 25, 2012 Copyright (c) 2012 ALL Consulting 10

Page 11: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Texas RRC

• Texas Statewide Rule 17 (SWR17) – All wells shall be equipped with a Bradenhead. Whenever pressure

develops between any two strings of casing, the district office shall be notified immediately. No cement may be pumped between any two strings of pipe at the top of the hole, except after permission has been granted by the District Office.

– (b) Any well showing pressure on the Bradenhead, or leaking gas, oil or geothermal resource between the surface and the production or oil string shall be tested in the following manner. The well shall be killed and pump pressure applied through the tubing head. Should the pressure gauge on the Bradenhead reflect the applied pressure, the casing shall be condemned and a new production or oil string shall be run and cemented. This method shall be used when the origin of the pressure cannot be determined otherwise.

• RRC regulations require wells to be constructed in such a way as to be able to keep fluids in various strata separate and contain pressures (a condition described as wellbore mechanical integrity).

July 25, 2012 Copyright (c) 2012 ALL Consulting 11

Page 12: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Annular Pressure Threshold*

• The APT is the amount of pressure that can be safely contained within an annulus and can vary based on a well’s construction.

• The APT is based on MAWOP as used in API RP 90 (see Appendix B and B1).

• APT-sc is calculated as the less of – 30% of the MIYP of the surface casing string – 0.5 psi/ft x surface casing setting depth

• APT-ic is calculated as the lesser of: – 50% of the MIYP of the intermediate string. – 80% of the MIYP of the next outer string. – 75% of the MCP (minimum collapse pressure) of the inner

casing or the production string.

July 25, 2012 Copyright (c) 2012 ALL Consulting 12

*NOT FINALIZED

Page 13: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Annular Pressure Observed/Response Flow Chart

Pressure Observed

Report to RRC

Repair to RRC Satisfaction

Yes Is Pressure

>APT-sc Or

>APT-ic

No

Diagnostics Determine Appropriate Response

Communicate with RRC with Recommendation

Implement Improved Response

Resume Monitoring

Is Pressure >APT-sc

Or >APT-ic

Is Pressure Caused by a Casing

Leak Communicate APT & Statement of Casing

Integrity to RRC

Yes No

No

Optional Reporting Method

RRC Draft Decision Chart

Page 14: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Pennsylvanian DEP

• Perhaps the most visible stray gas controversy has occurred in Dimock, PA.

• Stray gas concerns have prompted changes/refinements to the regulatory framework.

• Draft guidance includes a critical pressure standard.

• Critical Pressure at Protected Casing Seat – Sec 78.73(c) requires

pressure at the surface casing seat be no more than 80% of hydrostatic pressure at that depth. (0.8 x .433 x Depth)

July 25, 2012 Copyright (c) 2012 ALL Consulting 14 Photo Source: www.Herald-mail.com

Page 15: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

PA DEP Draft Decision Chart

July 25, 2012 Copyright (c) 2012 ALL Consulting 15

WELL INTEGRITY ASSESSMENT OBJECTIVE: Develop and employ best practices to proactively maintain freshwater quality of the Commonwealth of Pennsylvania by mitigating potential threats to freshwater supplies associated with existing well inventory while protecting public safety

Perform Post Drill Well Integrity Inspection on all Wells in existing Inventory Within Allotted Time Frame (TBD)

Criterion #6: Methane Concentration Near Wellhead (%LEL) Methane concentration taken 360 degrees around the edge of cellar at 3 feet above ground level: Threshold >= 10% of LEL (or >= 0.5% concentration of methane in air).

Criterion #1: Surface Annular Pressure, psi (minimum 72-hr continuously monitored shut-in pressure build-up test2) 1) Non-Freshwater Protection Casing Annulus: Threshold = 80% x 0.433 x shoe depth of shallowest shoe in tested annulus within test, or build up signature reveals the formation gradient is overcome/exceeded or that threshold pressure will most likely be exceeded based on extrapolation using regression analysis3,4. 2) Freshwater Protection Casing Annulus: Threshold = No bubbles and/or 0 psi3 .

