the sphs capacity building sessions - energy session presentations by energimidt and kenergy

39
Energy session Environmental Capacity Building Workshop, 26.11.2015, UN City Flemming V. Kristensen, EnergiMidt Kenn H. B. Frederiksen, Kenergy

Upload: sustainable-procurement-in-the-health-sector-sphs

Post on 11-Apr-2017

290 views

Category:

Environment


1 download

TRANSCRIPT

Energy session Environmental Capacity Building Workshop,

26.11.2015, UN City

Flemming V. Kristensen, EnergiMidt Kenn H. B. Frederiksen, Kenergy

About EnergiMidt

EnergiMidt is a modern Danish multi utility company providing heating, electricity, water, broadband communication and national and international energy consultancy.

• Customer owned company (Co operative structure)

• Approx. 235,000 customers • 750 employees

• Turnover in 2013: 394 Mill. € Headquartered in an Energy Class 1-building in Silkeborg, Denmark

About Kenergy

I worked at EnergiMidt in 23 years before establishing Kenergy. Kenergy is working together with EnergiMidt in several projects.

Kenergy is a consulting and engineering company focussing on renewable energy and energy efficiency projects.

Kenn H. B. Frederiksen

Grid activities

Electricity trading

Technical services

Combined Heat and Power Plants

Business areas of EnergiMidt Operation and maintenance of heating and electricity grid

Sale of electricity on the free market

Street light and traffic light

Operation and maintenance of own power plants up to 100 MW

Energy Consultancy International Energy audit and proposal, project development and financing

Broadband Installation of fibre broadband network, sale of internet connections and television

Sustainable Energy investment Wind Energy and Photovoltaic projects, International

International projects

A global outlook:

Competence in the field of energy consulting and renewable projects.

• 4 MW photovoltaic park in Spain

• 4,5 MW photovoltaic park in Italy

• 4,9 MW photovoltaic park in Bulgaria

• 24 MW of wind in Denmark

• 15 MW of wind in Germany

Above generating 105 GWh annually

Case story – WHR boiler in Bulgaria

• Kaolin AD, Bulgaria worked together with EnergiMidt on a sustainable solution for replacement of their existing WHR boiler that utilises the waste heat for steam production.

• The steam is used for various processes in the production.

• Gas reduction 1 to 1.5 mill. Nm3 p.a. depending on annual operating hours equal to 30%.

• Payback time was crucial, and the investment has break even within 2 years.

Case story – WHR boiler in Bulgaria

Case story – WHR boiler in Bulgaria

Case story – Gas engine in Bulgaria • An existing natural gas fired heat generator

was used in a drying process. • The hot exhaust gasses from a gas engine

eliminated the need for natural gas.

• The combined produced electricity was supplied to the grid at an attractive feed-in tariff.

• Simple pay-back time was 1,4 years

Case story – Gas engine in Bulgaria

Case story – Gas engine in Bulgaria

Case story – EnergiMidt new office building

• No external heating supply. A heat pump supplies server cooling and heats the building at the same time.

• Only passive cooling during summer time – no AC

• Cooling by means of: – Integrated PV panels – function as “sun

glasses” – High insulation – Natural ventilation – Night cooling

Case story – EnergiMidt new Office building

The sun and the potential ”I'd put my money on the sun and solar energy. What a source of power! I hope we don't have to wait 'til oil and coal run out before we tackle that.” “The photovoltaic effect was discovered in 1839”

Thomas Edison (1847–1931)

The sun and the potential

Source: IEA

One hour of sunshine can cover the yearly energy consumption of the world

Solar modules

Module types

• Etableret i 1993 • Effekt 4,8 kWp • Effekt efter modifikation 6 kWp • Finansiering: Energistyrelsen,

EnergiMidt

The first grid connected PV plant in Denmark

• 30 parcelhuse

• Netforhold

• Prisreduktioner

• Driftserfaringer

• Finansiering fra

Energistyrelsen, Eltra

og Elfor

Solbyprojektet: 1996-1998

• Fordelt i 8 områder

• Tidstypisk arkitektur

• Optimering af montage

• Prisreduktioner

• Kvalitetssikring

• Produktudvikling

• Dataopsamling

• Eltra, Energistyrelsen og brugerbetaling

Sol 300: 1998-2001

Sol 1000: 2001-2006

• Landsdækkende projekt

• Arkitektur

• Prisreduktioner

• Standard/pilotanlæg

• Gør det selv koncept

International projects

• PV in development countries

Larger RE projects

• 4 MW photovoltaic park in Spain

• 4,5 MW photovoltaic park in Italy

• 4,9 MW photovoltaic park in Bulgaria

• 15 MW of wind in Germany

Photovoltaics

Photovoltaics

Photovoltaics

Roof top systems Roof package model is based on 120 kWp PV systems built in units of 24 kWp.

Covers and area of approximately 750m2.

This is a flexible system with high performance and security and easy to maintain.

The system consist of the following equipment:

• 460 X PV modules polycrystalline each 260 Wp

• 5 X Fronius 20 kW

• Roof structure mounting system

• Electrical wiring

• Balance of system components

• Installation and fully commission

Structure - roof

Solarpanels Tier 1 suppliers all approved by financial institutes.

10 years factory warranty, 25 years power guarantee. (80% af nominel yield)

Solar inverters

Warranty 5 – 20 years depending of contract

Consumption profile

The consumption profile will determine the maximum size of the PV plant, so no exceed energy will be delivered to the utility network

Baseload

Production profile 200 kWp PV plant

Photovoltaics - Uganda

Consumption

Photovoltaics - Uganda

Financial – overview • The total cost for the system is app. 175,000 EUR

• Annual electricity production: 203,769 kWh

• Current tariff in Uganda: 0.1085 EUR/kWh (Large scale consumer eletricity price)

• Annual Savings in electricity: 22,109 EUR

• Simple pay back time: 8 years

• Lifetime of plant 25-30 years

O&M by local company

Contact information

Flemming V. Kristensen Tietgensvej 2 8600 Silkeborg Denmark Mobil: +452086 9638 E-mail: [email protected] www.energimidt.dk

Kenn H. B. Frederiksen Groenningen 43 8700 Horsens Denmark Mobil: +452086 9633 E-mail: [email protected] www.kenergy.dk