1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, Cody Gondek, Lee Huynh, Aaron McCusker, William Sear, Himanshi Singhal, Craig Wenkheimer, Nathan Yeo Customer: Steve Thilker, Collin Baukol, Cody Humbargar, Jason Latimer (Raytheon) Advisor: Dr. Brian Argrow REPTAR REcoverable ProTection After Reentry Test Readiness Review

Upload: others

Post on 23-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

1

CUAESSeniorProjects2016-2017:REPTARTRR

10/3/17

Team: Calvin Buechler,Kevin Faggiano,Dustin Fishelman,Cody Gondek,LeeHuynh,Aaron McCusker,WilliamSear, Himanshi Singhal,Craig Wenkheimer,NathanYeo

Customer: Steve Thilker,Collin Baukol,Cody Humbargar,JasonLatimer(Raytheon)

Advisor:Dr.BrianArgrow

REPTARREcoverable ProTection AfterReentry

TestReadinessReview

Page 2: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

Overview

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR2

Page 3: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARProjectStatement&Motivation

REPTARshallassistintherecovery ofade-orbited1URaytheonPayload.ThemissionbeginsoncetheSmallSat hasre-enteredtheatmosphereandhasreachedsubsonicvelocity.REPTARshallfacilitatethesubsonicdeceleration,landing,locationdetermination,andlocationtransmissionportionsofthemission.

Recoveryofpayloadenables:• Lowermissioncostsbyre-usingthepayload• Obtainsamplescollectedbypayloadon-board

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR3

Page 4: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

1)LaunchREPTARcomponentssurvivelaunchconditionsaspayloadattachedtoabus.

MissionConceptofOperations

1

2

2)Orbit/StandbyREPTARComponentssurviveonorbitconditions.Batterieschargedbybus.

3

4

3)De-orbitReceivecommandfrombustopowerREPTARsystems.Re-entryburn.

6)LandandRecoveryREPTARprotectspayloadduringgroundcontactandtransmitlocation.

5

REPTARSolution

Solution

Legend6

5)DecelerationDeceleratetosubsonicspeeds.

4)Re-entryReceivecommandfrombustopowerREPTARsystems.REPTARseparationfrombus.Re-entrycompletedbyRaytheonSystem.

Page 5: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

ConceptofOperations(CONOPS)REcoverable ProTection AfterReentry(REPTAR)

ReceiveLocationRecoveryteamreceiveslocation.

DescentAfterbeingdeceleratedtosubsonicspeeds,REPTARactivatesatmosphericdecelerationsystemstoprotectthepayload.

DecelerateSlowstosafelandingspeedsbydeployingaparachute.Transmitslocationduringdescent.

LandLandspayloadsafelywithinlaunchloadingrequirements.

TransmitLocationTransmitslocationtorecoveryelement.REPTAR

Page 6: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLevelsofSuccessCriteria Volume InstantaneousG-Loading Communication

Level 1Thevolumeof REPTARincludingpayloadshallnotexceedamaximumof6UStandard

Thepayload shallendureamaximuminstantaneousG-loadingoflessthan40G’s

REPTARshallbeaconitslocationover arangeof20miles

Level2Thevolumeof REPTARincludingpayloadshallnotexceedamaximumof4UStandard

--REPTARshallbeaconitslocationover arangeof30miles

Level3Thevolumeof REPTARincludingpayloadshallnotexceedamaximumof3UStandard

--REPTARshallbeaconitslocationover arangeof45miles

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR6

Page 7: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARMissionTimelineandFBD

10/3/17CUAESSeniorProjects2016-2017:REPTARCDR7

On-OrbitStandby• Maintainbatterycharge

ActiveComponent

InactiveComponent

7V4(BATT)12V

AVI_3V3

I2C

GPIOUARTBW_3V3

RF

RaytheonInterface

BatteryCharger

BatteryPack

LaunchInhibits

Avionics3V3Reg. Descent

• Triggeredbybussignal• Determinealtitude• AttainGPSlock

Deceleration[3,500m]• Triggered by parachute

deployment altitude beingreached

• Deploy parachute, bottom panel, andsidepanels.