Criterion #2: Stabilized Surface Vent Flow Rate (SVFR), scf/d2 1)Non-Freshwater Protection Casing Annulus: Threshold =5000 scf/d if TOC is not inside previous casing string. Threshold =2000 scf/d if TOC is inside previous casing string. 2) Freshwater Protection Casing Annulus: Threshold = No bubbles and/or 0 scf/d. 3) Total allowable cumulative SVRF per well (all annuli combined): Threshold = 5000 scf/d.

Criterion #3: Discharge of High TDS Fluids at Wellhead (TBD) 1) Non-Freshwater Protection Casing Annulus: Threshold = no TDS limit provided fluids are contained6. Freshwater Protection Casing Annulus: Threshold=500mg/l TDS 6.

Criterion #4: Liquid Hydrocarbons Presence of any liquid hydrocarbons at surface from any

annulus6.

Criterion #5: H2S Concentration Near Wellhead H2S concentration taken 360 degrees around edge of cellar at 3’ above ground level: Threshold > 20 ppm.

Exceed Any Single

Threshold? YES or NO

Provide results of

initial screening process to

DEP within 1 month of

well inventory

assessment completion. Update list annually.

TIER 1 Well No further

non-routine evaluations

required unless

conditions at well

change.

TIER 3 Well

Exceedence of thresholds in #4, #5 and or #6 requires immediate DEP notification and remediation/

corrective action to reduce wellhead environment below thresholds. If no

other threshold exceedences, becomes TIER 1 Well upon successful

remediation; otherwise requires further evaluation.

Perform quarterly Inspections in accordance with 78.88 on all TIER 1 Wells8. For wells where annular pressure was measured in a non-freshwater annular space below the prescribed benchmark of Criterion 1, complete an annual minimum 24-hour shut-in build-up pressure test and compare pressure to prior year’s measurement at same time interval.

1) Annual 24-hour shut-in pressure test result, IF REQUIRED, higher than previous year an in excess of 100 psi? 2) Any open flow rates higher than previous measurements? 3) Other Mechanical Integrity Testing (MIT) problems noted?

Exceed Any

Single Criterion? Yes

or NO?

Submit annual report to DEP including results of quarterly MIT inspections under 78.88. (?????)

TIER 2 Well Exceedence of thresholds in #1, #2,

and/or #3 only require further evaluation.

1) Develop evaluation plan for TIER 2 Wells

(includes prioritization of TIER 2 Wells based

on environmental sensitivity).

2) Submit Plan to DEP within 1 MONTH of first

quarterly monitoring event(i.e., evaluation of

wells against 6 Initial Screening Criterion).

Total elapsed time since FIRST quarterly monitoring event: 1 MONTH. Total time

elapsed since commencement of

initial screening process (?????).

1)Execute evaluation plan

following DEP approval. 2) Compile, submit, and present initial findings to DEP within 2 MONTHS of evaluation plan approval and provide progress reports at frequency specified in plan.

TIER 3 Well with confirmed gas migration. 1) If confirmed Gas Migration Case(i.e., post-drill methane in freshwater wells significantly greater than pre-drill methane levels or any other evidence that gas is escaping from the well and impacting

1) Report to DEP regarding corrective action/monitoring results. 2) Well becomes TIER 1 when corrective action reduces criteria below threshold and/or gas migration is eliminated

Submit annual report to DEP including results

of quarterly MIT Inspections under

78.88

Pathway/Procedure TBD—consider statistical test to

determine if increases in

pressure and/or flow rate are/is

statistically significant;

reference API RP 90 benchmark of

100 psi (?)

TIER 2 well with no confirmed gas migration: (???) 1)Inspect Well on quarterly basis and continue to monitor the exceeded criteria 2)If criteria does not fall below threshold within 1 year, becomes a TIER 3 well and must be remediated unless otherwise approved by DEP

TIER 3 Well with no confirmed gas migration: 1) Remediate/repair well until criteria are below threshold 2) Compile, submit, and present results to DEP within 1 MONTH of successful repair. 3) If unsuccessful, prepare, discuss, and implement secondary evaluation/remediation plan within 1 MONTH of determination that remediation/repair was not successful.

