    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 1 OF 8

    PART 1. GENERAL

    1.01 OVERVIEW

     A. This Section identifies mechanical, electrical, and plumbing (MEP) equipment namingconventions and acronyms for the A/E to use when identifying equipment in the Contract

    Documents. 

    PART 2. MEP EQUIPMENT NAMING CONVENTION

    1.02 GENERAL

     A. The 1st, 2nd, 3rd, 4th and 5th characters are the equipment type designator.

    - O A H U - X X - X X X

    Equipment Type Designator

    B. The 6th character is a dash and serves as a placeholder.

    - O A H U - X X - X X X

    Placeholder

    C. The 7th and 8th characters are the building floor.

    - O A H U - X X - X X X

    Building Floor Level

    D. The 9th character is a dash and serves as a placeholder.

    - O A H U - X X - X X X

    Placeholder

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    2/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 2 OF 8

    E. The 10th, 11th and 12th characters are sequential equipment numbers.

    - O A H U - X X - X X X

    Sequential Equipment Number

    F. Example for a chilled water pump on the 3rd floor of a building:

    1. Chilled Water Pump = CHWP

    2. CHWP-03-001

    G. Example for a secondary chilled water pump on the 1st floor of a building:

    1. Secondary Chilled Water Pump = CHWSP

    2. CHWSP-01-001

    H. Example for a fire/smoke damper on the 23rd floor:

    1. Fire/Smoke Damper = FSD (see MEP Equipment Tag List)

    2. FSD-23-001

    I. Variable Air Volume (VAV) Terminal Unit Identification:

    1. Fan Powered Box = FB

    2. VAV (no fan) Box = VB

    3. Box Size:

    a. A = 100 - 300 CFM

    Box Size (reference equipment schedule)

    Floor

    Sequential Number

    Max/Min CFM

    Heater kW

    FB-D-9-01

    300/100

    4.5

    Box Type

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    3/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 3 OF 8

    b. B = 175 - 600 CFM

    c. C = 275 - 1000 CFM

    d. D = 390 - 1500 CFM

    e. E = 535 – 2000 CFM

    PART 3. ELECTRICAL PANEL NAMING CONVENTION

    1.03 GENERAL

     A. The 1st, 2nd, 3rd, 4th and 5th characters are the building name.

    - B S R B - X X - X X X

    Building Name

    B. The 6th and 7th characters are the building floor.

    - B S R B 0 1 X X X X - X

    Building Floor Level

    C. The 8th and 9th characters are the system type. (*see list below)

    - B S R B 0 1 L S X X

    System Type

    D. The 10th character is the system voltage, L for Low voltage 120/208V, M for Medium voltage

    4 - 160V and H for High voltage 277/480.

    - B S R B 0 1 L S H X

    Voltage

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    4/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 4 OF 8

    E. The 11th character is the sequential panel alpha character.

    - B S R B 0 1 L S H A

    Sequential Panel Designation

    F. Example for Clinical Research Building (CRB), level 8, normal power, low voltage, 3rd

     panel insequential order:

    1. CRB08NPLC.

    G. Example for a Faculty Center Tower (FCT) high voltage, critical branch panel on the 20th floor:

    1. FCT20CBHA.

    H. System Types:

    1. Normal Power = NP

    2. Emergency Power = EP

    3. Critical Branch = CB

    4. Life Safety = LS

    5. Equipment Branch = EB

    PART 4. MECHANICAL ACRONYMS

     ACRONYM MECHANICAL EQUIPMENT

    DESCRIPTION

     ACRONYM MECHANICAL EQUIPMENT

    DESCRIPTION

     ACU Air Conditioning Unit FB Fan Powered VAV Terminal Unit

     ACCU Air Cooled Condensing Unit FCU Fan Coil Unit

     ACHP Electric Heat Pump FFH Final Filter Housing

     AHU Air Handling Unit FD Fire Damper

     AS Air Separator FM Flow Meter

     AVBE Air Valve Biological Exhaust FTK Flash Tank

     AVCE Air Valve Cage Exhaust FSD Fire/Smoke Damper

     AVEI Air Valve Exhaust Air IsolationRm.

