the first...relationship with italian company, edilteco®, who developed politerm ®blu –an...
TRANSCRIPT
50PROJECTS
THE FIRST
4unique selling points:
1. speed:100m2 of energystore TLA can be laid in just a few hours – up to ten times faster than traditional insulation board.
1. performance:energystore TLA achieves excellent thermalperformance with a U-Value as low as 0.08.
1. a single insulation structure:energystore TLA is poured insulation thatcreates a single screed free of gaps aroundservices and/or between boards resulting in amore level, solid structure.
1. economy:With energystore TLA there is
ZERO WASTE ... so no need for skip hire.
1
2
3
4
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 33 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
5 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
Introduction
over the past 40 years
energystore has focused on
supplying and installing the
highest quality cavity wall
insulation products into the UK
and Irish markets.
In 2018 energystore diversified its
product range to include a new
product – energystore tLa, a
thermal lightweight aggregate
comprising expanded polystyrene
beads (eps) coated in a special
additive, eIa.
When energystore tLa is
combined with cement and water,
a highly effective insulated screed
is created that has exceptional
thermal, acoustic and lightweight
characteristics that can greatly
help in the design of construction
projects.
energystore tLa was first trialed
in Northern Ireland in June 2018
by alpha Quarry products Ltd.
energystore tLa has been
developed under a franchise
relationship with Italian company,
edilteco®, who developed
politerm® Blu – an advanced
thermal lightweight aggregate – in
1981.
since the introduction of
politerm® Blu, edilteco® has
successfully established the
product in 46 countries
worldwide under exclusive
franchise partnerships.
energystore are delighted to be
edilteco’s 46th franchise partner,
and are proud to be able to bring
politerm® Blu to the UK and Irish
markets under its own exclusive
brand name: energystore tLa.
as the fifty recent installations in
this brochure clearly illustrate,
energystore tLa is unique. It is
economic, has great thermal
efficiency, is remarkably quick and
easy to install and produces zero
waste.
If you would like furtherinformation, please contactthe energystore technicalteam on tel: 0800 085 6687
energystore, the market leaders in the manufactureand installation of domestic and commercial insulationin the UK and Ireland, have developed a new productthat is set to revolutionise the insulation industry.
energystore TLA: an insulation revolution
... TLA is unique. It is economic,has great thermal efficiency, is
remarkably quick and easy toinstall and produces zero waste
“ “
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 77 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
Firstly, energystore would like to
thank Edilteco® for sharing their
vision to introduce politerm® Blu
into the UK and Irish markets.
edilteco’s technical support and
guidance in the early stages of
energystore tLa’s development
was invaluable.
First quarry partners
Alpha Quarry Products Ltdwere the first quarry partner to
install energystore tLa. the first
installation was executed in
County Down, Northern Ireland,
in June 2018.
paul, Jeanette and John have
done a fantastic job in helping
establish energystore tLa across
the province. Most of the positive
customer feedback in this
brochure is due to the quality of
their workmanship on-site.
a wide variety of clients
have installed energystore tLa in
a diverse range of projects
during its first six months on the
market, from large commercial
units, churches, new-build
domestic properties and
extensions to existing buildings.
Unique properties
the majority of early customers
were prepared to try the product
because, once explained, they
could immediately grasp
energystore tLa’s unique
properties.
Many more customers have
installed energystore tLa than
appear in these pages, but
energystore would like to thank
those who gave their time to
contribute comments for
publication here.
energystore would like to acknowledge the supportand assistance of several key companies who werekeen to trial energystore TLA – the unique, newconcept in thermal screed – in Northern Ireland.
thank you ...
Client: MCB Contractors LtdSite: Annalong, Co Down
John McBride commented ...
“It’s the end of board!”the product saved the company time
and no on-site waste needing to go to
landfill.
3
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES9 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build projectSite: Ballymaguire Rd,Stewartstown, Co Tyrone
Before and after pictures showing the
service pipes completely encased by
energystore tLa – with no gaps or
voids around the pipes, no cold
bridging and no wasted material.
a quick and effortless installation.
• BEFORE
• AFTER
architect robert Gilmour commented:
“It’s great to see such an innovative product that eliminates the need for cuttingboards around pipes ... with nowaste whatsoever on-site.”
robert is currently tendering for
renovation jobs and has said that
energystore tLa is ideal for projects
where there are split-level floor areas.