Preliminary Draft

Page 16: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

HOLISTIC WELL EVALUATION

July 25, 2012 Copyright (c) 2012 ALL Consulting 16

Well Integrity Certainty

Timeline Analysis

Casing & Cementing

Monitoring Data

Analysis

Pressure & Vent Rates

Page 17: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Holistic Well Evaluation

• Well evaluation may compliment a regional or area analysis, but should consider issues of concern away from the well itself.

• Developing an understanding of regional geology & hydrogeology, drilling & completion practices, well integrity practices, historic area issues, etc. are combined in holistic analysis.

• Very detailed well information may be required depending on the issue(s) of concern.

• No single data result is likely to conclusively demonstrate an overall finding relative to MI. Rather, it’s a combination.

July 25, 2012 Copyright (c) 2012 ALL Consulting 17

Page 18: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

PRESSURE BUILD-UP TESTING

July 25, 2012 Copyright (c) 2012 ALL Consulting 18

Page 19: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Barriers of Protection Christmas

Tree Pipeline to

Flow Process and Storage

Surface Casing

Intermediate Casing

Cement

Cement

Well Fluids

Oil or Gas Zone

Perforations

Production Casing

Cement

Tubing

19 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 20: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Shut-In Surface Casing Pressure

0

50

100

150

200

250

0 4 8 12 16 20 24 28 32 36 40 44 48

Pres

sure

(psig

)

Time (hours)

Initial Post Remediation

20 July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 21: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Testing Methods (IWI)

• Visual Inspection • Pressure Testing

– Shut-In Surface Casing Pressure Testing – Production Casing Build-Up/Leak-Off Testing – Pressure Differential Testing

• Pressure testing can be done as a single testing event or can be done using multiple tests to assess trends.

• Continuous pressure recordings are key.

21

0 100 200 300 400 500

0 1 2 3 4 5 10 20 30 40 50 100 200 300

Production Casing Intermediate Surface Casing

July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 22: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Pressure Testing

• Build-up and fall-off testing are used for various purposes:

– Characterizing & evaluating integrity – Checking integrity of perforations

• For wells having more than one exterior annulus (e.g., 3-string well), all annular spaces should be tested.

• Transducers and data loggers should be utilized to ensure accurate and continuous monitoring and to allow for more detailed characterization and evaluation.

• Annular pressures are generally stopped if pressures exceed 300 psig as a safety precaution.

22

Pressure transducer used for SISCP testing

Data logger used for SISCP testing

July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 23: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Shut-in Surface Casing Pressure Test

23

Test Assembly

Surface Casing Riser

Pressure Transducer & Data Logger

July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 24: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

QC for Pressure Testing

• Pressure testing annular spaces requires quality control to achieve a good test.

• SISCP testing is a BU test opposed to a typical SAPT for SWDs. Leak testing (e.g., couplings) should be done during or before pressure is bled off.

• If piping is exposed, freeze precautions may be required.

• Equipment should be tested and managed to avoid mud-plugging.

• Continuous recordings are important to confirm quality of results.

• Gages used should be of appropriate scale compared to pressure recorded

– Using a 10,000 psig gage to measure 20 psig pressure is inappropriate.

• Testing Procedures are recommended for field personnel to utilize.

July 25, 2012 Copyright (c) 2012 ALL Consulting 24

Page 25: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Outer Casing Retrofitting

• In some cases, some sort of stray gas may be identified from a annular space without an assembly to facilitate pressuring monitoring.

• Retrofitted well caps can be used in these cases to facilitate testing/monitoring.

July 25, 2012 Copyright (c) 2012 ALL Consulting 25

Page 26: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Pressure Trend Analysis

• Assessing pressures for well integrity requires continuous recording for purposes of assessing pressure signatures, anomalies, and trends.

• Casing annular pressures may be exposed to open borehole and various geologic units that may create varied signatures compared to a SAPT of a casing/tubing annulus.