Transmission• Triggeredbydeployments• TransmitLocation

Altimeter GPS

uController

Black Powder12VReg.

Burn Wire 3V3Reg.

BlackPowderCharge

Kanthal CoilandSpringDeployer (x5)

IridiumBatteryCharger

LaunchInhibits

Altimeter

Black Powder12VReg.

BlackPowderCharge

Burn Wire 3V3Reg.

Kanthal CoilandSpringDeployer (x5)

Page 8: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARKeyComponents

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR8

RaytheonPayload

ParachuteHousing

GPSAntenna

IridiumAntenna

AvionicsBay30cm

10cm 10cmLegs

SidePanels

Page 9: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAssemblyAnimation

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR9

AvionicsBay

DropTestMeasurementEquipment

LandingLegs

ParachuteHousing

LandingSidePanels

Page 10: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARCriticalProjectElements

Subsystem CPE Explanation

Descent ParachuteDeployment Iftheparachutedoesnotdeployandactproperly,it willbenearlyimpossibletoachieveanyofthemissionrequirements.

Landing Leg Deployment Thelegs lowerthemaximumGloadingthevehicleexperiences.Withoutsuccessfullegdeployment,safelandingwillnotbesatisfied.

Landing SidePanelDeployment Thesidepanelsassist inloweringthemaximumGloadinginthecaseofwindyweatherwherethevehiclewillhaveahorizontalvelocity.

Avionics SubsystemInteraction Ensuringthattheavionics integratewiththeothersubsystemswillbecrucialtosuccessofthemission.

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR10

Page 11: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARExecutiveSummary• ChangessinceMSR:

• Vibrationtesthasbeenremovedfromschedule

• Currentsystemstructurenotfullyrepresentativeofthefinalsystem

• ThermalProtectionSystem

• Payload• Aluminumcoverremovedfromparachutehousing

• TPSisrequiredtoprotectREPTARon-orbit

• Schedule:

• 11daysofmarginincorporatedbeforedroptest

• Budget:

• Allmaterialsin-houseorordered

• DropTestisonlyremainingmajorexpense

• $622.62margin– nooverallconcerns

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR11

Page 12: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

Schedule

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR12

Page 13: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

13

SubsystemConfidenceTesting

DeploymentTesting

FullSystemIntegration

FullSystemTestandFinalAnalysis

Page 14: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARTRRtoDropTest

14

SPRING

BREAK!

Page 15: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

Budget

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR15

Page 16: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR16

Page 17: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

TestReadiness

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR17

Page 18: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARPastTesting– DescentSubsystem

Test Measurement Sought RequirementValidation TestTakeaway

Plate Load Deformation duetochutedeployment

Verifiesstructuralintegrityofbaseplate

Plate isstrongenoughtowithstandtheforceofchutedeployment

Drag 𝐶"ofParachute Validatelanding speed

𝐶" forundamagedparachuteiswithin

threshold,𝐶" fordamagedparachute isnot

BP IgnitionAmountofblackpowder

neededtoejectchutefromhousing

Proveschutecan bedeployedusingblack

powder

Parachuteejectedproperly10timesoutof11inchosenconfiguration

Page 19: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARPastTesting– LandingSubsystem

Test Measurement Sought RequirementValidation TestTakeaway

LegandSidePanelDeployment

Percentageof timethatlegsandsidepanelsdeployin6

m/swinds

Validatesreliability ofdeployables

Littleconcernaboutproperdeploymentoflegsand

panels

LegLockingAmountoftorqueneededtoovercomeleglocking

mechanism

Highertorquerequiredtoovercomeleglocking

mechanismmeanslowerlikelihood legsfoldwhen

theyimpactground

Torqueatbreakwas~0.165Nmcausingascrew-indesigntobecreatedfor

ahighertolerance

FoamImpactDeterminecrushing

characteristicsofaluminumfoamlegs

Verifyvehicle canbeslowedtoastopwhilestayingbelow40G’s

Legscompressedalmostexactly asanticipated

Page 20: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAvionicsStatusDashboard

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR20

Page 21: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDay-In-The-Life(DITL)– FlightDressRehearsal

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR21

Purpose:ToverifytheintegratedperformanceoftheAvionicsHardwareandSoftware.

