Page 1: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

The RAL Front End Test Stand

Alan Letchford

CCLRC RAL ISIS Injector Group

Joint Accelerator Workshop 28–29 March 2006

Page 2: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

The Front End Test Stand (FETS) is a collaborative project, between CCLRC and UK universities, to design and construct a test stand for demonstrating key technologies for the front end of next generation high power accelerators.

By working closely with young university teams it is hoped to pass on the wealth of knowledge and experience of CCLRC staff to the next generation of accelerator engineers/physicists.

The FETS team has members from ASTeC and ISIS as well as the physics departments of Imperial College London and Warwick University.

Page 3: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

John Back (Warwick)Aaron Cheng (Imperial)Mike Clarke-Gayther (ISIS)Dan Faircloth (ISIS)Simon Jolly (Imperial)Ajit Kurup (Imperial)David Lee (Imperial)Alan Letchford (ISIS)Ciprian Plostinar (ASTeC)Jürgen Pozimski (ASTeC/Imperial)Peter Savage (Imperial)Chris Thomas (ISIS)

The FETS team

Page 4: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Proton beam powers in the MW range are called for in many applications eg

• Spallation Source• Neutrino factory• Waste transmutation

A big challenge for these future machines is controlling beam loss. Beam loss leads to component activation – component activation hinders hands-on maintenance.

Absolute loss levels in the new machines (1 – 10 MW beam power) must be similar to that on ISIS (160 kW beam power). Fractional loss must therefore be reduced by orders of magnitude.

Page 5: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

A significant source of beam loss in circular accelerators (synchrotron/accumulator/compressor) is trapping.

Some of the beam is not trapped by the RF. Untrapped beam leads to loss.

Page 6: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Chopping the beam in the linac can lead to near 100% trapping efficiency.

Chopping the linac beam gives little or no beam in the gap.

Page 7: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

The linac macro pulse is composed of beam bunches at the linac RF frequency – typically 100s MHz.

Few ns Unchopped beamChopper pulse

Chopped beamPartially chopped bunches lead to loss in the linac

Chopper pulse must rise between linac bunches

To achieve perfect chopping a very high speed (<2 ns) chopper is required

Page 8: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

The purpose of the RAL Front End Test Stand is to demonstrate high quality chopped beams of H- ions.

• 60 mA• 3 MeV• up to 2 ms pulse length• up to 50 pps repetition rate

The RF frequency choice is important and was the subject of prolonged discussion.Too high and perfect chopping isn’t feasible.Too low and it’s not a credible demonstrator for future machines.A high power source must be available.

Page 9: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

A frequency of 324 MHz has been chosen for FETS.

A suitable high power pulsed klystron is available off-the-shelf from Toshiba - E3740A, 3 MW peak power.

A klystron has been ordered for delivery in the 3rd quarter of 2006.

Page 10: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

FETS main components:• High brightness H- ion source.• Magnetic Low Energy Beam Transport (LEBT).• High current, high duty factor Radio Frequency Quadrupole.• Very high speed beam chopper.• Comprehensive diagnostics.

Page 11: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Ion Source

FETS will use the world leading ISIS H- Penning type ion source. This source routinely produces >40 mA in 250 s pulses at 50 pps.

An extensive ongoing development programme will increase the duty factor and fully characterise the beam.

Dan FairclothPeter SavageChris Thomas

Page 12: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

1.2ms 35mA beam at 50Hz

-80

-60

-40

-20

0

20

40

60

0 200 400 600 800 1000 1200 1400 1600 1800 2000Time (us)

Discharge Current (A)

Beam Current (mA)

Extract Volts (kV)

Recent work has succeeded in producing 1.2 ms, 35 mA pulses at 50 pps.

Page 13: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Vary Platform Volts

0

0.2

0.4

0.6

0.8

1

1.2

20 40 60 80 100 120 140 160 180 200 220

Volts above Platform (V)

Tra

nsm

issi

on 15kV

20kV

25kV

30kV

35kV

A series of Oxford university student projects has resulted in energy spread measurements of the H- beam.

