tida - prosective projects

128

Upload: derrick-staten

Post on 30-Jun-2015

172 views

Category:

Investor Relations


0 download

TRANSCRIPT

Page 1: TIDA - Prosective Projects
Page 2: TIDA - Prosective Projects
Page 3: TIDA - Prosective Projects

Chemicals &petrochemicals

Page 4: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

2

Chemicals & petrochemicals

C 2 0 1

Gas and Chemical Complex

Project Title Gas and Chemical Complex

Project summary

Project Idea Establishment of production of lower olefins from natural gas and their subsequent polymerization of 1 million tons olefins, 450 thousand tons of ethylene, 550 thousand tons of propylene, followed by polymerization. The project is planned to be launched in 2015-2016.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 1370

Total Project Budget $2638.84 mln

Financial and Economic Indicators

NPV $806.39 mln

IRR % 21.7

Discount Rate % 15.0

Discounted Payback Period (years) 6.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected] Initiator: OJSC «Tatneftekhiminvest-holding»

Page 5: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

3

Chemicals & petrochemicals

C 2 0 2

Modernization and subsequent production extension of Alabuga – Plastic LLC

Project Title Modernization and subsequent production extension of Alabuga – Plastic LLC

Project summary

Project Idea Modernization and subsequent production extension of Alabuga – Plastic LLC

Location Industrial Zone Alabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 106

Total Project Budget $2.0 mln

Funds Requested $1.6 mln

Financial and Economic Indicators

NPV $0.6 mln

IRR % 19

Discount Rate % 11

Discounted Payback Period (years) 5.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Page 6: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

4

Establishment of polyester thread and polyester fibers production

Project Title Establishment of polyester thread and polyester fibers production

Project summary

Project Idea Project involves construction of the first complex in Russia on production of polyester fibers with production capacity of 60 thousand tons per year for the textile industry, polyester high-modular low-shrinkable threads (HMLS) and high-strength polyester technical threads (HM) with capacity of 12 thousand tons per year for production.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 600

Total Project Budget $257.8 mln

Financial and Economic Indicators

NPV $35.5 mln

IRR % 37.8

Discount Rate % 15.0

Discounted Payback Period (years) 15

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Chemicals & petrochemicals

C 2 0 3

Page 7: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

5

Ethylene complex and other derivatives production

Project Title Ethylene complex and other derivatives production

Project summary

Project Idea Ethylene complex and derivatives (the 1st stage of the project). The total budget of the project is $3.21 bln, of which 40% is equity funds, 60% is debt funds.

Location Nizhnekamsk, the Republic of Tatarstan

Total Project Budget $1 239.3 mln

Financial and Economic Indicators

Discount Rate % 11

Discounted Payback Period, years 9.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected] Initiator: OJSC «Nizhnekamskneftekhim»

Chemicals & petrochemicals

C 2 0 4

Page 8: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

6

Construction of maleic anhydride production plant

Project Title Construction of maleic anhydride production plant

Project summary

Project Idea The project involves construction of maleic anhydride production plant. The project is at the stage of technical selection

Location The Republic of Tatarstan

Total Project Budget $60.67mln

Financial and Economic Indicators

Discount Rate % 10

Discounted Payback Period (years) 6.6

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected] Initiator: OJSC «Tatneftekhiminvest-holding»

Chemicals & petrochemicals

C 2 0 5 C 2 0 6

Page 9: TIDA - Prosective Projects

Ch

emiC

als

& p

etr

oC

hem

iCa

ls

7

Heavy Oil Residues processing plant

Project Title Heavy Oil Residue processing plant

Project summary

Project Idea Project involves construction of heavy oil residue processing plant with the raw material usage capacity of 2 mln tons per year based on heavy oil residue hydro conversion process with the use of nano sized catalysts. Feasibility study has been taken; researches on hydro conversion have been undertaken. Technology has been tested at laboratories and process development units.

Location Nizhnekamsk, the Republic of Tatarstan

Total Project Budget $408 mln

Financial and Economic Indicators

Discount Rate % 15

Payback Period (years) 4.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected] Initiator: OJSC «Tatneftekhiminvest-holding»

Chemicals & petrochemicals

C 2 0 6

Page 10: TIDA - Prosective Projects

Machinery & automotive parts

production

М 3 0 1

Page 11: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

9

Development of automobile components production by Closed Joint Stock Company

«Aktanysh Aggregate Plant»

Project Title Development of automobile components production by CJSC Aktanysh Aggregate Plant

Project summary

Project Idea The project involves increasing the production scale (hangers and brakes' components) in order to provide the demand of KAMAZ Group

Location Aktanysh, the Republic of Tatarstan

Estimated Number of Jobs Created 16

Total Project Budget $1.00 mln

Funds Requested $0.24 mln

Financial and Economic Indicators

NPV $0.14 mln

IRR % 17

Discount Rate % 11

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 1

Page 12: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

10

Construction of the plantfor automotive parts production

Project Title Construction of the plant for automotive parts production

Project summary

Project Idea Creation of the plant with world standard production in the Republic of Tatarstan with capacity over 30 tons per year;– The creation of sustainable supply canals of the automotive components and other components for key manufacturers of the machine-building products in Russia;– Implementation of new quality standards in the Autonormal segment components producers and other types of components. Thus, support of the Russia and the Republic of Tatarstan authorities efforts in the improving of the international competitiveness in industrial sector.

Location Menzelinsk, the Republic of Tatarstan

Estimated Number of Jobs Created 270

Total Project Budget $215.8mln

Financial and Economic Indicators

IRR % 24

Discount Rate % 9

Discounted Payback Period (years) 7.9

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 2 М 3 0 3

Page 13: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

11

The organization of modern production of fuel tanks for trucks

Project Title The organization of modern production offuel tanks for trucks

Project summary

Project Idea Fuel tanks production and their subsequent delivery for new established enterprises and plants in Russia: Volvo-Kaluga, SCANIA-C. Petersburg, Daimler-KAMAZ, Iveco AMT and for others producers of trucks as well: KAMAZ JSC, AZ ‘Ural’ OJSC. The production will be based on robotic technology. There is no Mass Production of the analogs of our technology in the Russian Federation.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 99

Total Project Budget $8.9 mln

Financial and Economic Indicators

NPV $6.9 mln

IRR % 31

Discount Rate % 12

Discounted Payback Period (years) 4.2

Contacts

Tatarstan Investment Development Agency, Tel.: +7 (843) 570 40 01, +7 917 227 69 92 (Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 3

Page 14: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

12

Development and re-equipment of ALNAS JSC

Project Title Development and re-equipment of ALNAS JSC

Project summary

Project Idea Re-equipment of automotive parts production plant will allow to make production more profitable due to the possibility of using new materials and process optimization

Location Almetevsk, the Republic of Tatarstan

Total Project Budget $37.4 mln

Funds Requested $28.3 mln

Financial and Economic Indicators

NPV $44.5 mln

Discount Rate % 10

Discounted Payback Period (years) 5.1

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 4 М 3 0 5

Page 15: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

13

Forging Production for manufacture of the automotive suspension

Project Title Forging Production for manufacture of the automotive suspension

Project summary

Project Idea The project objective is forging production organization to manufacture the automotive suspension elements. Products manufactured within the project are meant for suspension elements:- Torque rod- Steering rod pin- Steering rod end- Pneumatic suspension

Location Nabereznye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 78

Total Project Budget $8.0 mln

Financial and Economic Indicators

NPV $3.7 mln

IRR % 29

Discount Rate % 13

Discounted Payback Period (years) 5

Contacts

Tatarstan Investment Development Agency, Tel.: +7 (843) 570 40 01, +7 917 227 69 92 (Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 5

Page 16: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

14

Production of energy-efficient high-power batteries for vehicles

Machinery & automotive parts production

М 3 0 6 М 3 0 7

Project Title Production of energy-efficient high-power batteries for vehicles

Project summary

Project Idea Organization of the production developed by HimRusEnergo LLC. Energy-efficient start-up batteries will provide a guaranteed start-up for the any engine at the temperature level even less than minus 50ºС.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 21

Total Project Budget $14.45 mln

Funds Requested $7.22 mln

Financial and Economic Indicators

NPV $6.2 mln

IRR % 14

Discount Rate % 9

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Page 17: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

15

Modernization of foundry

Project Title Modernization of foundry

Project summary

Project Idea Establishment of modern high-tech foundry with new production facilities. This project involves the expansion and modernization of existing production foundry equipment. It is planned to manufacture complex shaped castings of aluminum alloys under high pressure in the mold and energy-efficient LED lamps. The target customers are KAMAZ JSC and other joint ventures, the defense industry companies, appliance manufacturers.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $10 mln

Financial and Economic Indicators

NPV $3.9 mln

IRR % 15.3

Discount Rate % 12.0

Discounted Payback Period (years) 2.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 7

Page 18: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

16

Modernization of existing manufacture

Project Title Modernization of existing manufacture

Project summary

Project Idea Re-equipment of foundry engineering for the reduction of net costs and quality improvement by the means of foundry modernization. Manufacture modernization is going to increase production capacity of iron casting to 250,000 tons per year, of non-ferrous castings to 64,000 tons per year.

