“RUMAH TYPE CARLA
69/96”PT. METROPOLITAN
LAND TBKPROYEK METLAND
MENTENGDISUSUN OLEH:NAMA : HESTI ROMADHONINIS : 2972NO/KELAS : 13/XII TGB ASMK N 2 WONOGIRI
![Page 2: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/2.jpg)
PT. METROPOLITAN LAND
TBKPT METROPOLITAN LAND TBK MERUPAKAN PERUSAHAAN YANG BERFOKUS PADA PENGEMBANGAN PERUMAHAN DAN KOMERSIAL. PERUSAHAAN INI DIDIRIKAN PADA TANGGAL 16 FEFRUARI 1994 DAN MULAI BEROPRASI PADA TANGGAL 28 OKTOBER 1994. MENCAPAI SERTIFIKASI ISO 9001:200 DARI SISTEM REGISTRAR SERIKAT PADA TAHUN 2004.
![Page 3: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/3.jpg)
MENJADI DEVELOPER TERKEMUKA DAN TERPERCAYA MELALUI TUJUAN KERJA DAN PERILAKU.
MENENTUKAN TINGGI KUALITAS PRODUK SESUAI DENGAN SPESIFIKASI HARGA WAJAR/KOMPETITIF, PENGIRIMAN TEPAT WAKTU.
SESUAI JANJI, JANGAN PERNAH MENYESATKAN, TEPAT SEPERTI YANG DIPERINTAHKAN.
VISI
![Page 4: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/4.jpg)
KAMI BERKOMITMEN UNTUK MEMBERIKAN KUALITAS PROPERTI PERUMAHAN DAN KOMERSIAL UNTUK KEPUASAN PELANGGAN.
KAMI BERINVESTASI DI PROPERTI DENGAN IMBALAN HASIL MENARIK.
KAMI BERPEGANG PADA TUJUAN FINANCIAL YANG MEMPERTAHANKAN PENGEMBALIAN TINGKAT MODAL TINGGI YANG DAPAT MENINGKATKAN NILAI INVESTASI PEMEGANG SAHAM.
MISI
![Page 5: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/5.jpg)
“RUMAH TYPE CARLA 69/96”PT METROPOLITAN LAND TBKPROYEK METLAND MENTENG
![Page 6: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/6.jpg)
STRUKTUR PROYEK METLAND MENTENG
Tahap 1
Metland Menteng
Tahap 2
Taman Tjikini Cluster Harmoni·Gladiola
·Caliandra
·Mergareta
·Algania
·Cordia
Cluster Valeria·Regina
·Valbo
·Sienna
·Celsa
·Cascabella
·Calia
·Valeria
Cluster Teresta·Florice
·Jasmine
·Carla
·Stella
![Page 7: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/7.jpg)
SITE PLAN CARLA 69/96INDONESIA MEMILIKI KARAKTER
IKLIM TROPIS. POSISI RUMAH PADA UMUMNYA ADALAH MENGHADAP TIMUR ARAH CAHAYA MATAHARI PAGI. AKAN TETAPI DESAIN RUMAH TYPR CARLA INI MENGHADAP SELATAN DAN UTARA. SERTA MEMILIKI LUAS LAHAN 6 m x 16 M (96 m).
![Page 8: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/8.jpg)
LUAS RUANGANa. R. TIDUR UTAMA + KM/WC = 100% x 3 x 6 = 18b. R. TIDUR = 100% x 3 x 3 = 9c. R. TAMU = 100% x 2,55 x 3 =
7,65d. R. KELUARGA = 100% x 3,3 x 3 =
9,9e. DAPUR + R. MAKAN = 100% x 3,3 x 3 =
9,9f. KM/WC = 100% x 1,43 x 2 =
2,86g. TERAS DEPAN = 50% x 1,2 x 2,1 =
1,26h. TERAS BELAKANG = 50% x 0,8 x 1 =
0,4i. BALKON = 75% x 1,2 x 2,1 =
1,89j. CARPORT = 50% x 3 x 5 =
7,5 68,4 69
![Page 9: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/9.jpg)
PENGATURAN RUANG
KETERANGAN :: RUANG PUBLIK: RUANG SEMI
PUBLIK: RUANG PRIVAT: RUANG SERVICE
![Page 10: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/10.jpg)
STRUKTUR BANGUNAN
PADA RUMAH TYPE CARLA INI MENGGUNAKAN 280X280X280 CM DAN BESI TULANGAN UTAMA 13 MM. PENGERJAANNYA DENGAN MESIN BOR. DI ATAS PONDASI BOR MINI ADA BLOK BETON (PILE CAP). PILE CAP INI MERUPAKAN MEDIA UNTUK MENGIKAT KOLOM DAN SLOOF.
PONDASI
![Page 11: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/11.jpg)
SLOOF
SLOOF YANG DIGUNAKAN BERUKURAN 20/15 CM DENGAN DIAMETER TULANGAN 13 MM DAN SENGKANG8-200 MM.
![Page 12: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/12.jpg)
KOLOMKOLOM YANG DIGUNAKAN ADA 2 JENIS YAITU KOLOM STRUKTUR UKURAN 40/13 DENGAN DIAMETER TULANGAN 13 MM SENGKANG 6-200 MM DAN KOLOM PRAKTIS UKURAN 13/13 DENGAN DIAMETER TULANGAN 13 MM SENGKANG 6-200 MM.
![Page 13: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/13.jpg)
TANGGAPLAT LANTAI MENGGUNAKAN BETON DENGAN KETEBALAN 12 CM. FINISHING PENUTUP LANTAI MENGGUNAKAN KERAMIK 60 X 60 CM, 25 X 25 CM, 20 X 20 CM, DAN 33 X 33 CM.
![Page 14: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/14.jpg)
RANGKA ATAPATAP YANG DIGUNAKAN
BERBENTUK LIMAS DENGAN
KONSTRUKSI BAJA RINGAN DAN
SUDUT KEMIRINGAN 35 . BAHAN
PENUTUP ATAP MENGGUNAKAN
PLAT BETON.
![Page 15: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/15.jpg)
DINDINGRUMAH INI MENGGUNAKAN PASANGAN BATU BATA DENGAN FINISHING DIACI DAN DICAT. PADA FASAT DEPAN FINISHING DINDING DIPADUKAN DENGAN BATU ALAM DAN KAMPROT HALUS
![Page 16: Tugas Akhir SMK N 2 Wonogiri "Rumah type carla 69" by Hesti Romadhoni](https://reader030.vdocuments.mx/reader030/viewer/2022020301/587942d91a28ab23468b699d/html5/thumbnails/16.jpg)
ADA PERTANYAAN
….?