The importance of good accurate data rich modelling and interoperability. Nick Tune Director BuildingSMART

Upload: others

Post on 07-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

The importance of good

accurate data rich modelling

and interoperability.

Nick Tune

Director BuildingSMART

Page 2: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

What is BIM?

Page 3: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

What is BIM?

Page 4: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)
Page 5: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)
Page 6: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Sketch up is not BIM

Page 7: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)
Page 8: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

PROCESS

Communication

Coordination

Collaboration

BIM is a process

Page 9: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)
Page 10: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Are you faking it?

Page 11: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

BIG BIM / LITTLE BIM

Big BIM is the process

of collaboration, data

sharing and workflow

integrations

Little BIM are the tools,

REVIT, Bentley etc

Page 12: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Interoperability and standardisation

Can we deliver BIM without

interoperability

/standardisation?

Not Big BIM / Level 3!!!

The Government want standardised

information/data!!!

Therefore we cant rely on native

formats, must have standards to

achieve this

Page 13: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Level 2, BIM ready?

– BS1192/ PAS; Digital plan of works; Protocol, Demand Matrix; Uniclass 2; File Based

collaboration - COBie

Input Output

Output

Output • One type of input in to

one resource

• Many outputs

depending on choice

• Modifying data is

simple, quick and

efficient

©Autodesk

Page 14: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

What is COBie?

Page 15: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

What is IFC? Why is it so important

- IFC's - Industry Foundation Classes, is a

data exchange method that specifies

elements that are used in building

construction in an agreed manner that

define a common language for

construction.

– IFCs provide a foundation for the

exchange and sharing of information

directly between software applications of

a shared building project model.

Page 16: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Can we deliver BIG BIM/ Level 3 now?

– Almost! If we all used the same software we could

probably do level 2.5 but we don’t and wont!!!!

– Still difficult to get COBie outputs from proprietary

software.

Page 17: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

COBie trial 2

The objectives of the 2013 trial are to:

– Test IFC as the primary schema for data exchange in a

federated modelling environment.

– Test supporting technologies and workflows to produce

COBie outputs.

– Ensure that trial activities incorporate current definitions

of COBie data requirement at various COBie drop

points and work stages.

Page 18: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Identify what needs to be done to enable IFC to work

effectively (primarily to identify key usage, development

needs of associated technologies, standards and

workflow).

– Identify the problems & determine solutions for Native

format – IFC – COBie & Native – COBie

– Identify the issues of federating models in different

native formats

– Use its voice and commercial strength to accelerate the

required development.

Page 19: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

HMG BIM Task Group COBie-UK-2012 tool Importance of standardised accurate complete, data

– Compliance

– All Components assigned to a System

– All Spaces assigned to a Zone

– Continuity

– System, Component Space and Zone can only be checked by

– by inspection

– or by checking against previous versions.

– Completeness

– Project Phase set to “CIC 3 : Design Development”

– Floors and Types must exist for all Spaces and Components respectively

– COBie demand matrix satisfied

Page 20: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Where is the industry now ?

– Little BIM, Mostly design based

proprietary software, limited use

in construction phase, little use

in maintenance

– Most haven't used level 2 tools

protocol/tools ie COBie etc

– Not aware of interoperability

issues

Page 21: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

BuildingSMART & open BIM

– BuildingSMART: a community of people

and organisations who are working with

open-BIM & sharing their experiences

– Working with government & industry to

develop standards, tools and training to

ensure that open BIM is used effectively

– We created the Industry Foundation

Classes (IFC) standard and building data

dictionary & are leading the development

and roll out of COBie in the UK

Page 22: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Who is behind BuildingSMART?

– We are a part of the international

BuildingSMART programme, with

representation across Europe, North

America, the Middle East, Far East &

Australasia.

– BRE taken control from Jan 13, because

we have a background in driving positive

change through programmes such as

Page 23: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Activity

– Technical and User working groups (members only)

– Monthly technical working group meetings – Level 2/COBie,

Infrastructure, building in-use, Level 3(ibim)

– Training – COBie & Competent person scheme (25% off for

members)

– Development of level 3, standards/tools (direct input from members)

– Technical guidance papers, information hub

Page 24: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

BuildingSMART UK - members

Page 25: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Ongoing:

• GovernBIM

• RegBIM

• TrainBIM (+COBie)

• KnoholEM

– Due to start:

• Resilient

• DIM Cities (Mini-KnoholEM)

• Energy management of districts (Mini-Resilient)

• C4C (Clouds for Co-ordination)

BRE/BuildingSMART UK projects;

Page 26: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Governance for projects

– Explores how different disciplines should

interact with one another

– Based off Digital plan of works/Demand

Matrix; defining the documents and the data

transfer

GovernBIM

Page 27: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Emphasises heavily upon the

integration of data transfer and

management in the Cloud

– Will be created using existing cloud

technologies and tested in a real

business environment

– Deliverable is a system that manages

data stored on a cloud in an effective

manner and allows for a controlled

project environment for the end-user

Clouds-for-Coordination

Page 28: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Building Regulations AD, Code for

Sustainable Homes and BREEAM to be

automatically checked

– Procedure to be carried out:

– Extracting data requirements and logical

relationship

– Translate the above in to a language

understandable off-shelf- rules engine

– Integrate rule engine to allow for

information retrieval from the BIM

– Validation against original requirements

– Deliverable is a rule engine (software) that

carried out the checks for the regulations

automatically

TSB RegBIM

Page 29: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

RenewBIM

Developing a BIM-compatible renewable energy modelling tool

• Technologies considered: Solar PV, Solar Thermal Heat pumps,

Biomass

Page 30: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– Need to increase awareness requirements of BIM/openBIM

– Vendor specific courses

– One-day courses; different messages

– Am I BIM compliant now?

– One message, approved compliance.

OpenBIM training

Page 31: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Training plan

Course Business Management BIM Project Management BIM Design Management BIM

Main topics General Understanding

Executive leadership

Management of change

Governance

Contract management

Methods of delivery

General Understanding

Governance

Contract management

Methods of delivery

Data formats

BIM process

Data sharing

Collaboration

General Understanding

Software vendor overview

3D modelling demonstrations

Data formats

BIM process

Data sharing

Collaboration

Designed for Associates

Clients

Directors

Managers

Senior Architects

Senior Design Engineers

Senior Technicians

Senior Contractors

Design Architects

Design Engineers

Technicians

FM managers

Contractors

Page 32: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

– buildingSMART BIM Designer/Project Manager/Business Manager

– BRE has a certification body that will certify the competency of the people on the course

– To retain the status, you need to:

– Have relevant CPD hours

– Produce short BIM reports on work done

BIM Accredited Professional

Training

Proof

Test Competency

Page 33: The importance of good accurate data rich modelling and ... · Infrastructure, building in-use, Level 3(ibim) –Training – COBie & Competent person scheme (25% off for members)

Thank you for listening, any questions and feedback?