Location Naberezhniye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 5000

Total Project Budget $391.65 mln

Financial and Economic Indicators

NPV $158.52 mln

IRR % 24.5

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 8 М 3 0 9

Page 19: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

17

Automobile seat production

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

Project Title Automobile seat production

Project summary

Project Idea Project envisages the production of automobile seats. Production program is to produce 40 000 sets of seats per year. Land with the size of 15 840 m2 is ready for the production allocation.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs 432

Total Project Budget $ 12.85 mln

Funds Requested $ 6.43 mln

Financial and Economic Indicators

NPV $3.23 mln

Discount Rate, % 12

Discounted Payback Period (years) 7.25

Contacts

Tatarstan Investment Development Agency,Tel.:+7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Machinery & automotive parts production

М 3 0 8 М 3 0 9

Page 20: TIDA - Prosective Projects

ma

Ch

iner

y &

au

tom

oti

ve

par

ts p

ro

du

Cti

on

18

Construction & building materials

production

C 4 0 1

Page 21: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

19

Plant of PLASTBAU panels’ production

Project Title Plant of PLASTBAU panels’ production

Project summary

Project Idea Production of construction elements made of expanded polystyrene, exploiting equipment and the technology of the Swiss company PLASTEDIL Int.Ltd. The technology is known under the trademark ‘PLASTBAU’. ‘PLASTBAU’ panels use advantageously differs from acting technology.

Location Zakamskaya Zone, the Republic of Tatarstan

Estimated Number of Jobs Created 34

Total Project Budget $10.62 mln

Funds Requested $10.59 mln

Financial and Economic Indicators

NPV $1.40 mln

IRR % 19.6

Discount Rate % 13.1

Discounted Payback Period (years) 3.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 1

Page 22: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

20

Local transport and logistics center

Project Title Local transport and logistics center

Project summary

Project Idea The project involves the construction of a local (presumably unit) logistics center, including production areas (for repairs, loading and unloading of road transport), associated buildings and structures in order to facilitate the modernization of the transport system and ensure the coordinated work of all types of transport that will link transport system with terminal and logistics. The project will contribute to the development of the industrial sector of the economy, the need to ensure the competitiveness of the special economic zone, the creation of conditions for small and medium-sized businesses.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 45

Total Project Budget $8.1 mln

Financial and Economic Indicators

NPV $6.1 mln

IRR % 39

Discount Rate % 8

Discounted Payback Period (years) 2.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 2 C 4 0 3

Page 23: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

21

Low water demand cement production with the use of non-metallic minerals

Project Title Low water demand cement production with the use of non-metallic minerals

Project summary

Project Idea Project involves production of water demand cement. Competitive advantages of low water demand cement, when compared to artificial cement, are low net costs, exploitation of local raw materials and superior technical characteristics.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 97

Total Project Budget $24.53 mln

Financial and Economic Indicators

NPV $6.10 mln

IRR % 21.49

Discount Rate % 15.00

Discounted Payback Period (years) 7.75

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 3

Page 24: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

22

Construction of cargo and passenger river port with transport logistics

Project Title Construction of cargo and passenger river port with transport logistics

Project summary

Project Idea Project is meant to provide high-quality logistics services to the special economic zone ‘Alabuga’, the Kama region and south-eastern part of the Republic of Tatarstan with the prospective entrance to the Russian cargo transportation market of the Volga region and Central Russia. The extensive transportation and logistics network will be created through the construction of three major complexes of ‘river-sea’ cargo port, which will allow to receive transit vessels, ferry terminals, transport, and logistics service centers.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 2132

Total Project Budget $159.7 mln

Funds Requested $135.8 mln

Financial and Economic Indicators

NPV $66.4 mln

IRR % 27

Discount Rate % 8

Discounted Payback Period (years) 4.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 4 C 4 0 5

Page 25: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

23

Technopark«Alabuga»

Project Title Technopark ‘Alabuga’

Project summary

Project Idea

The project involves production facilities and business center construction with the organization of the pilot production module and demonstration sites, research and development, service and infrastructure units. Project offers its tenants assistance in implementing of innovative projects in various fields, promotion in small and medium-sized manufacturing business development.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 600

Total Project Budget $36.7 mln

Funds Requested $19.1 mln

Financial and Economic Indicators

NPV $53.7 mln

IRR % 41

Discount Rate % 8

Discounted Payback Period (years) 3.3

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 5

Page 26: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

24

Construction of the toll highway Shali (M-7) – Bavly (M-5) as part of the new federal

highway route Kazan – Orenburg in the Republic of Tatarstan

Project TitleConstruction of the toll highway Shali (M-7) – Bavly (M-5)

as part of the new federal highway route Kazan – Orenburg in the Republic of Tatarstan

Project summary

Project Idea Establishment of the new transport route of a national importance. Construction of the modern motorway network in the main directions flows as part of the motor transport route ‘St. Petersburg – Vologda – Yoshkar-Ola – Kazan – Orenburg – the border of the Republic of Kazakhstan’ The development of highways in accordance with the needs of the residents, Russian economy and transport infrastructure of the Republic of Tatarstan

Location The Republic of Tatarstan

Estimated Number of Jobs Created Over 2000

Total Project Budget $3.21 bil

Funds Requested $2.52 bil

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 6 C 4 0 7

Page 27: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

25

Establishment of Sviazhsky interregional multimodal logistic Center

Project Title Establishment of Sviazhsky interregional multimodal logistic Center

Project summary

Project Idea Project involves the establishment of infrastructure that meets international standards and reduces timing and financial costs of maintenance on existing trade flows of international transport corridors 'East-West’ and ‘North-South’ and prospective – ‘Europe-Western China’. Project envisages obtaining revenue from the transport and service activities such as acceptance, temporary storage, processing, distribution, documentation, and shipment of goods to the destination, provided by the established multimodal logistics center next to the station Sviyazhsk. The complex will include a rail-road terminal with warehouses and container yard, a river port with a water-truck terminal, access tracks and roads, loading and unloading areas, service facilities.

Location Zelenodolsk, the Republic of Tatarstan

Estimated Number of Jobs Created -

Total Project Budget $609.54 mln

Funds Requested $271.70 mln

Financial and Economic Indicators

NPV $253.20 mln

IRR % 17.5

Discount Rate % 8.2

Discounted Payback Period (years) 9.6

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 7

Page 28: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

26

Construction of the Shore cement terminal for cement storage and transfer to Kazan city

Project Title Construction of the Shore cement terminal for cement storage and transfer to Kazan city

Project summary

Project Idea The idea of the project is to offer service for cement storage and transfer to Kazan city with buffer storage capacity of 8000 tons and capacity of cement transfer through water and railway transport of up to 500 000 tons per year.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 15

Total Project Budget $8.5 mln

Financial and Economic Indicators

NPV $14.6 mln

IRR % 38.5

Discount Rate % 19.0

Discounted Payback Period (years) 5.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 8 C 4 0 9

Page 29: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

27

Cable fitting production plant

Project Title Cable fitting production plant

Project summary

Project Idea Project involves construction of the Cable fitting of 110-220 kW production plant. The project is planned to be realized at techno polis ‘INVENT’. Engineering and transport infrastructure has been prepared. Financing is expected to be covered both by equity capital and debt.

Location Laishevsky District, the Republic of Tatarstan

Total Project Budget $21.92 mln

Financial and Economic Indicators

Discount Rate % 18

Discounted Payback Period (years) 5.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 0 8 C 4 0 9

Page 30: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

28

Nanomodified granulated composite material production

Project Title Nanomodified granulated composite material production

Project summary

Project Idea Project involves nanomodified granulated composite material production, as well as production of products made of it (for vehicle components and specified construction materials). The project is going to be realized at 'Kazan aviation industrial group named after Gorbunov S.P.’. The share of the partners is expected to make up 51 percent.

Location Kazan, the Republic of Tatarstan

Total Project Budget $60.97 mln

Financial and Economic Indicators

Discounted Payback Period (years) 8.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 0 C 4 1 1

Page 31: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

29

Logistics Park «Krugloe Pole»

Project Title Logistics Park ‘Krugloe Pole’

Project summary

Project Idea Construction of the multi-modal logistics park as the part of the national innovation system to ensure the development of the region, including infrastructure establishment necessary for the needs of industrial facilities. Rationale: The rapid development of the region and the lack of high-tech warehouses of class ‘A’.