DeviationsfromTestFlight:• Black Powder Trigger will be

representativeload• AltimeterReadingsfromEGSE

Page 22: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARParachuteDeployment

10/3/1722

Parachute

U-bolt• SetupDetails:• Verysimilartoflightarticle

• Repeatability:• FollowChecklist Procedure

• RiskReduction:• Increasesconfidencethatchutewilldeploy

• ExpectedResults:• 0.4gofBlackPowdertoEjectChute

• ActualResults:• SuccessfulEjection:10/11=90.9%• SuccessfulCanisters: 34/36=94.4%• OverallConfidenceofDeployment:85.8%

ParachuteHousing

Page 23: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARParachuteDeployment

10/3/1723

Page 24: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

FullSystemDropTest

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR24

Page 25: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARFullSystemDropTest

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR25

Scope DropREPTARfromairplaneincontrolledenvironment

• Requiresaircraft,largedropzone

Rationale Fullsystemdroptestistheculminatingtestthatprovidesproofofconceptandfullintegrationtesting

• Testinghighspeedparachutedeployment

• Locationdeterminationduringdescent

• G loadingprofile

RiskReduction

Reducesriskbyvalidatingin-flightperformancebeforerealflightwithexpensivepayload

Page 26: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDropTestLogistics

• April4th(primarydate)andApril11th(backupdate)• No-godays:Surfacewind ofmorethan 30knots(34.5mph)orcloudclearanceoflessthan

1000ft fromthedesireddropaltitude

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR26

FAA RulesandRegulations:SkydiveColorado

FR.3- Keepsafeduringdescentand

landingFR.4- locatableafterlanding

Page 27: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDropTestMeasurementUnit• Where?

• Housed where Raytheon Payload would be stored in actualmission

• How?

• Accelerometer(ADXL377,+/- 200Gwithanerrorof1G)

• RaspberryPiCamera

• Quantitiesfromthemainavionics:

• Altitude(Altimeter)

• Location(GPS)

• MassandVolume

• Mass:177gofinstruments+1157gofballast

• Volume:1U

• AdditionalMeasurementswillbetakenfromtheplane

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR27

Page 28: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARExpectedG-Model

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR28

ChuteDeployment

Page 29: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDriftZoneandRecovery

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR29

MonteCarloParametersInitialVelocity=32.0[m/s]InitialVelocityVariance=5.0[m/s]MinAlt=12500[ft],AltVariance=200[ft]HeadingRange=20[deg]Pos.Variance(x)=500[m]Pos.Variance(y)=500[m]Pos.Shift(x)=-250[m]Pos.Shift(y)=-250[m]WindVel.min=5[kts]WindVel.Variance=5[kts]WindDir.min=230[deg]WindDir.Variance=40[deg]ChuteOpenAltMin=1900[m]ChuteOpenVariance=200[m]StandardDeviation=213.5[m]KnownWinds2520253025402545

Page 30: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDropZone

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR30

Entiredropzoneisaccessibleforrecovery

1.5kmradiusReferenceCircle

Page 31: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARConsequencesTable

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR31

Quantities Allgolden!

