tkg manual stripper

6
Kirk kpatr ick W Prepare VOS Head Off Distributio Tel: +6 E-mail: en Wire R CAT ed by : Mr. SS (F ice : Block 80 n Center : 40, T 65 - 6296 nquiry@vossf Rope L TALOG John Lee / F .E.) P 3 King George Toh Guan Road 4992 F fe.com W Lubric G 201 / Gelsey Che PTE L e’s Ave #01-1 d East, #01-70 E Fax: +65 - Website: www catio 11 eong L TD 92, Singapore Enterprise Hub, - 6298 29 w.vossfe.com n Sys e 200803. Singapore 608 12 stems 582. s

Upload: fahreez

Post on 19-Jan-2016

43 views

Category:

Documents


1 download

DESCRIPTION

Clean your wire rope effortless, save your time and man power. Economic, effective and reliable. TKG USA

TRANSCRIPT

Page 1: TKG Manual Stripper

Kirk

kpatrrick W

Prepare

VOSHead OffDistributio

Tel: +6E-mail: en

 

Wire R

CAT

ed by : Mr.

SS (Ffice : Block 80n Center : 40, T

65 - 6296 nquiry@vossf

Rope L

TALOG

John Lee /

F.E.) P3 King GeorgeToh Guan Road

4992 Ffe.com W

Lubric

G 201

/ Gelsey Che

PTE Le’s Ave #01-1d East, #01-70 E

Fax: +65 -Website: www

catio

11

eong

LTD 92, Singapore

Enterprise Hub,

- 6298 29w.vossfe.com

n Sys

e 200803. Singapore 608

12

stems

582.

s

Page 2: TKG Manual Stripper

Page 10 of 20  

GROOVE CLEANER KIT Groove Cleaner Kits are provided in three configurations: Right Lay, Left Lay and Smooth Bore. Groove Cleaners act to clean the outer circumference as well as the wire rope groove pattern of contaminants that hinder the penetration of new coatings being applied inside the Seal Lubrication Chamber. Non-Spin and/or Double Armor wire ropes do not have or have little groove pattern to clean. Therefore, the Smooth Bore Groove Cleaners are offered to clean the outer circumference of these types of wire rope configurations. Right and Left Lay groove Cleaners available.

NOTE: All groove cleaners are 6-strand unless otherwise noted.

SMOOTH‐BORE GROOVE CLEANER ‐ 2 Groove Cleaner per set Smooth Bore Groove Cleaner                                   

Part Number                                                 Diameter (Inches)  Diameter (Millimeters) 

VMSBG516 5/16" 7-8 mm VMSBG12 1/2" 12.5 mm VMSBG916 9/16" 13-14 mm VMSBG58 5/8" 16 mm VMSBG34 3/4" 19 mm VMSBG1 1" 25 mm

VMSBG118 1-1/8" 28-29 mm VMSBG114 1-1/4" 32 mm

VMSBG1716 1-7/16" 36 mm VMSBG112 1-1/2" 37-38 mm VMSBG158 1-5/8" 41 mm VMSBG134 1-3/4" 44-45 mm VMSBG2 2" 51 mm

 

STANDARD / JUMBO GROOVE CLEANER KIT ‐ 2 Groove Cleaner per set Groove Cleaner                  Part Number                    (Left Lay) 

Groove Cleaner                  Part Number                    (Right Lay) 

Diameter (Inches)  Diameter (Millimeters) 

VM516LL VM516RL 5/16" 7-8 mm VM38LL VM38RL 3/8" 9-10 mm

VM716LL VM716RL 7/16" 11-12 mm VM12LL VM12RL 1/2" 12.5 mm

VM916LL VM916RL 9/16" 13-14 mm VM58LL VM58RL 5/8" 16 mm VM34LL VM34RL 3/4" 19 mm VM78LL VM78RL 7/8" 22-23 mm VM12LL VM1RL 1" 25 mm

VM118LL VM118RL 1-1/8" 28-29 mm VM114LL VM114RL 1-1/4" 32 mm VM138LL VM138RL 1-3/8" 35-36 mm VM112LL VM112RL 1-1/2" 37-38 mm VM158LL VM158RL 1-5/8" 41 mm VM134LL VM134RL 1-3/4" 44-45 mm VM178LL VM178RL 1-7/8" 48 mm

VM2LL VM2RL 2" 51 mm VM218LL VM218RL 2-1/8" 54 mm VM214LL VM214RL 2-1/4" 57-58 mm VM212LL VM212RL 2-1/2" 63-64 mm VM234LL VM234RL 2-3/4" 70 mm