Location Tukaevsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 2500

Total Project Budget $94.03 mln

Funds Requested $38.34 mln

Financial and Economic Indicators

NPV $10.11mln

IRR % 20.68

Discount Rate % 12.70

Discounted Payback Period (years) 6.1

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 1

Page 32: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

30

Establishment of building blocks production

Project Title Establishment of building blocks production

Project summary

Project Idea Project involves the establishment of building blocks production with production capacity of 1200 standard blocks (188x190x390) per day

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 25

Total Project Budget $58 mln

Financial and Economic Indicators

NPV $71 mln

IRR % 49

Discount Rate % 20

Discounted Payback Period (years) 1.3

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 2 C 4 1 3

Page 33: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

31

Production of cement and carbon dioxide based on the environment friendly

melt-thermal technology

Project Title Production of cement and carbon dioxide based on the environment friendly melt-thermal technology

Project summary

Project Idea The technology is designed for production of up to 200 tons of cement per year. The technology is going to be environment friendly due to the absence of combustion and high productiveness, so that it uses small amount of natural raw resources and has low level of industrial waste. The production is going to be located in the close proximity to consumers.

Location the Republic of Tatarstan

Estimated Number of Jobs Created 75

Total Project Budget $13.3 mln

Payback Period (years) 2.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 3

Page 34: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

32

Plant on structural steel production for the road and energy facilities

Project Title Plant on structural steel production for the road and energy facilities

Project summary

Project Idea Construction of new plant on structural steel production for the road and energy facilities

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 79

Total Project Budget $8.2 mln

Funds Requested $3.3 mln

Financial and Economic Indicators

NPV $0.7 mln

IRR % 12.68

Discount Rate % 20

Discounted Payback Period (years) 6.33

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 4 C 4 1 5

Page 35: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

33

Multifunctional residential complex «Mezhdurech’ye»

Project Title Multifunctional residential complex ‘Mezhdurech’ye’

Project summary

Project Idea

Construction of the Multifunctional residential complex ‘Mezhdurech’ye’. High level comfort housing with an economy class hotel and shopping center, yacht club, shopping, office and business centers. The size of the land allocated for building is 3.7 hectares. The planned volume of housing construction in 2015 is 70 000 m2. The project provides residential complex with comfortable accommodation from 22.04.2011 №13-PFA

Location Naberezhnye Chelny, the Republic of Tatarstan

Total Project Budget $99.4 mln

Funds Requested $49.7 mln

Financial and Economic Indicators

IRR % 35

Discount Rate % 10

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 5

Page 36: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

34

Building and commissioning of new high-comfort class residential house on Hadi Atlasi Street

Project Title Building and commissioning of new high-comfort class residential house on Hadi Atlasi Street

Project summary

Project Idea The main goal is to improve the territory and develop additional areas with high-comfort conditions. The company is going to buy a land, with subsequent construction and commissioning of high-comfort class residential house

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 62

Total Project Budget $6.6 mln

Financial and Economic Indicators

NPV $2.6 mln

IRR % 65.57

Discount Rate % 11

Discounted Payback Period (years) 2.6

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 6 C 4 1 7

Page 37: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

35

Modified plasterdry mix

Project Title Modified plaster dry mix

Project summary

Project Idea Commercial development of new formulations and technologies of gypsum plaster and plastering dry building mixes is based on the mineral resources of the Republic of Tatarstan. Physical and technical properties of dry building mixes can be controlled by means of a complex of modifying chemical and mineral supplements, including those based on industrial by-products.The nomenclature of gypsum building mixes produced in the Republic of Tatarstan does not meet current needs.Implementation of the proposed idea will expand the use of local mineral and chemical products, provide the construction market of Tatarstan with high quality and competitive dry plaster mixes and replace imported counterparts.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 25

Total Project Budget $0.9 mln

Funds Requested $0.8 mln

Financial and Economic Indicators

NPV $0.3 mln

IRR % 28

Discount Rate % 13

Discounted Payback Period (years) 2.9

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 7

Page 38: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

36

Modular boiler construction

Project Title Modular boiler construction

Project summary

Project Idea Construction of modular boiler (GSB) Kaleykino for heating the elementary school and kindergarten. Project implementation is planning to be on Public-Private Partnership principles.

Location Almetyevsky district, the Republic of Tatarstan

Total Project Budget $0.15mln

Financial and Economic Indicators

NPV $0.15 mln

IRR % 15

Discount Rate % 6

Discounted Payback Period (years) 9

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 8 C 4 1 9

Page 39: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

37

Organization of the production of units from wood and concrete permanent formwork

Project Title Organization of the production of units from wood and concrete permanent formwork

Project summary

Project Idea The aim of the project is to establish the enterprise in a special economic zone ‘Alabuga’, producing blocks of permanent formwork for the civil and industrial construction. Proposed construction technology allows building affordable and comfortable houses, which meets the requirements of SNiP on heat and noise protection, both low-rise and high-rise apartment buildings.

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 51

Total Project Budget $9.1 mln

Funds Requested $6.5 mln

Financial and Economic Indicators

NPV $9.1 mln

IRR % 72.9

Discount Rate % 15.0

Discounted Payback Period (years) 2.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 1 9

Page 40: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

38

C 4 2 1

Organization of prefabricated wooden houses’ production

Project Title Organization of prefabricated wooden houses’ production

Project summary

Project Idea The essence of the project is to establish enterprise producing sets such as panels of the walls and ceilings, beams, floors and roof for the highly prefabricated low-rise wooden houses. Along with the frame-panel house-building technology, a German technology of the massive wooden wall panels production is going to be used, which combines the advantages of conventional panel and the traditional massive wooden construction and deprived of their disadvantages will be applied.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 87

Total Project Budget $5.9 mln

Funds Requested $3.9 mln

Financial and Economic Indicators

NPV $7.1 mln

IRR % 45.28

Discount Rate % 16.00

Discounted Payback Period (years) 3.82

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 2 0

Page 41: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

39

C 4 2 1

Quick collapsible parking elevator with the modular design of the device

Project Title Quick collapsible parking elevator with the modular design of the device

Project summary

Project Idea Creating a network of high-rise car parks with automatic vehicles’ delivery. The chain of high-rise parking relieves city traffic and solves the problem of parking spaces’ shortage.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 5

Total Project Budget $0.16 mln

Financial and Economic Indicators

NPV $0.08 mln

IRR % 19.77

Discount Rate % 13.30

Discounted Payback Period (years) 2.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

Page 42: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

40

New mall and indoor market complex building & exploitation

Project Title New mall and indoor market complex building & exploitation

Project summary

Project Idea

The project goals are:– mall and indoor market complex building,– to rent commercial spaces out,– to get profit.To achieve these goals it is necessary to implement the following tasks:– to get a loan;– to build the mall;– to build the market complex;– to coordinate the work of mall and market complex;– to cooperate with tenants.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 29

Total Project Budget $25 mln

Funds Requested $20 mln

Financial and Economic Indicators

NPV $3.6 mln

IRR % 35

Discount Rate % 16

Discounted Payback Period (years) 4.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 2 2 C 4 2 3

Page 43: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

41

Construction of waste sorting and waste recycling complex

Project Title Construction of waste sorting and waste recycling complex

Project summary

Project Idea Construction of waste processing complex with annual capacity of 20 000 tons of solid waste processing and organization of production based on secondary resources, building materials, products of secondary polymers, structural products, products for household use.

Location Yelabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 40

Total Project Budget $16.6 mln

Funds Requested $14.9 mln

Financial and Economic Indicators

NPV $8.4 mln

IRR % 24

Discount Rate % 8

Discounted Payback Period (years) 5.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

C 4 2 3

Page 44: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

42

C 4 2 4 C 4 2 5

Establishment of metalware hardware production

Project Title Establishment of metalware hardware production

Project summary

Project Idea Metalware hardware production with high added value. Innovative electrolytic-plasmatic technology is used for roll processing. The second direction will be establishment of engineering production of electrolytic-plasmatic modules for modernization of metallurgical productions

Location SEZ Alabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 100

Total Project Budget $11.15 mln

Funds Requested $9.38 mln

Financial and Economic Indicators

IRR % 62%

Discount Rate % 25%

Discounted Payback Period (years) 4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Construction & building materials production

Page 45: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

43

C 4 2 5

Reconstruction of the main drain water lift up from 4th water lifting to ‘TatAISneft’ camera

Construction & building materials production

Project Title Reconstruction of the main drain water lift up from 4th water lifting to ‘TatAISneft’ camera

Project summary

Project Idea Improving the quality of water, reduction of network losses

Location Almetyevsk-Minnibaevo, the Republic of Tatarstan

Total Project Budget $3.13 mln

Funds Requested $2.04 mln

Financial and Economic Indicators

Discounted Payback Period (years) 20

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 46: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

44

C 4 2 6 C 4 2 7

Reconstruction of Volga water intake water treatment facility

Construction & building materials production

Project Title Reconstruction of Volga water intake water treatment facility

Project summary

Project Idea Modernization of cleansing waterworks on the Volga water intake with the use of modern methods of cleaning is required for the im-provement of water quality of the given drinking-water systems

