Find us: CRLmanagement WHAT YOU SHOULD EXPECT FROM OUR INSPECTION PROCESS We have detailed below the key stages of construction when we will carry out an inspection of the works on your site. It is your responsibility to inform us when you reach each stage in order for us to arrange for an inspector to visit your site and assess the work that has been carried out. You can request an inspection by visiting http://www.C-R-L.com/survey-request/ and submitting an inspection request. Please note that it can take up to 14 days for an inspection to be arranged, it is therefore imperative that you give us adequate notice to arrange a visit to your site. In respect of Final Inspections; you are required to ensure that the build work has completed, and no additional works are required on site, before requesting your Final Inspection. We will be unable to issue Policies until such time as our inspectors have signed your job off as complete and approved. In the event that one of our inspectors visits your site on your request for a Final Inspection, and an additional inspection is required following this due to incomplete works, an administration fee of £250 will be chargeable. We therefore request that you ensure the site is ready for inspection at the time of the request being made. 1 2 3 STAGE 1 (FOUNDATIONS) Ground conditions, type/depth of foundations, Engineers reports (if applicable), contaminated land, radon, pyrites etc. Provision of and planned. Proximity of services/sewers. STAGE 2 (SUBSTRUCTURE) Support of services where poor ground conditions are present. STAGE 3 (SUPERSTRUCTURE TO GROUND FLOOR) tie in method. Temporary works/formwork. Mortar droppings, wall ties, cavity barrier. Dpc’s turned up at cill ends. Shear walls (lateral restraint) expansion joints. Movement joints sound insulation. Position of services. Safety glass below 800mm. STAGE 4 (SUPERSTRUCTURE TO UPPER FLOORS) restraint tie in method. Temporary works/formwork. Mortar droppings, wall ties, cavity barrier. Lead trays, weep holes, sound insulation. Position of services. Perimeter noggings, stud walls supported. Staircase and newell post secure and properly supported. Winder sets secure components. Insulate stud walls on bathrooms and ceilings. Integral garages insulated correctly. STAGE 5 (ROOF STRUCTURE AND COVERINGS) trusses at chimney. STAGE 6 (PREPLASTER) resistant materials used in shower/wet areas. Continuous insulation of envelope. Fire stopping. STAGE 7 (FINAL) risks, no trip hazards. Walk around visual inspection of external envelope of building. Scored, damaged glass. Smoke alarms tested and commissioned. Fireplace and throat plate sealed. INITIAL INTERIM FINAL COMPLETION t/ +44 (0) 800 772 3200 | R OI/ +353 (1) 685 2043 | e/ in fo@c-r-l.c om | w/ www.c-r-l.c om SMS CRL to 81400 CRL Management Ltd is an Appointed Representative of BCR Legal Group Limited which is authorised and regulated by the Financial Conduct Authority. KEYSTAGES09012017_RS The Stages of Construction & inspection Construction Register & CRL are trading names of CRL Management Limited. Registered in the United Kingdom under registration number 07563546 - Registered Office Village 5, 15th Floor, 110 Bishopsgate , London, EC2N 4AY Belfast | Horsham | Liverpool | London | Malaga

Upload: vuongkien

Post on 22-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Find us: CRLmanagement

WHAT YOU SHOULD EXPECT FROM OUR INSPECTION PROCESS

We have detailed below the key stages of construction when we will carry out an inspection of the works on your site. It is your responsibility to inform us when you reach each stage in order for us to arrange for an inspector to visit your site and assess the work that has been carried out.

You can request an inspection by visiting http://www.C-R-L.com/survey-request/ and submitting an inspection request. Please note that it can take up to 14 days for an inspection to be arranged, it is therefore imperative that you give us adequate notice to arrange a visit to your site.

In respect of Final Inspections; you are required to ensure that the build work has completed, and no additional works are required on site, before requesting your Final Inspection. We will be unable to issue Policies until such time as our inspectors have signed your job off as complete and approved. In the event that one of our inspectors visits your site on your request for a Final Inspection, and an additional inspection is required following this due to incomplete works, an administration fee of £250 will be chargeable. We therefore request that you ensure the site is ready for inspection at the time of the request being made.

1

2

3

STAGE 1 (FOUNDATIONS)Ground conditions, type/depth of foundations, Engineers reports (if applicable), contaminated land, radon, pyrites etc. Provision of

and planned. Proximity of services/sewers.

STAGE 2 (SUBSTRUCTURE)

Support of services where poor ground conditions are present.

STAGE 3 (SUPERSTRUCTURE TO GROUND FLOOR)

tie in method. Temporary works/formwork. Mortar droppings, wall ties, cavity barrier. Dpc’s turned up at cill ends. Shear walls (lateral restraint) expansion joints. Movement joints sound insulation. Position of services. Safety glass below 800mm.

STAGE 4 (SUPERSTRUCTURE TO UPPER FLOORS)

restraint tie in method. Temporary works/formwork. Mortar droppings, wall ties, cavity barrier. Lead trays, weep holes, sound insulation. Position of services. Perimeter noggings, stud walls supported.Staircase and newell post secure and properly supported. Winder sets secure components. Insulate stud walls on bathrooms and ceilings. Integral garages insulated correctly.

STAGE 5 (ROOF STRUCTURE AND COVERINGS)

trusses at chimney.

STAGE 6 (PREPLASTER)

resistant materials used in shower/wet areas. Continuous insulation of envelope. Fire stopping.

STAGE 7 (FINAL)

risks, no trip hazards. Walk around visual inspection of external envelope of building. Scored, damaged glass. Smoke alarms tested and commissioned. Fireplace and throat plate sealed.

INITIAL

INTERIM

FINAL

COMPLETIO

N

t/ +44 (0) 800 772 3200 | R OI/ +353 (1) 685 2043 | e/ in [email protected] om | w/ www.c-r-l.c om

SMS CRL to 81400

CRL Management Ltd is an Appointed Representative of BCR Legal Group Limited which is authorised and regulated by the Financial Conduct Authority. KEYSTAGES09012017_RS

The Stages of Construction & inspection

Construction Register & CRL are trading names of CRL Management Limited. Registered in the United Kingdom under registration number 07563546 - Registered Office Village 5, 15th Floor, 110 Bishopsgate , London, EC2N 4AY

Belfast | Horsham | Liverpool | London | Malaga