LocationTransmissionFails

LandingFails ParachuteFails Allfail

G'sexperienced 37 37 52 840 840

LocationDetermined? Yes No Likely No No

TimetoLand(s) ~86s ~86s ~86s ~32s ~32s

Datasurvived Yes Yes Yes Likely Likely

Page 32: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARPostFlightAnalysis

Compare:

• G-loadingexperiencedduringflight• Expected driftvsactualdrift• Expectedtimetolandvsactualtimetoland

Review:

• Legdeploymentfootage

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR32

Page 33: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARSummaryofConfidenceforDropTest• DescentSystem:• 85%confidenceofparachutedeployment

• LandingSystem:• Highconfidencethatlegsandsidepanelswillproperlydeploy

• 95%confidencetowardsaluminumfoamlandingcharacteristics

• Concernstowardsuncontrollablelandingenvironment

• AvionicsSystem:• Highconfidenceinavionicssystemasdesigned

• Flightenvironmentcanintroduceissuesincommunication

• Overall:• Current:81%confidencethatfullsystemwillperformsuccessfullyindroptest

• Furthertestingtoreducevariance

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR33

Page 34: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

Questions?

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR34

Page 35: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARParachuteDragTest

• Objective:• Determinethecoefficientofdragofgoodandbadparachute

• MeasurementSought:• Force(lbs)andWind(MPH)

• ExpectedValue:• Basedonprovidedinfofrommanufacturer–• Goodparachute~2.2

• Badparachute<2.2

• HowitReducesRisk:• Highercoefficient,lowerlandingvelocity,stayunder40G’sduringlanding

• Toohighofcoefficient,goover40G’sduringdeployment

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR35

Page 36: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARParachuteDragTestCont.

• Results:• Goodparachuten=23,Avg =2.42,Std =0.529

• Badparachuten=32,Avg =2.09,Std =0.553

• WhatThisMeans:• IfparachuteCdis<2.05,landingisover40G’s

• Badparachute,lessthan66%confidentwillbemorethan2.05

• Goodparachute,slightlylessthan66%confidentwillbemorethan2.05

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR36

Page 37: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARParachuteDragTest

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR37

• Parachuteshockchordwillbeattachedtoropewhichwillbeattachedtoadigitalscalewithhook

• Thedigitalscalewillbeattachedtotherodofaheadrestinacar• Theropewillbeapproximately4metersinlength• Teammemberwillbegintoacceleratecarto13mph• Teammemberinbackseatwillslowlyreleaselineofropeasparachutegetstaut• Carwillstayat13mph,teammemberinbackwillrecorddifferentvaluesofforce

fromscale• Thirdteammemberwillholdanemometeroutwindowandrecordwinddataas

backseatmemberrecordsforce• Comparingthevelocityandforcewillallowcalculationofthecoefficientofdrag

ofparachute• Importantbecauseifcoefficientisoff,landingteammustpreparefordifferent

landingspeed

Page 38: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTests,NoParachute

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR38

• PVCHousingcreatedtoholdejectioncanister• PressuregaugeattachedtobottomofPVCHousing• Highspeedcameraplacedongauge• Canisterconnectedto12V,5Apowersupply• TopofPVCsealeddowntopreventleaks• FromModeltocreate20psiequilibrium,0.128gofpowder

needed• Results:

• Highspeedcamerashowedequilibriumpressureof24psi

• ~17%differenceinexperimentandmodel

Page 39: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAirCompressorTest

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR39

• Pressuregaugeremoved• U-boltattachedtobottomofhousing• ShockchordofparachutefedthroughhousingandattachedtoU-

bolt• ParachutefoldedinsidePVChousing• Aircompressorattachedtoholewhereejectioncanisterwouldbe• Aluminumfoiltapedovertop• Somepartsofexperimenthadsmallperforationinmiddleoffoil• Results:

• 40psi– slightemergenceofparachutethroughmiddle• 50psi– slightemergenceofparachutethroughsideoffoil• 50psiw/perforation– goodemergenceofparachutethrough

middle• 80psi– verygoodemergencethroughmiddle• 80psiw/perforation– fullydeployedthroughmiddle

Page 40: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTestsWithPVCHousing• Objective:• DetermineifparachutewilldeployfromPVChousing• Determineamountofblackpowderneededtodeploy• Determineifvelocityofparachuteistohigh