Location Каzan, the Republic of Tatarstan

Estimated Number of Jobs Created 79

Total Project Budget $69.38 mln

Funds Requested $46.4 mln

Financial and Economic Indicators

IRR % 0.1

Discount Rate % 0.1

Discounted Payback Period (years) 22.1

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 47: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

45

C 4 2 7

Construction of water supply unit «Tetsevsky» with the construction of water pipeline from the

Volga intake to the water supply site «Tetsevsky»

Construction & building materials production

Project TitleConstruction of water supply unit «Tetsevsky» with the

construction of water pipeline from the Volga intake to the water supply site «Tetsevsky»

Project summary

Project Idea Surface water deficit coverage at existing residential development and the newly built-up M-1, M-2 of Aviastroitelny district

Location Каzan, the Republic of Tatarstan

Estimated Number of Jobs Created 36

Total Project Budget $34.73 mln

Funds Requested $28.78 mln

Financial and Economic Indicators

IRR % 9.90

Discount Rate % 0.07

Discounted Payback Period (years) 9.9

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 48: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

46

Production of high thermal efficient building blocks, using a patented material

‘Silica granite’

Construction & building materials production

Project Title Production of high thermal efficient building blocks, using a patented material ‘Silica granite’

Project summary

Project Idea Production of building materials using cutting-edge equipment in cooperation with Russian Research Institution. Silica granite is a new generation material used for construction.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 10

Total Project Budget $0.48 mln

Funds Requested $0.42 mln

Financial and Economic Indicators

NPV $0.35 mln

IRR % 20

Discount Rate % 12

Discounted Payback Period (years) 2.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

C 4 2 8 C 4 2 9

Page 49: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

47

Construction of passenger gallery with travolator from underground station ‘Kremlevskaya’

to railway station ‘Kazan-1’

Construction & building materials production

Project TitleConstruction of passenger gallery with travolator

from underground station ‘Kremlevskaya’ to railway station ‘Kazan-1’

Project summary

Project Idea Glassed-in passenger gallery with travolator from underground station ‘Kremlevskaya’ to railway station ‘Kazan-1’ is supposed to create multifunctional transfer hub based on railway station ‘Kazan-1’

Location Kazan, the Republic of Tatarstan

Total Project Budget $40.60 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

C 4 2 9

Page 50: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

48

Rolling stock park renovation

Project Title Rolling stock park renovation

Project summary

Project Idea According to the project, 5 UKVZ 71-623 coaches are going to be bought each year from 2012 to 2016. Rolling stock park renovation will reduce maintenance costs, further safety and comfort of the trip.

Location Nizhnekamsk, the Republic of Tatarstan

Total Project Budget $12.05 mln

Financial and Economic Indicators

Discounted Payback Period (years) Over 10 years

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction & building materials production

C 4 3 0 C 4 3 1

Page 51: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

49

Transfer from central heat distribution station to individual heating units

Project Title Transfer from central heat distribution station to individual heating units

Project summary

Project Idea Transfer from central heat distribution station to individual heating units to consumers with the hot water provision function

Location The Republic of Tatarstan

Total Project Budget $26.55 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction & building materials production

C 4 3 1

Page 52: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

50

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

Reinforcing steel net production

Project Title Reinforcing steel net production

Project summary

Project Idea Production of reinforcing steel net, which can be used in reinforced concrete construction, glass, plastic, ceramics, gypsum works, and so on

Location Almetyevsk, the Republic of Tatarstan

Total Project Budget $0.75 mln

Funds Requested $0.53 mln

Financial and Economic Indicators

IRR % 46.6

Discount Rate % 25.0

Discounted Payback Period (years) 2.98

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction & building materials production

C 4 3 2 C 4 3 3

Page 53: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

51

Production of ceramic bricks

Project Title Production of ceramic bricks

Project summary

Project Idea Construction of ceramic brick factory with subsequent production output of 30 mln bricks per year based on Bolsheaksinskiy Staro-Kakerlinskiy clay deposit

Location Drozhzhanovsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 100

Total Project Budget $40.00 mln

Funds Requested $9.67 mln

Financial and Economic Indicators

Discount Rate % 30

Discounted Payback Period (years) 4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction & building materials production

C 4 3 3

Page 54: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

52

Project Title Construction of new tram-line Pr.Stroiteley – Yuzhnaya Str.

Project summary

Project Idea Construction of new tramline of 3.9 km double track road and 7.8 km solitary track road, construction of railway substation of container type (1800 kV)

Location Nizhnekamsk, the Republic of Tatarstan

Estimated Number of Jobs Created 66

Total Project Budget $13.15 mln

Financial and Economic Indicators

Discounted Payback Period (years) Over 15 years

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction of new tram-line Pr. Stroiteley – Yuzhnaya Str.

Construction & building materials production

C 4 3 4 C 4 3 5

Page 55: TIDA - Prosective Projects

Co

nst

ru

Cti

on

& b

uil

din

g m

ate

ria

ls p

ro

du

Cti

on

53

Modernization of Urussinsky State District Power Plant

Project Title Modernization of Urussinsky State District Power Plant

Project summary

Project Idea Project involves three stages: 1. CCGT unit construction – 127 MW; 2. Construction of heating line to Oktyabrsky and Tuymazi city (the Republic of Bashkortastan) 3. Deep reconstruction of old part of station

Location Yutazinsky district, the Republic of Tatarstan

Total Project Budget $241.09 mln(Stage I – $147.87 mln,Stage II – $45.00 mln,Stage III – $48.22 mln)

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction & building materials production

C 4 3 5

Page 56: TIDA - Prosective Projects

Medicine & pharmaceuticals

h 5 0 1

Page 57: TIDA - Prosective Projects

med

iCin

e &

ph

ar

ma

Ceu

tiC

als

55

Technopark ‘Medical science centre ‘Eydos’ in the high medicine technology field

Project Title Technopark ‘Medical science centre ‘Eydos’(high medicine technology field)

Project summary

Project Idea Establishment of advanced medical science centre, which will improve general level of healthcare in Russia due to domestic researches development

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 2500

Total Project Budget $38.52 mln

Funds Requested $28.92 mln

Financial and Economic Indicators

Payback Period (years) 6

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Medicine & pharmaceuticals

h 5 0 1

Page 58: TIDA - Prosective Projects

med

iCin

e &

ph

ar

ma

Ceu

tiC

als

56

Organization of the plant of medicines, drugs and other medical goods in the Republic of Tatarstan

Project Title Organization of the plant of medical preparation, drugs and other medical goods in the Republic of Tatarstan.

Project summary

Project Idea Construction of the new pharmaceutical plant on aseptic medicine production (infusion) meeting international requirements

Location SEZ ‘Alabuga’, the Republic of Tatarstan

Estimated Number of Jobs Created 147

Total Project Budget $62.0 mln

Funds Requested $61.9 mln

Financial and Economic Indicators

IRR % 49.00

Discount Rate % 17.42

Discounted Payback Period (years) 3.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Medicine & pharmaceuticals

h 5 0 2 h 5 0 3

Page 59: TIDA - Prosective Projects

med

iCin

e &

ph

ar

ma

Ceu

tiC

als

57

Establishment of the ointments production

Project Title Establishment of the ointments production

Project summary

Project Idea The aim of the project is to meet healthcare requirements of high-quality essential medicines in Russia and the Republic of Tatarstan and to set affordable prices.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 29

Total Project Budget $8.5 mln

Funds Requested $6.8 mln

Financial and Economic Indicators

NPV $6.4 mln

IRR % 72.5

Discount Rate % 20.0

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Medicine & pharmaceuticals

h 5 0 3

Page 60: TIDA - Prosective Projects

IT &telecommunications

i 6 0 1

Page 61: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

59

Appointments

Project Title Appointments

Project summary

Project Idea

Pluggable online booking SaaS solution for offline services such as sport clubs, banks, restaurants, clinics, cinemas, service stations, education centres and others.Idea is taken from Online Avia sales and Hotel booking systems and applied to other services.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $1.0 mln

Funds Requested $0.8 mln

Financial and Economic Indicators

NPV $0.33 mln

IRR % 24.5

Discount Rate % 15.0

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel/:+7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail:[email protected]

IT & telecommunications

i 6 0 1

Page 62: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

60

Online checkpoint

Project Title Online checkpoint

Project summary

Project Idea Innovative approach for generating online salesChallenge is to attract more customers to online stores.Solution is to subscribe to ready-to-use online checkpoint service based on customer loyalty programs. Service will add game mechanics to your web store and generate more customer traffic.Idea is taken from similar offline projects which broke through US retail market in 2011 and applied to online stores

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $1.2 mln

Funds Requested $1.02 mln

Financial and Economic Indicators

NPV $0.33 mln

IRR % 24.5

Discount Rate % 15.0

Discounted Payback Period (years) 3.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

IT & telecommunications

i 6 0 2 i 6 0 3

Page 63: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

61

WebComSystem

Project Title WebComSystem

Project summary

Project Idea The project represents a fundamentally new communication system to integrate the manufacturing segment of small and medium-sized businesses in a single trading network with the financial and information center anywhere in the world.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 106

Total Project Budget $6.5 mln

Funds Requested $4.5 mln

Financial and Economic Indicators

NPV $5.8 mln

IRR % 50

Discount Rate % 28

Discounted Payback Period (years) 4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

IT & telecommunications

i 6 0 3

Page 64: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

62

Product-Test

Project Title Product-Test

Project summary

Project Idea To build the first Russian consumer products rating & review service, analogous of Consumer Reports (U.S.) or Which? (U.K.).

