umdoni municipality enhancement... · 2019. 11. 1. · 4.1.3 how data cleansing is done the data...

25
UMDONI MUNICIPALITY REVENUE ENHANCEMENT POLICY

Upload: others

Post on 20-Sep-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

UMDONI MUNICIPALITY

REVENUE ENHANCEMENT POLICY

Page 2: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 1

INDEX

Page No.

1 Definitions 2

2 Introduction 2

3 Objectives of this Policy 2

4 Accurate Billing 3

5 Indigent Grants 16

6 Debt Collection 18

7. Grant Funding 21

8 Alternative Revenue Sources 21

9 Credit Control Policy 22

10 Policy Adoption 22

Page 3: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 2

1. DEFINITIONS

‘’Municipality’’ means Umdoni Local Municipality

‘’MFMA’’ means the Municipal Financial Management Act (Act No 56 of 2003).

‘’CFO’’ means the Chief Financial Officer of the Municipality.

‘’Accounting Officer’’ means the Municipal Manager of the Municipality.

‘’Indigent Debtor’’ means debtors that cannot afford to pay for services in terms of

the indigent policy of Umdoni municipality

2. INTRODUCTION

The revenue enhancement policy aims to ensure that the Municipality implements a

plan to increase its revenue/revenue base and also reducing its expenditure. This

policy aims to set guidelines towards ensuring financial sustainability and viability

over both the short and long-term.

3. OBJECTIVES OF THIS POLICY

The objectives of this policy are to:

3.1 Increase revenue and reduce expenditure without compromising service delivery.

3.2 Create viable and sustainable alternative sources of revenue.

3.2 Ensure that cash resources and reserves are maintained at the required levels to

avoid unfunded liabilities.

3.3 Achieve financial sustainability and viability with acceptable levels of service delivery

to the community.

Page 4: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 3

4. ACCURATE BILLING

Accurate billing for services is a critical element of the municipal revenue

management business model. Due to poor billing and revenue collection

municipalities are becoming increasingly dependent on intergovernmental funding to

balance their budget. This component specifically focuses on billing integrity as the

basis of municipal revenue. The phrase “garbage in, garbage out” does apply in this

instance. If the customer information and billing information is incorrect the

municipality has no basis to effectively collect revenue. The key billing programs in

this guide document are as follows:

(a) Data Cleansing.

(b) Billing

(c) Customer Information Auditing

4.1. Data Cleansing

4.1.1 Why is data cleansing essential?

A very high percentage of revenue from municipalities is derived from Service

charges (i.e. Rates, Refuse). It is a fact, however, that at present all municipalities in

South Africa have a high and growing outstanding debtor‟s book. This is a cause for

great concern since the principal source of municipal revenue is becoming

increasingly threatened, and the financial viability of some municipalities is

consequently being seriously questioned. At the same time, the cry for improved

infrastructural services, faster housing delivery, and the need to improve social

services is becoming ever louder. The responsibility for providing these services lies

within the realm of local government, but if municipalities do not receive their rightful

revenues they will not able to meet these challenges.

Something has to be done; revenue has to be enhanced. Data cleansing is an

important link in the redemptive process. It is the function of ensuring that the

information on which the municipal billing system is based is accurate and up to date.

Accurate and diligent billing is not only basic to sound accounting practice but is also

absolutely essential to the financial well-being, and therefore viability, of all

municipalities, since it achieves two critical objectives: the maximisation of revenue

Page 5: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 4

potential and the prevention of losses resulting from incorrect or inadequate

information.

4.1.2 Legislative requirements

Due to the benefits of accurate billing resulting from data cleansing, municipalities are

required by law to institute the process below.

The Municipal Systems Act (Act No.32 of 2000) requires municipalities to:

S(95) Customer Care and management

In relation to the levying of rates and other taxes by a municipality and the charging

of fees for municipal services, a municipality must, within its financial and

administrative capacity -

(e) Ensure that people liable for payments receive regular and accurate

accounts that indicate the basis for calculating the amounts due.

S(96) Debt collection responsibility of municipalities

A municipality -

(a) Collect all money that is due and payable to it, subject to this Act, and any

other applicable legislation (Section 96 (a)).

4.1.3 How data cleansing is done

The data cleansing process is divided into three stages:

(a) Database Data Cleansing.

(b) Returned Mail Cleansing.

(c) Physical Field Audit Surveys.