1
Client: Robert Gilmour Site: Brampton Rd, Bangor, Co Down
2
Client: Clare & Gareth Martin,GI Martin Architects Site: Drumbo, Co Down
Claire and Gareth Martin
used energystore tLa
in the construction of
their own home. they were
delighted with the time they
saved using tLa.
4
Volume of energystore TLA installed: 198 m2
Volume of energystore TLA installed: 250m2
Volume of energystore TLA installed: 150m2
Volume of energystore TLA installed: 256m2
• AFTER
• DURING• AFTER
• DURING
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 1211 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
Due to a late delivery of brick the builder fell behind
schedule. By using energystore tLa over an area of
600m2 beneath the underfloor heating pipes, the
refurbishment got back on track.
energystore tLa was installed on the Monday
morning, the underfloor heating was installed
24 hours later and screed was poured on the
Wednesday.
“Our design and buildteam believe that energystore TLA willbe essential on future projects
• AFTER
Cahill Rodgers, MJM Group Ltd
“Volume of energystore TLA installed: 600m2
Client: Noel Savage Construction LtdGood Shepherd Church,Ormeau Rd, Belfast, Co Antrim
5
Client: McAlorum Construction Ltd Carryduff, Co Down
the large 678m2 floor plan
comprised multiple rooms
divided by stud walling.
Underfloor heating
was installed then covered
with energystore tLa to a
depth of 50mm
6
Volume of energystore TLA installed: 678m2
...The job was complete
in three days
• DURING
• AFTER
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 14
energystore TLA
13 TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Beechview Developments Ltd,QS Ciaran JohnstonSite: Ballynahinch, Co Down
energystore tLa was installed in
the first of 130 houses for
Beechview Developments in
Ballynahinch. on a large site under
construction any cost saving,
especially on skip hire, is a bonus.
• AFTER
• BEFORE
7
Client: Andrew McMaster,Blackstaff Builders Ltd Site: Co Down
“Great insulation products from energystore. They insulated our wall cavities and also supplied energystore TLA – the thermal lightweight aggregate – for my basescreed floor. On both accounts there was no waste material to bedisposed of, which enabled me todeploy my staff on more constructive work on-site. Products and a company that I would recommend to anyone.”
andrew McMaster, Blackstaff Builders Ltd
8
Client: McGrady Contracts Ltd& Apex Housing AssociationSite: Castlewellan, Co Down
a big concern for apex housing
association on previous projects was the
drying time of the screed needed. 150m2
of energystore tLa was laid with a 50mm
sand/cement screed. after ten days the
moisture content in the energystore tLa
was only 5% and 1% on the screed floor.
this enabled the builder to complete all
34 houses on the development more
quickly than predicted.
9
Client: Ganson UK LtdSite: Home Bargains, Lisburn, Co Antrim
approximately 2,700m2 of
energystore tLa was laid during
construction of the store. It is
estimated that this saved
ten days of laying time that
board insulation might well have
required.
10
Volume of energystore TLA installed: 150m2
Volume of energystore TLA installed: 2,700m2
650m2 of energystore tLa was laid
over five floor levels for the new
MJM Group head office in Newry.
Builder Cahill rodgers said:
“a fantastic product used to cover all
four floors at various depths, including
the ground floor area.
the speed and efficency of the
installation saved us valuable time.
our design and build team believe that
energystore tLa will be essential on
future projects.”
Client: Peter McCann PCD Contracts, Glen Corr, Co Antrim
peter McCann installed approximately
55m2 of energystore tLa for pCD
Contracts in Carryduff.
a screed of energystore tLa was laid to
the depth of 170mm with 30mm of
mapei topcem. this produced a
thermal barrier with an indicative
U-value of 0.17.
11
Great insulation products from energystore.
There was no waste material to be disposed of
which enabled me to deploy my staffon more constructive work on site.
Products and a company that I would recommend to anyone.