Location The Republic of Tatarstan

Estimated Number of Jobs Created 11-14

Total Project Budget $0.7 mln

Funds Requested $0.7 mln

Financial and Economic Indicators

NPV $25 mln

IRR % 280

Discount Rate % 10

Discounted Payback Period (years) 1.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

IT & telecommunications

i 6 0 4 i 6 0 5

Page 65: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

63

Establishment of nanotechnology centre

Project Title Establishment of nanotechnology centre

Project summary

Project Idea

Establishment of nanotechnology centre for creating technologi-cal and engineering support for companies and implementation of new technology in the field of nanotechnology. Current share-holders are Rusnano OJSC, Tatneftehiminvest OJSC, Investment and Venture Fund of the Republic of Tatarstan state non-financial organization. Investors’ participation is expected to be in the form of equity financing.

Location Kazan, the Republic of Tatarstan

Total Project Budget $118.78 mln

Financial and Economic Indicators

Discount Rate % 18

Discounted Payback Period (years) 5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

IT & telecommunications

i 6 0 4 i 6 0 5

Page 66: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

64

Territorially detached innovative centre ‘INNOPOLIS’

IT & telecommunications

Project Title Territorially detached innovative centre ‘INNOPOLIS’

Project summary

Project Idea Innopolis is a new Russian city, which is specifically made for providing working and education process in IT sphere. The project will make it possible for young high-qualified experts from all over the country to work together, which will enhance innovative development of Russia.

Location Verhneuclonsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 60 000

Total Project Budget $2150 mln

Funds Requested $1075 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

i 6 0 6 i 6 0 7

Page 67: TIDA - Prosective Projects

it &

tel

eCo

mm

un

iCa

tio

ns

65

CG WIFI

Project Title CG WIFI

Project summary

Project Idea Provision of high-quality and high-speed Internet access by the use of wireless communications Wi-Fi to the gadgets with Wi-Fi adapter anywhere in the city

Location Chistopolsky district, the Republic of Tatarstan

Total Project Budget $0.24 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

IT & telecommunications

i 6 0 6 i 6 0 7

Page 68: TIDA - Prosective Projects

Agriculture & Food processing

a 7 0 1

Page 69: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

67

The complex on deep processing of wheat with an output of 700 tons per day

in the Republic of Tatarstan, Arsk district

Project Title Deep wheat processing complex with the production capacity of 700 tons per day in the Republic of Tatarstan, Arsk district

Project summary

Project Idea Lots of efforts and resources are given on growing crops in Tatarstan as well as in Russia. However, wheat processing is still not effective. Up to 20% of the harvest disappears. The surplus of wheat is on average 1.3 million tons per year. Advanced wheat processing is required, since it would allow gaining higher added value of the products, which is necessary for the import-substituting production sectors.The raw material for high-tech production is class-4 wheat.There are all conditions for establishment of advanced wheat processing in the Republic of Tatarstan.

Location Arsk, the Republic of Tatarstan

Estimated Number of Jobs Created 195

Total Project Budget $228.23 mln

Financial and Economic Indicators

Discounted Payback Period (years) 6.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 0 1

Page 70: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

68

Plant for deep wheat processing

Project Title Plant for deep wheat processing

Project summary

Project Idea Construction of the plant which consists of two main parts:• Construction of the port silo, storage capacity of which is 300-500 thousand tons per year.• Construction of production site with production capacity of 400 thousand tons of wheat per year.The project provides wheat processing into the following products:At the first stage of the Project:• Bran• gluten• the native starch• glucose-fructose syrupThe second stage is the production of products with higher added value: citric, lactic, succinic, itaconic acid

Location Near Sviazhsk, the Republic of Tatarstan

Estimated Number of Jobs Created 97

Total Project Budget $3.6 mln

Funds Requested $2.1 mln

Financial and Economic Indicators

NPV $1.14 mln

IRR % 37

Discount Rate % 15

Discounted Payback Period (years) 4.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 0 2 a 7 0 3

Page 71: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

69

Construction of agricultural grain processing mega-farm

Project Title Construction of agricultural grain processing mega-farm

Project summary

Project Idea The project involves construction of agricultural grain processing mega-farm and exploiting a range of products and possibilities, which mega-farm provides:– grain elevator complex with total capacity of 33,070 m3. (28,000 tons of grain);– flour and cereal processing,– feed milling plant,– extraction of vegetable oil.

Location Buinsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $10.9 mln

Funds Requested $7.6 mln

Financial and Economic Indicators

NPV $3.5 mln

IRR % 30.2

Discount Rate % 20.0

Discounted Payback Period (years) 6.23

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 0 3

Page 72: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

70

Establishment of a livestock complex on sheep and goat breeding

Project Title Establishment of a livestock complex on sheep and goat breeding

Project summary

Project Idea The main goal of this project is to establish a farm on goat milk and meat production. There are two main targets that are expected to be achieved:– Reconstruction of cattle-breeding complex for 500 goats next to the village of Shushary, Vysokogorsky district;– The purchase of goats, new equipment for high-quality animal husbandry, which allows obtaining large production output of milk, meat and wool.

Location Vysokogorskiy region, the Republic of Tatarstan

Estimated Number of Jobs Created 19

Total Project Budget $1.2 mln

Funds Requested $1.1 mln

Financial and Economic Indicators

NPV $3.4 mln

IRR % 72.02

Discount Rate % 15.00

Discounted Payback Period (years) 3.42

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 0 5 a 7 0 4

Page 73: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

71

Agricultural industrial park «Zakamsky region»

Project Title Agricultural industrial park «Zakamsky region»

Project summary

Project Idea Construction of agricultural industrial park will solve the problem of agricultural products storage, processing and distribution. Moreover, it will help to avoid intermediaries’ participation in production distribution, which will allow general price stabilization.

Location Tukavsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 850

Total Project Budget $86.77 mln

Funds Requested $61.06 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 0 5

Page 74: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

72

Establishment of sturgeon fishery with the use of closed system

Agriculture & Food processing

a 7 0 6

Project Title Establishment of sturgeon fishery with the use of closed system

Project summary

Project Idea Project involves establishment of contemporary plant on intensive fish breeding for further sale. Reverse water supply technology is used to achieve high production growth rate

Location Bavly, the Republic of Tatarstan

Estimated Number of Jobs Created 9

Total Project Budget $0.16 mln

Funds Requested $0.13 mln

Financial and Economic Indicators

NPV $0.07 mln

IRR % 33.3

Discount Rate % 14.0

Discounted Payback Period (years) 4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 75: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

73

Increase in sugar beet productivity capacity to 6 000 tons per day

Agriculture & Food processing

a 7 0 7

Project Title Increase in sugar beet productivity capacity to 6 000 tons per day

Project summary

Project Idea Expansion of sugar beet processing factory to reduce costs and whereby increase earning power

Location Buinsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 680

Total Project Budget $54.70 mln

Funds Requested $38.62 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 76: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

74

Establishment of commercial dairy farm

Agriculture & Food processing

a 7 0 8

Project Title Establishment of commercial dairy farm

Project summary

Project Idea The project involves establishment of commercial dairy farm with complete breeding and production cycle

Location Nizhnekamsky region, the Republic of Tatarstan

Estimated Number of Jobs Created 40

Total Project Budget $16.39 mln

Financial and Economic Indicators

NPV $6.60 mln

IRR % 22.74

Discount Rate % 15.00

Discounted Payback Period (years) 18

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 77: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

75

Establishment of a meat and dairy production

Agriculture & Food processing

a 7 0 9

Project Title Establishment of a meat and dairy production

Project summary

Project Idea Construction and start-up of a dairy farm with 400 heads of cattle

Location Drozhzhanovsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 25

Total Project Budget $2.0 mln

Funds Requested $1.9 mln

Financial and Economic Indicators

Discount Rate % 30

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 78: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

76

Project Title Creation of agro-industrial park

Project summary

Project Idea Construction and launch of a modern complex, which includes following: store space, sanitary-veterinary expertise laboratory, lines for milk and meat processing, vegetable canning line, warehouse, bakery, pastry and pasta production line

Location Drozhzhanovsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 80

Total Project Budget $3.62 mln

Funds Requested $2.07 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Creation of agro-industrial park