4.1.3.1 Database cleansing

Database cleansing is the first activity in the data cleansing process. It comprises

checking all billing data held by the municipality for inaccuracies and anomalies. The

purpose is to see that all the information the municipality has in its billing system is

accurate and correct. Where mistakes are detected, they are to be rectified

immediately; where anomalies arise, they are to be recorded for further investigation

in the field. Each debtor must be checked against four criteria, as follows:

Page 6: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 5

(i) Valuation rolls

The following pertinent information in respect of all properties owned within

the municipality‟s boundaries is recorded in the municipal valuation rolls:

(a) Name of the registered owner.

(b) Current usage of the property.

(c) How the property is categorised.

(d) Size of the property.

(e) Value of the property.

All of the above needs are to be checked for accuracy and their correct

recording in the billing system must be confirmed. Two important results

emanate from this.

(a) With the correct information, it becomes possible to ensure that the

correct bill is sent to the correct customer at the correct address.

(b) By checking usage, the correct tariffs linked to each consumer are

verified.

(ii) Debtor types

It is important to understand that customers should be charged according to

their debtor type and owner/tenant status. These categorisations should

normally be taken from the application forms customers are required to

complete when applying for services. However, many municipalities ignore

this field, which means that they are not able to levy charges according to the

correct debtor type and status. This could result in substantial potential

revenue losses to the municipality, and, at the same time, existing revenues

are not adequately protected. Data cleansing of the debtor type and

owner/tenant status requires:

(a) Ascertaining how the municipality bases its tariffs in respect of land

usage; and

(b) Assigning the appropriate debtor type to each customer according to

this information. This process will:

(c) Correct any meaningful debtor types; and

(d) Correct owner tenant information.

With this information, the correct charges can be determined for each

customer.

Page 7: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 6

(iii) Tariff analysis.

The next step is to compare the debtor type to the tariffs being charged. The

purpose here is to highlight whether the following errors have occurred:

(a) Owners of properties not being billed assessment rates and other

owner-specific services.

(b) Tenants being charged owner-specific services.

(c) Business consumers being charged domestic tariffs.

(d) Domestic consumers being charged business tariffs.

(e) Free basic services not being applied.

(f) Free basic services being applied in areas where there should be no

free services.

(v) Services.

Once all the cleansing items described above have been completed, the next

step is to confirm that each customer is billed correctly for each service

received. Within Umdoni Municipality, there are established rules and

procedures that determine the correct tariff for each debtor type. It is

necessary to check that the correct tariffs are being applied to each customer

and, if necessary, develop appropriate systems to ensure that this happens in

future.

4.1.3.2 Returned mail

Non-delivery of accounts is a major problem in debt collection and has serious

consequences for the municipality. It is therefore imperative that all returned mail be

carefully analysed to determine why bills were not received by intended recipients. All

returned mail should be split into the following categories.

(a) The customer is no longer residing at the given address.

(b) The postal address is incorrect.

(c) The physical address is wrong.

(d) The account is flagged inactive, while, in fact, it is active and therefore not

being billed.

(e) The account is wrongly flagged „active‟.

Once the reason for non-delivery has been established, contact should be made with

the owner of the property. There are various ways in which this can be done.

Page 8: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 7

(a) Check the system for telephone numbers and make contact telephonically to

clarify details, if possible.

(b) If contact cannot be made telephonically, do a title deeds search to determine

where the owner of the property is located.

(c) Another method is to do a credit check on the customer through a credit

bureau, which should reveal the customer‟s latest physical and/or postal

address and, possibly, telephone number.

(d) All the correct details should be captured in the system once the customer

has been located.

Should this desk research proof fruitless, it will then be necessary to physically visit

the property concerned to interview the current occupier in the hope that s/he can

provide a forwarding address or advise on the current whereabouts of the missing

customer. (See below for further details on field work methodology)

If an account is flagged „active‟, it is important to check that no bills are sent out, as

not only is this wrong, but it also distorts the outstanding debtor‟s figure. It is equally

necessary to check that if it is flagged „inactive‟ services are nevertheless being

provided and not charged for. This should be rectified immediately.

4.1.3.3 Data cleansing fieldwork

Where neither the billing system nor desk research is able to resolve the situation

regarding anomalous accounts, fieldwork may be necessary to determine what the

situation is „on the ground‟. This should not be done in an ad hoc manner. Instead, it

must be carefully planned, to save on resources, to ensure that the data obtained

from field research is captured in the billing system as quickly as possible, and to

mitigate against the risk of further corruption. The following fieldwork preparation is

necessary.

