![Page 1: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/1.jpg)
Members
Jim Desmond, Chair Vice Chair, County of San Diego (Representing County of San Diego)
Bill Sandke, Vice Chair Councilmember, City of Coronado (Representing South County)
Monica Montgomery Councilmember, City of San Diego
Bill Baber Councilmember, City of La Mesa (Representing East County)
Jewel Edson Mayor, City of Solana Beach (Representing North County Coastal)
Paul McNamara Mayor, City of Escondido (Representing North County Inland)
Bill Sandke Metropolitan Transit System
Jack Feller North County Transit District
Johanna Schiavoni San Diego County Regional Airport Authority
Garry Bonelli Commissioner, Port of San Diego
Alternates
Judy Ritter Mayor, City of Vista (Representing North County Inland)
Mary Salas Mayor, City of Chula Vista (Representing South County)
Chris Ward Councilmember, City of San Diego
Greg Cox Chair, County of San Diego
Nathan Fletcher Supervisor, County of San Diego
Jennifer Mendoza Councilmember, City of Lemon Grove (Representing East County)
Joe Mosca Councilmember, City of Encinitas (Representing North County Coastal)
Vacant Metropolitan Transit System
Sharon Jenkins / Terry Gaasterland North County Transit District
Mark West San Diego County Regional Airport Authority
Michael Zucchet Commissioner, Port of San Diego
Advisory Members
Gustavo Dallarda / Ann Fox Caltrans District 11
Erica Pinto, Jamul Fred Nelson, Jr., La Jolla Southern California Tribal Chairmen’s Association
Hasan Ikhrata Executive Director, SANDAG
Transportation Committee Agenda
Friday, June 5, 2020 9 a.m. to 12 noon
**Teleconference Meeting**
Agenda Highlights • ANNUAL REPORT TO LEGISLATURE ON PUBLIC TRANSIT
• TRANSPORTATION DEVELOPMENT ACT: FY 2020 PRODUCTIVITY IMPROVEMENT PROGRAM AND FY 2021 ALLOCATIONS
• DEL MAR BLUFFS LONG-TERM ALTERNATIVES MEETING ANNOUNCEMENT AMIDST COVID-19 PANDEMIC:
The SANDAG Transportation Committee meeting, will be conducted virtually in accordance with Governor Newsom’s State of Emergency declaration regarding the
COVID-19 outbreak, Executive Order N-29-20, and the Guidance for Gatherings issued by the California Department of Public Health. Members will primarily participate in the meeting virtually, while practicing social distancing, from
individual remote locations. There are a few options for public participation:
- Listen to the meeting audio stream through sandag.org - Observe the Transportation Committee meeting via GoToMeeting (registration required)
To register for the GoToMeeting webinar, follow the prompts to enter your name and email address. Members of the public who prefer not to share their names with SANDAG may use initials or a pseudonym; however, to receive a confirmation email,
including a link to join the webinar, you will need to enter a valid email address. On the morning of the meeting, click the “Join Webinar” link in the confirmation
email. To avoid connection issues, check your system requirements in advance. During the GoToMeeting webinar: To minimize/expand the webinar attendee
panel, click on the orange arrow at the top right corner of your screen. Attendees will be in “listen only” mode. View GoToMeeting FAQs for additional information.
SANDAG is relying on commercial technology to broadcast the meeting via GoToWebinar. With the recent increase of virtual meetings, platforms such as Microsoft Teams, WebEx, GoToMeeting, and Zoom are working to scale their
systems to meet the new demand. If we experience technical difficulty or you are unexpectedly disconnected from the broadcast, please close and re-open your
browser and click the link to re-join the meeting. SANDAG staff will take all possible measures to ensure a publicly accessible experience. Please note that the meeting will continue to be broadcast audio-only via the “Listen to the meeting” link on
www.sandag.org.
Public Comments: Persons who wish to address the members on an item to be considered at this meeting, or on non-agendized issues, may email comments to the
Clerk at [email protected] (please reference: “June 5, Transportation Committee Meeting” in your subject line and identify the item number(s) to which your
comments pertain). Comments received by 4 p.m. on Thursday, June 4, will be provided to members prior to the meeting. Comments received during the meeting
will be read into the record at the appropriate time for public comments. All comments received prior to the close of the meeting will be made part of the
meeting record.
![Page 2: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/2.jpg)
2 040320
Welcome to SANDAG. Members of the public may speak to the Transportation Committee on any item at the time the Committee is considering the item. Public speakers are limited to three minutes or less per person. The Committee may only take action on any item appearing on the agenda.
In order to keep the public informed in an efficient manner and facilitate public participation, SANDAG also provides access to all agenda and meeting materials online at sandag.org/meetings. Additionally, interested persons can sign up for email notifications at sandag.org/subscribe.
SANDAG operates its programs without regard to race, color, and national origin in compliance with Title VI of the Civil Rights Act. SANDAG has developed procedures for investigating and tracking Title VI complaints, and the procedures for filing a complaint are available to the public upon request. Questions concerning SANDAG nondiscrimination obligations or complaint procedures should be directed to the SANDAG General Counsel, John Kirk, at (619) 699-1997 or [email protected]. Any person who believes himself or herself or any specific class of persons to be subjected to discrimination prohibited by Title VI also may file a written complaint with the Federal Transit Administration.
In compliance with the Americans with Disabilities Act (ADA), SANDAG will accommodate persons who require assistance in order to participate in SANDAG meetings. If such assistance is required, please contact the SANDAG ADA Coordinator, the Director of Diversity and Equity, at (619) 699-1900, at least 72 hours in advance of the meeting. To request this document or related reports in an alternative format, please call (619) 699-1900 or (619) 699-1904 (TTY), or fax (619) 699-1905.
SANDAG agenda materials can be made available in alternative languages. To make a request, call (619) 699-1900 at least 72 hours in advance of the meeting.
Los materiales de la agenda de SANDAG están disponibles en otros idiomas. Para hacer una solicitud, llame al (619) 699-1900 al menos 72 horas antes de la reunión.
如有需要, 我们可以把SANDAG议程材料翻译成其他語言.
请在会议前至少 72 小时打电话 (619) 699-1900 提出请求.
Mission Statement The 18 cities and county government are SANDAG serving as the forum for regional decision-making. SANDAG
builds consensus; makes strategic plans; obtains and allocates resources; plans, engineers, and builds public transit; and provides information on a broad range of topics pertinent to the region’s quality of life.
San Diego Association of Governments ⋅ 401 B Street, Suite 800, San Diego, CA 92101-4231
(619) 699-1900 | Fax (619) 699-1905 | sandag.org
![Page 3: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/3.jpg)
3
Transportation Committee Friday, June 5, 2020
Item No. Action
+1. Approval of Meeting Minutes Approve
The Transportation Committee is asked to review and approve the minutes from its April 17, 2020, meeting.
2. Public Comments/Communications/Member Comments
Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation Committee (Committee) on any issue within the jurisdiction of SANDAG that is not on this agenda. Other public comments will be heard during the items under the heading “Reports.” Persons who wish to address the Committee on an item to be considered at this meeting, or on non-agendized issues, may email comments to the Clerk at [email protected] (please reference: “June 5, Transportation Committee Meeting” in your subject line and identify the item number(s) to which your comments pertain). Comments received by 4 p.m., on Thursday, June 4, will be provided to Committee members prior to the meeting. Comments received during the meeting will be read into the record at the appropriate time for public comments. All comments received prior to the close of the meeting will be made part of the meeting record. Committee members also may provide information and announcements under this agenda item.
3. Executive Director's Report
Hasan Ikhrata, SANDAG
Discussion
An update on key programs, projects, and agency initiatives, including the agency’s response to COVID-19, San Diego Forward: The 2021 Regional Plan, and the Airport Connectivity project, will be presented.
Reports
+4. Annual Report to Legislature on Public Transit
Jennifer Williamson, SANDAG
Recommend
The Transportation Committee is asked to recommend that the Board of Directors approve submission of the Annual Public Transit Report to the State Legislature.
+5. Transportation Development Act: FY 2020 Productivity Improvement Program and FY 2021 Allocations
Lisa Madsen, SANDAG
Recommend
An overview of the efforts taken by the Metropolitan Transit System (MTS) and North County Transit District (NCTD) to implement the FY 2020 Transportation Development Act (TDA) Productivity Improvement Program will be presented. The Transportation Committee is asked to recommend that the Board of Directors approve the eligibility of MTS and NCTD to receive their FY 2021 TDA allocations of funds.
![Page 4: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/4.jpg)
4
+6. Comprehensive Multimodal Corridor Plans
Richard Chavez, SANDAG
Discussion/Possible Action
An overview of the Comprehensive Multimodal Corridor Plans (CMCPs) program to refine and prioritize transportation solutions on five priority corridors using a policy, data, and collaboration-driven approach will be presented.
+7. Del Mar Bluffs Long-Term Alternatives
Linda Culp, SANDAG
Discussion/Possible Action
An overview of the current conditions and efforts underway to develop a long-term solution for rail infrastructure for the LOSSAN Rail Corridor in the City of Del Mar will be presented.
8. Continued Public Comments
If the five-speaker limit for public comments was exceeded at the beginning of this agenda, other public comments will be taken at this time. Subjects of previous agenda items may not again be addressed under public comment.
9. Upcoming Meetings Information
The next Transportation Committee meeting is scheduled for Friday, June 19, 2020, at 9 a.m.
10. Adjournment
+ next to an item indicates an attachment
![Page 5: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/5.jpg)
Transportation Committee Item: 1 June 5, 2020
April 17, 2020, Transportation Committee Meeting Minutes
Chair Jim Desmond (County of San Diego) called the meeting of the Transportation Committee to order at 9 a.m.
1. Approval of Meeting Minutes (Approve)
Action: Upon a motion by Commissioner Garry Bonelli (Port of San Diego [Port]), and a second by Vice Chair Bill Sandke (South County), the Transportation Committee approved the minutes from the March 6, 2020, meeting, as amended. Yes: Chair Desmond, Vice Chair Sandke, Councilmember Monica Montgomery (City of San Diego), Councilmember Bill Baber (East County), Mayor Jewel Edson (North County Coastal), Mayor Paul McNamara (North County Inland), Deputy Mayor Jack Feller (North County Transit District [NCTD]), Commissioner Bonelli, and Joanna Schiavoni (San Diego County Regional Airport Authority [SDCRAA]). No: None. Abstain: None. Absent: Metropolitan Transit System [MTS]).
2. Public Comments/Communications/ Member Comments
None.
3. Executive Director's Report (Discussion)
Executive Director Hasan Ikhrata presented an update on key programs, projects, and agency initiatives, including the agency’s response to COVID-19, San Diego Forward: The 2021 Regional Plan and the Airport Connectivity project.
Action: Discussion only.
Reports
4A. Independent Taxpayer Oversight Committee Report: Initial Findings and Recommendations (Discussion)
ITOC Chair Kai Ramer introduced the item.
Associate Accountant Samuel Diche and Jennifer Farr, Davis Farr LLP, presented an overview of the initial findings and recommendations of the FY 2019 TransNet Fiscal and Compliance Audit.
Action: Discussion only.
4B. FY 2019 TransNet Extension Ordinance Funding Eligibility Request (Recommend)
Samuel Diche presented the item.
Action: Upon a motion by Mayor Edson, and a second by Vice Chair Sandke, the Transportation Committee recommended that the Board of Directors, acting as the San Diego County Regional Transportation Commission, approved the TransNet funding eligibility request of the North County Transit District. Yes: Chair Desmond, Vice Chair Sandke, Councilmember Montgomery, Councilmember Baber, Mayor Edson, Mayor McNamara, Deputy Mayor Feller, Commissioner Bonelli, and Joanna Schiavoni. No: None. Abstain: None. Absent: MTS.
Action: Approve
The Transportation Committee is asked to approve the minutes from its April 17, 2020, meeting.
![Page 6: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/6.jpg)
2
5. State and Federal Discretionary Programs: Proposed SANDAG Submittals (Approve)
Senior TransNet Program Manager Ariana zur Nieden presented the item.
Action: Upon a motion by Vice Chair Sandke, and a second by Mayor McNamara, the Transportation Committee approved the proposed slate of SANDAG projects for submittal to the U.S. Department of Transportation FFY 2020 BUILD Grant Program, and state SB 1 Trade Corridor Enhancement, Solutions for Congested Corridors; and Local Partnership Programs. Yes: Chair Desmond, Vice Chair Sandke, Councilmember Montgomery, Councilmember Baber, Mayor Edson, Mayor McNamara, Deputy Mayor Feller, Commissioner Bonelli, and Joanna Schiavoni. No: None. Abstain: None. Absent: MTS.
6. Continued Public Comments
None.
7. Upcoming Meetings
Chair Desmond announced the cancellation of the Transportation Committee meeting scheduled for Friday, May 1, 2020. The next Transportation Committee meeting is scheduled for Friday, May 15, 2020, at 9 a.m.
8. Adjournment
Chair Desmond adjourned the meeting at 10:17 a.m.
![Page 7: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/7.jpg)
Meeting Start Time: 9 a.m. Meeting Adjourned Time: 10:17 a.m.