Agriculture & Food processing

a 7 1 0 a 7 1 1

Page 79: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

77

Establishment of a meat and dairy production

Project Title Reconstruction and modernization of a dairy products factory

Project summary

Project Idea Increasing output of current factory SPPK «Drozhzhanovsky dairy factory» up to 60 tons of dairy products with it following realization

Location Drozhzhanovsky district, the Republic of Tatarstan

Total Project Budget $5 mln

Funds Requested $3.5 mln

Financial and Economic Indicators

Discount Rate % 30

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Agriculture & Food processing

a 7 1 1

Page 80: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

78

Reconstruction and launch of a meat processing company

Agriculture & Food processing

a 7 1 2

Project Title Reconstruction and launch of a meat processing company

Project summary

Project Idea Modernization of existing manufacturing process of meat production, purchase of modern lines for sausage and ready to cook products

Location Drozhzhanovsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $1.83 mln

Funds Requested $1.28 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 81: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

79

New chocolate factory

Project Title New chocolate factory

Project summary

Project Idea The chocolate candies segment has the largest market share in terms of the volume – around 45% from the whole sweets market in Russia. Import covers significant part of Russia’s sweets consumption, and its ousting would give sizable potential to domestic producers in increasing production. Privolzhsky Federal Region production of chocolate candies doesn’t cover its internal consumption of the region, the lack of production is about 18 000 tons per year. New high quality products made in Tatarstan on the basis of existing Bakery-Confectionery Factory with local brand will increase the Republic prestige in Volga Region and the whole of Russia.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 200

Total Project Budget $56.25 mln

Financial and Economic Indicators

NPV $9.375 mln

IRR % 15 (with load of capacity on a 50% level)

Discount Rate % 12

Discounted Payback Period (years) 4-7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 1 3

Page 82: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

80

Establishment of potato processing manufacture

Project Title Establishment of potato processing manufacture

Project summary

Project Idea The project involves establishment of potato processing manufacture, which will produce potato chips and French fries

Location Kukmorsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 87

Total Project Budget $19.91 mln

Funds Requested $13.65 mln

Financial and Economic Indicators

NPV $0.54 mln

Discounted Payback Period (years) 9.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 1 4

Page 83: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

81

Reconstruction of «Pervomaisky distillery» in the processing of agricultural products

Project Title Reconstruction of ‘Pervomaisky distillery’ in the processing of agricultural products

Project summary

Project Idea Creating a complex on agricultural products processing based on the acquired company. Malt, molasses, animal feed and drinking water is planned to be produced after the reconstruction.

Location Almetyevsk district, the Republic of Tatarstan

Total Project Budget $2.7 mln

Financial and Economic Indicators

IRR % 35.32

Discount Rate % 15.00

Discounted Payback Period (years) 1.8

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 1 5

Page 84: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

82

Production of carrot juice of direct extraction «BiO+»

Project Title Production of direct extraction carrot juice «BiO+»

Project summary

Project Idea The project involves production of the environment-friendly product – carrot juice of direct extraction «BiO +».

Location Sarmanovsky region, the Republic of Tatarstan

Estimated Number of Jobs Created 63

Total Project Budget $7.1 mln

Funds Requested $4.9 mln

Financial and Economic Indicators

NPV $1.8 mln

IRR % 29.5

Discount Rate % 20

Discounted Payback Period (years) 5.33

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 1 6

Page 85: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

83

«Chistopol» Poultry Plant developmentProject Title «Chistopol» Poultry Plant development

Project summary

Project Idea Expansion of the production facilities by the means of reconstruction and re-equipment of the current void sites.As the result, poultry production capacity will be three times as much as it has been before the development and production will reach the capacity of 115 mln eggs per year.

Location Kargali, Chistopol region, the Republic of Tatarstan

Estimated Number of Jobs Created 116

Total Project Budget $15.85 mln

Funds Requested $11.20 mln

Financial and Economic Indicators

NPV $3.8 mln

IRR % 15.76

Discount Rate % 10.00

Discounted Payback Period (years) 8.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Agriculture & Food processing

a 7 1 7

Page 86: TIDA - Prosective Projects

ag

riC

ult

ur

e &

Fo

od

pr

oC

essi

ng

84

New ‘Dessert-Boutique’ shops opening

Agriculture & Food processing

a 7 1 8

Project Title New ‘Dessert-Boutique’ shops opening

Project summary

Project Idea Products are cakes, packed desserts, chocolate candies and figures made of chocolate, which are made of natural components only. There are currently five working shops in the Republic of Tatarstan, six more shops are planned to be opened in the Republic and other regions of Russia.

Location Naberezhniye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $2395.55 mln

Funds Requested $754.41mln

Financial and Economic Indicators

NPV $433.87mln

IRR % 42.7%

Discount Rate % 18.0%

Discounted Payback Period (years) 3.74

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 87: TIDA - Prosective Projects

Service industry &tourism

Page 88: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

86

Hostel

Project Title Hostel

Project summary

Project Idea Hostel provides budget oriented, sociable accommodation where guests can rent a bed usually a bunk bed and share a bathroom, lounge and kitchen. Hostels are very popular among young travelers, foreign tourists and other people who prefer to stay in the downtown of the city and pay less money. This type of accommodation always is going to be in demand, especially during Kazan Universiade 2013, World Cup 2018 and others.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 24

Total Project Budget $3.95 mln

Funds Requested $3.63 mln

Financial and Economic Indicators

NPV $4.05 mln

IRR % 19

Discount Rate % 9

Discounted Payback Period (years) 6.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Service industry & tourism

s 8 0 2s 8 0 1

Page 89: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

87

Tourist and recreational cluster «Kama Pearl»

Project Title Tourist and recreational cluster ‘Kama Pearl’

Project summary

Project Idea The project aims to construct a complex of tourism and recreation buildings. TRC ‘Kama Pearl’ is located next to M-7 federal highway, along the river. Kama river, which contributes to recreation and boating development, including sailing, hiking, wakeboarding, as well as water sports: water skiing, surfing and windsurfing. Environment, flora and fauna, as well as the presence of archaeological and historical sites allows to develop a hunting and fishing tourism, ecological and cultural tourism.

Location Ribno-Slobodskoi District, the Republic of Tatarstan

Estimated Number of Jobs Created 452

Total Project Budget $0.42 mln

Financial and Economic Indicators

NPV $0.56 mln

Discount Rate % 7.5

Payback Period (years) 7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Service industry & tourism

s 8 0 2

Page 90: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

88

Agro-touristic complex «Kama Compound»

Project Title Agro-touristic complex ‘Kama Compound’.

Project summary

Project Idea Project involves construction of the agro-touristic and recreation complex.

Location Kama-Ustinsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 26

Total Project Budget $1.50 mln

Funds Requested $1.46 mln

Financial and Economic Indicators

NPV $0.83 mln

IRR % 39

Discount Rate % 18

Discounted Payback Period (years) 3.2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Service industry & tourism

s 8 0 4 s 8 0 3

Page 91: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

89

Developing of «Ostrich Paradise» recreation centre

Project Title Developing of ‘Ostrich Paradise’ recreation centre

Project summary

Project Idea Project involves the development of a modern efficient facility in the livestock sphere and the establishment of tourist related infrastructure.

Location Pestrechinsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 25

Total Project Budget $1.97 mln

Financial and Economic Indicators

NPV $1.12 mln

IRR % 29.93

Discount Rate % 15.00

Discounted Payback Period (years) 5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Service industry & tourism

s 8 0 4 s 8 0 3

Page 92: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

90

Tourist-recreational park in ‘Kamskie Polyany’

Project Title Tourist-recreational park in ‘Kamskie Polyany’

Project summary

Project Idea The aim of the project is to create a low-cost recreation and touristic complex with festival and event platform

Location Kamskie Polyany, Nizhnekamsk, the Republic of Tatarstan

Total Project Budget $16.6 mln

Funds Requested $8.3 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Service industry & tourism

s 8 0 5 s 8 0 6

Page 93: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

91

‘Emerald Coast’ tourist and recreation complex

Service industry & tourism

s 8 0 5 s 8 0 6

Project Title ‘Emerald Coast’ tourist and recreation complex

Project summary

Project Idea Touristic and recreation possibilities development, stimulation of small and medium-sized business development in different spheres of tourist and health-improving services.Realization of the ‘Elabuga Banks’ project is supposed to create touristic, recreation and health-improving infrastructural objects in the territory of Kama and Toyma rivers strand of 250 hectares

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 1035

Total Project Budget $116.52 mln

Funds Requested $61.00 mln

Financial and Economic Indicators

NPV $27.78 mln

IRR % 8

Discount Rate % 8

Discounted Payback Period (years) 9.1

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 94: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

92

Event playground of tourist recreational park ‘Kamskiye Polyany’

Service industry & tourism

s 8 0 7 s 8 0 8

Project Title Event playground of tourist recreational park ‘Kamskiye Polyany’

Project summary

Project Idea The project involves establishment of active recreation objects and economy class tourism

Location Nizhnekamsky district, the Republic of Tatarstan

Total Project Budget $16.17 mln

Funds Requested $8.08 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 95: TIDA - Prosective Projects

ser

viC

e in

du

str

y &

to

ur

ism

93

Suburban settlement ‘Pyatidvor’ye’

Service industry & tourism

s 8 0 8

Project Title Suburban settlement ‘Pyatidvor’ye’

Project summary

Project Idea Project involves construction of the Suburban settlement ‘Pyatidvor’ye’ which is located at Volga river’s high coast. Conditions are perfect for having a rest with the whole family during the whole year. The main advantage of the village is that it gathers both developed infrastructure and beauty of the nature.