(a) An appropriate fieldwork questionnaire should be designed to obtain the

following information:

(b) The customer‟s correct name and postal and physical address.

(c) The correct owner/tenant situation.

(d) Whether the tariffs levied on the property are correctly related to the type of

property, e.g. domestic residential, commercial, municipal, industrial, religious

(e) Whether the classification of the debtor is correct or not.

(f) The correct stand number.

Page 9: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 8

(g) Verification of meter numbers and their correspondence with those registered

in the revenue system.

(h) Correct ward allocation.

(i) Indigent status of the customer.

(j) Confirmation of the services received by the customer.

(k) Nearest pay station to the customer.

(l) Recruit fieldworkers who meet the following minimum qualifications:

(m) A regular reporting system must be instituted to ensure consistency and

reliability.

(n) Information must be regularly checked and comparisons made so that

anomalies may be identified and explanations found.

4.2. Billing

4.2.1 Why is accurate billing essential?

A substantial portion of any local municipality‟s revenue is derived from the delivery

of services. To facilitate this revenue generation, the municipality needs to bill its

customers on a regular basis. It is imperative that the billing is done accurately, as

invoices that do not reflect the true nature and quantity of services delivered will

probably result in non-payment. The billing function is the principal mechanism that

drives all cash flow, the main source of customer information, and critically

fundamental to the success of any municipality.

4.2.2 Legislative requirements

The Municipal Systems Act (Act No 32 of 2000) requires that:

S(96) Debt collection responsibility of municipalities

A municipality-

(a) must collect all money that is due and payable to it, subject to this Act and any other

applicable legislation; and

(b) for this purpose, must adopt, maintain and implement a credit control and debt

collection policy which is consistent with its rates and tariff policies and complies

with the provisions of this Act.

4.2.3 Critical elements of successful billing

A successful billing process is a function of both technology and accurate input.

Page 10: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 9

The technology (in the form of financial software) must have the required financial

integrity to process transactions accurately. Most financial software available on the

market has this financial integrity. Successful billing is therefore mostly a function of

the accuracy of the data input into the system. For this reason, it is important that

relevant controls are put into place that to ensure complete and accurate billing.

(a) Billing allows properties to be seamlessly tied to a service connection within a

property to an individual, the customer. The customer is then responsible for

the payment of the said bill.

(b) It is critical that the property base of any municipality is accurate; without this

accuracy, a customer cannot be billed and services cannot be connected.

Services are billed according to the services provided to a property. The key

to successful billing relies on the software being able to provide reliable and

accurate information on:

(i) Accurate property information;

(ii) Accurate customer information:

(iii) Accurate tariffs associated to the properties, which can be done

through various variables, including land usage, debtor type, land

zone, and service type;

(iv) Accurate ward information per property; and

(v) Flexibility to meet the municipality‟s reporting needs.

Billing integrity

The integrity of billing can be enhanced by the following controls:

(a) Preventative Controls.

(b) Detection Controls.

Preventative Controls

Preventative controls are controls that relate to the system processes and are by

definition designed to prevent errors occurring. They are vitally important to an

efficient billing process, as preventing errors before they occur is less time

consuming than making errors and then having to go back and fix them. If fewer

mistakes need to be rectified, fewer staff are required. Below are two types of

preventative controls:

- Access control to certain functionality on the software system.

Page 11: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 10

- Password protection.

Page 12: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 11

Detection Controls

Detection controls are controls that are put into place to identify potential errors.

Before a final billing is processed, detection controls allow the overall results to be

analysed before significant time, effort, and paper are expended.

These detection controls mainly focus on exception reporting, e.g.:

- Accounts not billed.

- Accounts with no valuations.

- Abnormal billings.

4.2.4 Billing processes

There are a number of system processes that need to be adhered to with regard to

the finalisation of each billing cycle:

- Capturing of all receipts.

- Importing of any data files.

- Third party files.

- EFTs from financial institutions.

- Journals and credit notes.

The following IT processes need to be followed:

- Pre-billing reports.

- Variance reports.

- Backups.

- Bill.

- Produce audit reports.

- Verifying reports.

- Prepare file for bill print.

- Roll over to next period.

Billing periods

Billing periods/cycles need to be understood for each service.

- Assessment rates can be billed annually or monthly.