• MeasurementSought:• Amountofblackpowderneededingramsto2decimals• VelocityofparachutedoesnotputREPTARover40G’s

• ExpectedValue:• Amountofpowdertobe>0.10gramswhichisapproximately75psi• 80psiiswhatexpelledparachuteduringcompressortest

• With4kgREPTAR,velocityofparachutemustbe80m/stogoover40G’s• HowitReducesRisk:• Needparachutetodeployinordertobeunder40G’s• EnsuresREPTARstaysunder40G’sduringdeployment

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR40

Page 41: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTestsWithPVCHousing

• Results:• .1gramspowderpredictedtobe~75psiinstantaneouspressure• Didnothearignitiongooffandnomovementofparachute

• .4gramspowderpredictedtobe~248psiinstantaneouspressure• Parachutelefthousing,videorecorded,burntparachute

• Fromvideo,velocitycalculatedtobe3.29– 4.83m/s

• WhatThisMeans:• ParachutewillnotcauseREPTARtogoover40G’s

• Needtoconductblackpowdertestwithfiberglasshousing

• 0.40gramsshouldbesufficienttoexpelparachutefromhousing

• 99%confidenceparachutewillnotcauseREPTARtogoover40G’s

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR41

Page 42: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTestsWithPVCHousing

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR42

• PVCHousingwithejectioncanisterinside• ParachuteshockchordattachedtoU-bolt• Parachutefoldedinsideofhousingwithrecoverywaddingbetweenitandejectioncanister• Aluminumfoilwithsmallperforationinmiddleandtapeddown• Canisterattachedtopowersupplywith12Vand5A• Results:

• .1gramspowderpredictedtobe~75psiinstantaneouspressure• Didnothearignitiongooffandnomovementofparachute

• .4gramspowderpredictedtobe~248psiinstantaneouspressure• Parachutelefthousing,videorecorded,burntparachute

• Couldlowergramsandprobablystilldeploy

Page 43: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTestChecklist

1.Fillcanisterwith0.4gblackpowderandplacerecoverywaddinginside2.Wipedowninsidewithwetrag3.Dryinsidewithdrytowel4.Lightsandingofinsidewith600grit5.LubeinsidewithAerokroil6.Placeejectioncanister7.Feedparachutethroughbottomandconnecttou-bolt8.Screwhousingtowoodandplaceinvisefacing180degrees9.Tapeholesonbackofhousingwithelectricaltape10.2.5sheetsofrecoverywaddingplacedoverejectioncanister11.Lubeupsidesofparachute12.Twistingparachutefoldandfitinsidehousing,pushdowntomakesureparachuteisflushwithhousingsurface13.Connectpowerlinestocanisterlinesandcheckresistanceonotherside14.Connectothersidetopowersupplyandturnonpowerforignition

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR43

Page 44: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDropTest

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR44

• LinesplacedacrossECOTtogivemeasurementsofdistance• Highspeedcamerasetupwithtwootherteammembers

filming• Cautiontapeplacedtocutoffcourtyardfrombystanders• Parachutewasasinflatedaspossiblebeforedrop• Droppedfrom8th storywindowinsteadof3rd dueto

difficulties• Anemometerongroundgavemaximumreadingof2.2

mph• Driftmodelstated2.2mphwouldprovide4meter

maximumdrift• Troublecommunicatingandensuringsafetyofbystanders• Oncedropped,acceleratedtowindspeedandmovedaway

fromtower• Minimalgooddatawasacquired

Page 45: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAluminumPlateLoadTestExplanation

• Model:• MATLABsimulationtodetermineG-loading

• Solidworks tocomparedeformation

• Purpose:• Showaluminumplatewithstandsimpulsefrom

parachuteinflation

• Verifymodelandsimulations

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR45

Page 46: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAluminumPlateLoadTest

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR46

• AluminumplatewillbeattachedtorailingsofCubeSat• U-boltwillbeplacedincenterandscrewedintoplate• ShockchordofparachutewillbeattachedtoU-bolt• Whenparachutedeploysandbecomestautitwillcauseapproximately40G’sor

353lbs offorceonthealuminumplate• Testistoensureplatewillnotfracture/buckle• Platewithrailingswillbesuspendedupsidedown• AchainwillbeattachedtoU-boltandotherendwillholdatenpoundplate• Chainwillbe1meterinlength• Tenpoundplatewillbeheldagainstaluminumplateanddroppedvertically• Ifaluminumplatebreaksitwillneedtobereinforced.Ifnottestisasuccess

Page 47: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLoadTest:Measurements

• Whatandhowwell?• Deformation:mmtotwodecimalplaces

• DropHeight:intonearest1/16th

• Massofweight:kgtonearestg

• How?• Distancebetweenstraightedgegoingacrossplatetotopofdeformationwithcaliper

• Tapemeasureinprojectsworkshop

• Scalefromcompositeslab

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR47

Page 48: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAluminumPlateLoadTestSolidWorks

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR48

48G’sImpulse2”thickplate- 2.84mmDisplacement

48G’sImpulse4”thickplate- 2.15mmDisplacement

Page 49: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAluminumPlateLoadTest

• Objective:• Determinedeformationofaluminumplateduetoinstantaneousforcefromparachute

becomingtaut

• MeasurementSought:• Deformationinmmtotwodecimalplaces

• ExpectedValue:• FromSolidWorkssimulations,deformationis2.80mm

• HowitReducesRisk:• Ensuresaluminumplateand/orU-boltdoesnotfracture

• Minimizesdeformationthatcouldaffectantennas

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR49

Page 50: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAluminumPlateLoadTest

• Results:• Measureddeformationtobe2.43mm

• Errorcouldexistinmethodofmeasuringduetohumanerror

• Errorfromcaliperused

• WhatThisMeans:• Increasedthicknesstominimizedeformation

• Antennashavechanceofbeingslightlyangled

• Aluminumplatewillnotfractureandparachutelost

• 99%confidencealuminumplateand/orU-boltwillfracture

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR50

Page 51: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

LandingBackup

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR51

Page 52: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARFoamLegDropTest• Objective• Toachievelandingvelocities to determine crushingcharacteristicsofa

onelegsetupaswellasG-loadinginaonelegscenarioata5.7m/slandingvelocity

• RequirementDR3.2 Thepayloadshallnot experience instantaneousloading exceeding 40G's

• MeasurementSought• Deformationof foamleginthecompressivedirectionaswellasG-

Loaduponimpact

• Expectedvalue• Expectedtodeform forvalidationofERGAerospace’sprojectedvalue

of70%+ compression• G-Loadingof 11.8G's

• Howitreducesrisk• Providesverificationof design toreduce G-loading belowthe40G

limitrequirement

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR52

8cm

Page 53: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARFoamLegDropTest• Results• Droppedat1.66m± 0.05m

• InitialLegLength: 8.00± 0.05cm

• InitialLegWidth: 1.80± 0.05cm

• FinalLegLength: 2.35± 0.05cm

• FinalLegWidth: 3.60± 0.05cm

• G-Loadingexperienced: 29.2G's

• Whatthismeansforourproject• Thisshowsthattheassumptionofa65%deformationduringcalculationsforareasand

lengthsrequiredforthelegdesigncanbeuppedto70%deformationfollowingthevalidationofERGAerospace’sclaim

• 98%duetotheperformancemeetingexpectationsoffoam,andincreasingareawouldlowerG-Loadingexperienced

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR53

Page 54: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARFoamLeg DropTest

• Using kinematicstheproperheighttodropwasfound• V= V_0+at= 0+ 9.81t

• X= X_0+V_0t+½at^2

• V= 5.7m/s

• Solvingfor Xthe legmustdrop 1.66m toachievetheproperimpactvelocity

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR54

Page 55: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLegLockingTesting

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR55

• Objective• To determinethepointofbreakageforthe leg

locking mechanism

• RequirementDR3.2 Thepayloadshallnot experience instantaneousloading exceeding40G's