• Weather and external conditions can also impact results, making continuous recording a necessity.

July 25, 2012 Copyright (c) 2012 ALL Consulting 26

Page 27: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Pressure Curve Signature Analysis

27

0

25

50

75

100

125

150

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Asymptotic Linear

Pressure test signatures collected using continuous monitoring devices allow detailed evaluation of annular pressure and its significance.

Pressure curve analysis facilitates a more robust assessment of trends than would otherwise be possible.

July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 28: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Identifying Potential Anomalies

28

0

25

50

75

100

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Mud Clog Leak Freeze

An added benefit of the continuous data collection is that it also has proven to be a valuable tool in identifying testing errors.

July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 29: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Identifying Pressure Trends

29 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

25

50

75

100

125

150

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

September-11 December-11 February-12 March-12 May-12

Page 30: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Pressure Decline Analysis

30 July 25, 2012 Copyright (c) 2012 ALL Consulting

132

111

90

72

62

0

20

40

60

80

100

120

140

Jul-11 Sep-11 Nov-11 Jan-12 Mar-12 May-12 Jul-12 Sep-12 Nov-12 Jan-13

Pres

sure

Range of Expected Decline

Page 31: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Lack of Stabilized Pressure

31 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

25

50

75

100

125

150

175

200

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Page 32: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Formation influences to Pressure

32 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

20

40

60

80

100

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Page 33: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Multiple Influences on Pressure

33 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

25

50

75

100

125

150

175

0 5 10 15 20 25 30 35 40 45 50

Pre

ssur

e

Time

Page 34: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Leaks, Weather, or ??

34 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

10

20

30

40

50

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Page 35: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Peak followed by Stabilization

35 July 25, 2012 Copyright (c) 2012 ALL Consulting

0

5

10

15

20

25

30

35

40

45

50

0 5 10 15 20 25 30 35 40 45 50

Pres

sure

Time

Page 36: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

EXTERNAL WELL INTEGRITY

July 25, 2012 Copyright (c) 2012 ALL Consulting 36

EPA National Mechanical Integrity Test Working Group, Eastern Kansas, 1987

Photo Source: J. Daniel Arthur, 1987

Page 37: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

What are We Testing For?

• Well integrity specific to stray gas intrusion within the wellbore and/or specific to a nearby issue (such as a complaint).

• Potential presence of natural gas external to the production casing.

• Testing methods target assessment of significant gas or two-phase fluid movement external to the production casing.

July 25, 2012 Copyright (c) 2012 ALL Consulting 37

Gas M

igra

tion

Page 38: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Testing Limitations

• Testing methods focus on the vertical portion of the wellbore.

• Depending on the location of the suspected gas intrusion, well modification may be required to fully assess (e.g., pulling tubing or casing).

• Each test has limitations (e.g., determining flow direction)

• Failure to effectively plan and implement quality control measures will likely yield poor results.

July 25, 2012 Copyright (c) 2012 ALL Consulting 38

Page 39: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Common Questions

• Can testing methods confirm whether flow from the production zone is occurring versus flow from shallower zones? – YES! Testing methods are available that can confirm where

external flow is occurring and whether it may be coming from the production zone or a shallower zone.

• Can testing methods confirm a well is or is not impacting shallow groundwater? – Depends. Methods can be used to confirm whether or not the

well has adequate integrity. Analysis can also confirm where gas flow is and often whether it is significant. However, other testing may be required depending on the situation. If a well has no integrity issues, it cannot be the cause of shallow groundwater problems…

July 25, 2012 Copyright (c) 2012 ALL Consulting 39

Page 40: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Testing Methods (EWI)

• Visual Analysis and inspection • Well drilling and completion analysis

– Casing and cementing records review • Vent Rate testing • Geology Review • Cement bond type logs • Temperature Logs • Noise Logs • Perforation – Build-Up testing

July 25, 2012 Copyright (c) 2012 ALL Consulting 40

Page 41: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Visual Inspection

• Visual Inspection is a necessity! • Visual inspection is important to assess site

safety. • LEL monitoring/testing is a recommended BMP

for gas well operations (see following slide) • Visual inspection can facilitate:

– identification of bubbling in the well cellar. • Bubbling is generally heard before it’s seen.