    GCC Glycol Cooling Coil

     AVES Air Valve Exhaust Air Surgery GCH Glycol Chiller

     AVGE Air Valve General Exhaust GEF General Exhaust Fan

     AVRE Air Valve Radiological Exhaust GUH Gas Unit Heater

     AVRP Air Valve Return Air ProtectiveEnvironmental Rm.

    H Humidifier

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    5/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 5 OF 8

     ACRONYM MECHANICAL EQUIPMENT

    DESCRIPTION

     ACRONYM MECHANICAL EQUIPMENT

    DESCRIPTION

     AVRR Air Valve Return Air Radiology

     AVSR Air Valve Supply Air Radiology HC Hot Water Heating Coil

     AVRS Air Valve Return Air Surgery HEF Fume Hood Exhaust Fan

     AVSI Air Valve Supply Air Isolation Rm. HEX Steam to Water Heat Exchanger

     AVSL Air Valve Supply Lab HPSRS High Seam Pressure ReducingStation

     AVSP Air Valve Supply` Air Protective

    Environmental Rm.

    HRCH Heat Recover Chiller

     AVSS Air Valve Supply Air Surgery HWP Hot Water Pump

    BEF Biological Exhaust Fan KEF Kitchen Exhaust Fan

    BP Boiler Feed Pump OAHU Outside Air Handling Unit

    BTD Bubble Tight Damper PACU Packaged Air Conditioning Unit

    CEF Cage Wash Exhaust Fan MPSRS Medium Steam Pressure ReducingStation

    CF Chemical Feeder RF Return Fan

    CH Chiller REF Radiological Exhaust Fan

    CHHEX Chilled Water Heat Exchanger SB Steam Boiler

    CTK Compression Tank SC Steam Heating Coil

    CC Cooling Coil SD Smoke Damper

    CHWP Primary or Chilled Water Pump SF Supply Fan

    CHWSP Secondary Chilled Water Pump SPF Stairwell Pressurization Fan

    CHWTP Chilled Water Tertiary Pump SG Clean Steam Generator

    CP Condensate Pump TACU Telecommunication Fan Coil Unit

    CR Condensate Receiver

    CRAC Computer Room AC Units TEF Toilet Exhaust Fan

    CT Cooling Tower TFCU Telecommunication Fan Coil Unit

    CWP Chiller Condenser Water Pump VB VAV Terminal Unit

    CWSF Condenser Water Side Stream

    Filter

    VFD Variable Frequency Drive

    DA Deareator

    DDVAV Dual Duct VAV Terminal Unit

    DSTR Duplex Strainer

    EDH Electric Duct Heater

    EF Exhaust Fan

    FLTR Filter Caisson

    EHC Electric Heating Coil

    ERU Energy Recovery Unit

    EUH Electric Unit HeaterETK Expansion Tank

    HUH Hot Water Unit Heater

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    6/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 6 OF 8

    PART 5. ELECTRICAL ACRONYMS

     ACRONYM ELECTRICAL EQUIPMENT

    DESCRIPTION

     ACRONYM ELECTRICA EQUIPMENT

    DESCRIPTION

     ATS Automatic Transfer Switch MSG Main Switchgear

    DP Distribution Panel T Transformer

    EG Emergency Generator TE Transformer (Emergency Power)

    MCC Motor Control Center TN Transformer (Normal Power)

    MSB Main Switch Board UPS Uninterruptible Power System

    PART 6. PLUMBING ACRONYMS

     ACRONYM PLUMBING EQUIPMENTDESCRIPTION

     ACRONYM PLUMBING EQUIPMENTDESCRIPTION

     ANT Acid Neutralization Tank LAC Laboratory Air Compressor

     AVB Atmospheric Vacuum Breaker

    (Potable Water)

    LAV Lavatory

    BFP Backflow Preventer (PotableWater)