VM3LL VM3RL 3" 76 mm VM318LL VM318RL 3-1/8" 79-80 mm VM314LL VM314RL 3-1/4" 82-83 mm VM312LL VM312RL 3-1/2" 89 mm VM334LL VM334RL 3-3/4" 95 mm VM378LL VM378RL 3-7/8" 98-99 mm

Page 3: TKG Manual Stripper

Page 11 of 20  

OPTIONAL COMPONENTS AVAILABLE  

MANUAL STRIPPER The Manual Stripper provides a rotational base for the Groove Cleaners apart from the lubrication process. This item allows the user the ability to surface strip a majority of their wire rope for inspection purposes. It can either be tied off to allow the wire rope to pass through it or it can be pulled along the wire rope. A Centering (Alignment) Bushing with a center hole cut to the diameter of the wire rope is required to be inserted in the Manual Stripper to keep it centered. Each manual Stripper is provided with one diameter Centering Bushing. Additional diameters are priced separately.

MANUAL STRIPPER CENTERING BUSHING PART NUMBER CHART 

Centering Bushings for VPSMSB  3/8” to 2” Wire Rope Part No. 

Centering Bushings for VPJMSB 3/8” to 3” Wire Rope Part No. 

Accommodates Wire Rope Diameters:           Inches 

Accommodates Wire Rope Diameters: Millimeters 

VMS38MSB VMJ38MSB 3/8” 9-10 mm VMS12MSB VMJ12MSB 1/2” 12.5 mm

VMS916MSB VMJ916MSB 9/16” 13-14 mm VM58MSB VMJ58MSB 5/8” 16 mm

VMS34MSB VMJ34MSB 3/4” 19 mm VMS78MSB VMJ78MSB 7/8” 22-23 mm VMS1MSB VMJ1MSB 1” 25 mm

VMS1-18MSB VMJ1-18MSB 1-1/8” 28-29 mm VMS1-14MSB VMJ1-14MSB 1-1/4” 32 mm

VMS1-516MSB VMJ1-516MSB 1-5/16” 33-34 mm VMS1-38MSB VMJ1-38MSB 1-3/8” 35-36 mm VMS1-12MSB VMJ1-12MSB 1-1/2”’’ 37-38 mm

VMS1-916MSB VMJ1-916MSB 1-9/16” 39-40 mm VMS1-58MSB VMJ1-58MSB 1-5/8” 41 mm VMS1-34MSB VMJ1-34MSB 1-3/4” 44-45 mm VMS1-78MSB VMJ1-78MSB 1-7/8” 48 mm

VMS2MSB VMJ2MSB 2” 51 mm N/A VMJ2-18MSB 2-1/8” 54 mm N/A VMJ2-14MSB 2-1/4” 57-58 mm N/A VMJ2-38MSB 2-3/8” 60 mm N/A VMJ2-12MSB 2-1/2” 64 mm N/A VMJ3MSB 3” 76 mm

 

 

 

DIGITAL FLOW METER Provides a digital reading of the lubricant flow rate in ounces and pounds during the lubrication process. A final total is also provided after the maintenance project is complete. This allows the user an excellent method to assist them in accurately evaluating the amount of coating product required for a broad range of projects incorporating different viscosity coatings and wire rope diameters.

 

 

Page 4: TKG Manual Stripper

 

DynagarresistancKirkpatriallow it talso allomissed dprotectioprotectioenvironmcopper bmarine oCopy of  

 

NationaMIL‐PRF

o LC50 Bio

o To T

ViscositColor:   TextureSoap TyHydroxyOil SepaPenetraViscositViscositDroppinLow TemRust tesSalt FogSalt SprAccelerLoad WAdhesivVolatile4‐Weld,4‐Ball W 

 

Enrd Blue  is ance  to  softenick Wire Ropto stay aliveows  it  to conduring the  inon against won against  fments. Dynabearing alloyorganisms pethe test data

al Stock NuF‐18458C (TMeets or Suo‐Aquatic RTest DuratiTest Specimty:                  e:           ype:            ystearate Maration % (Fation: mm, ty, cST at 40ty, cST at 10ng Point, C mperature st, ASTM D‐g Corrosion ray, Fed. Staated Weath