– Whether pipe fittings or valves may be leaking? – Other issues that may be present?

July 25, 2012 Copyright (c) 2012 ALL Consulting 41

Page 42: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

LEL Monitoring Recommendations

• Monitor at the lip of the cellar at the well pad surface (i.e. at the ground surface level).

• If there is no wind: – Monitor at the edge of the cellar at a height of five (5) feet (ft) above

the ground surface (ags). – Monitor 5 ft ags & 5 ft from edge of cellar. Repeat at 5 ft intervals

until no readings detected. – Monitor in 4 directions/90 degree separation.

• Additional monitoring is required if there is a residence or private/public building within approximately 500 ft radial distance of the cellar: – Monitor at a distance of five (5) ft away from the edge of the cellar in a

direction towards the building and at a height of five (5) ft ags. Continually make measurements at increasing distances (in 5 foot increments) away from the edge of the cellar in a direction towards the building until two consecutive non-detect readings are obtained.

July 25, 2012 Copyright (c) 2012 ALL Consulting 42

Page 43: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Vent Rate Testing

• Vent Rate testing is done to compliment pressure build-up testing and to obtain an idea of the volume of gas may be present?

• Vent rate testing can be done using flow meter or manometer – depending on rate.

• Most annular venting, when present, are extremely low, making a manometer or balloon test most appropriate.

• Even if no venting is identified, balloon tests provide good visual documentation.

July 25, 2012 Copyright (c) 2012 ALL Consulting 43

Page 44: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Annular Vent Rate Testing • Used to measure gas venting

volumes. • Measured in inches of water using

a U-tube manometer. • Measurement converted to a flow

rate recorded as thousand cubic feet per day (MCF/d).

• Balloon tests are completed when manometer readings are <0.1 inches of water.

• Photographic documentation of balloon after 10 minutes.

44 July 25, 2012 Copyright (c) 2012 ALL Consulting

Page 45: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Volumetric Analysis

• Typically used for instances of stray gas intrusion

• Volumetric analysis can supplement other analyses in assessing well integrity and developing a plan for corrective action (if one is needed)

• If venting is used as a remedial measure, understanding volume and vent rate trends facilitates safe and effective action plans – NOTE: A Canadian study showed that

surface casing vent flows (SCVFs) are considered non-serious when venting sweet gas at low rates (<10.6 MCF/D). [Komex International, May 2002]

45 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 46: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Geology Review

• Understanding local and regional geology as well as historic activities is critical to assessing an alleged stray gas issue. – Many areas of the country have shallow-system naturally

occurring gas from various sources (e.g., coals, shales, etc.). – Several areas have had significant historic oil and/or gas

development with wells abandoned for more than 50 or even 100 years.

• Geologic review may incorporate review of mud logs, seismic, geophysical logs, research geologic units, researching historic activities (e.g., former commercially productive zones, etc.)

• The Geology review can help to understand what potential sources may be present that could be a source for stray gas intrusion into the wellbore?

July 25, 2012 Copyright (c) 2012 ALL Consulting 46

Page 47: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Casing & Cementing

• In addition to understanding details of drilling & completion activities, once a well is in operation, casing & cementing is key in assessing well integrity relative to possible stray gas intrusion and related EWI issues.

• Pressure testing casing shoes before drill-out and casings prior to fracturing has become commonplace.

• Cement evaluation is often a critical piece in the assessment of stray gas intrusion and EWI evaluation.

July 25, 2012 Copyright (c) 2012 ALL Consulting 47

Page 48: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Assessing Casing & Cement

• Prior to considering logging, understanding cementing methods is critical. Insights regarding hole preparation, procedures, cement types, additives, etc. is important. – For instance, a lighter weight cement may show

differently on a bond log than a heavier cement.