3
Confirmed Attendance at Transportation Committee Meeting
Jurisdiction Name Member/ Alternate
Attended
County of San Diego
Jim Desmond, Chair Member Yes
Greg Cox Alternate No
Nathan Fletcher Alternate No
South County Bill Sandke, Vice Chair Member Yes
Mary Salas Alternate No
City of San Diego Monica Montgomery Member Yes
Chris Ward Alternate No
East County Bill Baber Member Yes
Jennifer Mendoza Alternate Yes
Metropolitan Transit System Bill Sandke Member No
Vacant Alternate No
North County Coastal Jewel Edson Member Yes
Joe Mosca Alternate Yes
North County Inland Paul McNamara Member Yes
Judy Ritter Alternate Yes
North County Transit District
Jack Feller Member Yes
Sharon Jenkins Alternate No
Terry Gaasterland Alternate No
Port of San Diego Garry Bonelli Member Yes
Michael Zucchet Alternate No
San Diego County Regional Airport Authority
Johanna Schiavoni Member Yes
Mark West Alternate No
Advisory Members
Caltrans Gustavo Dallarda Member Yes
Ann Fox Alternate No
Southern California Tribal Chairmen’s Association
Erica Pinto Member No
Fred Nelson, Jr. Member No
Other Attendees
NCTD Matt Tucker Yes
MTS Paul Jablonski Yes
![Page 8: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/8.jpg)
Transportation Committee Item: 4 June 5, 2020
Annual Report to Legislature on Public Transit
Overview
Assembly Bill 805 (AB 805) (Gonzalez, 2017) requires the Board of Directors to provide a report, developed through the Transportation Committee, to the State Legislature on or before July 1 of each year that outlines the region’s public transit needs, transit funding criteria, recommended transit funding levels, additional work on public transit, and specifies the funds spent explicitly on public transportation.
Key Considerations
This report is a reflection of the public transit system that was in place in FY 2019. Over the past several years, the San Diego region had seen a decline in public transit ridership despite significant investments such as the launch of Rapid services, implementation of Interstate 15 (I-15) Centerline stations, and improvements at Oceanside Transit Center and other stations throughout the region. Technology changes, shared mobility, and new modes being used for travel have influenced a decline in the number of people taking transit. In response to these challenges, the Metropolitan Transit System (MTS) implemented its Transit Optimization Plan in 2018 to streamline services and increase frequencies on many Trolley and bus routes such as SuperLoop Rapid and the Blue Line Trolley; the North County Transit District (NCTD) initiated two studies to undertake a comprehensive operations analysis and long range strategic plan, and investigate opportunities for the integration of land use and transit in North County.
This systemwide ridership resurgence is reflected in the 1.2 million ridership increase on the MTS bus and Trolley in the first six months of FY 2020 over the same months in 2018. NCTD experienced overall ridership productivity gains on the Sprinter in FY 2020. These gains are a harbinger of people’s willingness to take transit when it is an accessible and competitive option to driving alone. It is important to note that these trends are only reflective of what occurred in FY 2019 and early FY 2020. Recent experience with the COVID-19 pandemic is already resulting in a substantial downtrend in all major performance indicators for both operators.
In concert with the operators’ efforts, long range planning must also adapt to the modern transportation landscape. SANDAG is developing a bold new vision for the region’s transportation system for the Board’s consideration. This vision will focus on creating a more complete system, one in which a comprehensive public transit system complements a more efficient highway system to connect people from where they live to where they work, go to school, shop, and play.
As SANDAG builds its next Regional Plan, it continues to advance public transportation projects that will help realize that vision. The attached report provides an overview of the existing conditions that public transit operates in and includes five primary elements, covered in a series of appendices, that reflect this commitment toward a fully realized public transportation system – one that is integrated with a more complete transportation system overall (Attachment 1).
Fiscal Impact:
The Annual Report on Public Transit is funded in the FY 2020 Program Budget through Overall Work Plan Element No. 3321000: Advanced Planning.
Schedule/Scope Impact:
Assembly Bill 805 requires that SANDAG submit an annual report on public transit to the State Legislature by July 1 of each year.
Action: Recommend
The Transportation Committee is asked to recommend that the Board of Directors approve submission of the Annual Public Transit Report to the Legislature.
![Page 9: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/9.jpg)
2
Next Steps
Pending recommendation by the Transportation Committee, the Board is scheduled to consider the report at its June 12, 2020, meeting for submission to the State Legislature.
Coleen Clementson, Director of Regional Planning
Key Staff Contacts: Jennifer Williamson, (619) 699-1959, [email protected] Irene McCormack, (619) 699-1960, [email protected]
Attachment: 1. FY 2019 Annual Report to the California State Legislature on Public Transit in the San Diego Region
![Page 10: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/10.jpg)
JUNE 2020
FY 2019 ANNUAL REPORT TO THE LEGISLATURE ON PUBLIC TRANSIT IN THE SAN DIEGO REGION
Assembly Bill 805 (AB 805) (Gonzalez, 2017) requires the Board of Directors to provide an annual report, developed through the Transportation Committee, to the State Legislature that outlines the region’s efforts to support public transportation. The legislation, its criteria, and all required data are detailed in this report’s appendices.
As the San Diego Association of Governments (SANDAG) continues to advance public transit and report its progress for FY 2019 as required by law, the San Diego region and municipalities across the country face several challenges. Carbon emissions from passenger vehicles continue to increase, traffic congestion continues to worsen, and not enough people are choosing public transit over driving.
In the last two years, the Los Angeles-San Diego-San Luis Obispo Rail Corridor (LOSSAN) Rail Corridor that runs along the San Diego County’s north coastal area, experienced damage due to cliff erosion that closed the tracks for several days. The damage happened in the area known as the Del Mar Bluffs. This is significant because the LOSSAN Rail Corridor is the second busiest intercity rail corridor in the nation supporting commuter, intercity, and freight rail services. Emergency construction crews were dispatched to stabilize the bluffs while SANDAG and North County Transit District (NCTD) leadership worked with state officials to accelerate plans to relocate the tracks inland, launching the LOSSAN San Diego Regional Rail Corridor Working Group.
The LOSSAN Rail Corridor resiliency – once considered a long-term challenge – has been elevated to the forefront of the region’s transportation concerns.
During FY 2019 construction on the Mid-Coast Trolley project reached its halfway point. The project will extend the UC San Diego Blue Line Trolley 11-miles north along Interstate 5, from Downtown San Diego to UC San Diego and the University community. The $2.1 billion project is the largest transit infrastructure project ever developed in the San Diego region. There are nine new stations and it is projected to attract 21,000 new daily transit riders.
In recent years, technology changes, shared mobility, and new modes being used for travel have influenced a decline in the number of people taking transit. In response to these challenges, the Metropolitan Transit System (MTS) implemented its Transit Optimization Plan in 2018 to streamline services and increase frequencies on many Trolley and bus routes such as SuperLoop Rapid and the Blue Line Trolley; NCTD initiated two studies to undertake a comprehensive operations analysis and long range strategic plan, and investigate opportunities for the integration of land use and transit in North County.
This systemwide ridership resurgence is reflected in the 1.2 million ridership increase on the MTS bus and Trolley in the first six months of FY 2020 over the same months in 2018. NCTD experienced overall ridership productivity gains on the Sprinter in FY 2020. These gains are a harbinger of people’s willingness to take transit when it is an accessible and competitive option to driving alone.
While this report focuses on past statistics, it is relevant to note that today the world faces a new and perilous challenge: the ongoing COVID-19 pandemic. In California, mandatory shelter-in-place measures have led to an economic downturn, high unemployment, and stalled local tax revenues for public projects in the short term. The fall in sales tax revenue will impact one of our region’s primary financial instruments for raising and leveraging local tax dollars for public transit projects: the TransNet half-cent sales tax. This could lead to the delay or postponement of projects and programs across our region. Even with these challenges, our region is planning for long-term improvements and enhancing public transit options on the ground now.
Attachment 1
3
![Page 11: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/11.jpg)
JUNE 2020
2
FY 2019 ANNUAL REPORT TO THE LEGISLATURE ON PUBLIC TRANSIT IN THE SAN DIEGO REGION
To address challenges such as eroding bluffs, a housing shortage, community health concerns, and meeting ambitious Greenhouse Gas reduction goals, SANDAG must design a transportation system that uses interconnected strategies to improve every step of a traveler’s journey. SANDAG’s vision for the 2021 Regional Plan provides a framework focused on designing a system to holistically meet the needs of diverse users. SANDAG developed a set of strategies called the 5 Big Moves. Using the 5 Big Moves SANDAG is building a plan for a bold new regional transportation system that is safe, convenient, considers all users of the system, and meets state climate mandates. Complete Corridors, Transit Leap, Mobility Hubs, Flexible Fleets, and the Next Operating System, when combined, will deliver a fully-integrated system that provides compelling alternatives to the private automobile and frees up space on roadways.
Our commitment to long-term planning will continue to be a top priority. SANDAG will adapt to any long-term economic and societal changes resulting from the COVID-19 pandemic, such as a potential increase in telework, while staying focused on our goal: making public transportation more efficient, more convenient, and more accessible than it is today.
4
![Page 12: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/12.jpg)
3
Appendices
APPENDIX A: Public Transit Needs................................................................................................................... 4
APPENDIX B: Transit Funding Criteria ............................................................................................................ 14
APPENDIX C: Additional Work on Public Transit ............................................................................................ 17
APPENDIX D: Recommended Transit Funding Levels ..................................................................................... 19
APPENDIX E: Funds Spent on Public Transit (FY 2019) ................................................................................... 21
Section 9795
Section 9795 of the California State Government Code states the following:
(a)(1) Any report required or requested by law to be submitted by a state or local agency to the Members of either house of the Legislature generally, shall instead be submitted as a printed copy to the Secretary of the Senate, as an electronic copy to the Chief Clerk of the Assembly, and as an electronic or printed copy to the Legislative Counsel. Each report shall include a summary of its contents, not to exceed one page in length. If the report is submitted by a state agency, that agency shall also provide an electronic copy of the summary directly to each member of the appropriate house or houses of the Legislature. Notice of receipt of the report shall also be recorded in the journal of the appropriate house or houses of the Legislature by the secretary or clerk of that house.
(2) In addition to and as part of the information made available to the public in electronic form pursuant to Section 10248, the Legislative Counsel shall make available a list of the reports submitted by state and local agencies, as specified in paragraph (1). If the Legislative Counsel receives a request from a member of the public for a report contained in the list, the Legislative Counsel is not required to provide a copy of the report and may refer the requester to the state or local agency that authored the report, or to the California State Library as the final repository of public information.
(b) No report shall be distributed to a Member of the Legislature unless specifically requested by that Member.
(c) Compliance with subdivision (a) shall be deemed to be full compliance with subdivision (c) of Section 10242.5 .
(d) A state agency report and summary subject to this section shall include an Internet website where the report can be downloaded and telephone number to call to order a hard copy of the report.
A report submitted by a state agency subject to this section shall also be posted at the agency's Internet website.
(e) For purposes of this section, “report” includes any study or audit.
5
![Page 13: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/13.jpg)
4
APPENDIX A: Public Transit Needs
A comprehensive list of transit projects identified by SANDAG and the region’s transit operators that would meet the transit needs of the San Diego region is included in the 2019 Federal Regional Transportation Plan (2019 Federal RTP)1. The 2019 Federal RTP is a federally- and state- mandated document that presents the overall vision for how the San Diego region will grow through 2050, including all the transportation-related investments that will be needed to support that vision.
The 2019 Federal RTP includes two transportation networks. The “revenue constrained transportation network” will be built with the financial resources the region can reasonably expect to be available between now and 2050. It also incorporates an “unconstrained transportation network,” which contains all transportation projects that could potentially benefit mobility in the region without regard to cost. The revenue constrained network relies on estimates of future funds, and therefore funding for some of the projects included in the network remains uncertain. Figures 1.1-1.3 represent transit and active transportation projects in the 2019 Federal RTP revenue constrained and unconstrained networks. Each project is ranked depending upon a variety of metrics. These metrics can be found in the discussion of transit funding criteria (Appendix B).
Each year, the Metropolitan Transit System (MTS) and North County Transit District (NCTD) are required to submit a Service Implementation Plan (SIP) to SANDAG in advance of the budget approval process. The SIPs list the operational changes each transit operator implemented or plans to implement in order to balance proposed fiscal year budgets. A discussion of the transit operator gaps and deficiencies is included in the SANDAG Coordinated Plan, which is completed every two years. A summary of the service needs identified by each transit operator in their FY 2020 SIP is outlined in a Figure 2 below.
1 The FY 2018 AB 805 Report referenced the constrained and unconstrained project lists in San Diego Forward: The
Regional Plan. This report utilizes the 2019 Federal RTP, which is the more recently updated document.