Wear Index (ve % (Sec. 4e Matter (2., kg.:           Wear Diame

Dnvironmn extreme pring under  sepe Lubricatio with the wintinuously renitial  lubricatwear and shofling off at hgard Blue hays and is comerformed by a is available

mber         Type I & Tyurpasses ReRating, EPAon: 48 hr., men Used: M

Mineral Oil Fed 791‐32(ASTM D210 degrees C00 degrees (F)         Flexibility (‐1743         Resistanceandard 791hering (ASTASTM D2594.6.6. 150 rp.0% Max.)   

eter, mm, m

T

Dynamental Fressure unleevere workion Systems ire rope as tedistribute  ittion processock loads, whigh  speed was outstandimpatible withindependen

e upon reque

pe II)      equirementA/600/4‐90/  Mysidopsis 

%:         1.1)      17):       Centigrade: Centigrade

(Section 4.4

e ASTM B111, TM 4001 TM G 152, 196)       pm @ 151 +     

max.      

VO803 King Geor

Tel: +65E

The information in this pThere are many factors out

agardriendly aded environg  conditionas well as mhe strands mtself  to coves. An Unleadhile additionwire  rope  trang structurah conventionnt test laboraest.  

ts.  /027     

Bahia  

    e:     

4.4, No crac

17     (10 days)    153)     

+/‐2 deg. F)

OSS (F.E.) Prge’s Avenue #015 6296 4992     FaE‐mail: enquiry@vpublication is based on our tside our control or knowle

d BluWire Ro

onmental wirns, water  resmanual handmove during er any  interned extreme nal additives avel  speeds,al and cheminal seal mateatories have 

cks @ 6 Deg

):   

PTE LTD 1‐192 Singapore 2ax: +65 6298 2912vossfe.com experience and reports froedge which affect the use a

e™ope Lubre rope  lubrsistance, andd applicationload bearing

nal strand arpressure adenhance re and  long  seical stability.erials. Aquatshown it to 

9P (O

NBSL513321

grees C)   PP1PP39120

200803 2 

om customers. nd performance 

bricant icant blended  it’s  compan.  Its slicknesg operationsreas, which mdditive providsistance to wervice  in hig. It won’t coic toxicity tehave superio

9150‐01‐520Pass  

Over 25,000

NLGI Grade Blue  Smooth/CreLithium 12  50% Nomina1.94%   305  320  21‐23  177 C (350 FPass     Pass  1,000 hr. / PPass  Pass   34.43  99.7  1.02  250  0.65 

Page 17 o

ed  for excellatibility withss and viscos. This attribmay have bedes exceptiowater wash‐gh  temperatrrode steel aests on sensitor LC‐50 valu

0‐8116  

0 ppm)  

2  

eamy  

al  

F)  

Pass  

of 20 

ent h all sity ute een onal off, ure and tive ues. 

Page 5: TKG Manual Stripper

 

Dynagarperformrope strfor  all  KprolongicustomerequiremDocume 

 

NationaMIL‐PRF

o LC50 Ac

o To T

BiodegrViscositColor:   TextureFlash PoDroppinOil SepaWorkedSalt SprAccelerRust tesSalt FogSalt SprAccelerLow TemLoad WAdhesivVolatile 

 

 

 

 

rd  “E”  is  a ance  levels ands. ExceptKirkpatrick  Wng the workers. Dynagarments  undeentation is av

al Stock NuF‐18458C (TMeets or Sucute ToxicitTest DuratiTest Specimradability Rty:                    e:           oint, ASTM ng Point, ASaration % (Fd Penetratioray, Fed. Stdated Weathst, ASTM D‐g Corrosion ray, Fed. Staated Weathmperature 

Wear Index (ve % (Sec. 4e Matter      

DEnvironrevolutionaof petroleumtional  for mWire  Rope  Lking life of wid  “E” was  ter  the  “Envvailable upon

mber         Type II)        urpasses Rety Bio‐aquaton: 48 Houmen Used: MRating (CEC 

D92 (C/F)  STM D566  Fed. Std. 79on: mm, (Ad. 791, TM hering (Fed‐1743         Resistanceandard 791hering (G23Flexibility (ASTM D2594.6.6. 150 rp    

T

Dynanmentalry  non‐toxicm‐based greaanual applicLubrication ire rope whihe benchmavironmentalln request.  

equirementtic Rating, Eurs  Mysidopsis L‐33‐A‐93) 

            91, TM 321)STM D217)4001      d 791‐4001, 

e ASTM B111, TM 4001 3, 10 days)  (Sec. 4.4.4 n96)       pm @ 151 +

VO803 King Geor

Tel: +65E

The information in this pThere are many factors out

agardl Safe Wc  environmeases  in the acation; DynaSystem  Modle at the samark product ly  Preferab

ts  EPA/600/4‐

Bahia      

)     :     