• Cementing Records • Logging tools used for assessing cement bonding • Physical testing

July 25, 2012 Copyright (c) 2012 ALL Consulting 48

Page 49: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Source: www.bridge7.com

Cement Bond Long Interpretation

Good Cement • Low Amplitude • Strong VDL

No Cement • High Amplitude • VDL Straight • Collars “Ringing”

Partial Cement • Varied Amplitude • Varied VDL

Microannulus • Varied Amplitude • Varied VDL • Pressured/No

Pressure

49 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 50: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

RCBL Microannulus

50 Copyright (c) 2012 ALL Consulting July 25, 2012

1500 psig • A Microannulus (MA) is typically

defined as a small separation between casing and cement where gas can travel, but not liquid.

• A misconception is that if a well has a MA, it is continuous over the entire wellbore.

• Actual conditions and testing reveal that often times, a MA occurs over discrete intervals (see example).

• Recognizing the presence of the MA is important when assessing EWI related to stray gas intrusion in a wellbore annular space.

0 psig

Page 51: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Temperature & Noise Logging

• Temperature & noise logging, in association with cement evaluation type logging, is likely the most useful when attempting to assess gas movement behind pipe .

• Effective T/A logging requires planning and well preparation.

• T/A logging should be complimented by other information (e.g., vent rate, RCBL, etc.).

• T/A logs can be used to confirm EWI relative to gas movement behind pipe.

• T/A logging can confirm the general source (e.g., producing zone versus shallower interval)

July 25, 2012 Copyright (c) 2012 ALL Consulting 51

Page 52: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

T/A Logging Procedures

• Prior to logging the well, the well needs to be prepared for noise and temperature logging.

– Production Tubing Removed. – Wellbore and annular spaces should be 100% fluid filled.

• The well should be allowed to stabilize (e.g., temperature, pressure, fluids). • Temperature is logged from top to bottom and noise is typically logged on the upward pass. • Logging should be conducted with the wellbore configured for the particular issue and often

requires multiple configurations to fully assess – Example: Production Casing Closed/Surface Casing Venting

• The logging company will log temperature on the downward pass at a consistent speed of no more than 35 ft/min.

• Anomalies identified on the temperature log should be documented and evaluated closely during noise logging.

• After completion of the temperature log on the downward pass, fluid levels in all casings should be re-filled as required.

• All unnecessary equipment should be turned off to minimize noise prior to the commencement of the upward pass.

• Noise logging intervals commonly range from 25 to 250 feet. Data collection intervals can be made more dense in the event an issue is identified.

July 25, 2012 Copyright (c) 2012 ALL Consulting 52

Well Configuration Well Prep/Stabilization Temperature Logging Noise Logging Repeat As Necessary

Page 53: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Logging Equipment

Copyright (c) 2012 ALL Consulting 53

Logging Truck running a Temperature-Audio Log (Photo taken by ALL Consulting with permission granted by CDK Perforating, 2012)

Temperature-Audio Logging Tool (Photo taken by ALL Consulting with permission granted by CDK Perforating, 2012)

July 25, 2012

Page 54: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Temperature Logging

• Temperature logging is one of the most basic logging tools used for downhole evaluations.

• Temperature logs are routinely used in the UIC program for assessing EWI, confirming injected waste is arriving and staying in the permitted injection zone, assessing wells for remedial workovers, and more.

• Temperature logging not limited for use by the oil & gas industry or for injection wells.

July 25, 2012 Copyright (c) 2012 ALL Consulting 54

Page 55: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Temperature Log Interpretation

Recorded Temperature

Temperature Gradient

Recorded Temperature

Temperature Gradient

Recorded Temperature

Temperature Gradient

Fluid Entrance from Formation

Fluid Entrance & Downward Fluid Movement

Gas Intrusion

55 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 56: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Noise Logging

• First described by Arco in ~1955 as a “quantitative “ tool, but utility was questionable.

• In 1973, Dr. McKinley (Exxon) started pointing out the utility of noise logging and ultimately worked with EPA and published a document on MI.

