tida board progress report

30
TICD LLC TIDA Board Progress Report Infrastructure Plan and Sustainability Plan Updates October 14, 2009

Upload: others

Post on 16-Jan-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TIDA Board Progress Report

TICD LLC

TIDA Board Progress Report

Infrastructure Plan and Sustainability Plan Updates

October 14, 2009

Page 2: TIDA Board Progress Report

AGENDA

– Water System– Wastewater System– Stormwater Management– Electrical Supply– Energy Sustainability Alternatives

Page 3: TIDA Board Progress Report

Proposed Domestic Water System2009

1. No changes to conceptual layout of the domestic water system

2. Reduced total domestic demands

3. Prepared “Water Tank Siting Study”

Page 4: TIDA Board Progress Report

1. Water demands revised by SFPUC based on the 2004 Water Study. Includes water demands and conservation projected to 2030.

• 2006 Estimated Domestic Water Demand1.54 million gallons per day

• 2009 Estimated Domestic Water Demand1.10 million gallons per day

2. EIR to study potential for recylced water use within residential unit toilets for further reduction in domestic water demand

Proposed Domestic Water SystemRevised Domestic Water Demands

Page 5: TIDA Board Progress Report

Proposed Domestic Water SystemWater Tank Siting Study

Tank Siting Study1.Reviewed potential locations for water tanks based on

a. Topographyb. Elevationc. Accessd. Site plan

2.10 potential locations identified

3.Coordinated with SFPUC to determine preferred locations

Page 6: TIDA Board Progress Report

Proposed Domestic Water SystemWater Tank Siting Study

Tank Siting Study1.Three potential tank sites identified

2.Location Ja. Will replace existing 1 mill. gallon tank

3.Location E & Ha. Only one tank will be needed for systemb. Location H preferredc. Both being studied in EIR

Page 7: TIDA Board Progress Report

Proposed Domestic Water SystemStatus of SFPUC Coordination

Status of Planning with SFPUC

1.Conceptual Agreement;a. Water system layoutb. Domestic water demandsc. Water tank location alternativesd. System design criteria

2.Draft Letter of Agreement Pending Final Water Supply Assessment

Page 8: TIDA Board Progress Report

Proposed Wastewater System2009

1. No changes to conceptual layout of the sanitary sewer system

2. Reviewed Wastewater Treatment Alternatives

Page 9: TIDA Board Progress Report

Baseline System1.Headworks/Primary Sedimentation2.Secondary Treatment Using TF/SC3.MF and RO for recycled water4.UV prior to recycled use or outfall to Bay

Proposed Wastewater SystemWastewater Treatment Plan Alternatives

Alternative 11.Secondary effluent receives further treatment in constructed wetland prior to MF/RO and UV2.Wetland area will require signage and fencing.3.Water quality improved prior to outfall to Bay

Alternative 21.Disinfected effluent not recycled would be polished in wetland prior to outfall to Bay2.Wetland area would not require signage or fencing3.Water quality improved prior to outfall to Bay

Page 10: TIDA Board Progress Report

Additional Options Considered

1.Membrane Bioreactors (MBR)a. Power requirements and operational costs are significantly higher

2.Wastewater Treatment Ponds (Oswald Ponds)a. Ponds would require 10 to 15-acres of area and would not be accessible to publicb. Ponds would need to be 15 to 20 feet deepc. Would need to be constructed above ground with levees due to groundwater and potential

hazardous materialsd. Levees would require significant geotechnical stabilization e. Ponds would not be compatible with proposed open space program

Proposed Wastewater SystemWastewater Treatment Plan Alternatives

Page 11: TIDA Board Progress Report

Status of Planning with SFPUC

1.Conceptual agreement;a. System layoutb. Sewer demandsc. System design criteria

2.Draft Letter of Agreement for wastewater system design criteria

3.Finance, design, construction and O&M of wastewater treatment plant will be the responsibility of the SFPUC

a. SFPUC in agreement with the waste water treatment plant alternatives being studied

4.SFPUC studying the potential for a cogeneration plant at the wastewater treatment plant.