ASTM G15

17     (10 days)       no cracks @

+/‐2 deg. F)

OSS (F.E.) Prge’s Avenue #015 6296 4992     FaE‐mail: enquiry@vpublication is based on our tside our control or knowle

d “E”Wire Ropentally  safe areas of fluidgard “E” alsdels  providime time meeused  in 200le  Lubrican

‐90/027  

2, 153)   

@ 6 Degrees

):   

PTE LTD 1‐192 Singapore 2ax: +65 6298 2912vossfe.com experience and reports froedge which affect the use a

” ™pe Lubriwire  rope 

d film and coso meets  theng  optimumeting the env02  to establits”  program

9P

2

9NSS3O13PPP1P2

s C)   P391

200803 2 

om customers. nd performance 

icant lubricant  torrosion proe operationam  coating  anvironmental csh MIL‐PRF‐m  (NSWCCD

9150‐01‐520Pass    

21,085 ppm

97%  NLGI Grade Semi‐Clear BSmooth/Cre316C/601F  Over 400 de1.37  301  Pass  Pass  Pass  1,000 hr. / PPass  2 Dots / PasPass (No Cra35.58  99.7%  1.02% Max. 

Page 18 o

hat  meets otection of wal  requiremend  penetratconcerns of 18458C TypD,  Code  63

0‐8143  

   

2  Brown  eamy  

egrees F   

Pass  

ss  acking)   

of 20 

the wire ents tion our e  II 32). 

Page 6: TKG Manual Stripper

 

Testi

Naval AThe wirereducinglabor relubricatiopersonnROI of a P2 AFLOThe old grease. AA wire rogrease scable, sa Ex.: KirkBreakev Chief ofThe mancrane caCost Sav United SDiligent pressuresystems All new as part o  

 

 

 

 

 

 

 

monials

Air Systems e rope lubrig material usequired to pon system iel to place g

approximately

OAT Award cable cleaniAfterwards tope lubricatisimultaneousaving as tota

kpatrick Caven Point: 1

f Naval Opernual processables. Utilizinvings: $ 366

States Coasuse of press

e lubrication manufacture

United Statof their stan

Command /cation syste

sage and wasperform cablis a safer agrease on thy $ 135,900.

Submittal, Cing method ehe new greaion system isly. This pro

al of 1,080 Ho

ble Lubricatyear.

rations Pilots required 6 ng the wire r,356.48 Brea

st Guard Navsure wire rop

systems wed by The K

tes Coast Gndard equip

/ Chief of Naem evaluatedste disposal e cleaning

alternative thheir gloves a60 and a bre

Commandeemployed so

ase was appls now used

ocess has reours annually

tor, USA Ar

t Ergonomicworkers andrope lubricatakeven Point

val Engineepe lubricationith a provenirkpatrick Gro

Guard Buoy ment when

aval Operatid during thecosts. Signifand lubrica

han the preand wipe theeakeven poin

r, Naval Basolvents and hlied by handthat automa

educed worky at a saving

rctic: 10-yea

cs Program d 2 full days tion system tt: 10.5 Days.

ring Manuan systems can history of oup, Inc., Da

and Constrthey leave t

 

ons Preprode project apficant labor sting events.

evious methoe crane cablent of .41 year

se Norfolk, Shand scrapin. This procesatically remok time from 6gs of nearly $

ar cost savin

Evaluation to completethe process

l Chapter 61an increase performance

allas, TX.

ruction Tendthe ship yar

duction Evappears to hasavings are p Of equal od used bee. The cost rs.

Secretary ofng, with a wss was time

oves the old 6 man-hours

$43,000.00.

ngs: $652,0

2000 the cleaningrequired 3 w

13 the service le in Coast

ders have a rd.

aluation 200ave significapossible dueimportance,

ecause it doanalysis sho

f the Navy 1ire brush to consuming agrease and

s to 30 minu

00, Labor re

g and lubricaworkers for 4

life of wire roGuard appli

Kirkpatrick

Page 19 o

2 ant potential e to the reduc

the wire rooes not requowed a 10-y

998 remove the and dangerore-applies n

utes for 450

eduction: 75

ation of a se4 hours. Ann

ope. Wire Rocations inclu

k Model SU3

 

of 20 

for ced ope uire year

old ous. new ’ of

5%,

et of nual

ope ude

35B