• For identification of gas movement behind pipe, noise logging can be crucial.

• Typically run with a temperature log and interpreted using other logs and data for the subject well.

• Unfortunately, interpretation is not commonly as straightforward as you might think!

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

200hz 600hz 1000hz 2000hz 4000hz 6000hz

56 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 57: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Stray Gas and Noise Logging

July 25, 2012 Copyright (c) 2012 ALL Consulting 57

1,000

100

0.1

10

10 1

AIR WATER DIESEL DETECTOR DIAMETER: 1-11/16" PIPE SIZES: 1-7/8" - 2"

p x q - PSI x MCF DAY

PEAK

-TO

-PEA

K M

ILLI

VOLT

S N

OIS

E LE

VEL A

BOVE

600

Hz

Fig. 2 – Noise level generated by flow past a detector.

• When evaluating gas movement behind pipe opposed to liquid, audio analysis is a fundamental tool.

• As McKinley documented in 1979, gas movement makes more noise than liquid movement past a detector.

• Although noise logging can be used to assess liquid movement behind pipe, it is ideal for assessing gas movement!

Page 58: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

0 20 40 60 80 100

0

1000

2000

3000

4000

5000

6000

7000

0 50 100 150 200

Audio (mV)

Dep

th (f

t)

Temperature (°F)

Temperature-Audio Log Casing configuration: 5-1/2" casing closed,

5-1/2" x 9-5/8" annulus open

Temperature 200hz 600hz 1000hz 2000hz 4000hz 6000hz

Frequency Cuts

Significance

Below 200 Hz

• Noise in the range from 10 Hz to 100 Hz generally accounts for mechanical or surface noise including cable vibrations caused by the motors of logging trucks, by lubricator motion, and other surface disturbances

200 Hz – 600 Hz

• Eliminates most surface noise while still being low enough to detect the action of gas moving upward through liquid (McKinley, Bowler and Rumble, 1973).

• Discrete bubbling – reflected by a spectrum peak in the 300 to 600 Hz range (McKinley, Bowler and Rumble, 1973)

• Mild Slugging – spectrum peak above 200 Hz decreases with only a slight indication of bubble peak, (McKinley, Bowler and Rumble, 1973)

• Severe Slugging - more energy is transferred into a band around 200 Hz. (McKinley, Bowler and Rumble, 1973)

• Above 200 Hz, channel type leaks exhibit the same frequency structure as does free-stream, grid-generated turbulence (McKinley, Bowler and Rumble ,1973).

1,000 Hz – 2,000 Hz

• Noise spectra show presence of free-stream turbulence which is characteristic of single-phase flow (McKinley, Bowler and Rumble, 1973).

• Above 1,000 Hz two-phase leaks are indiscernible from single-phase leaks (McKinley, Bowler and Rumble, 1973).

Noise/Audio Logs

July 25, 2012 58 Copyright (c) 2012 ALL Consulting

Page 59: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Typical Noise Distribution

0 10 20 30 40 50

200-600 Hz

600-1,000 Hz

1,000-2,000 Hz

2,000-4,000 Hz

4,000-6,000 Hz

>6,000 Hz

Dual-Phase Single Phase

July 25, 2012 Copyright (c) 2012 ALL Consulting 59

The amplitude distribution varies depending on single or dual-phase flow.

Page 60: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Single v. Dual Phase Flow

July 25, 2012 Copyright (c) 2012 ALL Consulting 60

1 2 3 6 8 10 20 30

Dept

h

Sound Level Peak-To-Peak (mV)

200

Hz

Dept

h

Sound Level Peak-to-Peak (mV) 1 2 3 4 6 8 10 20 30 40 50

Noise Log characteristics of a gas-liquid, two phase leak

Noise Log characteristics of single phase leak

Page 61: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Restrictions and Two-Phase Flow

61 Copyright (c) 2012 ALL Consulting July 25, 2012 0 20 40 60 80 100

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

6500

Audio (mV)

Dept

h (ft

)

200hz 600hz 1000hz 2000hz 4000hz 6000hz

NOISE LEVEL

DEPT

H

C

A

B

NOTE: the example above is from McKinley (1973) and although a great example, actual conditions can vary. The example to the right shows two-phase flow and a restriction as evident from the RCBL.