Page 13: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 12

Billing formulas

Billing can simplistically be broken down into three separate components:

- Customer.

- Tariff.

- Usage.

Each one of these components — independently or interrelated — is fundamental to

accurate billing.

Customer

The customer is the key component to billing, i.e., no customer results in no billing.

The following attributes relating to a customer are key to accurate billing:

- Name.

- Physical and postal addresses.

- ID/company registration/CC/trust/number

- Classification.

If any of these is incorrect then the collection of the debt is impaired.

In addition to getting these attributes, the processes must be corrected around:

- creating a new customer; and

- closing a customer.

Tariff

A tariff is basically a rate that the customer gets charged for the service delivered.

The tariff:

- Is based on land usage;

- Varies per each service;

- Varies per customer classification;

If a customer is incorrectly classified, the wrong tariff could be used, which may result

in incorrect billing.

Usage

The usage varies depending on the service that is billed. The usage per service is:

- Assessment rates: valuations.

- Refuse: land usage and/or bins.

Page 14: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 13

- Sundries: normally fixed rates.

The usage is the component that probably causes the biggest problems to billing

integrity.

Common problems are:

- Finger problems in capturing data;

- No valuations: site or improvements or both.

4.3 Customer Information Auditing

Sustainable local government is based on several inter-linked activities. One such

activity is the customer information audit, the process of establishing exactly who the

municipality‟s customers are and what they are entitled to receive in terms of the

municipality‟s commitment to service delivery. Customers can be categorised as

residential and non-residential. Residential customers receive services (at least a

basic level) based on fundamental rights enshrined in our Constitution. Non-

residential customers are entitled to services based on the economic goods they

produce. Without an accurate record of who a municipality‟s customers are, service

delivery to customers becomes an arbitrary process, literally a matter of „hit-and-run‟,

hoping that all receive what they were promised, for which potentially very little

revenue is received in return. Customer information audits are, therefore, important

to ensure that a municipality has the means to charge all its customers for the

services it delivers and for which the municipality is entitled to receive payment.

Payment for services is a municipality‟s primary source of revenue, and without this

income municipalities will not be able to deliver services and fulfil the socio-economic

role that is expected from them in terms of law. Municipalities face many challenges.

Some challenges are the result of the ongoing transformation of local government

and the consolidation of municipal boundaries that has led to the amalgamation of

various administrations into a single municipal administration. Another challenge

relates to municipalities not having the necessary procedures in place to maintain the

integrity of their customer information; they soon face the effects of outdated, or even

obsolete, information. Customer information audits are, therefore, necessary for at

least two reasons:

(a) To ensure that a municipality keeps essential information on all customers in

its area of jurisdiction; and

(b) To ensure that this information is a true reflection of its customer profile.

Page 15: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 14

4.3.1. Legislative requirements

The Municipal Systems Act (Act No 32 of 2000) requires:

95 Customer care and management

In relation to the levying of rates and other taxes by a municipality and the charging of fees

for municipal services, a municipality must, within its financial and administrative capacity-

(a) establish a sound customer management system that aims to create a positive and

reciprocal relationship between persons liable for these payments and the

municipality, and where applicable, a service provider,

The Municipal Finance Management Act of 2003 (Act No 56 of 2003) requires

Revenue management

64.(1) The accounting officer of a municipality is responsible for the management of the

revenue of the municipality.

64 (2) The accounting officer must for the purposes of subsection (1) take all reasonable

steps to ensure—

(e) that the municipality has and maintains a management, accounting and information

system which—

(i) recognises revenue when it is earned;

(ii) accounts for debtors; and

(iii) accounts for receipts of revenue;

4.3.2 Why municipal information systems currently lack integrity?

Unequal access to services in the past resulted in the majority of citizens receiving

services without an obligation to pay, or for which payment was hard to enforce. In

most instances, services were delivered to communities through communal

infrastructure. Individual households, therefore, had no service identity and non-

payment was often a collective, „communal‟ response to this impersonalised service.

Households resisted the communal approach to service delivery, demanding

recognition of the household as the primary unit to which services should be

delivered. The amalgamation of municipal administrations, the consolidation of the

service delivery environment, as well as the constitutional imperative of equitable

service delivery has brought to light the vast disparities in customer information

systems. While service delivery could be improved relatively easily through the

Page 16: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 15

upgrading and expansion of services infrastructure, the management of these

services and, more importantly, the sustainable delivery of such services through the

collection of charges to a substantially larger customer base proved to be far more

complex than initially imagined. As a result, gaps in base information have become

evident and projected revenue streams based on extended billing failed to flow into

municipal coffers.