6
![Page 14: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/14.jpg)
APPENDIX A
5
Figure 1.1: Regional Public Transit Needs (Transit Facilities)
Service Route Description HSR 598 Commuter Rail Overlay (Temecula to Airport ITC)
HSR -- Extension from Airport ITC to San Ysidro/ Otay Mesa
COASTER 398 Double tracking, grade separation at Leucadia Blvd and two other locations, stations/platforms at Convention Center/Petco Park and Del Mar Fairgrounds, and extension to Gaslamp and Camp Pendleton
COASTER 398 COASTER extension to National City
SPRINTER 399
SPRINTER efficiency improvements; double tracking Oceanside to Escondido; includes six rail grade separations at El Camino Real, Melrose Dr, Vista Village Dr/Main St, North Dr, Civic Center, Auto Pkwy and Mission Ave and a Branch Extension to Westfield North County1
SPRINTER 588 SPRINTER Express
Trolley 510 Mid-Coast Trolley Extension
Trolley 510 Blue Line/Mid-Coast Frequency Enhancements and rail grade separations at 28th St, 32nd St, E St, H St, Palomar St, Taylor and Ash St, and Blue/Orange Track Connection at 12th/Imperial
Trolley 520 Orange Line Frequency Enhancements and four rail grade separations at Euclid Ave, Broadway/Lemon Grove Ave, Allison Ave/University Ave, Severin Dr
Trolley 522 Orange Line Express - El Cajon to San Diego International Airport Intermodal Transit Center (ITC)
Trolley 540 Blue Line Express - Santa Fe Depot to San Ysidro via Downtown
Trolley 550 SDSU to Palomar Station via East San Diego, Southeast San Diego, National City
Trolley 560 SDSU to Downtown San Diego via El Cajon Blvd/Mid-City (transition of Mid-City Rapid to Trolley)
Trolley 561 UTC COASTER Connection
Trolley 561 COASTER Connection to Sorrento Mesa/Carroll Canyon (extension of Route 510)
Trolley 562 San Ysidro to Carmel Valley via Chula Vista, National City, Southeast San Diego, Mid-City, Mission Valley, and Kearny Mesa
Trolley 563 Pacific Beach to El Cajon Transit Center via Balboa and Kearny Mesa
Trolley 564 Otay Mesa East Border Crossing to Western Chula Vista via Otay Ranch/Millennia
Trolley 566 Palomar St Trolley Station to Carmel Valley via
Mid-City, Kearny Mesa (Route 562 Express)
Trolley 510, 520, 540, 522, and 560
Downtown Trolley Tunnel
Rapid 2 North Park to Downtown San Diego via 30th St, Golden Hill
Rapid 10 La Mesa to Ocean Beach via Mid-City, Hillcrest,
Old Town
Rapid 11 Spring Valley to SDSU via Southeast San Diego, Downtown, Hillcrest, Mid-City
Rapid 28 Point Loma to Kearny Mesa via Old Town, Linda Vista
Rapid 30 Old Town to Sorrento Mesa via Pacific Beach,
7
![Page 15: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/15.jpg)
APPENDIX A
6
Figure 1.1: Regional Public Transit Needs (Transit Facilities)
Service Route Description La Jolla, UTC
Rapid 41 Fashion Valley to UTC/UC San Diego via Linda Vista and Clairemont Rapid 90
El Cajon Transit Center to San Diego International Airport ITC via SR 94, City College (peak only)
Rapid 103 Solana Beach to Sabre Springs Rapid station via Carmel Valley
Rapid 120 Kearny Mesa to Downtown via Mission Valley
Rapid 235 Temecula (peak only) Extension of Escondido to Downtown Rapid (formerly Route 610)
Rapid 430 Oceanside to Escondido (peak only)
Rapid 440 Carlsbad to Escondido Transit Center via Palomar Airport Rd
Rapid 471 Downtown Escondido to East Escondido
Rapid 473 UTC/UC San Diego to Oceanside via Hwy 101 Coastal Communities, Carmel Valley
Rapid 474 Oceanside to Vista via Mission Ave/Santa Fe Road Corridor
Rapid 477 Camp Pendleton to Carlsbad Village via College Blvd, Plaza Camino Real
Rapid 550 SDSU to Palomar Station via East San Diego, Southeast San Diego, National City2
Rapid 635 Eastlake to Palomar Trolley via Main St Corridor
Rapid 636 SDSU to Spring Valley via East San Diego,
Lemon Grove, Skyline
Rapid 637 North Park to 32nd St Trolley via Golden Hill
Rapid 638 Iris Trolley to Otay Mesa via Otay, Airway Dr,
SR 905 Corridor
Rapid 639 Iris Trolley Station to North Island via Imperial Beach and Silver Strand, Coronado
Rapid 640A Route 640A: I-5 - San Ysidro to Old Town Transit Center via City College
640B Route 640B: I-5 Iris Trolley/Palomar to Kearny Mesa via City College
Rapid 650 Chula Vista to Palomar Airport Rd Business Park via I-805/I-5 (peak only)
Rapid 652 Downtown to UTC via Kearny Mesa Guideway/
I-805
Rapid 653 Mid-City to Palomar Airport Rd via Kearny Mesa/
I-805/I-5
Rapid
688 San Ysidro to Sorrento Mesa via I-805/I-15/SR 52 Corridors; Otay Mesa Port of Entry (POE) to UTC/Torrey Pines via Otay Ranch/Millennia,I-805 Corridor; Mid City to Sorrento Mesa via I-805 Corridor. All Peak Only
689
690
Rapid 692 Grossmont Center to Otay Town Center/Millennia via Southwest College, SR125, Spring Valley
Rapid 709 H St Trolley to Millennia via H St Corridor, Southwestern College
Rapid 870 El Cajon to UTC via Santee, SR 52, I-805
Rapid 890 El Cajon to Sorrento Mesa via SR 52, Kearny Mesa
8
![Page 16: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/16.jpg)
APPENDIX A
7
Figure 1.1: Regional Public Transit Needs (Transit Facilities)
Service Route Description
Rapid 905 Extension of Iris Trolley Station to Otay Mesa Port of Entry (POE) with new service to Otay Mesa East POE
Rapid 910 Coronado to Downtown via Coronado Bridge
Rapid 940 Oceanside to Sorrento Mesa via I-5, Carlsbad, Encinitas (peak only)
Rapid SR 163 DARs Kearny Mesa to Downtown via SR 163. Stations at Sharp/Children's Hospital, University Ave, and Fashion Valley Transit Center
Shuttle 448/449 San Marcos Shuttle3
Streetcar 551 Chula Vista Downtown4
Streetcar 552 National City Downtown4
Streetcar 553 Downtown San Diego: Little Italy to East Village4
Streetcar 554 Hillcrest/Balboa Park/Downtown San Diego Loop4
Streetcar 555 30th St to Downtown San Diego via North Park/Golden Hill4
Streetcar 557 El Cajon Downtown4
Streetcar 558 Escondido Downtown4
Streetcar 559 Oceanside Downtown4
Streetcar 565 Mission Beach to La Jolla via Pacific Beach4
Airport Express – Airport Express Routes5
Local – Local Bus Routes - 15 minutes in key corridors
Local – Local Bus Routes - 10 minutes in key corridors
Intermodal Transit Center
– San Diego International Airport Intermodal Transit Center
Intermodal Transit Center
– San Ysidro Intermodal Transit Center
Intermodal Transit Center
– Otay Mesa East Intermodal Transit Center
Other – Other Improvements (Vehicles, transit system rehabilitation, maintenance facilities, ITS, regulatory compliance, park and ride, and transit center expansions)
Source: Table A.5 Revenue Constrained and Unconstrained Transit Facilities (2019 Federal RTP)
1 Unconstrained rail facilities (shared use freight and passengers) 2 Rapid Route 550 appeared only as a Trolley route in the Unconstrained Network 3 Capital cost to be funded by the City of San Marcos 4 Streetcar cost is representative of 10% of the total capital cost 5 Capital cost to be funded by aviation and other private funds
9
![Page 17: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/17.jpg)
APPENDIX A
8
Figure 1.2: Regional Public Transit Needs (Active Transportation)
Project Jurisdiction(s) Uptown – Fashion Valley to Downtown San Diego San Diego
Uptown – Old Town to Hillcrest San Diego
Uptown – Hillcrest to Balboa Park San Diego
North Park – Mid-City – City Heights San Diego
North Park – Mid-City – Hillcrest to City Heights (City Heights – Old Town Corridor)
San Diego
North Park – Mid-City – City Heights to Rolando San Diego
Bayshore Bikeway – Main St to Palomar Chula Vista, Imperial Beach
Coastal Rail Trail Encinitas – Chesterfield to Solana Beach Encinitas
Pershing and El Prado – Cross-Park San Diego
San Ysidro to Imperial Beach – Bayshore Bikeway Connection Imperial Beach
San Diego
Terrace Dr/Central Ave – Adams to Wightman San Diego
San Diego River Trail – I-805 to Fenton San Diego
San Diego River Trail – Short gap connections San Diego
Coastal Rail Trail Encinitas - Leucadia to G St Encinitas
San Diego River Trail – Father Junipero Serra Trail to Santee Santee
Downtown to Southeast connections San Diego
Coastal Rail Trail San Diego – UTC San Diego
Coastal Rail Trail San Diego - Rose Canyon San Diego
Coastal Rail Trail San Diego – Pac Hwy (W Washington St to Laurel St) San Diego
Coastal Rail Trail San Diego – Pac Hwy (Laurel St to Santa Fe Depot) San Diego
Coastal Rail Trail San Diego – Pac Hwy (Taylor St to W Washington St) San Diego
Coastal Rail Trail San Diego- Pac Hwy (Fiesta Island Rd to Taylor St) San Diego
City Heights /Encanto/Lemon Grove Lemon Grove, San Diego
City Heights/Fairmount Corridor San Diego
Rolando to Grossmont/La Mesa La Mesa, El Cajon, San Diego
La Mesa/Lemon Grove/El Cajon connections Lemon Grove, La Mesa
San Diego River Trail – Qualcomm Stadium to Ward Rd San Diego
San Diego River Trail – Rancho Mission Rd to Camino Del Rio North San Diego
Coastal Rail Trail Carlsbad – Reach 4 Cannon to Palomar Airport Rd Carlsbad
Coastal Rail Trail Carlsbad – Reach 5 Palomar Airport Rd to Poinsettia Station Carlsbad
Coastal Rail Trail Encinitas – Carlsbad to Leucadia Encinitas
Coastal Rail Trail Del Mar Del Mar
Coastal Rail Trail San Diego – Del Mar to Sorrento via Carmel Valley Del Mar, San Diego
Coastal Rail Trail San Diego – Carmel Valley to Roselle via Sorrento San Diego
Coastal Rail Trail San Diego – Roselle Canyon San Diego
Chula Vista National City connections Chula Vista, National City
Pacific Beach to Mission Beach San Diego
Ocean Beach to Mission Bay San Diego
10
![Page 18: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/18.jpg)
APPENDIX A
9
Figure 1.2: Regional Public Transit Needs (Active Transportation)
Project Jurisdiction(s) San Diego River Trail – Bridge connection (Sefton Field to Mission Valley YMCA) San Diego
San Diego River Trail – Mast Park to Lakeside baseball park Santee
I-8 Flyover – Camino del Rio S to Camino del Rio N San Diego
Coastal Rail Trail Oceanside - Broadway to Eaton Oceanside
El Cajon – Santee connections El Cajon, La Mesa, Santee
San Diego River Trail – Father JS Trail to West Hills Parkway San Diego
Inland Rail Trail Oceanside Oceanside
Coastal Rail Trail Carlsbad – Reach 3 Tamarack to Cannon Carlsbad
Clairemont Dr (Mission Bay to Burgener) San Diego
Harbor Dr (Downtown to Ocean Beach) San Diego
Mira Mesa Bike Blvd San Diego
Sweetwater River Bikeway Ramps National City
Coastal Rail Trail Oceanside – Alta Loma Marsh bridge Oceanside
Coastal Rail Trail San Diego – Mission Bay (Clairemont to Tecolote) San Diego
Bayshore Bikeway Coronado – Golf course adjacent Coronado
San Luis Rey River Trail Oceanside, Unincorporated
Encinitas-San Marcos Corridor – Double Peak Dr to San Marcos Blvd San Marcos
Escondido Creek Bikeway – Quince St to Broadway Escondido
Escondido Creek Bikeway – Escondido Creek to Washington Ave Escondido
Escondido Creek Bikeway – 9th Ave to Escondido Creek Escondido
Escondido Creek Bikeway – El Norte Pkwy to northern bikeway terminus Escondido
Encinitas to San Marcos Corridor – Leucadia Blvd to El Camino Real Carlsbad, Encinitas
I-15 Bikeway – Via Rancho Pkwy to Lost Oak Ln Escondido
I-15 Bikeway – Rancho Bernardo Community Park to Lake Hodges Bridge San Diego
I-15 Bikeway – Camino del Norte to Aguamiel Rd San Diego
I-15 Bikeway – Poway Rd interchange to Carmel Mountain Rd San Diego
SR 56 Bikeway – Azuaga St to Rancho Peñasquitos Blvd San Diego
I-15 Bikeway – Murphy Canyon Rd to Affinity Ct San Diego
SR 56 Bikeway – El Camino Real to Caminito Pointe San Diego
SR 52 Bikeway – I-5 to Santo Rd San Diego
SR 52 Bikeway – SR 52/Mast Dr to San Diego River Trail San Diego
I-8 Corridor – San Diego River Trail to Riverside Dr Unincorporated
I-805 Connector – Bonita Rd to Floyd Ave Chula Vista, Unincorporated
SR 125 Connector – Bonita Rd to U.S. –Mexico Border Chula Vista, San Diego
SR 905 Connector – E Beyer Blvd to U.S.–Mexico Border San Diego, Unincorporated
El Camino Real Bike Lanes – Douglas Dr to Mesa Dr Oceanside
Vista Way Connector from Arcadia Vista, Unincorporated
I-15 Bikeway – W. Country Club Ln to Nutmeg St Escondido
El Camino Real Bike Lanes – Marron Rd to SR 78 offramp Carlsbad
Carlsbad to San Marcos Corridor – Paseo del Norte to Avenida Encinas Carlsbad
11
![Page 19: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/19.jpg)
APPENDIX A
10
Figure 1.2: Regional Public Transit Needs (Active Transportation)
Project Jurisdiction(s) Encinitas to San Marcos Corridor – Kristen Ct to Ecke Ranch Rd Encinitas
Encinitas to San Marcos Corridor – Encinitas Blvd/I-5 Interchange Encinitas
Mira Mesa Corridor – Reagan Rd to Parkdale Ave San Diego
Mira Mesa Corridor – Scranton Rd to I-805 San Diego
Mira Mesa Corridor – Sorrento Valley Rd to Sorrento Valley Blvd San Diego
Mid-County Bikeway – I-5/Via de la Valle Interchange San Diego
Mid-County Bikeway – Rancho Santa Fe segment San Diego, Unincorporated