Location Kazan, the Republic of Tatarstan

Total Project Budget $19.65 mln

Funds Requested $2.17 mln

Financial and Economic Indicators

NPV $3.93 mln

IRR % 43

Discount Rate % 13

Discounted Payback Period (years) 2.43

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 96: TIDA - Prosective Projects

h 9 0 1

Page 97: TIDA - Prosective Projects

ha

lal

ind

ust

ry

95

Halal ice cream production and distribution

Project Title Halal ice cream production and distribution

Project summary

Project Idea Purchasing machines for production of soft ice cream and its maintenance. Production of ice cream for restaurants, cafes and shops.

Location Kazan, the Republic of Tatarstan

Total Project Budget $0.25 mln

Funds Requested $0.12 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Halal industry

h 9 0 1

Page 98: TIDA - Prosective Projects

ha

lal

ind

ust

ry

96

Project Title Establishment of Hajj Fund in the Republic of Tatarstan

Project summary

Project Idea Hajj Fund is an investment saving fund, based on Islam finance principles. It will provide opportunity to deposit money, particularly to save to perform Hajj in Mecca in more systematic manner.

Location Kazan, the Republic of Tatarstan

Total Project Budget $10 mln

Funds Requested Subject to agreement

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Establishment of Hajj Fund in the Republic of Tatarstan

Halal industry

h 9 0 3h 9 0 2

Page 99: TIDA - Prosective Projects

ha

lal

ind

ust

ry

97

‘Usmaniya-dom’ hostel

Project Title ‘Usmaniya-dom’ hostel

Project summary

Project Idea ‘Usmaniya-dom’ hostel with Halal services and conditions provided to pray

Location Kazan, the Republic of Tatarstan

Total Project Budget $2.25 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Halal industry

h 9 0 3

Page 100: TIDA - Prosective Projects

ha

lal

ind

ust

ry

98

Residential compound ‘Berdyamlek’

Halal industry

h 9 0 5h 9 0 4

Project Title Residential compound ‘Berdyamlek’

Project summary

Project Idea Construction of mosque for 200 people and accommodation units at Dubravnaya str.

Location Kazan, the Republic of Tatarstan

Total Project Budget $12.70 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 101: TIDA - Prosective Projects

ha

lal

ind

ust

ry

99

Islamic community center and business incubator ‘Giylem’

Halal industry

h 9 0 5

Project Title Islamic community center and business incubator ‘Giylem’

Project summary

Project Idea Construction of Islamic community center and business incubator ‘Giylem’ connected to non-state educational institution ‘Russian Islamic University’. Business incubator is supposed to provide conditions to Muslim businessmen to work according to the Islamic principles and traditions

Location Kazan, the Republic of Tatarstan

Total Project Budget $3.86 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Page 102: TIDA - Prosective Projects

ha

lal

ind

ust

ry

100

Project Title Establishment of complex ‘Gamyal’ on Halal meat products production

Project summary

Project Idea Establishment of complex ‘Gamyal’ on Halal meat products production and sale

Location Kazan, the Republic of Tatarstan

Total Project Budget $10.29 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Establishment of complex ‘Gamyal’ on Halal meat products production

Halal industry

h 9 0 7h 9 0 6

Page 103: TIDA - Prosective Projects

ha

lal

ind

ust

ry

101

Commercial center‘Gailya’

Project Title Commercial center ‘Gailya’

Project summary

Project Idea Construction of ‘Gailya’ mosque for 300 people and commercial center (business center, hotel, restaurant)

Location Kazan, the Republic of Tatarstan

Total Project Budget $2.89 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Halal industry

h 9 0 7

Page 104: TIDA - Prosective Projects

ha

lal

ind

ust

ry

102

Project Title Construction of department store ‘Halal’

Project summary

Project Idea Construction of department store ‘Halal’ at Musina Str. for the sale of Halal products

Location Kazan, the Republic of Tatarstan

Total Project Budget $0.64 mln

Project Initiator Muslim Religious Board (MRB) of the Republic of Tatarstan

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Construction of department store ‘Halal’

Halal industry

h 9 0 8

Page 105: TIDA - Prosective Projects

Others

Page 106: TIDA - Prosective Projects

oth

ers

104

Modernization of washing and steaming station Urussu

Project Title Modernization of washing and steaming station Urussu

Project summary

Project Idea Washing complex is a complex of structures and devices for cleaning railway cisterns from the residues of petroleum products and for preparations for filling by different liquid products.The technology is based on the usage of the advanced methods and environmentally friendly detergents. All processes are automated. Tank washing is manufactured in a closed circuit.The project capacity is 50 tanks per day.

Location Urussu, the Republic of Tatarstan

Total Project Budget $3.0 mln

Funds Requested $0.9 mln

Financial and Economic Indicators

NPV $0.7 mln

IRR % 30

Discount Rate % 15

Discounted Payback Period (years) 3.3

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 1

Page 107: TIDA - Prosective Projects

oth

ers

105

Extension of metallized paper manufacturing

Project Title Extension of metallized paper manufacturing

Project summary

Project Idea Creation of the new direction of metallized self-adhesive paper production (5 000 tons per year), metallized parafinned paper on the base of silicone component (4 000 tons per year)

Location Tyulyachi village, the Republic of Tatarstan

Estimated Number of Jobs Created 62

Total Project Budget $134 mln

Funds Requested $100 mln

Financial and Economic Indicators

NPV $11.3 mln

IRR % 12.03

Discount Rate % 9.00

Discounted Payback Period (years) 8.5

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 2

Page 108: TIDA - Prosective Projects

oth

ers

106

Manufacturing of LED luminaires for outdoor and indoor lighting

Project Title Manufacturing of LED luminaires for outdoor and indoor lighting

Project summary

Project Idea This project involves the use of electronic ballasts devices (ECG) instead of common electromagnetic devices for exterior lighting (mostly, for the road lighting)

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 170

Total Project Budget $6.0 mln

Funds Requested $4.9 mln

Financial and Economic Indicators

NPV $8.7 mln

IRR % 11

Discount Rate % 20

Discounted Payback Period (years) 7.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 3

Page 109: TIDA - Prosective Projects

oth

ers

107

The development of competitive refrigeration equipment POZIS based on energy-efficient,

environmentally safe technology with the implementation of isobutene and cyclopentene

Project Title

The development of competitive refrigeration equipment POZIS based on energy-efficient, environmentally safe technology with the implementation of isobutene and

cyclopentene

Project summary

Project Idea Project involves the reconstruction of refrigeration equipment for the introduction of innovative technology to produce qualitatively new refrigeration equipment according to the international standards ISO, using environmentally friendly components (isobutane and cyclopentane)

Location Zelenodolsk, the Republic of Tatarstan

Estimated Number of Jobs Created 265

Total Project Budget $27.5 mln

Funds Requested $26.7 mln

Financial and Economic Indicators

Discount Rate % 8.25

Discounted Payback Period (years) 11

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 4

Page 110: TIDA - Prosective Projects

oth

ers

108

Creation of Textile Plant(furniture textile)

Project Title Creation of Textile Plant (furniture textile)

Project summary

Project Idea Project involves furniture textile production. Agreements on furniture textile purchase intentions are signed. The aim of the project is an import substitution.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 20

Total Project Budget $2.13 mln

Funds Requested $1.90 mln

Financial and Economic Indicators

NPV $2.5 mln

Discounted Payback Period (years) 1.7

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 5 o 1 3 0 6

Page 111: TIDA - Prosective Projects

oth

ers

109

Ecological Parkof the Republic of Tatarstan

Project Title Ecological Park of the Republic of Tatarstan

Project summary

Project Idea

Ecopark Project is a cluster of interrelated plants working in the sphere of household and industrial waste recycling based on modern innovative technology and manufactures producing products from the recycled materials.