Andrew McMaster, Blackstaff Builders Ltd
““
Client: Cahill Rodgers, MJM Group LtdSite: MJM Group head office, Newry, Co Down
12
15 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
“Our design and build team believe that
energystore TLA will be essential on future projects”
Cahill Rodgers
Volume of energystore TLA installed: 55m2
Volume of energystore TLA installed: 650m2
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 16
• DURING
Client: Michael McMahon Site: Malone Park, Belfast, Co Antrim
15
energystore TLA
17 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Seamus Woulahan,Seaview Developments LtdSite: Belfast, Co Antrim
seamus Woulahan says that:
“With limited space energystore tLa
was fantastic as we would have
struggled to get insulation boards
onto the site.
once the underfloor heating went
down the liquid screed just glided
over the pipes leaving a perfect floor
ready for tiling.”
approx. 900m2 of energystore tLa was
laid. With the amount of service pipes
coming up through the floor the time
saved here by installing a modern, liquid
insulation was remarkable as the
building had to be ready for Christmas
opening. since insulation board wasn’t
used there were no voids or gaps around
the pipe work, just a solid thermal slab
ready for the shop to be fitted out and
with no wastage of material.
13
Client: Peter O’Hare, Peter O’Hare Ltd Site: Spar, Carrickfergus, Co Antrim
14
“once the underfloor
heating went down
the liquid screed just
glided over the pipes
leaving a perfect floor
ready for tiling ...”
“With the amount of service pipescoming up from the floor the time saved here by installing amodern insulation was remarkable ...”Peter O’Hare
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 18
Client: BARNI Site: Castle Street, Belfast, Co Antrim
energystore tLa was poured on all
three floors of this new boutique
hotel in Belfast.
Castle street is a busy area and there
was limited storage space on-site,
making energystore tLa the perfect
solution for this client.
a frame was built to take the lead
over the pump. this meant
energystore tLa could easily be
pumped over the public wall to
overcome the lack of access.
this also meant the pedestrian
walkways weren’t blocked, which
saved the client having to apply for
costly permits.
the three-floor structure had
energystore tLa installed throughout
in just one day which then dried
within 24 hours so the liquid screed
could be poured. 50m3 was installed
on a 400m2 site.
16
Volume of energystore TLA installed: 900m2
Volume of energystore TLA installed: 20m3
Volume of energystore TLA installed: 50m3
Seamus Woulahan
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 20
energystore TLA
energystore tLa was installed in this
new-build home in rostrevor.
250m2 was used across both floors of
the construction.
Client: Ganson UK LtdSite: Self-build site, Crossgar, Co Down
18
Client: Self-build projectSite: New-build houseRostrevor, Co Down
17
40m3 of energystore tLa was installed in
this one-off new-build home
energystore TLA...quick, easy, economic & effectivewith NO waste
“Volume of energystore TLA installed: 250m2
Volume of energystore TLA installed: 40m3
• BEFORE
• AFTER
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 2221 TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build projectSite: Castlereagh Rd, Belfast, Co Antrim
the client used energystore tLa as they
were concerned about pipework on-site.
Cutting board to accommodate the
pipes would have been a
time-consuming task and might have
compromised the U-values of the
finished structure. energystore tLa
proved an efficient, workable solution
while providing high U-values.
19
Client: Self-build project Site: Close Rd, Cabra Newry, Co Down
Following the installation of
energystore tLa the client was
quick to comment:
“energystore TLA is a joy to work with!”
20Client: Beechview Developments LtdSite: Edengrove, Ballynahinch, Co Down
Beechview is a development of
127 new-build properties.
tLa was specified for this build due to
the speed of installation and time saved.
22
Client: Self-build projectSite: Creevy Rd, Boardmills, Co Antrim
45m3 of energystore tLa was
installed in this new-build
home on road, Boardmills,
antrim.
Volume of energystore TLA installed: 460m2
Volume of energystore TLA installed: 16m3
21
Volume of energystore TLA installed: 45m3
• DURING
• AFTER• AFTER
• AFTER
• DURING
23 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Charmwood Joinery LtdSite: Carryduff, Co Down
energystore tLa was the preferred
insulation for this one-off new-build
home in Carryduff.
23
• Speed: 100m2 can be laid in a few hours• Performance: U-Value as low as 0.08 can be achieved• Single insulation screed: a more level, solid structure
• Zero waste and zero storage
Volume of energystore TLA installed: 15m3
Client: Self-build projectSite: Strangford Rd, Co Down
the builder would have had a difficult
task in maintaining U-values and
smooth surfaces around the pipework
in this construction. By using
energystore tLa these problems were
quickly and easily overcome.