El Camino Real Bike Lanes – Manchester Ave to Tennis Club Dr Encinitas
Mid-County Bikeway – Manchester Ave/I-5 Interchange to San Elijo Ave Encinitas
Central Coast Corridor – Van Nuys St to San Rafael Pl San Diego
Clairemont – Centre-City Corridor – Coastal Rail Trail to Genesee Ave San Diego
SR 125 Corridor – Mission Gorge Rd to Glen Vista Way Santee
SR 125 Corridor – Prospect Ave to Weld Blvd Santee, El Cajon
I-8 Corridor – Lakeside Ave to SR 67 Unincorporated
I-8 Corridor – Willows Rd to SR 79 Unincorporated
E County Northern Loop – N Marshall Ave to El Cajon Blvd El Cajon
E County Northern Loop – Washington Ave to Dewitt Ct El Cajon
E County Northern Loop – SR 94 onramp to Del Rio Rd Unincorporated
E County Southern Loop – Pointe Pkwy to Omega St Unincorporated
SR 125 Corridor – SR 94 to S of Avocado St Unincorporated
Centre City – La Mesa Corridor – Gateside Rd to Campo Rd La Mesa, Unincorporated
Bay to Ranch Bikeway – River Ash Dr to Paseo Ranchero Chula Vista
Mid-County Bikeway – San Elijo Ave to 101 Terminus Encinitas
Central Coast Corridor – Van Nuys St San Diego
E County Northern Loop – El Cajon Blvd to Washington Ave El Cajon
E County Northern Loop – Calavo Dr to Sweetwater Springs Blvd Unincorporated
Central Coast Corridor – Torrey Pines Rd to Nautilus St San Diego
Central Coast Corridor – Via Del Norte to Van Nuys St San Diego
Kearny Mesa to Beaches Corridor – Ingraham St from Garnet Ave to Pacific Beach Dr
San Diego
Kearny Mesa to Beaches Corridor – Clairemont Dr to Genesee Ave San Diego
Kearny Mesa to Beaches Corridor – Genesee Ave to Linda Vista Dr San Diego
Bay to Ranch Bikeway – E J St from 2nd Ave to Paseo Del Rey Chula Vista
Chula Vista Greenbelt – Bay Blvd to Oleander Ave Chula Vista
Safe Routes to Transit Various
Local Bike Projects/Local Pedestrian/Safety/Traffic Calming Various
Regional Bicycle and Pedestrian Programs Various
Safe Routes to School Various
Source: Table A.5 Revenue Constrained and Unconstrained Active Transportation Projects (2019 Federal RTP)
12
![Page 20: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/20.jpg)
APPENDIX A
11
Figure 1.3: Regional Public Transit Needs (Active Transportation – Safe Routes to Transit at Existing Stations)
Project Jurisdiction(s) Plaza Camino Real Transit Center Carlsbad
El Camino Real at Cannon/College Carlsbad
Carlsbad Poinsettia COASTER Station Carlsbad
Carlsbad Village COASTER Station Carlsbad
E St Trolley Station Chula Vista
Old Highway 80 between El Cajon and Alpine County – Fallbrook
Fallbrook High School County – Fallbrook
WB Jamacha Blvd at Sweetwater Springs Blvd County – Spring Valley
Jamacha Blvd at Lamplighter Village Dr County – Spring Valley
SB Sweetwater Rd at Troy St County – Spring Valley
Sweetwater Rd between Jamacha Blvd and Broadway County – Spring Valley
Buena Creek SPRINTER Station County of San Diego
Encinitas COASTER Station Encinitas
Encinitas pedestrian undercrossing connections Encinitas
Escondido Transit Center Escondido
Del Lago Transit Station Escondido
Amaya Trolley Station La Mesa
70th St Trolley Station La Mesa
National City Blvd and E 32nd St/W 33rd St National City
Oceanside Transit Center Oceanside
Coast Highway SPRINTER Station Oceanside
Crouch St SPRINTER Station Oceanside
El Camino Real SPRINTER Station Oceanside
Rancho Del Oro SPRINTER Station Oceanside
College Blvd SPRINTER Station Oceanside
Oceanside High School Oceanside
San Luis Rey Transit Center Oceanside
Tri-City Medical Center Oceanside
32nd and Commercial Trolley Station San Diego – Barrio Logan
Euclid Ave between Home Ave and Roselawn Ave San Diego – City Heights
Alvarado Trolley Station San Diego – College Area
70th St between El Cajon Blvd and Alvarado Rd San Diego – College Area
12th and Imperial Transit Center San Diego – Downtown
Harbor Dr Pedestrian Bridge San Diego – Downtown
Harborside Trolley Station San Diego - Harborside
Pacific Fleet Trolley Station San Diego – Harborside
Washington St at Hancock St/I-5 Overcrossing San Diego – Mission Hills
WB Hotel Circle S. at Bachman Pl San Diego – Mission Valley
Fenton Parkway Trolley Station San Diego – Mission Valley
13
![Page 21: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/21.jpg)
APPENDIX A
12
Figure 1.3: Regional Public Transit Needs (Active Transportation – Safe Routes to Transit at Existing Stations)
Project Jurisdiction(s) Grantville Trolley Station San Diego – Mission Valley
Morena/Linda Vista Trolley Station San Diego – Mission Valley
54th St between Euclid Ave and Chollas Pkwy San Diego – Oak Park
EB Airway Rd at Dublin Dr San Diego – Otay Mesa
EB Airway Rd at Excellante St (Southwestern College) San Diego – Otay Mesa
La Media Rd at Airway Rd San Diego – Otay Mesa
WB Siempre Vida Rd at La Media Rd San Diego – Otay Mesa
SB Hollister St at Conifer Ave (Palm St Trolley Station) San Diego – Palm City
NB S. Vista Ave at Beyer Blvd Trolley Station San Diego – San Ysidro
Calle Primera between Willow Rd and Via de San Ysidro San Diego – San Ysidro
Sorrento Valley COASTER Station San Diego – Sorrento Valley
SB Gilman Dr at Villa La Jolla Dr San Diego – University City
EB Eastgate Mall between I-805 and Miramar Rd San Diego – University City
Palomar College SPRINTER Station San Marcos
San Marcos Civic Center SPRINTER Station San Marcos
Cal State San Marcos SPRINTER Station San Marcos
Nordahl Rd SPRINTER Station San Marcos
Rancheros Dr/State Department of Rehabilitation San Marcos
Solana Beach COASTER Station Solana Beach
Melrose Dr SPRINTER Station Vista
Vista Transit Center Vista
Civic Center–Vista SPRINTER Station Vista
Sweetwater Rd between Jamacha Blvd and Broadway County – Spring Valley
Source: Table A.5 Revenue Constrained and Unconstrained Active Transportation Retrofits - Safe Routes to Transit at Existing Stations (2019 Federal RTP)
14
![Page 22: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/22.jpg)
APPENDIX A
13
Figure 2: Operator Identified Service Area Needs
Route Day Description Urban Zone
MTS Identified Service Area Needs
FY 2020–2022
8/9 All Adjust schedule due to Old Town Transit Center (OTTC) Reconfiguration Yes
10 All Adjust schedule due to OTTC Reconfiguration Yes
28 All Adjust schedule due to OTTC Reconfiguration Yes
30 All Adjust schedule due to OTTC Reconfiguration Yes
44 All Adjust schedule due to OTTC Reconfiguration Yes
83 All Adjust schedule due to OTTC Reconfiguration Yes
84 All Adjust schedule due to OTTC Reconfiguration Yes
88 All Adjust schedule due to OTTC Reconfiguration Yes
105 All Adjust schedule due to OTTC Reconfiguration Yes
150 All Adjust schedule due to OTTC Reconfiguration Yes
Iris Rapid All Rapid service connecting Otay Mesa and Imperial Beach with the UC San Diego Blue Line Trolley at the Iris Avenue Transit Center. Yes
Mid-Coast Feeder Bus
All MTS will complete the Feeder Bus Study for the Mid-Coast Light Rail Extension to University City Yes
NCTD Identified Service Area Needs
FY 2020–2022
COASTER All Carlsbad Poinsettia COASTER Station Rideshare Program N/A
SPRINTER All Cal State University San Marcos (CSUSM) Micromobility Pilot All
Source: MTS and NCTD FY 2020 Service Implementation Plans
15
![Page 23: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/23.jpg)
14
APPENDIX B: Transit Project Evaluation Criteria
SANDAG prioritizes projects and their phasing through the development of project evaluation criteria and network-based performance measures as part of the 2019 Federal RTP, among other factors. Input for the criteria are received through public workshops, as well as from the region’s planning directors, the transit operators, SANDAG policy committees, and the Board of Directors.
The project evaluation criteria for the 2019 Federal RTP are organized within the three goals established by the Board of Directors: (1) Innovative Mobility and Planning; (2) Healthy Environment and Communities; and (3) Vibrant Economy. Each individual criterion is nested into one of the three goals. A new set of criteria will be developed for the 2021 Regional Plan.
Project Evaluation Criteria Transit Services
No. Criteria Description Calculation Max Score
Total Percent Policy Objectives
Innovative Mobility & Planning
1
Provides Time Competitive/ Reliable Transit Service
What is the percentage of the route located in priority treatment?
Analysis of percentage of transit route within dedicated transit guideway; dedicated arterial lane, interrupted rail, or Managed Lane; or HOV lane or arterial spot treatment
10
35
Mobility Choices, Complete Communities
2 Serves Daily Trips
What is the number of additional daily transit trips resulting from the project?
Change in daily transit linked trips
15 Mobility Choices, Complete Communities
3
Provides Access to Evacuation Routes
How will the project provide evacuation access for regional hazards?
Proximity analysis of hazard areas (dam failure, earthquake, flood, landslide, liquefaction, tsunami, and wildfire), weighted by population and employment
5
Mobility Choices, Partnerships and Collaboration, Binational Collaboration with Baja California, Preservation and Safety of the Transportation System
4 Daily System Utilization
What is the daily transit utilization?
Daily passenger miles/ daily service seat miles (system wide)
5 Mobility Choices, Complete Communities
Healthy Environment & Communities
5
Greenhouse Gas and Pollutant Emissions
A) What is the reduction in CO2 emissions from implementing the project?
Reduction in CO2 emissions
5 30
Environmental Stewardship, Energy and Climate Change Mitigation and Adaptation
16
![Page 24: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/24.jpg)
APPENDIX B
15
Project Evaluation Criteria Transit Services
No. Criteria Description Calculation Max Score
Total Percent Policy Objectives
B) What is the reduction in smog forming pollutants from implementing the project?
Reduction in smog forming pollutants
5
6 Serves RCP Smart Growth Areas
What is the share of trips on the transit service serving RCP Smart Growth areas?
Share of trips on transit service serving all existing/planned or potential Smart Growth Areas is calculated, using select link analysis
10
Complete Communities, Regional Economic Prosperity, Habitat and Open Space Preservation
7 Physical Activity
What is the increase in physical activity?
Increase in time engaged in moderate transportation-related physical activity
10 Mobility Choices, Complete Communities
Vibrant Economy
8 Accessibility
A) What is the increase in job and school trips by transit?
Change in daily transit linked work and school trips
4
35
Mobility Choices, Regional Economic Prosperity
B) How will the project support access to recreational areas and beaches?
Acres of parkland/ recreational areas and beaches within 1/4 mile of project
3 Complete Communities, Habitat and Open Space Preservation
C) What is the increase in transit trips by disadvantaged communities?
Change in total transit trips by disadvantaged community’s population
3 Mobility Choices, Partnerships and Collaboration
D) How will the project facilitate pedestrian and bike access?
Project located within 1/4 mile of pedestrian and bike facilities
3 Mobility Choices, Complete Communities
E) What is the increase in transit trips to federally recognized Indian reservations?
Change in total transit trips to/from Indian reservations
2 Mobility Choices, Partnerships and Collaboration
17
![Page 25: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/25.jpg)
APPENDIX B
16
Project Evaluation Criteria Transit Services
No. Criteria Description Calculation Max Score
Total Percent Policy Objectives
9 Project Cost-Effectiveness
What is the cost-effectiveness of the project?
Enhanced cost-effectiveness measure incorporates the following components: • Project cost • Fuel costs • Greenhouse gas
emissions • Smog forming
pollutants • Physical activity • Safety
20
Mobility Choices, Regional Economic Prosperity, Binational Collaboration with Baja California, Preservation and Safety of the Transportation System, Environmental Stewardship, Energy and Climate Change Mitigation and Adaptation
Source: 2019 Federal RTP (Appendix M: Table M.3)
18
![Page 26: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/26.jpg)
17
APPENDIX C: Additional Work on Public Transit
In addition to the regular work that SANDAG undertakes as part of its core mission to develop transportation programs and projects, there are a variety of additional efforts that are undertaken at the direction of the SANDAG Board of Directors which are transit supportive. The transit supportive studies and work that SANDAG implemented in FY 2019 are outlined below. They total over $25 million. Studies that more directly impacted transit projects are listed in Appendix E.