4.3.3 The challenges that must be met

Customer information is dynamic. Changes to the data must be identified and

captured in time in order to maintain the integrity of the billing system. Incorrect data

results in undelivered municipal accounts or incorrectly addressed and, therefore,

rejected municipal accounts. This results in unpaid accounts, triggered either by the

consumer not receiving the account or the consumer becoming unwilling to pay due

to incorrect information reflected on the account. The fundamental challenge that the

customer information audit needs to address is, therefore, the growing municipal

services debt burden that is exacerbated by the gradual decline in the integrity of the

customer data system underlying the billing process. This in turn encourages

payment avoidance and widespread service delivery dissatisfaction leading to the

likelihood of collective resistance to payment for services and the development of a

„culture of non-payment‟, which is already prevalent in a number of communities in

South Africa. Many municipalities have substantial debtor books in excess of 120

days. With the increasingly alarming situation that is developing, many municipalities

have responded with a knee-jerk reaction, reasoning that a tough, blanket debt

collection drive is the only way to collect the outstanding amounts. Results in these

instances have been largely disappointing, since municipalities failed to understand

that in our highly complex society debt collection should be based on a multi-faceted

strategy that commences with a review of customer information to ensure that the

basis for billing is sound.

4.3.4 What does a customer information audit seek to achieve?

A customer information audit seeks to establish a sound basis for the billing of

service charges, which, in turn, facilitates the collection of revenue. More specifically,

it seeks to:

(a) Verify and rectify customer information for purposes of accurate billing; and

Page 17: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 16

(b) Collect additional information about consumer households that could improve

customer service; for instance, the determination of consumer households‟

indigent status to facilitate services subsidies.

The ultimate objective of a customer information audit is to achieve customer

satisfaction through the rendering of municipal services to consumers.

4.3.5 Programme scope

Against the background of legislative requirements and the importance of reliable

customer information for a wide range of purposes, it is imperative that municipalities

design appropriate data collection and maintenance procedures that meet basic legal

and functional requirements. To achieve this, the customer information audit is

divided into three distinct, complementary parts. Depending on the data needs of a

municipality, the data collection process could integrate all three parts into a single

programme.

(a) Part A is aimed at collecting basic customer information, as well as

information on land use.

(b) Part B is designed to develop an economic profile of each consumer

household with the primary aim to derive an indigent indicator, hence the

focus on questions around income and expenditure and asset ownership.

(c) Part C is aimed at identifying skills within households that could be useful

during the implementation of municipal works (capital projects, etc.). The

primary aim of this part is to establish a basis for poverty alleviation

programmes through job creation and local economic development initiatives.

Data collection is costly, and it is advisable to collect as much information as possible

when a municipality decides to engage in a customer information audit. The following

items should be collected as a minimum requirement:

- Stand data, including primary land use for purposes of classifying properties as

residential or non-residential, as well as a ward number;

- Customer data, such as first names or initials and surname, contact telephone

numbers, and ID number (the last is particularly important when verifying

customer credit standing and other information that may determine a person‟s

creditworthiness);

Page 18: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 17

- Household data, such as combined household income (e.g., by using income

brackets that would identify a household as indigent), primary sources of income,

including pensions and other social grants;

One cannot be prescriptive on the implementation process. However, there are a

number of key components to the process that should not be overlooked when

embarking on a customer information audit.

The implementation timeframe for a customer information audit is largely dependent

on the preparation of the field work and the participation of the municipality in this

process. In formalised (urban) areas, the actual data collection is likely to be easier

than is the case in spread-out rural villages. The use of support tools, such as maps,

is critical in informal rural areas but these are often not available. This hampers

coverage checks and may result in incomplete customer information in certain areas.

5. INDIGENT GRANTS

It is important that Indigent Management is implemented in parallel with the Debt

Collection and with Credit Control programmes.

A further requirement for managing indigents is that many people that can pay

services simply do not pay claiming that they are indigent. This is normally picked up

through the indigent registration process.

5.1 Legislative requirements

The Municipal Systems Act (Act No 32 of 2000) requires that:

S 74 Tariff policy

(1) A municipal council must adopt and implement a tariff policy on the levying of fees for

municipal services provided by the municipality itself or by way of service delivery

agreements, and which complies with the provisions of this Act, the Municipal Finance

Management Act and any other applicable legislation. [Sub-s. (1) substituted by s. 10 of Act

44 of 2003.]