24
Volume of energystore TLA installed: 50m3
• BEFORE
• AFTER
• AFTER
energystore TLA
25 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: O’Higgins & BraniffSite: Dundrum, Co Down
the tLa could be walked on within a
remarkable 24 hours in this one-off
new-build home.
energystore tLa was
used throughout this
new-build detached
house in portstewart.
25
Client: Private new-build Site: Portstewart, Co L’Derry
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 26
Volume of energystore TLA installed: 20m3
Volume of energystore TLA installed: 11m3
26
Client: Brian OwensContracts LtdSite: Ballynahinch, Co Down
the construction featured much
pipework that threatened to slow
down the build.
the client therefore opted to use
energystore tLa for its ease of
installation, which also saved time,
money and labour.
27
Volume of energystore TLA installed: 20m3
Client: Blackstaff Builders Ltd Site: Kircubbin, Co Down
a one-off new-build
28
Volume of energystore TLA installed: 143m2• AFTER
• AFTER
TLA • 50 INSTALLATION CASE STUDIES 2827 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build project Site: Hilltown, Newry, Co Down
energystore tLa was used over
both floors of this large new-build
project – a total of 265m2 was
poured.
30
Volume of energystore TLA installed: 265m2
fast, easy and... NO MORE WASTE!
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 28
Volume of energystore TLA installed: 30m3
Client: 3D Contracts (NI) Ltd Site: Portstewart,Co L’Derry
29
• AFTER
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 30
energystore TLA
29 TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build project Site: Rathfriland, Co Down
energystore tLa created a smooth,
level surface for the underfloor
heating and reduced the amount of
liquid screed used on top. all
without compromising the U-value
of the final structure.
31
Volume of energystore TLA installed: 20m2
Client: Self-build projectSite: Crawfordsburn, Co Down
the client saved time on this
150m2 new-build development by
using energystore tLa, and the
surface was walkable after 24
hours.
32
Volume of energystore TLA installed: 27m3
• BEFORE
• AFTER
Client: Dixon ContractorsSite: Dunloy, Co Antrim
energystore tLa was installed
and dry within 24 hours on this
build.
34
Volume of energystore TLA installed: 20m3
• DURING
• AFTER
Client: Advanced Roofing LtdSite: Brunswick Rd, Portstewart, Co L’Derry
33
Darren Cruz of advanced roofing Ltd
said: ”Due to extensive pipework
on-site energystore tLa limited waste
and left a solid thermal slab for the
underfloor heating. It would have been
very labour-intensive to have cut board.”
Client: Self-build projectSite: Carrickmacross, Co Monaghan
a new-build project. energystore tLa
saved the builder time as there was no
time-consuming cutting of board
involved on the job and the screed was
dry within 24 hours.
38
energystore TLA
31 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build projectSite: Banbridge, Co Down
a new-build project – energystore tLa
was dry within 24 hours.Volume of energystore TLA installed: 100m2
Client: : Self-build project Site: Clonduff Rd, Hilltown, Newry, Co Down
energystore tLa provided a smooth level
surface for the underfloor heating
installation and was dry in 24 hours.
36
Volume of energystore TLA installed: 315m2
Client: DMG ConstructionServices LtdSite: Hilltown, Newry, Co Down
a new-build project.
the plumber was able to install the
underfloor heating the next day.
37
Volume of energystore TLA installed: 250m2
Volume of energystore TLA installed: 250m2
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 32
35
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 3433 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: RA&D Cochrane Bros. Ltd Site: Church RdHolywood, Co Down
20m3 of energystore tLa was
poured at this new-build
property in holywood.
• BEFORE
• AFTER
40
Client: McAlorum Construction Ltd Site: ApartmentsPrincetown Rd, Bangor, Co Down
720m2 of energystore tLa was poured at
these apartments in Bangor.
the intermediate floors in the building
benefitted from energystore tLa’s
acoustic properties and quick drying
time.
39
Volume of energystore TLA installed: 720m2
“It’s great to see such an innovative product that eliminates the need to cutboards around pipes ... No waste whatsoever on-site.”Robert Gilmour, Robert Gilmour Architects
“It’s the end of board!”John McBride, John McBride Construction Ltd
“Due to a late delivery of brick thebuilder fell behind schedule. By using energystore TLA therefurbishment got back on track andthe job was complete in three days.”