FY 2019 Transportation Supportive Expenditures
Overall Work Program (OWP) Expenditures
2300000 Travel Demand Modeling $1,965,217
2300400 Land Use, Demographic, and Econometric Modeling $1,123,576
2300600 Geographic Information Systems for Research, Planning, and Project Delivery $839,035
2300700 Data Visualization, Dissemination, and Analysis Methods $278,699
2300800 Regional Geographic Information Systems Data Warehouse $191,148
2300900 Data Governance and Data Acquisition $230,047
2301100 Transportation Studies $385,665
3100400 Regional Plan Implementation $514,409
3100600 Air Quality Planning and Transportation Conformity $125,209
3102000 San Diego Forward: The Regional Plan $2,508,050
3201400 Regional Sea-Level Rise Adaptation Guidance for Transportation Infrastructure $119,418
3300100 TransNet Smart Growth Incentive and Active Transportation Grant Programs $300,838
3300200 Active Transportation Planning and Programs $1,018,113
3310700 Transportation Demand Management Program $389,065
3310701 Transportation Demand Management – Planning Studies/Pilot Projects $291,449
3310702 Transportation Demand Management – Employer Services $1,321,673
3310703 Transportation Demand Management – Program and Service Delivery $700,317
3310704 Transportation Demand Management – Regional Vanpool Program $3,398,925
3310711 Transportation Demand Management – Outreach Program $760,426
3311100 Regional Intelligent Transportation Systems Program Management $613,668
3311700 Transportation Performance Monitoring and Reporting $88,502
3321700 Inter-Regional Park and Ride Strategy $156,547
3330300 Intergovernmental Review $42,177
3330700 TSM – Integrated Corridor Management Programs $186,548
3330900 TDM and TSM Analysis Toolbox $226,154
3331000 San Diego Regional Military Multimodal Access Strategy $148,069
3331100 Data Management Solution for Analytics $26,328
3400100 Interregional Planning: Imperial, Orange, and Riverside Counties $35,899
3400200 Interregional Planning: Binational Planning and Coordination $412,181
3400500 Interregional Planning: Tribal Liaison Program $108,639
7300000 TransNet Public Information Program $323,556
7300100 Public Involvement Program $355,778
7300200 Marketing Coordination and Implementation $132,863
19
![Page 27: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/27.jpg)
APPENDIX C
18
FY 2019 Transportation Supportive Expenditures
7300300 PC, Internet, and Database Applications $958,553
7300400 Government Relations $834,915
7300500 Interagency Coordination $1,535,206
7300600 Social Equity Program $65,743
Subtotal $22,712,605
Capital Improvement Program (CIP) Expenditures
1200100 TransNet EAP Program Management $2,541,901
Subtotal $2,541,901
TOTAL $25,254,505
Source: SANDAG FY 2019 Actual Expenditures (OWPs and CIPs)
20
![Page 28: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/28.jpg)
19
APPENDIX D: Recommended Transit Funding Levels
SANDAG, as the Metropolitan Planning Organization and the Regional Transportation Planning Agency, is required by state and federal laws to develop and adopt a Regional Transportation Improvement Program (RTIP). The RTIP is a multi-billion-dollar, multi-year program of proposed projects for major transportation improvements in the San Diego Region. Transportation projects funded with federal and state dollars, as well as SANDAG’s transportation sales tax program (TransNet), must be included in an approved RTIP. Locally funded projects also may be programmed and included at the discretion of the agency.
All public transit funding that is recommended for expenditure in the five-year period covered by the RTIP is Board of Directors approved. The 2018 RTIP table below (Figure 1) covers the approved funding levels for transit-related projects from FY 2019 through FY 2023. More than $9 billion is identified to fund transit and multimodal projects during this time frame.
21
![Page 29: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/29.jpg)
APPENDIX D
20
Figure 1: Recommended Transit and Multimodal Funding Levels FY 2019 – FY 2023
Description Federal State TransNet Local/ Private
Total
Major Transit
Mid-Coast $1,043,509 $0 $1,127,692 $0 $2,171,201
Other Trolley $42,000 $0 $0 $0 $42,000
LOSSAN Corridor $257,966 $179,289 $208,282 $35,090 $680,627
Central Mobility Station $8,800 $0 $1,950 $0 $10,750
Bus Rapid Transit (Rapid) $100,217 $315,598 $358,907 $23,959 $798,681
Subtotal Major Transit $1,452,492 $494,887 $1,696,831 $59,049 $3,703,259
Operations/Maintenance
Transit (including operations/planning/capital) $1,667,813 $600,614 $875,115 $1,157,833 $4,301,376
Subtotal Operations/Maintenance $1,667,813 $600,614 $875,115 $1,157,833 $4,301,376
Major Multimodal Facilities
Interstate 5 $2,254 $0 $920 $0 $3,174
Interstate 805 $128,098 $106,041 $211,618 $7,380 $453,137
Complete Corridor Studies $27,000 $0 $13,000 $0 $40,000
Subtotal Major Multimodal Facilities $157,352 $106,041 $225,538 $7,380 $496,312
Multimodal facilities that benefit transit are included. They are funded by highway funds.
Active Transportation
Bicycle/Pedestrian $6,734 $117,361 $238,651 $62,316 $425,062
Smart Growth $0 $0 $39,548 $26,797 $66,345
Subtotal Active Transportation $6,734 $117,361 $278,199 $89,113 $491,408
Transportation Systems/Demand Management
ITS/Traffic Signal $9,538 $23,023 $101,662 $26,575 $160,798
Transportation Demand Management (TDM) $67,319 $0 $0 $0 $67,319
Subtotal Transportation Systems Management/TDM $76,856 $23,023 $101,662 $26,575 $228,117
TDM projects support the provision of first mile/last mile services and do outreach activities that support public transit
Source: 2018 Regional Transportation Improvement Program (FY 2019–2023) (Last Amended March 2020) Although included in the FY 2018 version of this report, Border Access/Port projects were removed from this table for not having enough of a multimodal or transit focus.
22
![Page 30: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/30.jpg)
21
APPENDIX E: Funds Spent Specifically on Public Transit (FY 2019)
This section of the report identifies funds spent in FY 2019 in the provision of public transit. The projects that represent the biggest expenditures from the SANDAG budget are the Mid-Coast Trolley, South Bay Rapid, and double tracking of the COASTER corridor. The largest expenditures made by MTS and NCTD were on the operation of transit services, vehicle and facility replacements. The figures below summarize FY 2019 Expenditures (Figure 1) and list the specific SANDAG transit (Figures 2, 3, and 4) and multimodal (Figure 5) expenditures. The SANDAG Expenditures total over $530.5 million.
Figure 1: Summary of FY 2019 Expenditures
SANDAG – Transit Projects $501,948,088
SANDAG – Multimodal Projects* $28,761,501
MTS $285,280,513
NCTD $106,308,937
Total Funds Spent $922,229,039
*This line item does not include the “Transportation Studies” from Appendix C. Sources:
• FY 2019 SANDAG Actuals for all itemized expenditures in Figures 2-5 from each of the projects listed in the Overall Work Program and Capital Improvement Program that are transit and multi-modal projects.
• MTS Comprehensive Audit Financial Report for the fiscal years ended June 30, 2019 and 2018. • NCTD Comprehensive Audit Financial Report for the fiscal years ended June 30, 2019 and 2018.
Figure 2: FY 2019 SANDAG Transit Expenditures (OWPs)
3101800 Chula Vista Light Rail Trolley Improvement Study $158,239
3320100 Short-Range Transit Service Activities $737,611
3320200 Coordinated Plan and Enhanced Mobility for Seniors and Disabled - FTA 5310 $151,588
3320300 Passenger Counting Program $227,646
3320900 Job Access and Reverse Commute Pass-Through $154,535
3321000 2050 Regional Transportation Plan Transit Plan - Advance Planning $533,024
3321400 Enhanced Mobility for Seniors and Disabled Pass Through $3,570,367
3321600 Mid-Coast Corridor Mobility Hub Implementation Strategy $214,593
3400600 LOSSAN Rail Corridor Planning $150,527
Subtotal $5,898,130
23
![Page 31: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/31.jpg)
APPENDIX E
22
Figure 3: FY 2019 SANDAG Transit Expenditures (CIPs)
1041502 SuperLoop $246,773
1049600 East County Bus Maintenance Facility $120,006
1128100 Mainline Drainage $1,290,682
1128400 Document Control $8,765
1129200 OCS Insulator/Catch Cable Re $996,468
1131300 NCTD Bus Wash Replacement-West Division $204,523
1131400 LRV Procurement Support $17,259
1139601 Transnet Operations: I-15 Operations $7,474,903
1139602 Transnet Operations: SuperLoop $2,235,869
1139603 Transnet Operations: Mid City Rapid $2,252,651
1139604 Transnet Operations: South Bay BRT $2,593,697
1139607 Transnet Operations: Mira Mesa Rapid $1,456,556
1142300 NCTD E. Division Maintenance Fac. $29,112
1142500 Centralized Train Control $216,638
1142600 Jt Transportation Ops Center $284,870
1144000 Substation SCADA Design $1,038,358
1145000 Los Peñasquitos Lagoon Bridge $334,661
1145500 Airport Connection $16,252
1146100 Del Mar Bluffs IV $372,699
1146700 UCSD Mid-Coast Improvements $1,815,442
1201507 I-15 BRT Stations-South $1,583,536
1201509 Downtown BRT $18,872
1201511 Mira Mesa Blvd Queue Jumpers $16,912
1201513 I-15 S. Bay BRT Maintenance Facility $2,304
1201514 DT Multiuse & Bus Facility $10,160,154
1201515 Clairmont Mesa Blvd BRT Station $7,252
1201518 I-15 Mira Mesa TS Parking $2,040
1210030 Blue Line Stations $588,185
1210040 Blue Line Rail $215,528
1239801 Sorrento-Miramar Double Track Phase I $4,947
1239803 Oceanside Station $111,875
1239805 Poinsettia/Carlsbad Run-thru $16,451,367
1239806 San Elijo Lagoon Double Track $3,941,784
1239807 Sorrento Valley Double Track $21,206
1239809 Eastbrook to Shell Double Track $352,869
1239810 Carlsbad Village Double Track $27,548
1239811 Elvira to Morena Double Track $24,335,107
1239812 Sorrento to Miramar Phase II $861,181
1239813 San Dieguito Double Track $703,962
1239814 LOSSAN PE $83,524
1239815 San Diego River Bridge $17,465,811
24
![Page 32: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/32.jpg)
APPENDIX E
23
Figure 3: FY 2019 SANDAG Transit Expenditures (CIPs)
1239816 Batiquitos Lagoon Double Track $782,586
1239817 Chesterfield DR Crossing Improvements $2,570,834
1239819 Carlsbad Village Double Track Trench $64,765
1240001 Mid-City Rapid Bus $40,632
1257001 Mid-Coast Corridor Transit Project $363,980,513
1280504 Otay BRT $23,795,968
1280510 Palomar/SR94 HOV/DAR/BRT Sta $1,029,387
1280513 I-805/SR 94 Bus on Shoulder Dem $2,132,619
9109900 General MTS Engineering Supp $5,857
Subtotal $494,365,309
Figure 4: FY 2019 Senior Mini Grant Expenditures (Cycle 9, Round 2)
1270400 City of La Mesa Rides4Neighbors $157,240
1270500 City of Oceanside Solutions for Seniors on the Go $208,100
1270800 FACT Senior Ride Reimbursement $181,259
1271000 Jewish Family Service Rides & Smiles $142,342
1271100 Peninsula Shepherd Senior Center $57,852
1271300 Traveler's Aid SenioRide $190,418
1271800 Jewish Family Service On the Go – Eastern San Diego $159,445
1271900 FACT Sustain RideFACT $314,371
1272000 Jewish Family Service Northern San Diego Rides & Smiles $144,273
1272200 City of Coronado Out and About $46,868
1272500 Renewing Life Volunteer Driver $82,481
Subtotal $1,684,649
Figure 5: FY 2019 Multi-Modal Expenditures
Active Transportation
1223017 Barham Dr. Urban Trail Improvements $5,264,254
1223055 Bayshore Bikeway- Barrio Logan $1,310,949
1143700 Bayshore Bikeway Seg 4&5 $62,548
1129900 Bayshore Bikeway Segment 8B $44,259
1223056 Border to Bayshore Bikeway $852,464
1223054 Central Avenue Bikeway $365,164
1223016 CRT San Diego to Rose Creek $8,614,255
1223058 Downtown to Imperial Ave Bikeway $1,473,318
1223023 Inland Rail Trail $5,437,232
1223087 North Park/Mid-City Orange Bikeway $47,246
1223079 NP/MC Bikeway Howard-Orange $345,949
1223078 NP/MC Bikeway- Landis $228,061
25
![Page 33: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/33.jpg)
APPENDIX E
24
Figure 5: FY 2019 Multi-Modal Expenditures
1223020 NP/MC Bikeway- Robinson Bikeway $158,598
1223082 NP/MC Bikeway: Georgia-Meade $562,681
1223080 NP/MC Bikeway: Monroe $85,324
1223081 NP/MC Bikeway: University $1,025,924
1223057 Pershing Drive Bikeway $388,264
1223053 SD River Trail Carlton Oaks Se $222,151
1223052 SD River Trail Qualcomm Segment $47,379
1223014 SR-15 Bike Path Design/Env Doc $139,200
1223083 Uptown Bikeway: E Hillcrest $769,918
1223085 Uptown Bikeway: Mission Hills $4,082
1223086 Uptown Bikeway: Park Blvd $120,976
1223084 Uptown Bikeway: Washington St $775,903
Subtotal $28,346,099
Multimodal Other
1201506 I-15 DARs (Hale & Hillary) $7,312
1201504 I-15 FasTrak $403,685
1201501 I-15 South $4,405
Subtotal $415,402
TOTAL $28,761,501
Links to Source Data
SANDAG FY 2019 Budget: https://www.sandag.org/uploads/publicationid/FinalFY19Budget.pdf
MTS Comprehensive Annual Financial Report for the Fiscal Years Ended June 30, 2019 and 2018: https://www.sdmts.com/sites/default/files/attachments/2019_mts_cafr_final_secured.pdf
NCTD Comprehensive Annual Financial Report for the Fiscal Years Ended June 30, 2019 and 2018: https://lfportal.nctd.org/weblink/docview.aspx?dbid=0&id=141401&cr=1
26
![Page 34: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/34.jpg)
Transportation Committee Item: 5 June 5, 2020
Transportation Development Act: FY 2020 Productivity Improvement Program and FY 2021 Allocations
Overview
The Transportation Development Act (TDA) provides one-quarter percent of the state sales tax for operating and capital support of public transportation systems and non-motorized transportation projects. The San Diego Association of Governments (SANDAG), as the designated Regional Transportation Planning Agency, is responsible for the allocation of TDA funds to the region’s cities, county, transit operators, and the Consolidated Transportation Service Agency (CTSA).
