the story continues… jack moehle. peer graduation “take a couple years off and find out what you...

11
N ew D ata Pre vio u s D a ta 0 .1 1 10 100 10 00 D ista nc e (k m ) 4 5 6 7 8 M agnitude 0 .1 1 10 100 1 000 D ista nc e (k m ) 4 5 6 7 8 M agnitude N ew D ata Pre vio u s D a ta N ew D ata Pre vio u s D a ta 0 .1 1 10 100 10 00 D ista nc e (k m ) 4 5 6 7 8 M agnitude 0 .1 1 10 100 1 000 D ista nc e (k m ) 4 5 6 7 8 M agnitude 0 .1 1 10 100 10 00 D ista nc e (k m ) 4 5 6 7 8 M agnitude 0 .1 1 10 100 1 000 D ista nc e (k m ) 4 5 6 7 8 M agnitude D ecision Variable Intensity M easure D am age M easure Engineering D em and Param eter B ase S hear D rift D am age Threshold Collapse O nset FEM A 273 Perform ance Levels IO LS CP PBEE today $,% replacement Downtim e,days C asualty rate 0 25% 50% 100% 0 1 7 30 180 0.0 0.0001 0.001 0.01 0.25 PEER contribution B ase S hear D rift D am age Threshold Collapse O nset FEM A 273 Perform ance Levels IO LS CP PBEE today $,% replacement Downtim e,days C asualty rate 0 25% 50% 100% 0 1 7 30 180 0.0 0.0001 0.001 0.01 0.25 PEER contribution The story continues… Jack Moehle

Post on 20-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

New Data Previous Data

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km)

4

5

6

7

8

Mag

nitude

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km )

4

5

6

7

8

Mag

nitude

New Data Previous DataNew Data Previous Data

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km)

4

5

6

7

8

Mag

nitude

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km )

4

5

6

7

8

Mag

nitude

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km)

4

5

6

7

8

Mag

nitude

0 . 1 1 1 0 1 0 0 1 0 0 0Distance (km )

4

5

6

7

8

Mag

nitude

Decision VariableDecision Variable

Intensity MeasureIntensity Measure

Damage MeasureDamage Measure

Engineering Demand Parameter

Engineering Demand Parameterdrift as an EDP

Mean Annualized Loss = $34,000

Mean Annualized Loss = $34,000

Decision VariableDecision Variable

Intensity MeasureIntensity Measure

Damage MeasureDamage Measure

Engineering Demand Parameter

Engineering Demand Parameter

Engineering Demand Parameter

Engineering Demand Parameterdrift as an EDPdrift as an EDP

Mean Annualized Loss = $34,000

Mean Annualized Loss = $34,000

Base Shear

Drift

Damage Threshold

CollapseOnset

OPEN

OPEN

OPEN

FEMA 273 Performance LevelsIO LS CP

PBEE today

$, % replacement

Downtime, days

Casualty rate

0 25% 50% 100%

0 1 7 30 180

0.0 0.0001 0.001 0.01 0.25

PEER contribution

Base Shear

Drift

Damage Threshold

CollapseOnset

OPEN

OPEN

OPEN

OPEN

OPEN

OPEN

FEMA 273 Performance LevelsIO LS CP

PBEE today

$, % replacement

Downtime, days

Casualty rate

0 25% 50% 100%

0 1 7 30 180

0.0 0.0001 0.001 0.01 0.25

PEER contribution

The story continues…

Jack Moehle

PEER Graduation“Take a couple years off and find out what

you really want to do.”

Tall Buildings Initiative

Los Angeles Tall Buildings Structural Design Council

FEMA

Courtesy Solomon Cordwell Buenz

• Two-year initiative

• Broad community support

• Final guidelines ca 2008/2009

NEES GC ProjectRisk Mitigation for Older Concrete Buildings

Example ongoing projects in PEER Lifelines

• Bridge model calibration for linear and nonlinear response (Stojadinovic)

• Seismic soil pressures on retaining structures (Sitar)

• Organizational decision processes for lifelines mitigation investment priorities (Meszaros)

State of California funding

• General Fund– PEER operations, including outreach

• Transportation Fund– Resources available for an

extended research program on transportation-related subjects.

NSF final review report

• Over the ten years, PEER has mobilized a formidable, multi-disciplinary, intellectual group and melded this into a powerful team with a common purpose. As a result, PEER has taken the emerging performance-based earthquake engineering (PBEE) concepts of the late 1990’s and has developed them into a practical integrated framework, supported by a wide portfolio of tools.

NSF final review report

• The PEER leadership team has been exemplary in guiding the Center to its success. This was evident in the strong esprit-de-corps amongst all PEER members and through the authoritative set of summary presentations. The latter seamlessly conveyed a coherent and readily understandable picture of what is a radical new paradigm for a notoriously conservative industry.

NSF final review report

• Follow-on funding commitments totaling $11.4m from the State of California, Caltrans, PG&E, the University of California and other stakeholders will underpin PEER’s longer term continuation. Its relationships with the California Seismic Safety Commission (CSSC) and with city governances should enable PEER to grow its influence on public policy and decision making.

NSF final review report

• PEER has, in its ten years of effort, developed a productive, sustainable partnership with industry, government agencies, and professional engineering associations in research, education and technology transfer.