Noel Savage, Noel Savage Construction Ltd
“Great insulation products fromenergystore ... they filled ourcavities and also supplied energystore TLA – the thermal lightweight aggregate – for mybase screed floor. Products and a company that Iwould recommend to anyone.”
Andrew McMaster, Blackstaff Builders Ltd
“A fantastic product ...Our design and build team believe thatenergystore TLA will be essential on future projects.
Cahill Rodgers, MJM Marine Ltd
“With limited space energystore TLA wasfantastic as we would have struggled to getinsulation boards to the site. Once the underfloor heating went down theliquid screed just glided over the pipesleaving a perfect floor ready for tiling.”
Seamus Woulahan, Seaview Developments Ltd
With the amount of service
pipes coming up through the
floor, the time saved by
installing a modern insulation was
remarkable as the building had to be ready for
Christmas opening. since insulation board
wasn’t used, there were no voids or gaps
around the pipework, just a solid thermal slab
ready for the shop to be fitted out and with no
wastage of material.”
Peter O’Hare, Peter O’Hare Ltd
energystore TLA
customer feedback
“
“I am absolutely convinced energystore tLa is the way
forward. the hotel was four storeys so having a
lightweight product was a huge benefit. the acoustics for
the intermediate floors passed with flying colours. I will
definitely be using energystore tLa for future projects.
Steven Darragh, BARNI
“energystore TLA was fast and efficient.It gave us a smooth and level surfacewhich made it easy for the plumber toinstall the underfloor heating. All in all, the product was excellent.”
Neil Braniff, O’Higgins & Braniff
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 3635 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA energystore TLA
Client: Contracting Management DevelopmentSite: Greenisland Rd, Craigavon
one-off new-build
Volume of energystore TLA installed: 30m3
Client: Self-build projectSite: Corcreeny Rd,Hillsborough, Co Down
42
Volume of energystore TLA installed: 34m3
• DURING • AFTER
Client: Self-build projectSite: Castlereagh Rd, Belfast, Co Antrim
Cutting board for this project would have
been time-consuming (see below) and
labour-intensive. energystore tLa saved
the project time with easy installation and
fast drying.
43
Client: Ganson UK LtdSite: Saintfield, Co Down
A refurb of two commercial buildings
converted into Saintfield Community
Centre. energystore TLA solved the
problem of the varied floor levels
throughout the build.
If PIR insulation boards had been used
various thicknesses would have been
required to make up the different depths.
50m3 of energystore TLA was poured in,
easily acquiring the depth required in
each part of the build, leaving a solid
thermal slab with no gaps, voids and no
wasted material going to landfill. All in all
a quicker and more environmentally
friendly way of laying insulation.
44
Volume of energystore TLA installed: 50m3
41
energystore TLA
Client: Island HomesSite: Greenisland,Co Antrim
17m3 of energystore tLa
was laid for Island homes’
impressive site at Upper
road, Greenisland.
47
Volume of energystore TLA installed: 17m3
Client: Self-build projectSite: Yellow Rd, Hilltown,Newry, Co Down
48
Volume of energystore TLA installed: 221m2
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 3737 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
• BEFORE
• AFTER
Client: Blackstaff Builders LtdSite: Kircubbin, Co Down
Volume of energystore TLA installed: 14m3
Client: Self-build project Site: Groomsport,Co Down
energystore tLa saved the
client time. the build had
pipework that would have
been very time-consuming to
cut board around. the
energystore tLa could be
walked on within 24 hours.
46
45
• BEFORE
• AFTER
Volume of energystore TLA installed: 17m3
39 ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES
energystore TLA
Client: Self-build project Site: Orby Rd, Belfast, Co Antrim
None of the floor levels were even on
this project.
Using energystore tLa meant that the
floors could be insulated in just one
installation pour.
49
Volume of energystore TLA installed: 198 m2
Client: Ganson UK Ltd Site: Boucher Crescent,Belfast, Co Antrim
50
for more information please call us ...
tel: 0800 085 6687or visit: www.energystoreltd.com
Volume of energystore TLA installed: 250 m2
ENERGYSTORE TLA • 50 INSTALLATION CASE STUDIES 39
T: 0800 085 6687 www.energystoreltd.com