Pursuant to California Public Utilities Code Section 99244, a transit operator can be allocated no more in FY 2021 than it was allocated in FY 2020 unless the region’s transportation planning agency determines that the operator made a reasonable effort to implement the productivity improvement recommendations adopted after the last triennial TDA audit (completed in June 2019). SANDAG evaluates operator effort by tracking performance measures over a rolling three-year period, as well as an annual review of actions taken by each operator to address recommendations received during the triennial audit.
Based on the performance measures monitored as part of the TDA Productivity Improvement Program, and the agencies responses to the audit recommendations, staff has determined that the Metropolitan Transit System (MTS) and the North County Transit District (NCTD) have made reasonable efforts toward achieving their FY 2019 productivity improvements and should be allocated their full allocation of FY 2021 TDA Funds.
Additionally, SANDAG has monitored the performance of the CTSA in accordance with the performance measures set forth in its contract, and determined that it is meeting those goals.
Key Considerations
The TDA Productivity Improvement Program includes all of the performance measures included in the state TDA Guidebook Section 99246(d). Additionally, SANDAG tracks multiyear trend analysis since it is recognized that steps taken by the transit agencies to improve system performance often take several years to be fully realized. The Productivity Improvement Program for FY 2020 included an evaluation of the following six TDA performance measures over a three-year period (Quarter 2 FY 2017 to Quarter 2 FY 2020):
• Operating Cost Per Passenger (adjusted for annual inflation) – measures cost-effectiveness
• Operating Cost Per Revenue Hour (adjusted for annual inflation) – measures cost-efficiency
Action: Recommend
An overview of the efforts taken by the Metropolitan Transit System (MTS) and North County Transit District (NCTD) to implement the FY 2020 Transportation Development Act (TDA) Productivity Improvement Program will be presented. The Transportation Committee is asked to recommend that the Board of Directors approve the eligibility of MTS and NCTD to receive their FY 2021 TDA allocations of funds.
Fiscal Impact:
Approval of the requests will allow the requesting agencies to receive their full FY 2021 Transportation Development Act (TDA) revenue apportionment. Denial of the eligibility request may result in a potential reduction of funding in a future fiscal year.
Schedule/Scope Impact:
The Metropolitan Transit System and North County Transit District can be allocated no more in FY 2021 than they were in FY 2020 unless it is determined that they made a reasonable effort to implement the productivity improvement recommendations adopted after the last triennial TDA audit.
![Page 35: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/35.jpg)
2
• Passengers Per Revenue Hour – measures service productivity
• Passengers Per Revenue Mile – measures service productivity
• Revenue Hours Per Employee – measures labor productivity
• Farebox Recovery Ratio – measures cost-efficiency
Attachments 1 and 2 include the summary and charts for each of the six performance measures by mode.
The performance measures, which are reviewed quarterly by the Regional Short-Range Transit Planning Task Force, help determine if the agency is obtaining the desired results from the system and if overall performance is improving based on updated regional strategies, fare changes, and/or service operation plans. These performance measures also help the transit agencies determine where improvements can be made. Improvements can then be incorporated into each operator’s service implementation plan, which are included in the Coordinated Public Transit – Human Services Transportation Plan prepared by SANDAG.
TDA Triennial Audit Recommendations
In addition to the three-year performance measures monitoring associated with the annual TDA claim, the TDA Triennial Performance Audit included the development of improvement recommendations for the transit agencies. The most recent performance audit completed in June 2019 included one recommendation for MTS, and two for NCTD. These recommendations have been addressed by NCTD and MTS. Their action plans, the progress made to date to implement them, and updated responses (from Form B of the 2020 TDA Claim) are included in Attachments 3 and 4, respectively.
CTSA Performance Review
At the direction of the Transportation Committee, SANDAG amended its contract agreement with Full Access to Coordinated Transportation (FACT), the designated CTSA for San Diego County, in June of 2019 to add performance measures. FACT’s FY 2020 Quarter 2 report is included in Attachment 5. Since there have only been two full quarters of data received since the new contract was implemented, a long-term analysis of the data like the one that is completed for the transit operators is not yet possible. However, the monitoring report shows that FACT is fully complying with all requirements in the agreement.
Next Steps
SANDAG staff will continue to monitor the performance indicators on a quarterly basis.
Coleen Clementson, Director of Regional Planning
Key Staff Contact: Lisa Madsen, (619) 595-1432, [email protected] Attachments: 1. FY 2020 Productivity Improvement Performance Measure Summary
2. FY 2020 Productivity Improvement Performance Measure Results by Mode 3. MTS Annual TDA Claim Form (Form B) 4. NCTD Annual TDA Claim Form (Form B) 5. CTSA Performance Monitoring Report FY 2020 Q2
![Page 36: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/36.jpg)
Attachment 1
3
FY 2020 Productivity Improvement Performance Measures Summary
This Attachment 1 provides a summary of the Metropolitan Transit System (MTS) and the North County Transit District’s (NCTD) performance through Quarter 2 of FY 2020. Attachment 2 includes charts for each of the six performance measures by mode. In recent years, both MTS and NCTD have worked to improve ridership after years of decline. This downward trend was not unique to the San Diego region. MTS implemented its Transit Optimization Plan, while NCTD also implemented significant service changes to increase productivity. Both agencies also looked to stabilize ridership and revenue metrics by updating the regional fare ordinance and reinvesting resources from underutilized services into more productive areas and routes with high demand. Despite the challenges that are being faced throughout the transit industry, the operators in the San Diego region have actively worked to maintain their productivity measures. By the end of Quarter 2 of FY 2020 (December 31, 2019), regional ridership had increased almost 1% (0.93%) over the second quarter of FY2019.
However, with the outbreak of the COVID-19 global pandemic in early 2020, the agencies are again facing declines in ridership while working to protect the health and safety of their employees and riders.
MTS FY 2020 Performance
• Summary: The MTS farebox recovery ratio for MTS Fixed-Route services ended the quarter at 35%. This is above the 31.9% TDA minimum threshold requirement. For ADA services, the farebox recovery rate ended the quarter at 11.5%, and is also above the TDA minimum threshold of 10%. MTS is working to improve the efficiency of both the fixed-route and ADA service, which is outlined in their response in Attachment 3.
• MTS Trolley has seen a 2.3% increase in the operating cost per passenger, a 3.5% increase in the operating cost per revenue hour, a 1.2% increase in passengers per revenue hour, and a 0.31% increase in passengers per revenue mile since Quarter 2 in FY 2019.
• MTS Bus has seen a 4.5% increase in the operating cost per passenger, a 2% increase in the operating cost per revenue hour, a 2.4% decrease in passengers per revenue hour, and a 2.3% decrease in passengers per revenue mile since Quarter 2 in FY 2019.
• Rapid (Routes 201, 202, 204, 215, 225, 235, and 237) has seen a 6.8% increase in the operating cost per passenger, a 6.3% increase in the operating cost per revenue hour, a 0.52% decrease in passengers per revenue hour, and a 5.6% decrease in passengers per revenue mile since Quarter 2 in FY 2019.
• MTS ADA has seen a 6.4% decrease in the operating cost per passenger, a 7% decrease in the operating cost per revenue hour, a 0.66% decrease in passengers per revenue hour, and a 0.17% decrease in passengers per revenue mile since Quarter 2 in FY 2019.
![Page 37: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/37.jpg)
4
NCTD FY 2020 Performance
• Summary: NCTD farebox recovery rate for fixed-route services has decreased, ending the quarter at 16.85%, which is below the 18.8% TDA minimum threshold requirement. For ADA services, the farebox recovery rate ended the quarter at 8.6%, which is below the TDA minimum threshold of 10%. However, NCTD is working to improve the operating efficiency of both the fixed-route and ADA service, as evidenced in their response in Attachment 4.
• NCTD COASTER has seen a 22.8% increase in the operating cost per passenger, a 20.6% decrease in the operating cost per revenue hour, a 35.3% decrease in passengers per revenue hour, and a 17.5% decrease in passengers per revenue mile since Quarter 2 in FY 2019.
• NCTD SPRINTER has seen a 2.1% decrease in the operating cost per passenger, a 5.5% increase in the operating cost per revenue hour, a 7.8% increase in passengers per revenue hour, and an 8.3% increase in passengers per revenue mile since Quarter 2 in FY 2019.
• NCTD BREEZE (including FLEX) has seen a 2.1% increase in the operating cost per passenger, a 0.2% decrease in the operating cost per revenue hour, a 2.3% decrease in passengers per revenue hour, and a 2.3% decrease in passengers per revenue mile since Quarter 2 in FY 2019.
• NCTD ADA has seen a 16.7% increase in the operating cost per passenger, a 30.4% increase in the operating cost per revenue hour, a 11.7% increase in passengers per revenue hour, and a 11.6% increase in passengers per revenue mile since Quarter 2 in FY 2019.
![Page 38: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/38.jpg)
Attachment 2
5
FY 2020 Productivity Improvement Performance Measure Results by Mode
$0
$5
$10
$15
$20
$25
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 1: Operating Cost per PassengerRail (COASTER, SPRINTER, Trolley)
COASTER SPRINTER Trolley
$0
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 2: Operating Cost per PassengerBus (MTS Bus, Rapid, and NCTD Breeze)
MTS Bus RAPID NCTD Bus
![Page 39: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/39.jpg)
6
$0
$10
$20
$30
$40
$50
$60
$70
$80
$90
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 3: Operating Cost per PassengerBus (MTS and NCTD ADA Patatransit)
MTS ADA NCTD ADA
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
2nd Qtr 3rd Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 4: Operating Cost per Revenue HourRail (COASTER, SPRINTER, Trolley)
COASTER SPRINTER Trolley
![Page 40: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/40.jpg)
7
$0
$25
$50
$75
$100
$125
$150
$175
$200
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 5: Operating Cost per Revenue HourBus (MTS Bus, Rapid, and NCTD Breeze)
MTS FR RAPID NCTD FR
$0
$25
$50
$75
$100
$125
$150
$175
$200
2nd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 6: Operating Cost per Revenue HourBus (MTS and NCTD ADA Paratransit)
MTS ADA NCTD ADA
![Page 41: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/41.jpg)
8
0
50
100
150
200
250
300
2nd Qtr 3rd Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 7: Passengers per Revenue HourRail (COASTER, SPRINTER, Trolley)
COASTER SPRINTER Trolley
0
10
20
30
40
50
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20MTS Bus RAPID NCTD Bus
![Page 42: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/42.jpg)
9
0
1
2
3
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 9: Passengers per Revenue Hour Bus (MTS and NCTD ADA Paratransit)
MTS ADA NCTD ADA
0
1
2
3
4
5
6
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 10: Passengers per Revenue Mile Rail (COASTER, SPRINTER, Trolley)
COASTER SPRINTER Trolley
![Page 43: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/43.jpg)
10
0
1
2
3
4
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 11: Passengers per Revenue Mile Bus (MTS Bus, Rapid, and NCTD Breeze)
MTS Bus RAPID NCTD Bus
0.00
0.05
0.10
0.15
0.20
0.25
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 12: Passengers per Revenue Mile Bus (MTS and NCTD ADA Patatransit)
MTS ADA NCTD ADA
![Page 44: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/44.jpg)
11
0
25
50
75
100
125
150
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 13: Revenue Hours per Employee Rail (COASTER, SPRINTER, Trolley)
COASTER SPRINTER Trolley
0
100
200
300
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 14: Revenue Hours per EmployeeBus (MTS Bus, Rapid, and NCTD Breeze)
MTS Bus RAPID NCTD Bus
![Page 45: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/45.jpg)
12
0
50
100
150
200
250
300
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 15: Revenue Hours per EmployeeBus (MTS and NCTD ADA Patatransit)
MTS ADA NCTD ADA
0%
20%
40%
60%
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 16: Farebox Recovery Ratio Bus and Rail (MTS Fixed Route)
MTS Bus RAPID Trolley MTS FR Combined MTS Threshold
![Page 46: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/46.jpg)
13
0%
20%
40%
60%
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 17: Farebox Recovery Ratio Bus and Rail (NCTD Fixed Route)
NCTD Bus COASTER SPRINTER NCTD FR Combined NCTD Threshold
0%
5%
10%
15%
20%
2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr
FY17 FY18 FY19 FY20
Figure 18: Farebox Recovery Ratio Bus (MTS and NCTD ADA Paratransit)
MTS ADA NCTD ADA ADA Threshold
![Page 47: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/47.jpg)
Attachment 3
14
Page Performance Audit Recommendation(s)
Actions Taken to Implement Recommendations
40 Recommendations
The auditor recommended that the Metropolitan Transit System track and document the farebox recovery ratio very closely over the next several years both with Senate Bill 508 reporting and without. The auditor offered that a fare increase would bring farebox revenue back to historical averages and ought to be considered at the earliest opportunity.
The auditor notes an erosion of the Metropolitan Transit System’s (MTS’) systemwide farebox recovery ratio (FRR) during the audit period, from 40.5% in FY 2015 to 31.7% in FY 2018. In spite of the reduction, MTS is still in compliance with the Transportation Development Act (TDA) FRR thresholds. The decline over the audit period was partially a result of costs increasing faster than revenues, but also due to changes in Governmental Accounting Standards Board (GASB) accounting rules that added costs to the balance sheet.
GASB Statement 68 now requires reporting of the net pension liability in accrual-based financial statements, compared to the previous method in which funding and accounting were aligned. Further, GASB Statement 75 requires the balance sheet to report the total Unfunded Actuarial Accrued Liability for other post-employment benefits other than pensions, rather than the annual contribution expected based on a calculated long-term liability. These are accounting changes that have no impact on costs or revenues, simply in how future liabilities are reported.
