the sphs capacity building sessions - energy session presentations by energimidt and kenergy
TRANSCRIPT
Energy session Environmental Capacity Building Workshop,
26.11.2015, UN City
Flemming V. Kristensen, EnergiMidt Kenn H. B. Frederiksen, Kenergy
About EnergiMidt
EnergiMidt is a modern Danish multi utility company providing heating, electricity, water, broadband communication and national and international energy consultancy.
• Customer owned company (Co operative structure)
• Approx. 235,000 customers • 750 employees
• Turnover in 2013: 394 Mill. € Headquartered in an Energy Class 1-building in Silkeborg, Denmark
About Kenergy
I worked at EnergiMidt in 23 years before establishing Kenergy. Kenergy is working together with EnergiMidt in several projects.
Kenergy is a consulting and engineering company focussing on renewable energy and energy efficiency projects.
Kenn H. B. Frederiksen
Grid activities
Electricity trading
Technical services
Combined Heat and Power Plants
Business areas of EnergiMidt Operation and maintenance of heating and electricity grid
Sale of electricity on the free market
Street light and traffic light
Operation and maintenance of own power plants up to 100 MW
Energy Consultancy International Energy audit and proposal, project development and financing
Broadband Installation of fibre broadband network, sale of internet connections and television
Sustainable Energy investment Wind Energy and Photovoltaic projects, International
International projects
A global outlook:
Competence in the field of energy consulting and renewable projects.
• 4 MW photovoltaic park in Spain
• 4,5 MW photovoltaic park in Italy
• 4,9 MW photovoltaic park in Bulgaria
• 24 MW of wind in Denmark
• 15 MW of wind in Germany
Above generating 105 GWh annually
Case story – WHR boiler in Bulgaria
• Kaolin AD, Bulgaria worked together with EnergiMidt on a sustainable solution for replacement of their existing WHR boiler that utilises the waste heat for steam production.
• The steam is used for various processes in the production.
• Gas reduction 1 to 1.5 mill. Nm3 p.a. depending on annual operating hours equal to 30%.
• Payback time was crucial, and the investment has break even within 2 years.
Case story – Gas engine in Bulgaria • An existing natural gas fired heat generator
was used in a drying process. • The hot exhaust gasses from a gas engine
eliminated the need for natural gas.
• The combined produced electricity was supplied to the grid at an attractive feed-in tariff.
• Simple pay-back time was 1,4 years
Case story – EnergiMidt new office building
• No external heating supply. A heat pump supplies server cooling and heats the building at the same time.
• Only passive cooling during summer time – no AC
• Cooling by means of: – Integrated PV panels – function as “sun
glasses” – High insulation – Natural ventilation – Night cooling
Business model
3-in-1 solution
Financing
Selection and delivery
of equipment
Consultant services
on energy efficiency
The sun and the potential ”I'd put my money on the sun and solar energy. What a source of power! I hope we don't have to wait 'til oil and coal run out before we tackle that.” “The photovoltaic effect was discovered in 1839”
Thomas Edison (1847–1931)
The sun and the potential
Source: IEA
One hour of sunshine can cover the yearly energy consumption of the world
• Etableret i 1993 • Effekt 4,8 kWp • Effekt efter modifikation 6 kWp • Finansiering: Energistyrelsen,
EnergiMidt
The first grid connected PV plant in Denmark
• 30 parcelhuse
• Netforhold
• Prisreduktioner
• Driftserfaringer
• Finansiering fra
Energistyrelsen, Eltra
og Elfor
Solbyprojektet: 1996-1998
• Fordelt i 8 områder
• Tidstypisk arkitektur
• Optimering af montage
• Prisreduktioner
• Kvalitetssikring
• Produktudvikling
• Dataopsamling
• Eltra, Energistyrelsen og brugerbetaling
Sol 300: 1998-2001
Sol 1000: 2001-2006
• Landsdækkende projekt
• Arkitektur
• Prisreduktioner
• Standard/pilotanlæg
• Gør det selv koncept
Larger RE projects
• 4 MW photovoltaic park in Spain
• 4,5 MW photovoltaic park in Italy
• 4,9 MW photovoltaic park in Bulgaria
• 15 MW of wind in Germany
Roof top systems Roof package model is based on 120 kWp PV systems built in units of 24 kWp.
Covers and area of approximately 750m2.
This is a flexible system with high performance and security and easy to maintain.
The system consist of the following equipment:
• 460 X PV modules polycrystalline each 260 Wp
• 5 X Fronius 20 kW
• Roof structure mounting system
• Electrical wiring
• Balance of system components
• Installation and fully commission
Solarpanels Tier 1 suppliers all approved by financial institutes.
10 years factory warranty, 25 years power guarantee. (80% af nominel yield)
Consumption profile
The consumption profile will determine the maximum size of the PV plant, so no exceed energy will be delivered to the utility network
Financial – overview • The total cost for the system is app. 175,000 EUR
• Annual electricity production: 203,769 kWh
• Current tariff in Uganda: 0.1085 EUR/kWh (Large scale consumer eletricity price)
• Annual Savings in electricity: 22,109 EUR
• Simple pay back time: 8 years
• Lifetime of plant 25-30 years
Contact information
Flemming V. Kristensen Tietgensvej 2 8600 Silkeborg Denmark Mobil: +452086 9638 E-mail: [email protected] www.energimidt.dk