Location Pestrechinsk municipal district, the Republic of Tatarstan

Estimated Number of Jobs Created 115

Total Project Budget $37.15 mln

Financial and Economic Indicators

Discount Rate % 12

Discounted Payback Period (years) 5.5

Contacts

Tatarstan Investment Development Agency, Tel.: +7 (843) 570 40 01, +7 917 227 69 92 (Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 6

Page 112: TIDA - Prosective Projects

oth

ers

110

Modular industrial recycling park on disposing 3,000 trucks per year

Project Title Modular industrial recycling park on disposing 3,000 trucks per year

Project summary

Project Idea Modern high-tech Industrial Park on recycling trucks including the modules: processing of waste tires, processing of wiring, processing black and colored scrap metal, processing and recycling waste oil, gas generation. According to the agency ‘Autostat’, there are 5.3 million trucks in Russia, more than 60% are older than 10 years and can be recycled.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 198

Total Project Budget $16.06 mln

Funds Requested $9.20 mln

Financial and Economic Indicators

NPV $15.3 mln

IRR % 52

Discount Rate % 12

Discounted Payback Period (years) 3.3

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 7 o 1 3 0 8

Page 113: TIDA - Prosective Projects

oth

ers

111

Manufacturing air ducts by the SPIRO's technology

Project Title Manufacturing air ducts by the SPIRO's technology

Project summary

Project Idea Project involves manufacturing air ducts by the SPIRO's technology. SPIRO also provides full range of services, which are production designing (planning), manufacturing processes adjusting

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 75

Total Project Budget $1.6 mln

Funds Requested $1.1 mln

Financial and Economic Indicators

NPV $2.4 mln

IRR % 46

Discount Rate % 20

Discounted Payback Period (years) 3

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 8

Page 114: TIDA - Prosective Projects

oth

ers

112

Reconstruction of the main water drainage system

Project Title Reconstruction of the main water drainage system

Project summary

Project Idea Project involves the reconstruction and modernization of the main water drainage system which will improve the quality of the water and reduce the network losses

Location Almetyevsk-Minnibaevo, the Republic of Tatarstan

Total Project Budget $3.3 mln

Funds Requested $2.1 mln

Financial and Economic Indicators

Discounted Payback Period (years) 20

Contacts

Tatarstan Investment Development Agency, Tel.: +7 (843) 570 40 01, +7 917 227 69 92 (Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 0 9 o 1 3 1 0

Page 115: TIDA - Prosective Projects

oth

ers

113

Establishment of alveolated cardboard pallet manufacture

Project Title Establishment of alveolated cardboard pallet manufacture

Project summary

Project Idea The project involves design and construction of cardboard pallet manufacture plant based on Finnish technology in the Republic of Tatarstan. Production is to be carried by the modern equipment, productive capacity of which is 3 million pallets per year.

Location Kazan, the Republic of Tatarstan

Estimated Number of Jobs Created 50

Total Project Budget $12.55 mln

Financial and Economic Indicators

NPV $1.63 mln

IRR % 24.1

Discounted Payback Period (years) 5.79

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 0

Page 116: TIDA - Prosective Projects

oth

ers

114

Initiation of nylon fibers-6.6 production with the productive capacity of 2 400 tn per year

of nylon fibers and 10 mln high quality tights

Project Title Initiation of nylon fibers-6.6 production with the productive capacity of 2 400 tons nylon fibers and 10 mln high quality

tights per year

Project summary

Project Idea Initiation of contemporary joint production unit based on existing enterprise, producing nylon fibers-6.6 and high quality tights out of them

Location Elabuga, the Republic of Tatarstan

Estimated Number of Jobs Created 300

Total Project Budget $107.67 mln

Financial and Economic Indicators

NPV $71.04 mln

IRR % 43.2

Discount Rate % 20.0

Discounted Payback Period (years) 5.05

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 1 o 1 3 1 2

Page 117: TIDA - Prosective Projects

oth

ers

115

Improving of the heating supply efficiency, Zelenodolsk

Project Title Improving of the heating supply efficiency, Zelenodolsk

Project summary

Project Idea Project involves improvement of the heating supply efficiency in Zelenodolsk. Partners’ share is going to be up to 70 percent.

Location Zelenodolsk, the Republic of Tatarstan

Total Project Budget $41.5 mln

Financial and Economic Indicators

Discount Rate % 10

Discounted Payback Period (years) 9.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 2

Page 118: TIDA - Prosective Projects

oth

ers

116

Constructionof the mini Thermal Power Plant

Project Title Construction of the mini Thermal Power Plant

Project summary

Project Idea Project involves construction of the mini Thermal Power Plant for existing company ‘POZIS’ OJSC (expected partners’ share is up to 80 percent)

Location Kazan, the Republic of Tatarstan

Total Project Budget $18.1 mln

Financial and Economic Indicators

Discount Rate % 10

Discounted Payback Period (years) 6.76

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 3 o 1 3 1 4

Page 119: TIDA - Prosective Projects

oth

ers

117

Construction of the tram line in Naberezhnye Chelny

Project Title Construction of the tram line in Naberezhnye Chelny

Project summary

Project Idea The project involves the tram line construction on the main street with high passenger flow. The project will help to relieve highway speed traffic flow, reduce waiting time and improve the environment.

Location Naberezhnye Chelny, the Republic of Tatarstan

Estimated Number of Jobs Created 80

Total Project Budget $17.1 mln

Financial and Economic Indicators

NPV $5.9 mln

IRR % 20

Discount Rate % 10

Discounted Payback Period (years) 12

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 4

Page 120: TIDA - Prosective Projects

oth

ers

118

Manufacture and distribution of footwear cleaning device

Project Title Manufacture and distribution of footwear cleaning device

Project summary

Project Idea Producer offers the range of footwear cleaning and disinfection devices as well as the set of expendable materials for the maintenance of technical availability of the devices.

Location The Republic of Tatarstan

Estimated Number of Jobs Created 108

Total Project Budget $0.68 mln

Financial and Economic Indicators

NPV $0.14 mln

Discounted Payback Period (years) 2

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 5 o 1 3 1 6

Page 121: TIDA - Prosective Projects

oth

ers

119

Complete modernization of the existing genuine leather production enterprise

Project Title Complete modernization of the existing genuine leather production enterprise

Project summary

Project Idea The project involves establishment of high technology tannery on genuine leather production based on existing enterprise. High frequency plasmatic installation adapted to the manufacture conditions is supposed to be implemented.

Location Sabinsky District, the Republic of Tatarstan

Estimated Number of Jobs Created 175

Total Project Budget $14.67 mln

Funds Requested $10.27 mln

Financial and Economic Indicators

NPV $17.45 mln

IRR % 39.63

Discount Rate % 0-20

Discounted Payback Period (years) 3.4

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-Mail: [email protected]

Others

o 1 3 1 6

Page 122: TIDA - Prosective Projects

oth

ers

120

Tatarsko-Shatrashansky zeolite mine working

Project Title Tatarsko-Shatrashansky zeolite mine working

Project summary

Project Idea Manufactory of the products used in:– livestock, aviculture, fur-farming, pisciculture;– agriculture and plant cultivation;– making different types of construction materials;– water cleaning systems for human consuming purpose

Location Drozhzhanovsky district, the Republic of Tatarstan

Estimated Number of Jobs Created 120

Total Project Budget $67.50 mln

Funds Requested $66.67 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Others

o 1 3 1 7 o 1 3 1 8

Page 123: TIDA - Prosective Projects

oth

ers

121

Improvement of the heat supply system effectiveness

Project Title Improvement of the heat supply system effectiveness

Project summary

Project Idea Improvement of the heat supply system effectiveness in Elabuga (expected partner share is 80 percent)

Location Elabuga, the Republic of Tatarstan

Total Project Budget $44.20 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Others

o 1 3 1 8

Page 124: TIDA - Prosective Projects

oth

ers

122

Project Title Luxurious bus purchase

Project summary

Project Idea Purchase of 5 intercity luxurious buses for 45 passengers each. They will be used for passenger carriage to health resorts at Black Sea and Azov Sea, corporate client services, and sportsmen carriage during Universiade Kazan 2013 Russia

Location Almetyevsk, the Republic of Tatarstan

Total Project Budget $1.13 mln

Financial and Economic Indicators

NPV $0.05 mln

IRR % 9.1

Discount Rate % 8.1

Discounted Payback Period (years) 9.6

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)E-mail: [email protected]

Luxurious bus purchase

Others

o 1 3 1 9 o 1 3 2 0

Page 125: TIDA - Prosective Projects

oth

ers

Hospital reconstruction

Project Title Hospital reconstruction

Project summary

Project Idea Reconstruction and repair of diagnostic suite ‘City hospital №5’

Location Naberezhniye Chelny, the Republic of Tatarstan

Total Project Budget $11.42 mln

Contacts

Tatarstan Investment Development Agency,Tel.: +7 (843) 570 40 01, +7 917 227 69 92(Guzel Mullayarova, Idelya Nizamova)420107, 50 Peterburgskaya St, KazanE-mail: [email protected]

Others

o 1 3 2 0

Page 126: TIDA - Prosective Projects

124

For notes

Page 127: TIDA - Prosective Projects
Page 128: TIDA - Prosective Projects

50, Peterburgskaya st., Kazan, Tatarstan, 420107tel. +7 843-570-40-01fax +7 [email protected]

Tatarstan InvestmentDevelopment Agency

www.tida.tatarstan.ruwww.invest.tatarstan.ru