(2) A tariff policy must reflect at least the following principles, namely that-

(a) users of municipal services should be treated equitably in the application of tariffs

Page 19: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 18

(b) the amount individual users pay for services should generally be in proportion to their

use of that service;

(c) poor households must have access to at least basic services through-

(i) tariffs that cover only operating and maintenance costs,

(ii) special tariffs or life line tariffs for low levels of use or consumption

of services or for basic levels of service; or

(iii) any other direct or indirect method of subsidisation of tariffs for

poor households;

(d) tariffs must reflect the costs reasonably associated with rendering the service, including

capital, operating, maintenance, administration and replacement costs, and interest

charges;

(e) tariffs must be set at levels that facilitate the financial sustainability of the service, taking

into account subsidisation from sources other than the service concerned;

(f) provision may be made in appropriate circumstances for a surcharge on the tariff for a

service;

(g) provision may be made for the promotion of local economic development through

special tariffs for categories of commercial and industrial users;

(h) the economical, efficient and effective use of resources, the recycling of waste, and other

appropriate environmental objectives must be encouraged;

(i) the extent of subsidisation of tariffs for poor households and other categories of users

should be fully disclosed.

(3) A tariff policy may differentiate between different categories of users, debtors, service

providers, services, service standards, geographical areas and other matters as long as the

differentiation does not amount to unfair discrimination.

5.2 The challenges

In terms of the legal requirements referred to above, municipalities are obligated to

implement strategies, policies, and procedures to give effect to the requirements of

law. The main challenges to implementation include:

- Budgetary constraints;

- Capacity shortages;

- Inconsistent application of evaluation criteria when evaluating applications;

- No verification of the correctness of information supplied;

Page 20: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 19

- Role confusion relating to the different aspects of the process, e.g., debates

between Finance and Technical Departments on the responsibility of handling

certain portions of the process;

- Large and growing number of backlogs of applications;

- High potential for fraud as no audit trail is in place to track applications,

approvals, and payments;

- poor utilisation of the information obtained for the formulation of local

economic development initiatives and other strategies.

5.3 How indigent grants should be managed

This is required to be addressed in the Indigent Policy of Umdoni Municipality.

6. DEBT COLLECTION

Debt collection and service delivery are the two greatest challenges facing local

government in South Africa. Consumers owe local government billions of rand and

the figure keeps growing at an alarming rate. The fact that not only household

consumers but also businesses and the government itself are in arrears

demonstrates that debt collection practices are inadequate and that the factors that

underlie the reasons for, and consequences of, non-payment are not fully understood

and have not been sufficiently addressed in a disciplined manner.

The high level of outstanding debt is not only having serious negative consequences

on the cash flow of most municipalities, but also holds a much greater threat. Since

the bulk of municipal income comes from payment for services, municipal incomes

are becoming increasingly depleted. This means that municipalities are becoming

increasingly unable to either sustain actual service delivery or maintain the existing

service infrastructure, let alone undertake new development work to meet the needs

of the poor. Thus, if the pattern of non-payment persists and discipline in the form of

regular payments is not restored, municipalities will not be able to deliver on national

developmental priorities on a sustainable basis and the consequences will jeopardise

the very livelihood of the communities they are supposed to serve.

6.1 Legislative requirements

The Municipal Systems Act (Act No 32 of 2000) requires:

Page 21: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 20

S(96) Debt collection responsibility of municipalities

A municipality-

(a) Collect all money that is due and payable to it, subject to this Act, and any

other applicable legislation

Page 22: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 21

6.2 Why is there a huge debt problem in local government?

The reasons for municipalities not collecting their debts are numerous and varied.

Research and the collective practical information gained from the implementation of

various debt collection projects and programmes undertaken throughout South Africa

indicates that the main reasons for poor debt collection include the following:

- Lack of political will to enforce credit control measures, due to:

- Lack of accurate data on which credit control measures can be taken;

- Credit control measures being taken on indigent households; and

- Councillors influencing the operations of officials;

- Lack of skills and capacity to manage the collection of outstanding debt;

- Lack of adequate debt collection administration systems;

- Lack of integration and co-ordination among the financial management, credit

control, and debt collection systems within municipalities; and

- Incorrect interpretation of legislation pertaining to credit control and debt

collection procedures.