5.TIDA and PUC working on terms to transfer 4-6 acres of land for demonstration scale sustainable infrastructure and technologies

Proposed Wastewater SystemStatus of Discussions with the SFPUC

Page 12: TIDA Board Progress Report

Proposed Reclaimed Water System2009

1. Recycled water for irrigation and appropriate commercial plumbinga. EIR to study the potential for recycled water in residential toilets

2. Removed recycled water from YBIa. Minimal demand and significant energy to pump to higher elevations

3. Will continue to refine the layout with the SFPUC through the Master Planning phases and Final Designs

Page 13: TIDA Board Progress Report

1. All treatment flows pumped to wetland area2. No treatment train3. Increased construction, energy consumption, and operation and maintenance costs

associated with number and size of lift stations.

Proposed Storm Drainage System2006

Page 14: TIDA Board Progress Report

• Full array of stormwater treatment around the island –optimized to land uses and development program.

• More localized treatment around the Island• Treatment train approach – robust system with

treatment provided by horizontal development.

Proposed Storm Drainage System2009

• Multiple removal mechanisms, high treatment levels • Most flexible with phasing• Utilizes stormwater as a resource for wetland habitat

creation and educational visibility• Less pumping of storm water .

Page 15: TIDA Board Progress Report

Proposed Storm Drainage SystemExamples of Treatment Elements

Roadway Bio-Retention Cells

Flow Through PlantersOpen Space Bio-Retention Cells

Pervious Pavements Wetland AreasBio-Swales

Page 16: TIDA Board Progress Report

Status of Planning with SFPUC

1.Conceptual agreement;a. Treatment conceptsb. System design criteria

2.Draft Letter of Agreement Pending

Proposed Wastewater SystemStatus of Discussions with the SFPUC

Page 17: TIDA Board Progress Report

Off-Site Electrical Service

1. Total proposed power demand at full build out is less than the capacity of the existing system

2. No upgrades to the system required for Treasure Island development

3. SFPUC may construct optional upgrades for added reliability and redundancy.

Page 18: TIDA Board Progress Report

Off-Site Electrical Service

Optional Upgrades for Reliability and Redundancy1.Improvements to Davis Substation

a. Cooling fans to increase capacityb. Connection to adjacent substation and improved switch gear for redundancy

2.Improvements to Overhead Linea. New conductor to increase capacityb. Add redundant line to existing poles to increase capacity and reliabilityc. Add underground line

3.Additional connection to PG&E system at lands end prior to connection to submarine cables.

ADDITIONAL CONNECTION TO PG&E`

Page 19: TIDA Board Progress Report

Status of Planning with SFPUC

1.Conceptual Agreement with the optional off-site improvements being studied in the EIR

2.Working closely with the SFPUC to finalize on-site system layout and peak loads.

Electrical ServiceStatus of Discussions with the SFPUC

Page 20: TIDA Board Progress Report

• Solar Power Generation• District Energy – Central Plant• Automated Waste Collection

Energy Sustainability Alternatives

Page 21: TIDA Board Progress Report

• Design-build-operate• Operators• Integrated Systems Providers• Financing Companies

Energy Sustainability AlternativesDiscussions with Industry Providers

Page 22: TIDA Board Progress Report

Rooftop-mount1. Buildings 1,2 and 3

2. New Buildings

•SolarCity © 2009

Energy Sustainability AlternativesSolar Power

Page 23: TIDA Board Progress Report

Recurrent Energy © 2009

Energy Sustainability AlternativesSolar Power

Ground-mount

Page 24: TIDA Board Progress Report

Energy Sustainability AlternativesSolar Power

Ground-mount1. Potential ground-mount locations

Page 25: TIDA Board Progress Report

NRG Thermal © 2009

Energy Sustainability AlternativesDistrict Energy

Central Heating and Cooling

Page 26: TIDA Board Progress Report

Energy Sustainability AlternativesDistrict Energy

Central Heating and Cooling• Combined heat & power

Page 27: TIDA Board Progress Report

Central Heating and Cooling• Centralized vs. Satellite Plant Options

Central Plant DistrictSatellite Plant Districts

Energy Sustainability AlternativesDistrict Energy

Page 28: TIDA Board Progress Report

Energy Sustainability AlternativesAutomated Waste Collection

Automated Waste Collection1. Discussions with Recology and Transvac

2. Turnkey system at no cost to Project

3. Equal or lower trash collection rates than traditional method

Envac

Page 29: TIDA Board Progress Report

•Street Cross Section

Energy Sustainability AlternativesAutomated Waste Collection

Page 30: TIDA Board Progress Report