MTS also notes that there are other “local funds” that are allowable through Section 99268.19 of the Public Utilities Code that were not included within the FRR calculation. Together they amounted to over $12 million in revenue for FY 2018 and FY 2019. Incorporating these, as MTS could do in the future, would result in a relatively significant increase in FRR of over 4 percentage points for MTS rail services and nearly 5 percentage points for MTS bus services, resulting in a system wide FRR of 39.1% in FY 2019. These items include advertising revenues, energy credits, and naming rights. Since historically we haven’t had challenges meeting the FRR target and thus have not needed to look at other “local funds” to enhance our revenue streams, we can track these sources of revenues and determine the impacts on FRR with and without these revenue sources.
Lastly, during the TDA audit process in early 2019, MTS was seeking approval from its Board of Directors and the SANDAG Board of Directors to adjust and simplify fares, with recommended changes that would increase annual revenues by approximately $5 million (primarily driven by the $1 increase in the day pass). Both MTS and NCTD Boards approved the changes and they were implemented in September 2019.
MTS' focus in the coming years will be to drive additional riders to the system through a simplified fare structure, and a significant enhancement of our transit network as the MTS Board considers pursuing additional funding through a future sales tax ballot measure.
ANNUAL TDA CLAIM FORM Form B STATEMENT OF EFFORTS MADE TO IMPLEMENT
PERFORMANCE AUDIT RECOMMENDATIONS
SANDAG Staff Member: Lisa Madsen Date Completed: April 28, 2020 Operator: Metropolitan Transit System (MTS) Date of Last Performance Audit: June 2019
![Page 48: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/48.jpg)
Attachment 4
15
ANNUAL TDA CLAIM FORM Form B STATEMENT OF EFFORTS MADE TO IMPLEMENT
PERFORMANCE AUDIT RECOMMENDATIONS
SANDAG Staff Member: Lisa Madsen Date Completed: April 24, 2020
Operator: North County Transit District (NCTD)
Date of Last Performance Audit: June 2019
Page Performance Audit Recommendation(s)
Actions Taken to Implement Recommendations
Recommendation 1
Expand efforts to understand what riders want and how to grow demand.
Actions Taken to Implement Recommendations
The North County Transit District (NCTD) has worked with outside consultants to develop a Strategic Multimodal Transit Implementation Plan (SMTIP). This is a ten-year strategic plan that provides insight over current and future travel patterns and demand within NCTD’s service area and identifies service and capital improvements that will support NCTD’s efforts to provide high quality transit services to North County residents and visitors over the long-term. Since the Transportation Development Act (TDA) audit, NCTD has completed the following:
• A review of existing plans, policies, and transit data to provide an up-to-date profile of existing conditions, as well as to track current and future initiatives to consider and integrate into the strategic plan.
• A Transfer Survey, where surveyors went to busy intermodal stations to talk to transit riders and document their trips, with a special focus on origin and destination, as well as the modal combinations that compose their everyday trips.
• A Location-Based Services (LBS) Travel Demand Analysis, anonymous cellphone-based data was used to identify overall trip characteristics within and around NCTD’s service area to understand the volume, length, and destinations of all trips in the region.
• Two Technical Working Group meetings, which participants heard: (1) a summary of results from the Land Use Transit Integration Study analysis and how it will be used as the foundation for the SMTIP; and (2) the key takeaways from the Transfer Study and the LBS Travel-Demand Analysis.
Over the course of the upcoming year, the information gathered over the past year and half will be used to develop service and capital improvement recommendations. These recommendations will include high-level cost and implementation considerations.
![Page 49: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/49.jpg)
16
Page Performance Audit Recommendation(s)
Actions Taken to Implement Recommendations
Recommendation 2
Closely track and document Farebox recovery ratio both with traditional calculation and according to SB 508 provisions.
NCTD calculates the farebox recovery ratio under two methods: (1) the method allowed under Public Utilities Code (PUC § 99270.1), which divides fare revenues to operating costs; and (2) the method allowed under Senate Bill 508 (Section 99268.19), where local funds can be used to supplement fare revenue for the purpose of meeting the applicable farebox recovery ratio. In addition, NCTD deducts from operating expenses the exclusions allowed under PUC 99268.17. The second method is reported to the State Controller’s Office.
NCTD and SANDAG have not yet reevaluated whether the 18.8% farebox recovery ratio (blended rate of urban/rural rate determined by legislation) should continue to be applicable to NCTD. During the 2019 legislative session the State legislature had discussions regarding a TDA reform that could have modified or eliminated the farebox recovery ratio. That effort did not move forward. Currently in the 2020 legislative session, due to the COVID-19 pandemic, the State legislature is working to temporarily suspend the imposition of financial penalties associated with non-compliance with farebox recovery requirements. NCTD and SANDAG will continue to track these efforts at the State level.
![Page 50: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/50.jpg)
10/01/19 - 12/31/19
mm/dd/yy - mm/dd/yy
Contract Number:
5000644
TDA Article 4.5 Funds
Number of referrals 100% referrals number reported (by agency)
Manage CAM
meetings and agendasAt least 4 CAM meetings held annually
CAM meeting agendas Report agenda and attendance from each CAM meeting
1 technical training
workshop per year,
and
6 training/education
items on CAM agenda
Report all training items
Number of web hits to
FACT website100% documentation of web hits
Number of web hits for
"Find a Ride" page100% documentation of web hits
Number of providers in
the database
Maintain contact with 100% of the agencies in the database each
year
List of identified
sources of funding. Update funding inventory at least annually
Number of applications
to SANDAG, DOT and
other funding sources
Provide list of annual applications submitted and dollar amount of
successful applications.
2. Facilitate at least 4 Council on Access and Mobility (CAM) Meetings annually.
3,404 web hits
Contact Information:
760-754-1252
Arun Prem, Executive Director
Full Access and Coordinated Transportation, Inc. (FACT)
516 Civic Center Dr., Oceanside, CA 92054
•CAM Meeting on November 12, 2019
•FACT Annual Meeting on December 17, 2019
•Next CAM Meeting Scheduled for February 2020
•See Attachment A, Pg. 2 for Agendas
• Attendance:
oCAM Meeting on November 12th: 20 Participants
oFACT Annual Meeting on December 17th: Approximately 80 Participants
•Presentation by Judi Bonilla, Advocates For Aging, on Customer service and Age Sensitivity Training- 11/12/19
•FACT Annual Meeting, Networking and Presentations by Hon. Todd Gloria, Hasan Ikhrata, and Colin Parent - 12/17/19
•Group training tentatively scheduled for Spring 2020: Customer Service and Age Sensitivity Training that was reviewed and
discussed at the 11/12/19 CAM Meeting.
3. Maintain a public webpage that hosts a comprehensive and up to date database of specialized transportation providers, including options for seniors and persons with disabilities.
CTSA Performance Monitoring Report
TASK PERFORMANCE MEASURE/DELIVERABLE QUARTERLY DATA
1. Provide information and referral services.
343 Referrals (See Attachment A, Pg. 1 for a breakdown by agency)
Consolidated Transportation Services Agency (CTSA) QUARTER: 2 Notes:
391 web hits
•Current number of agencies: 180
•Approximately 25% of agencies in the database are contacted each quarter to verify annually that all agencies’ information is
accurate. 43 agencies where contacted this quarter (Attachment A, Pg. 4)
•Number of agencies added: 1
4. Increase/leverage available funding for senior/disabled transportation in the San Diego Region.
Caltrans' FTA 5310 program, FTA 5339 (b) and (c) programs, FTA Mobility for All Grants, NCMM Grants, County of San Diego
Community Enhancement Grant (CE) and Neighborhood Reinvestment Program (NRP), and SANDAG's Specialized Transportation
Program (STGP): TransNet SMG and FTA 5310), and Coordinated Agency Services (Currently 8 contracts); New contracts: City of
Escondido began 11/1/19 and Scripps Healthcare to begin 1/15/20.
•No applications where submitted this quarter
•Caltrans FTA 5310 program application - submitted 9/5/2019 - waiting for award announcements
•FTA 5339 (b) Application through Caltrans - submitted 6/19/19 - Awarded: $466,883, Announcement 11/25/19
Attachment 5
17
![Page 51: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/51.jpg)
ATTACHMENT A
AGENCY NAME # OF REFERRALS TO AGENCY
AMERICAN CANCER SOCIETY 2
CARE VAN EXPANDED SERVICES 1
City of Escondido - Senior Service Council 1
City of La Mesa - Rides4Neighbors 6
City of Oceanside - Solutions for Seniors 12
CITY OF SAN MARCOS - CATCH A RIDE 4
Elderhelp - Seniors - A - Go - Go 1
FACT - RideFACT 218
GOGOGRANDPARENT 2
Jewish Family Service - On the Go 3
MTS Access 60
NCTD FLEX 1
NCTD LIFT 26
Scripps Mercy Shuttle 1
SHARP Healthcare Transportation 5
TOTAL 343
*RideFACT provided 2,735 trips in October and 2,388 trips in November for seniors and/or
individuals with disabilities who had no other transportation options
OCTOBER - DECEMBER 2019
18
![Page 52: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/52.jpg)
FACT| 516 Civic Center Dr. Oceanside CA 92054 |Ph: (760) 754 1252 |Fax: (760) 757 3226 E-mail: Budd Anderson, CAM Liaison, [email protected]
FACT is a 501 (c) (3) Non-Profit Corporation
MEETING AGENDA AND NOTICE Council on Access & Mobility (CAM) Meeting
Tuesday, November 12, 2019 10:00 a.m. – 11:30 a.m. City of Oceanside
Country Club Senior Center, Room G/H 455 Country Club Lane Oceanside, CA 92054
1. Introductions (please sign-in)
2. Presentation/Training:
• Judi Bonilla, Overview of Customer Service & Age Sensitivity Training for FACT
• Training Update and Recommended Topics – Budd
3. CAM Chair and Vice Chair Nominations - Budd
4. CTSA and FACT Transportation Services Updates 1. Referrals – Meagan 2. Ridership – Meagan 3. New Coordinated Services Contracts and Pilots – Meagan 4. Website Update – Meagan 5. Staffing Update – Budd 6. Leveraging FACT Report and Report Release Event – Meagan 7. 2019 FACT Annual Meeting, December 17th – Budd
5. General Information
1. Accompanied/Unaccompanied Rider Policies - Meagan
2. SANDAG Regional Plan Working Group Forum Recap– Budd and Meagan 3. 19-02-012 TNC Access for All, Workshop Recap – Meagan 4. APTA and CalAct Conference Recap – Budd and Meagan
6. CAM Member Updates
***Next CAM Event– FACT Annual Meeting, Tuesday December 17, 2019, 8:30AM at Braille Institute
19
![Page 53: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/53.jpg)
ANNUAL BOARD of DIRECTORS MEETING
December 17, 2019 Braille Institute
8:30 AM
Meet & Greet Refreshments sponsored by FACT’s Transportation Brokerage partners
9:00 AM
Call to Order Welcoming Remarks by Board Chair
Presentation
Hon. TODD GLORIA, ASSEMBLYMEMBER
FACT Annual Report FY 2019
Presentation
Mr. HASAN IKHRATA, EXECUTIVE DIRECTOR, SANDAG
FACT Board Member Introductions & Board Officers 2020 Recognition of Riders, Vendor of the Year, CAM
Public Comment
Action Item FY 2019 Independent Financial Audit Report
Presentation
Mr. RAY TELLIS, FTA REGION IX ADMINISTRATOR
Presentation Mr. COLIN PARENT, EXECUTIVE DIRECTOR, CIRCULATE SAN DIEGO
REPORT LEVERAGING FACT
2019 Norine Sigafoose Partner of the Year Award CITY of OCEANSIDE
Closing
Adjournment
20
![Page 54: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/54.jpg)
• October- December 2019 o LYFT o UBER o MTS o MTS ACCESS o MTS TRAVEL TRAINING PROGRAM o NCTD o OCEANSIDE- VOLUNTEER DRIVER SERVICES o OUT & ABOUT ESCONDIDO o PARKINSON’S ASSOCIATION SAN DIEGO o RING A RIDE o SOLANA BEACH PRESBYTERIAN CHURCH o THE CARLSBAD CONNECTOR o TOP STATE MEDICAL TRANSPORT o TRAVELER’S AID- REUNIFICATION PROGRAM o UPLIFT SENIOR PARTNERS PLUS o CARE 4 U MOBILITY o CARE VAN- FALLBROOK o CARE VAN EXPANDED SERVICE o SAN MARCOS- CATCH-A-RIDE! o DAV VETERANS SPECIAL MODE TRANSPORTATION o FALLBROOK TAXI o CASA DE SALUD SENIOR CENTER o CAMP PENDLETON Y SHUTTLE o ESCONDIDO PARK AVE CAFÉ VAN SERVICE o FLEX 371 RAMONA COMMUTER o FLEX 372 RAMONA MDDAY o FLEX 392 CAMP PENDLETON o FLEX 395 SAN ONOFRE o GOLDEN STATE TRANSPORTATION o JFS BALBOA AVE OLDER ADULT CENTER o JFS COLLEGE AVE SOCIAL & WELLNESS CENTER o JFS ON THE GO NAVGATOR o JFS ON THE GO EXCURSIONS o JFS RIDE & SMILES o JFS ON THE GO SILVER o JFS OTG OUT & ABOUT DEMENTIA FRIENDLY EXCURSIONS o UNIVERSITY CITY OLDER ALDULT CENTER o LA JOLLA SENIOR EXPRESS o NORTH COUNTY INLAND CENTER o ARS TRANSPORTATION o HOSTELLING INTERNATIONAL- SAN DIEGO DOWNTOWN o HOSTELLING SAN DIEGO POINT LOMA o INTERNATIONAL RESCUE COMMITTEE TRANSPORTATION
21
![Page 55: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/55.jpg)
***REVISED***
Transportation Committee Item: 6 June 5, 2020
Comprehensive Multimodal Corridor Plans
Overview
On September 27, 2019, the Board of Directors took
action to advance development of the 5 Big Moves by
allocating $40 million over the next five fiscal years to
complete Comprehensive Multimodal Corridor Plans
(CMCPs) for 12 corridors throughout the region.