Page 14: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

A pepper-pot system will measure the beam emittance as a function of position downstream of the source. Provides data for the LEBT design and information about space charge/neutralisation.

Page 15: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Magnetic LEBT

A 3 solenoid magnetic LEBT is being designed, based on the one successfully used on the ISIS RFQ pre-injector upgrade.

An electrostatic LEBT has been rejected due to the close proximity of the caesiated ion source.

John Back

Page 16: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Optimisation of the magnetic design is nearing completion.

Page 17: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

An initial beam optics design has been completed. Further optimisation will be carried out based on the results of the pepper-pot measurements.

Page 18: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

324 MHz RFQ

A 0.5 m, 324 MHz 4-vane RFQ cold model design is almost complete. Machining tests have been successfully completed in Aluminium. The cold model contains all the significant features of the final 4 m long design.

Cold model production will start very soon – delayed by machine tool problems at IC.

Tests of the brazing technique were completed successfully.

Aaron ChengAjit Karup

Alan LetchfordPeter Savage

Page 19: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Final optimisation of some details – such as the vane end cut-aways – is all that remains to be done.

A 4 rod RFQ design is also being investigated.

Page 20: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

A computer controlled bead pull system is under development to perform cavity field measurements on the cold models

Page 21: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

An initial beam dynamics design has been completed for the FETS 324 MHz RFQ. Negligible emittance growth and 94% transmission for a 60 mA beam. Further optimisation is expected.

Page 22: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

High speed beam chopper

A novel tandem chopper technique has been developed at RAL to overcome the conflicting requirements of fast rise time (< 2ns) and long flat-top (up to 100 s).

A ‘fast’ chopper creates a short, clean gap in which a ‘slow’ chopper can switch on. The fast pulser is limited in flat-top but can switch between bunches. The slow pulser cannot switch between pulses but can generate the required flat-top.

Giulia BellodiMike Clarke-Gayther

Frank Gerigk Ciprian Plostinar

Page 23: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

A state of the art fast switch developed for RAL has achieved ±1.4 kV with rise and fall times less than 2 ns.

Page 24: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Helical structure B / Construction

BEAM

PULSE OUT

PULSE IN

BEAM

PULSE OUT

PULSE IN

BEAM

BEAM

AdjustableL-C trimmer

Adjust cablelengths to change delay

A trimmable helical structure with adjustable delays replaces the more ‘typical’ meander line.

Page 25: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Three chopper line optics designs are under investigation. A short line keeps the emittance growth low but makes chopping harder and requires some challenging technology. A long line is ‘easier’ but controlling the emittance is more challenging.

The short ‘ESS’ solution will require novel, compact, high gradient quadrupoles and DTL-like cavities. Hybrid permanent and electromagnetic quads are being investigated.

Page 26: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

DiagnosticsDavid Lee

Jürgen Pozimski(Christoph Gabor)

Accurate diagnostics are essential for FETS to be successful. In addition to more usual diagnostic devices, non-destructive laser stripping techniques will be employed.

Photo detachment

Detection of distribution

Charge separation

---

--

--

“no” momentum transfer

I(t,y,x)-> 2 D profile, transv.

magnetic dipole

I(t,y)-> profile, long. (TOF)

Page 27: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

SNS laser beam profile monitor system.

Page 28: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

La se r

beamaxis

CC D cam era

12

Faraday cup

electrostaticLE B T

2 e inze l lensesR =40m m

m agneticco ils

D um ping system S cintilla to r

ionsource

differen tie ll pum p ingtank

2*T

P

1*T

P

1*TP

1*10 hP a-4 1*10 hP a-5

TP = Turbopum p 1, 2 s lit pos ition of em ittance scanner

IAP Frankfurt laser transverse emittance measurement system.

Page 29: The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006

Joint Accelerator Workshop 28–29 March 2006

Timescales

A fairly aggressive schedule has been set:

Ion source commissioned by beginning 2007.LEBT commissioned by end 2007.RFQ commissioned by end 2008.MEBT/Chopper commissioned by mid-end 2009.Diagnostics commissioned in parallel.

A tough timescale to meet for our small group and dependent on appropriate resources.