    LGA Lavatory Gas/Vacuum Local AlarmPanel

    COCM Carbon Dioxide Cylinder Manifold LGMA Laboratory Gas/Vacuum Master

     Alarm Panel

    COT Carbon Dioxide Tank LGV Laboratory Gas/Vacuum Zone ValveWall Box

    COTG Cleanout To Grade (Exterior) LI Linter Interceptor

    CWT Combination Fire And DomesticWater Storage (Surge) Tank

    LNT Liquid Nitrogen Tank

    DB Dialysis Water Supply and Drain

    Wall Box

    LOT Liquid Oxygen Tank

    DGV Dental Gas/Vacuum Zone ValveWall Box

    LVP Laboratory Vacuum Pump

    DHWRP Domestic Hot Water Recirculating

    Pump

    MAC Medical Air Compressor

    DIS De-ionized Water System MGA Medical Gas/Vacuum Local Alarm

    Panel

    DWBT Domestic Water Bladder Tank MGMA Medical Gas/Vacuum Master AlarmPanel

    DWEXT Domestic Hot Water Expansion

    Tank

    MGV Medical Gas/Vacuum Zone Valve

    Wall BoxDWP Domestic Water Booster Pump MS Mop Sink

    DWPRV Domestic Water Pressure

    Regulating Valve

    MVP Medical Vacuum Pump

    DWT Domestic Water Storage (Surge)Tank

    NCM Nitrogen Cylinder Manifold

    EDF Electric Drinking Fountain NOCM Nitrous Oxide Cylinder Manifold

    ES Emergency Shower OCM Oxygen Cylinder Manifold

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    7/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 7 OF 8

     ACRONYM PLUMBING EQUIPMENT

    DESCRIPTION

     ACRONYM PLUMBING EQUIPMENT

    DESCRIPTION

    ESEW Emergency Shower and Eyewash

    Unit

    OD Overflow Roof Drain (Secondary)

    ESP Elevator Sump Pump OI Oil Interceptor

    EW Eyewash PT Plaster Trap

    EWC Electric Water Cooler PVB Pressure Vacuum Breaker (Potable

    Water)

    EWH Electric Water Heater RD Roof Drain (Primary)

    FCO Floor Cleanout ROS Reverse Osmosis System

    FCV Flow Control Valve (Domestic Hot

    Water Balancing)

    SA Shock Absorber (Water Hammer

     Arrestor)

    FD Floor Drain SAMPW Sampling Well (Exterior Drainage)

    FDC Fire Department Connection SE Sewage Ejector

    FHC Fire Hose Cabinet SH ShowerFOT Fuel Oil Tank (Diesel) SK Sink

    FP Fire Protection Water Pump SP Sump Pump

    FPATS Fire Pump Automatic Transfer

    Switch

    STP Storm Sump Pump

    FPBFP Fire Protection Backflow Preventer SWH Steam Domestic Water heater

    FPDAC Fire Protection Dry AirCompressor

    TD Trench Drain

    FPSG Fire Pump Switch Gear TMV Thermostatic Master Mixing Valve

     Assembly

    FS Floor Sink TP Trap Primer

    FWT Fire Protection Water Storage

    (Surge) Tank

    UR Urinal

    GI Grease Interceptor WC Water Closet (Toilet)

    GWH Gas Fired Domestic Water Heater WCO Wall Cleanout

    HB Hose Bibb WD Water Supply And Drain Wall Box(Clothes Washer)

    IW Indirect Waste Receptor WH Wall Hydrant

    JP Jockey Pump (Fire ProtectionWater Pressure Maintenance)

    WS Water Softener

  • 8/17/2019 Texas University - Z2011 Equipment Naming Convention and Acronyms

    8/8

    Element Z General Design RequirementsOwner Standards and Other

    RequirementsZ2011 Equipment NamingConvention and Acronyms

    The University of Texas EQUIPMENT NAMING CONVENTION AND ACRONYMSMD Anderson Cancer Center Z2011

    ODG022613 8 OF 8

    PART 7. DOCUMENT REVISION HISTORY

    Issue Date Revision Description Reviser

    01-01-07 Initial Adoption of Element

    Rev. 1 03-25-08 Added medium voltage to Part 3-1.03-D and added MEPacronyms to Part 5.

    JCD

    Rev. 2 06-21-11 Added Smoke Damper acronym (SD) and Heat Recovery

    Chiller (HRCH) to Part 4, Mechanical Acronyms.

    JCD

    Rev. 3 05-17-12 Added Dual Duct VAV Terminal Unit (DDVAV) to mechanicalacronym list.

    JCD

    Rev. 4 10-30-12 Added AVSS, AVRS, AVSP, AVRP, AVSI & AVES to themechanical acronym list.

    JCD

    Rev. 5 02-26-13 Added AVRR and AVSR to the mechanical acronym list. PDN

    Rev. 6

    END OF ELEMENT Z2011