CMCPs promote a planning process that utilizes a
holistic and multimodal approach and strives to achieve
a balanced transportation system. Comprehensive
Multimodal Corridor Planning is undertaken to help
inform the decision-making process and provide
communities with an overall vision for the future of the
corridor including guidance and coordination for future
improvements necessary to meet corridor plan goals.
This planning process is designed to establish consensus
on the scope and priority of transportation solutions
within each corridor area.
CMCPs must be completed to be eligible for Solutions
for Congested Corridors Program funding, a competitive
funding program created by Senate Bill 1. The CMCPs
also will be used to compete for other local, state, and federal funds.
Discussion
The September 27, 2019, Board action identified 5 of the 12 corridors as priority corridors with completion of
the CMCPs by summer 2021. The five priority corridors include: (1) Central Mobility Hub and Connections;
(2) State Route 52 (SR 52); (3) State Route 67 (SR 67); (4) SPRINTER/Palomar Airport Road/State Route 78; and
(5) Purple Line/Interstate 805 (I-805)/ Blue Line/Interstate 5 (I-5) South. This listing includes recommended
adjustments since last approved by the Board on September 27, 2019. Because the policy consideration
priorities are anticipated to be different, the SR 52/SR 67 corridor is recommended to be split into two
separate corridors. Because there is overlap in the geographical area and the policy considerations priorities
are anticipated to be similar, it is recommended that the Purple Line/I-805 and Blue Line/I-5 South corridors
be combined. High speed transit is no longer being considered on the SR 52/67 corridors as part of the
5 Big Moves. It is recommended that this be eliminated from the scope of the SR 52 and SR 67 corridor
studies. These adjustments will facilitate a more efficient process for the completion of the five priority
CMCPs.
A workshop was held with Caltrans District 11 to develop guidelines for the delivery of the CMCP program,
teams have been established that include staff from the San Diego Association of Governments, Caltrans,
and Cities/County, and project management plans have been developed for each CMCP.
Action: Discussion/Possible Action
An overview of the Comprehensive
Multimodal Corridor Plans (CMCPs) program
to refine and prioritize transportation solutions
on five priority corridors using a policy, data,
and collaboration-driven approach will be
presented.
Fiscal Impact:
Funding for development of the
Comprehensive Multimodal Corridor Plans is
included in the Capital Improvement Program
Nos. 1600501, 1600502, 1605201, 1607801,
and 1680501 in the amended FY 2020
Program Budget.
Schedule/Scope Impact:
The next major milestone is the summer/fall
2020 presentation on preliminary results of
data analysis for each of the five corridors.
![Page 56: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/56.jpg)
2
Geographical Study Areas
The draft geographical study area for each corridor is shown in Attachment 1. The areas have been
established to capture the prevalent travel sheds for each corridor.
Issues and Opportunities
An issues and opportunities statement has been prepared for each corridor and is shown in Attachment 2.
These draft statements are a work in progress, will evolve over time, and are included in this report for
discussion purposes.
Policy Considerations
Each corridor team is in the process of prioritizing the 12 policy considerations shown in Attachment 3.
The priorities will be presented to the Transportation Committee beginning summer/fall 2020 for review and
discussion. Policy considerations for transportation corridor studies established by the California
Transportation Commission, Federal Transit Administration, and Federal Highway Administration can
generally be grouped into 12 categories. These 12 policy considerations were presented to the
Transportation Committee at its February 21, 2020, meeting. Based on comments received at that meeting,
changes are shown in underline and strikeout.
Schedule and Next Steps
Stakeholder engagement and community outreach was originally scheduled for summer 2020. Stakeholder
engagement will proceed but the COVID-19 pandemic has delayed the public outreach to fall 2020 or
winter 2020/2021. However, even with the delay to public outreach, it is believed that the CMCPs can still be
completed by summer 2021, in time for anticipated Senate Bill 1 funding opportunities. Beginning
summer/fall 2020, a series of presentations will be scheduled for the Transportation Committee to discuss
data analysis findings, policy priorities, and the status of stakeholder engagement.
Coleen Clementson, Director of Regional Planning
Key Staff Contact: Richard Chavez, (619) 699-6989, [email protected]
Attachments: 1. CMCP Geographical Areas
2. Comprehensive Multimodal Corridor Plan Issues and Opportunities Statements
3. Policy Considerations
![Page 57: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/57.jpg)
Attachment 1
3
![Page 58: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/58.jpg)
Attachment 2
4
Comprehensive Multimodal Corridor Plan (CMCP) Issues and Opportunities Statements Draft: May 22, 2020 The following are draft statements of the issues and opportunities for the priority Comprehensive Multimodal Corridor Plans (CMCPs). The issues and opportunity statements will evolve over time. The Transportation Committee is asked to review and comment. For a general depiction of the geographical area covered by each corridor study, see Attachment 1. Central Mobility Hub and Connections Corridor Currently the region lacks seamless, direct, and quality transit connections to access the San Diego International Airport (SDIA). With an anticipated increase of 16 million annual passengers to 40 million annual passengers by 2050, improved transit and roadway connections are needed. Coronado is home to one of the region’s major military bases. With limited road and waterway access, Coronado experiences a high level of delay during peak periods. When traffic incidents occur on the Coronado Bridge or on the Silver Strand (State Route 75), access to and from Coronado is impacted. Interstate 5 (I-5) between Downtown San Diego and Interstate 8 provides access to SDIA, job centers in Downtown San Diego, and job centers further north. I-5 experiences delays in the northbound direction in the morning peak and southbound in the afternoon peak period. Opportunities exist for the creation of a Central Mobility Hub in the study area, providing high-speed, high-quality transit connections to destinations throughout the region. Future technologies may also provide opportunities for new transportation services and to better manage existing transportation infrastructure. Purple Line (Purple Line/Blue Line Express/I-5 South/I-805) Corridor There are high levels of congestion along the segment of I-5 between Downtown San Diego and San Ysidro and Interstate 805 (I-805), especially during the peak periods. Ten of the region’s top fifty bottlenecks are located in the corridor. Within the study area, cross-border travel and goods movement are also subject to high-levels of delay. Along I-805, there are lengthy delays for commuters traveling to employment centers in University City and Sorrento Valley. There is a lack of high-speed transit, contiguous high-occupancy-vehicle and managed lanes (HOV/ML), and bikeways in the corridor. Local streets and arterials typically lack accommodation for bicycle and pedestrian movement, especially at freeway crossings. Intelligent Transportation Systems (ITS) applications has been pinpointed as an important need in the corridor with particular attention to goods movement and border activities. Sea to Santee (SR 52) Corridor There are high levels of congestion in the westbound direction during the morning peak and in the eastbound direction during the afternoon peak on SR 52. Maintaining a distinct community character while improving transportation efficiency and travel reliability are needed. There are also needs for a safe, well-maintained transportation system augmented with opportunities to reduce bottleneck delay, deploy technology to manage traffic demands, improve network integration with connectors to HOV/ML and Mobility Hubs, improve bike/pedestrian access, and develop reliable transit options. San Vicente (SR 67) Corridor Improving operational safety and emergency evacuation options are the principal needs for this corridor. Maintaining community character, trip reliability and efficiency, greenhouse gas emissions reduction strategies, protecting natural resources, and an equitable distribution of transportation improvements are also needed. Developing a multimodal transportation strategy that includes bicycle, pedestrian, and transit services and the application of ITS technologies provides opportunities to improve the transportation system.
![Page 59: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/59.jpg)
5
North County Regional (SPRINTER/SR 78/Palomar Airport Road/SR 76) Corridor Population and employment growth in this corridor has led to an increase in travel demand and travel related delay. Efficient movement of people and goods is limited by an incomplete transportation network including missing freeway-to-freeway connectors at the I-5/SR 78 interchange, gaps in the Inland Rail Trail bikeway, low SPRINTER frequencies and travel speeds, gaps in the arterial system, and a lack of HOV/ML on SR 78. These factors have resulted in high levels of congestion on SR 78. There is also a need to optimize the existing transportation network with operational improvements, smart signals, and transportation system management techniques.
![Page 60: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/60.jpg)
Attachment 3
6
Policy Considerations
Policy considerations for the development of Comprehensive Multimodal Corridor Plans (CMCPs) are the
overarching goals used to refine project scope and define the priority transportation solutions for each
corridor. Per transportation corridor planning guidelines established by the California Transportation
Commission, Federal Transit Administration, and Federal Highway Administration, policy considerations
include:
1. Public safety and security
2. Preserve existing transportation infrastructure
3. Multimodal focus
4. Economic development and goods movement
5. System operations and efficiency congestion relief
6. Low- income and disadvantaged community focus
7. Reduce greenhouse gas emissions and Vehicle Miles Traveled (VMT)
8. Improve air quality and public health
9. Active transportation and micromobility
10. Prevent residential and small business displacement
11. Increase supply of affordable housing
12. Improve jobs-housing balance
Changes to the policy considerations since last presented to the Transportation Committee on February 21,
2020, are shown in underline and strikeout.
![Page 61: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/61.jpg)
Transportation Committee Item: 7 June 5, 2020
Del Mar Bluffs Long-Term Alternatives
Overview
The Los Angeles-San Diego-San Luis Obispo (LOSSAN) Rail Corridor connects San Diego with points north along the coastal rail corridor (Attachment 1). It is the second-busiest intercity passenger rail corridor in the nation, and San Diego’s only viable freight rail corridor.
Part of the LOSSAN Rail Corridor traverses along the Del Mar Bluffs, a coastal bluff area that is subject to erosion. The Del Mar Bluffs are subject to natural retreat, which is influenced by weather, tides, surf, and sea level rise. The bluffs can naturally be expected to retreat at an annual average rate of up to six inches per year. However, bluff retreat occurs in episodes which may be significantly above or below the average rate of retreat at any specific location. Continued bluff retreat will occur and threatens the viability of rail service.
Since 1998, the San Diego Association of Governments (SANDAG) and the North County Transit District (NCTD) have completed several projects to limit retreat in the most at-risk locations. The stabilization efforts will continue to be a priority for both agencies.
At the same time these short-term improvement solutions are being pursued, SANDAG also is moving ahead to evaluate long-term alternative alignments and costs for relocating the tracks off the bluff. In September 2019, the Board of Directors allocated $3 million in part for an engineering evaluation of these alternatives. This conceptual planning study is scheduled to begin in June.
Key Considerations
In 2017, SANDAG completed the Conceptual Engineering and Environmental Constraints for Double Track Alignment Alternatives Between Del Mar Fairgrounds and Sorrento Valley, which evaluated five potential tunnel alignments (Attachment 2). Major findings of the study include:
• Each alignment runs between San Dieguito Lagoon through Los Penasquitos Lagoon to Sorrento Valley.
• Each is about 5 miles in total length with underground sections between 10,000 and 13,000 feet in length.
• Each alignment adds a second track to this segment of the corridor.
• The Camino Del Mar Alternative is proposed as cut and cover (10-70 feet below grade).
• The remaining four alternatives are proposed as bored tunnels (30-250 feet below grade).
• Emergency access was proposed for all five alignments including stairs and third tunnels.
• Ventilation is required and proposed at both portals and mid-tunnel.
• Numerous impacts were documented in the report including right-of-way, circulation, construction, and visuals.
• Cost estimates ranged from $2.5 billion to $3.5 billion in 2017 dollars.
• Passenger rail travel time to traverse this section ranged from 3.2 minutes to 6 minutes.
Action: Discussion/Possible Action
An overview of the current conditions and efforts underway to develop a long-term solution for rail infrastructure for the LOSSAN Rail Corridor in the City of Del Mar will be presented.
Fiscal Impact:
Rough order of magnitude cost estimates for all tunnel alternatives range from $2.5 billion to $3.5 billion in 2017 dollars.
Schedule/Scope Impact:
SANDAG will continue to study these tunnel alignments over the next 12-18 months to develop updated alignments and cost estimates.
![Page 62: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/62.jpg)
2
Next Steps
In June, SANDAG is expected to begin a detailed conceptual engineering evaluation of the five tunnel alternatives including evaluating the latest in tunnel technology and construction, updated cost estimates, and a technical evaluation in an effort to narrow down the number of alternatives from five. The study is expected to take 12-18 months. Preliminary and final findings and recommendations of the study will be presented to the Transportation Committee and the Board of Directors. Staff also will continue to report back to the San Diego Regional Rail Corridor Working Group, a group of local, state, and federal leaders convened by California State Transportation Agency Secretary David Kim, to focus attention on both short-term and long-term solutions along the Del Mar Bluffs.
John Haggerty, Director of Engineering and Construction
Key Staff Contact: Linda Culp, (619) 6957, [email protected] Attachments: 1. LOSSAN Rail Corridor Map
2. Del Mar Tunnel Alternative Alignments, 2017
![Page 63: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/63.jpg)
LOSSAN Rail Corridor Map
Project Area
Attachment 1
3
![Page 64: Transportation Committee Agenda...Public comments under this agenda item will be limited to five public speakers. Members of the public shall have the opportunity to address the Transportation](https://reader033.vdocuments.mx/reader033/viewer/2022042411/5f29953b5c558b6de923b0fa/html5/thumbnails/64.jpg)
Del Mar Tunnel Alternative Alignments, 2017
Attachment 2