the most important infrastructure. of...

31

Upload: others

Post on 04-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project
Page 2: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

The most important infrastructure. Of all.

Page 3: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

One focused business

The most important infrastructure. Of all. 3

Page 4: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Facts 2014

The most important infrastructure. Of all.

4

Grid size 11-12,000 km high voltage lines

Substations 170

Employees 1121

Balance sheet NOK 41,1 billion

Revenues (adj) NOK 6,2 billion

EBITDA (adj) NOK 3,2 billion

Profit after tax

(adj)

NOK 1,3 billion

Page 5: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

One defined mission

The most important infrastructure. Of all. 5

“ To build the next generation power system in Norway by 2030.

Page 6: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

2

Focused

investments

Page 7: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Investments in the power system

- the long term picture

7Focused investments

Page 8: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Bringing Statnetts investments

to a new level

Focused investments 8

0

1

2

3

4

5

6

7

8

9

10

11

12

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Expected Investments(2014)

(Investments in billion NOK)

Page 9: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Secure power supply

Lofoten (substations)

2015

Increased

transformer capacity

Northern Norway

(substations)

2017/2018

Ørskog-Sogndal

(new powerline)

Voltage upgrade

west corridor;

Solholm-

Arendal

Feda-Ertsmyra

Lyse-Førre-

Saurdal

Ofoten - Balsfjord (new

powerline) 2017/2018

AC-cables Tjeldsundet

(reserve power) 2015

Voltage upgrade Central

Norway;

Klæbu-Namsos and Namsos-

Nedre Røssåga 2017

Increased transformer

capacity Eastern Norway

2015/2016

New 420 kV AC

cables Oslofjord

2018

Nordlink, sea cable

connecting Norway and

Germany 2020

NSN, sea cable

connecting Norway

and Great Britain

2021

Lakselv substation

2015

Projects under construction 2015

Recently commissioned:

- Skagerak 4

- Sima-Samnanger

- Østre Korridor

- Varangerbotn-Skogfoss

- Ytre Oslofjord

Focused investments

Page 10: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Connecting the European power market

NSN (UK)-Capacity app. 1400 MW

-Est. compl. 2021

NordLink-Capacity app. 1400 MW

-Est. compl. 2020

Focused investments

Page 11: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Needle eye

https://vimeo.com/136111749

Page 12: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

60 helicopter flights per tower – 36 000 for

the Ørskog – Sogndal project in total

Page 13: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Work in high voltage environment

Page 14: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Marine operations – laying of sea cable

Page 15: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Health and safety, comes first – always

• Injury frequency halved

• No severe environmental damages

• Stable, absence due to illness- 3,2 in 2014

0

1

2

3

4

5

6

7

8

9

10

2013-12 2014-02 2014-04 2014-06 2014-08 2014-10 2014-12

Development injury frequency,incl. Contractors,

(12 month rolling mean)

H1-verdi StatnettSkadefraværsfrekvens i StatnettAbsence frequency of injury in Statnett

12

Page 16: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

S&P research update, May 2014

3

Page 17: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Ownership and financing

«Business Risk: Excellent»

2012 Meld. St. #14

17

Long term state ownership

All investments politically sanctioned (license,

white paper on grid development)

Equity injection 2014 supported by two governments

Mature and predictable regulation

The TSOs essential role in the power system makes it important that these functions are unified and owned by the State.

Page 18: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Predictable revenues and profitability

«Business Risk: Excellent» 18

Costs 40% Costs 60% efficiency score

Efficiency score: 100%

Successful benchmark with other European TSOs

The 15% efficiency programme

Timely compensation

No time lag on investments, system service costs or depreciation, two years lag on operational costs

(compensated with inflation)

2. Regulated rate of return:

(2,5%+inflation+0,875*5%)

0,73

1. Revenues:

* 40% + (5ySwap rate+margin) * 60%

Page 19: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project
Page 20: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Conservative finance policy

Sufficient liquidity

• 12 months reserves

• NOK 6,5 bn RCF

Low counterparty risk

• Minimum rating requirements

• Credit Support Annex (CSA)

Reduced interest rate risk

• New regulated rate of return from 2013

• Seek to correlate rate on debt with NVE-interest rate

Low finance risk 20

Page 21: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Multiple sources of capital as of 30.06.2015

Low finance risk 21

Issues in SEK (SEK 200 million)

Domestic Bonds (NOK 6 060 million)

Issues in CHF (CHF 400 million)

Issues in JPY (JPY 4 000 million)

Drawn Bank Loans EIB & NIB (NOK 5 466 million)

Issues in USD (USD 720 million)

Issues in EUR (EUR 70 million)

Issues in Domestic Commercial Papers (NOK 500 million)

Page 22: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Low re-financing risk as of 30.06.2015

Low finance risk 22

0

500

1000

1500

2000

2015 2017 2019 2021 2023 2025 2027 2029 2031 2033 2035 2037 2039 2041 2043 2045

Bank Loans (EIB & NIB)

Domestic Bonds

International Bonds

Commercial Paper

Page 23: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Long term funding

NOK 3.1 billion in new long term loans in 2014

• Three transactions from two different markets

• Average volume weighted tenor 11,5 years

Significant funding program going forward – across markets

Core bank group:

Low finance risk 23

Page 24: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Summary

5

Page 25: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project
Page 26: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

DisclaimerThis presentation has been prepared by, and the information contained herein

(unless otherwise indicated) has been provided by Statnett SF (the

"Company"). By viewing this presentation you agree to be bound by the

following conditions:

This document may only be used internally for business purposes and shall

not be used for any unlawful or unauthorized purposes.

