New York Headquarters 4110 Quentin Road Brooklyn, NY 11234-4322 Phone: 718.645.3962 Brooklyn Laboratory 3604 Quentin Road Brooklyn, NY 11234-4204 Phone: 718.758.4205 Rhode Island Regional Office One Richmond Square – Suite 121F Providence, RI 02906-5139 Phone: 401.499.4354 [email protected] - www.chrysalisarchaeology.com To: City of New York – Landmarks Preservation Commission City of New York – Department of Design and Construction WSP/Parsons Brinckerhoff From: Alyssa Loorya, M.A., MPhil., R.P.A. and Christopher Ricciardi, Ph.D., R.P.A. Re: In-Progress Field Memorandum for the Record #01 as part of Washington Square Park, New York, New York County, New York – Water Mains Replacement and Connections Project (MED608) - Located at W. 4 th St between Broadway and LaGuardia Place, Washington Square East, and Washington Square North between Fifth Avenue and University Place in Manhattan, New York Date: November 3, 2015 INTRODUCTION Chrysalis Archaeological Consultants, Inc. (Chrysalis), has been retained by the WSP-Parsons Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct all necessary Cultural Resource Management (Archaeological) tasks associated with the Water Mains Replacement and Connections Project (MED608) at Washington Square Park, located at W. 4th Street between Broadway and LaGuardia Place, Washington Square East, and Washington Square North between Fifth Avenue and University Place in Manhattan, New York (Map 01). An Archaeological Monitoring Plan, Unanticipated Discoverers and Human Remain Protocol Plan previously submitted to, and approved by, the City of New York – Landmarks Preservation Commission (LPC), describes the procedures and tasks to be performed as part of the Phase IB Archaeological Project. This In-Progress Field Memorandum for the Record #01 describes the discovery of the Burial Vault as part of monitoring for the Consolidated Edison gas line excavation (Map 01).

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

NewYorkHeadquarters4110QuentinRoad

Brooklyn,NY11234-4322

Phone:718.645.3962

BrooklynLaboratory3604QuentinRoad

Brooklyn,NY11234-4204

Phone:718.758.4205

RhodeIslandRegionalOfficeOneRichmondSquare–Suite121F

Providence,RI02906-5139

Phone:401.499.4354

[email protected]

To: City of New York – Landmarks Preservation Commission City of New York – Department of Design and Construction WSP/Parsons Brinckerhoff From: Alyssa Loorya, M.A., MPhil., R.P.A. and

Christopher Ricciardi, Ph.D., R.P.A. Re: In-Progress Field Memorandum for the Record #01 as part of Washington Square Park,

New York, New York County, New York – Water Mains Replacement and Connections Project (MED608) - Located at W. 4th St between Broadway and LaGuardia Place, Washington Square East, and Washington Square North between Fifth Avenue and University Place in Manhattan, New York

Date: November 3, 2015 INTRODUCTION Chrysalis Archaeological Consultants, Inc. (Chrysalis), has been retained by the WSP-Parsons Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct all necessary Cultural Resource Management (Archaeological) tasks associated with the Water Mains Replacement and Connections Project (MED608) at Washington Square Park, located at W. 4th Street between Broadway and LaGuardia Place, Washington Square East, and Washington Square North between Fifth Avenue and University Place in Manhattan, New York (Map 01). An Archaeological Monitoring Plan, Unanticipated Discoverers and Human Remain Protocol Plan previously submitted to, and approved by, the City of New York – Landmarks Preservation Commission (LPC), describes the procedures and tasks to be performed as part of the Phase IB Archaeological Project. This In-Progress Field Memorandum for the Record #01 describes the discovery of the Burial Vault as part of monitoring for the Consolidated Edison gas line excavation (Map 01).

Page 2: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

2

Map 01: Approximate location of Consolidated Edison’s Gas Line Trench.

Page 3: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

3

On Tuesday, November 3, 2015 archaeological monitoring identified a burial vault just south of Waverly Place, along Washington Square East. The arched brick roof of the vault was exposed at approximately 3.5’ below surface. The rear wall of the vault, constructed of stone, was also exposed. A concrete duct bank runs along the top of the vault. Two stones were removed to view inside the vault. At the far end of the vault a set of steps and a door were observed. The roof of the vault exhibits a patch where it had been previously opened – beneath this patch are a depression and a scatter of bricks (Image 01). On the left side of the vault there appears to be an articulated skeleton present, surrounded by broken wood (presumably remnants of the coffin) (Image 02). What appears to be a small pile of disarticulated bone was observed in the northeast corner of the vault. The southeast corner of the vault contains a large pile of disarticulated bone. From the small view available and digital photographs that were taken there appears to be between 9 and 12 skulls present (Image 03). The floor of the vault exhibits several wooden fragments of various sizes and what appears to be at least one coffin plate. Based on conversations with the contractor – a portion of the vault roof needs to be removed for installation of a water line; and approximately 3’ – 4’ of the rear wall of the vault needs to be removed for installation of the gas line. Excavation for the gas line will extend to approximately 8’ below surface. Presently the contractor is removing the concrete duct that lies along the roof of the vault and clearing the area surrounding the vault structure so that it can be documented. Chrysalis will coordinate with LPC tomorrow, Wednesday November 4, 2015. Chrysalis will also notify the Office of the Medical Examiner and begin enacting all approved protocols. Following consultation with LPC, we will know the level of documentation required and a determination will be made if the skeletal remains will be documented in place, or documented and removed. If the remains are to be removed, Chrysalis will coordinate with the Funeral Director to obtain the necessary Department of Health permits as required by New York City law. Once all parties agree to the path forward Chrysalis will gather the resources to continue to the documentation and potentially removal of the skeletal remains. If skeleton remains are removed from the site they will be transported to Chrysalis’ laboratory and arrangements will be made for re-interment following the conclusion of the project.

Page 4: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

4

Image 01: Burial vault interior looking east.

Page 5: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

5

Image 02: Possible articulated skeleton and pile of disarticulated human skeletal remains.

Page 6: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

6

Image 03: Large pile of disarticulated human skeletal remains.

Page 7: To: City of New York – Landmarks Preservation …...2015/11/03  · Brinckerhoff (WSP-PB) on behalf of the City of New York - Department of Design and Construction (DDC) to conduct

7

REFERENCES Chrysalis Archaeological Consultants, Inc. 2015 Archaeological Monitoring, Unanticipated Discoveries and Human Remains

Protocol Plans for the Water Mains Replacement and Connections Project (MED608) - Located at West 4th Street between Broadway and LaGuardia Place, Washington Square East, and Washington Square North between Fifth Avenue and University Place in Manhattan, New York. Report on file with the City of New York – Landmarks Preservation Commission. New York, New York.