6.3 Delivery options

Municipalities have several options on how to address debt collection. The following

are the most common.

- An ‘in-house’ approach. Using this approach, the municipality physically

undertakes debt collection itself. In the long term, this is probably the most cost-

efficient and sustainable solution. Rapid rising municipal debt arrears — as a

result of a current lack of capacity within most municipalities throughout South

Africa — and a foreseeable absence of trained personnel, experience, and

appropriate debt collection systems remain a serious challenge.

- A ‘co-sourcing’ approach. With this approach, the municipality is assisted by

outsourcing certain aspects of the debt collection process. A major benefit is the

transfer of skills, thus enabling the municipality to build up a sustainable debt

collection capacity in the longer term.

- A ‘full-outsourcing’ approach. Here the municipality appoints a firm of

professional debt collectors, who should be registered members of the Council

for Debt Collectors, to undertake all debt collection. The main advantages of this

approach are that it is short term, low cost, and low risk to the municipality, since

the debt collector is only paid a commission on the monies that are collected.

Page 23: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 22

However, the full-outsourcing approach could be adjusted over time to a co-

sourcing approach. With the experience gained through this process, together

with skills transfer, an in house approach could be developed and integrated

within the municipality‟s own accounting and management systems.

It is essential, however, that the debt collection process is integrated with the credit

control and indigent grant management processes.

6.4 Important elements of the debt collection process

The intention of debt collection is twofold: to collect monies due to the municipality

and to rehabilitate the debtor to ensure that the municipality reaps the benefit of the

annuity cash flow going forward. The value of regular payments outstrips the value of

part collections.

Many municipalities engage in aggressive debt collection exercises with very little

impact because of poor data. This process is both costly and time consuming for the

municipality and could result in poor community council relations.

The ability to collect debt remains dependent on the accuracy of the debtor

information. Inaccurate debt information results in poor debt collection. The following

information is critical to the collection process.

- Is the customer information correct?

- Is the account information correct?

- Have the correct tariffs been applied?

- Is the outstanding amount correct?

- Is the usage correct?

- Property valuations

- Have all outstanding credits been passed?

- Does the customer still exist?

- Is the customer indigent?

It is only once this information is correct that municipalities can implement action to

collect the debt and communicate with the debtor. Debt collection without accurate

information may result in partial collections, if any, and a debtor that is not fully

rehabilitated could continue to default.

Page 24: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 23

It is only once the debtor information has been cleaned and it is established that the

customer does exist and can pay that the municipality can effectively implement a

credit control policy and debt collection process.

6.5 Debt collection process

This is required to be detailed and implemented in accordance with the municipality‟s

debt collection policy.

7. GRANT FUNDING

7.1 Existing Grants

In order to ensure that conditional grants are continuously being received the

municipality must ensure that all requirements, conditions, and legislations relating to

grants are totally met. To ensure this the user department must develop and

implement a detailed action plan and ensure that all the necessary requirements and

controls are being adhered to.

7.2 Applications for additional Grant Funding

Umdoni Municipality should always be in the lookout, and continuously have

strategies and plans in place, to secure grant funding. This should be a collective

approach and a „‟thinking out of the box‟‟ approach should be used.

8. ALTERNATIVE REVENUE SOURCES.

One of the key fundamentals in ensuring developmental local government is to

ensure that developmental infrastructure is in place for provision of services

and to support Local Economic Development in the Municipality.

To maximise infrastructure investment beyond both the equitable share and

MIG allocations, the Municipality will adopt a „Rain Maker‟ approach to finding

alternative sources of capital funding. This will be done by identifying

programs/projects in the IDP and commission either internally or externally experts

to source funding for such projects from different funders.

To ensure sustainability however clear guidelines for business plan

development will be issued to ensure that proper consideration is given for the

following;

Page 25: UMDONI MUNICIPALITY ENHANCEMENT... · 2019. 11. 1. · 4.1.3 How data cleansing is done The data cleansing process is divided into three stages: (a) Database Data Cleansing. (b) Returned

Adopted by Council on 25 June 2014 24

- Implications of such projects/programs on future revenue,

- Implications on maintenance; and

- Implications on operational budget.

9. CREDIT CONTROL POLICY

An important aspect of revenue enhancement is having a good Credit Control Policy

which is compiled with.

10. POLICY ADOPTION

This policy has been considered and approved by the Council of UMDONI LOCAL

MUNICIPALITY on this 25th day of June 2014.