Page 62: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Noise Log with RCBL

62 Copyright (c) 2012 ALL Consulting July 25, 2012

• Noise logging rarely yields ideal results.

• Even with good cement, audio amplitudes within the 30 mV range are common.

• However, sometimes a near perfect log is obtained. This example also is void of near surface disturbance, which is common with noise logging (i.e., increase noise activity in the upper 500’).

• Remember that noise logs, like most logs, have settings controlled by the logging engineer and so logs can vary based on factors other than EWI.

Page 63: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Mid-Section Gas Intrusion

63 Copyright (c) 2012 ALL Consulting July 25, 2012

• In this example, gas intrusion is observed above 2,000’ with apparent flow upward.

• Flow appears to be single phase flow (gas only).

• The noise log confirms the absence of deep gas in the annular space.

Page 64: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Noise Log Example

64 Copyright (c) 2012 ALL Consulting July 25, 2012

• Similar to the previous slide, gas intrusion in the well’s mid-section is identified.

• However, noise amplitudes are much higher than the prior example.

• This may indicate higher rates or flow through tighter restrictions.

• Review of the entire log also shows higher sensitivity on the lower portion of the log. This suggests that sensitivities may be artificially higher than actual.

• The noise log confirms the absence of deep gas in the annular space.

Page 65: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Noise Log Example

65 Copyright (c) 2012 ALL Consulting July 25, 2012

• In this example, gas intrusion is observed at about 3,500’.

• Flow appears to be single phase flow (gas only).

• Audio peaks likely due to restrictions or second gas intrusion point present.

• The noise log confirms the absence of deep gas in the annular space.

Page 66: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

REMEDIAL ACTION CONSIDERATIONS

July 25, 2012 Copyright (c) 2012 ALL Consulting 66

Photo Courtesy Baker Hughes

Page 67: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Thinking Ahead…

• Keep in mind that the best option for remediation of stray gas intrusion into the wellbore may simply be “venting”.

• Physical remedial activities, such as perforating the production casing and squeezing with cement or other products is, challenging!

• Often, specialty products, such as micro-fine cement, resins (e.g., Maraseal), etc. may be required.

• Assuring perforations are sealed for purposes of production operations must also be considered.

July 25, 2012 Copyright (c) 2012 ALL Consulting 67

Page 68: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

TAKE-AWAYS…

July 25, 2012 Copyright (c) 2012 ALL Consulting 68

Page 69: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

Considerations… • A combination of testing methods and

analyses can be used effectively to assess well integrity

• Regulatory Agencies tend to seek tests and analysis methods that provide a black & white answer, but tend to recognize the complexities.

• Most testing methods do not offer an absolute and definitive answer regarding well integrity

• Sometimes, achieving an absolute finding is difficult or impossible. This is why EPA allows some leak-off on the SAPT – achieving a zero leak-off is generally impossible considering all the factors involved

• Some issues are simply a nuisance and not a significant environmental or safety concern

69 Copyright (c) 2012 ALL Consulting July 25, 2012

Page 70: Understanding and Assessing Well Integrity Relative to ... · Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues ... 80% x 0.433 x shoe depth

CONTACT INFORMATION J. DANIEL ARTHUR, P.E., SPEC PROJECT MANAGER [email protected] ALL CONSULTING 1718 S. CHEYENNE AVE. TULSA, OK 74119 WWW.ALL-LLC.COM

Citation Information: Arthur, J.D. (ALL Consulting); Casey, Greg (ALL Consulting); Kennedy, J. (ALL Consulting); Wilson, P. (ALL Consulting). “Understanding and Assessing Well Integrity Relative to Wellbore Stray Gas Intrusion Issues”. Presented at the Ground Water Protection Council’s Stray Gas Forum, Cleveland, Ohio, July 24-26, 2012.