This document and the information therein are being furnished to you solely

for your information and may not be reproduced, redistributed or passed on, in

whole or in part, to any other person.

This document does not constitute or form part of and should not be

construed as, an offer to sell or issue or the solicitation of an offer to buy or

acquire securities of the Company or any of its subsidiaries in any jurisdiction

or an inducement to enter into investment activity.

No part of this document, nor the fact of its distribution or reception,

should form the basis of, or be relied on in connection with, any contract

or commitment or investment decision whatsoever.

This document is not a prospectus and does not comply with rules or

regulations regarding investor information, and has not been approved

by or filed with any stock exchange or regulatory authority.

Amongst others, this document does not disclose risks and other significant

issues related to an investment in any securities. This presentation includes

and is based on, among other things, forward-looking information and

statements. Such forward-looking information and statements are based on

the current expectations, estimates and projection of the Company or

assumptions based on information available to the Company. Such forward-

looking information and statements reflect current views with respect to future

events and are subject risks, uncertainties and assumptions. The Company

cannot give any assurance as to the correctness of such information and

statements.

Investors should only subscribe for any transferable securities on the basis of

information in a relevant prospectus and term sheet, and not on the basis of

any information provided herein.

The information contained in this document has not been independently

verified and no representation or warranty, express or implied, is made as to,

and no reliance should be placed on, the fairness, accuracy, completeness or

correctness of the information or opinions contained herein.

The Company shall have no liability whatsoever (in negligence or otherwise)

for any loss howsoever arising from any use of this document or its contents

or otherwise arising in connection with this document.

The information contained in this document is provided as at the date of this

document and is subject to change without notice.

Because of the possibility of human or mechanical error by the Company,

its affiliates or its third party licensors, the Company, its affiliates and its third

party licensors do not guarantee the accuracy, adequacy, completeness or

availability of any information and is not responsible for any errors or

omissions or for the results obtained from the use of such information. The

Company gives no express or implied warranties, including, but not limited

to, any warranties of merchantability or fitness for a particular purpose or use.

In no event shall the Company, its affiliates and its third party licensors be

liable for any direct, indirect, special or consequential damages in connection

with subscriber's or others use of the data/information contained herein.

Access to the data or information contained herein is subject to termination

in the event any agreement with a third party of information or software is

terminated.

This presentation is subject to Norwegian law, and any dispute arising in

respect of this presentation is subject to the exclusive jurisdiction of

Norwegian courts.

Page 27: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project
Page 28: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Key investments

Under implementation Location Expected investment

in million NOK

Ørskog - Sogndal, new 420 kV power line Møre og Romsdal/Sogn og Fjordane 4 600 - 5 600

Ofoten - Balsfjord, new 420 kV power line Nordland/Troms 3 000 - 4 000

Licences pending or appealed

Western Corridor, voltage upgrade Vest-Agder/Rogaland 6 000 - 9 000

Namsos - Trollheim, new 420 kV power line Trøndelag/Møre og Romsdal 5 400 - 7 700

Balsfjord - Hammerfest, new 420 kV power line Troms/Finnmark 5 000 - 8 000

Interconnectors

Cable to England EUR 750 - 1 0001)

Cable to Germany EUR 750 - 1 000)

Latest commissioned facilities

Skagerak 4 Norway/Denmark

Eastern Corridor Vest-Agder/Telemark

Ytre Oslofjord Telemark/Østfold

Focused investments 28 1) Statnett's share

Page 29: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Reconciliation of financial key figures

Appendix 29*You will find these figures in note 4 in the annual report

In million NOK

Unadjusted figures 2007 2008 2009 2010 2011 2012 2013 2014 H1- 2015

Revenue 3 415 4 256 2 862 7 247 5 497 5 334 4 561 5 563 2 874

EBITDA 1 535 1 722 259 3 945 2 426 2 260 1 394 2 528 1 769

EBIT 1 025 1 194 -403 3 279 1 628 1 433 346 1 378 1 010

Profit after tax 651 1 517 -480 2 198 1 000 837 82 829 607

Adjustments

Accumulated higher revenue* -293 428 -633 1 554 2 617 3 455 2 413 1 790 1 494

Adjustment for changes in acc. higher/lower revenue -20 -721 1 061 -2 187 -1 064 -838 1 042 623 296

Adjusted figures

Adjusted revenue 3 395 3 535 3 923 5 060 4 433 4 496 5 603 6 186 3 170

EBITDA 1 515 1 001 1 320 1 758 1 362 1 422 2 436 3 151 2 065

EBIT 1 005 473 658 1 092 564 595 1 388 2 001 1 306

Profit after tax 637 998 284 623 234 234 832 1 284 823

Page 30: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project

Calculation of allowed regulated revenue

Appendix 30

Page 31: The most important infrastructure. Of all.seb.no/contentassets/2cdecd69e45b43d1bbcd36da3e52adaf/statnett.pdf60 helicopter flights per tower –36 000 for the Ørskog –Sogndal project