• MeasurementSought• Amountof torqueheldbylockingmechanism

housingwalls

• Howitreducesrisk• Byverifyingtheload requiredtobreak,thedesigncan

bealteredto notallowrotationuponlandingfollowingthelockingofthemechanism

Page 56: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLegLockingTesting

• Results• Thesetup broke followinga 0.6kgloadappliedattheendofa 16.5cmvicegrip

equatingtoa0.165Nload

• Whatthismeansforourproject• This causedaredesigntoinvolve athickerhousingwallanda screw-insetup forthe

housingwalls

• By changingthedesignit uppedthe confidenceto 99%

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR56

Page 57: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLegDeploymentTesting

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR57

• Objective• Toachievereliabilitynumbersfordeploymentof

the aluminumfoamlegs

• RequirementDR3.2 Thepayloadshallnot experience instantaneousloading exceeding 40G's

• MeasurementSought• Numberofsuccessful deploymentsinboth no-windand6

m/swindscenarios

• Expectedvalue• 95% deployment successrate

• Howitreducesrisk• Indicatesthe reliabilityofthesedeployments following

extensivetestingfortheironmissiondeployment probability

Page 58: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLegDeploymentTesting

• Results• Thesetupwastested 40 timesinboththeno-windand6m/swindscenarios and

successfullydeployedinallcases

• Whatthismeansforourproject• This verifiedthedesignof utilizingtorsionspringsandepoxyfordeployment

purposes whilethelegsareattachedtoa slottedpin

• Thisresultprovideda confidencelevelof 99%

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR58

Page 59: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARSidePanelDeploymentTesting

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR59

• Objective• Toachievereliabilitynumbersfordeploymentof

the machinedaluminumsidepanels

• RequirementDR3.2 Thepayloadshallnot experience instantaneousloading exceeding 40G's

• MeasurementSought• Numberofsuccessful deploymentsinboth no-windand6

m/swindscenarios

• Expectedvalue• 95% deployment successrate

• Howitreducesrisk• Indicatesthe reliabilityofthesedeployments following

extensivetestingfortheironmissiondeployment probability

Page 60: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARSidePanelDeploymentTesting

• Results• Thesetupwastested 40 timesinboththeno-windand6m/swindscenarios and

successfullydeployedinallcases

• Whatthismeansforourproject• This verifiedthedesignof utilizingtorsionspringsandepoxyfordeployment

purposes whilethe sidepanels areattached with steelpins

• Thisresultprovideda confidencelevelof 99%

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR60

Page 61: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

AvionicsBackup

Page 62: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAltitudeDeterminationAlgorithm

10/3/1762

EGSETestingComponents:• AltimeterBreakoutBoard• Rasberry Pi3EGSE

FlightTestingComponents:• MainBoard• Raspberry Pi 3 EGSE

(ifMSP430FRdriversfail)

Page 63: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDeploymentAlgorithm

10/3/1763

EGSETestingComponents:• N/A

FlightTestingComponents:• MainBoard• EGSE(ifMSP430FRdriversfail)

Page 64: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARLocationDetermination/TransmissionAlgorithm

10/3/1764

EGSETestingComponents:• IridiumRockBlock• VenusGPS• Rasbperry Pi3EGSE

FlightTestingComponents:• MainBoard• Rasberry Pi 3 EGSE

(if MSP430FRdriversfail)

Page 65: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTAR3V3InternalRegulator

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR65

ResponsibleFor:• ProvidingpowertoGPS,Iridium,and

MSP430FR

HardwareTests:• VerifyAbsoluteVoltageAccuracy(+-5%)

• VerifyVoltageRipple(<300mV)

• VerifyCurrentDraw(2AMax)

SoftwareTests:• N/A

Off-ramps:• Hardware:COTSDev.Board

Page 66: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAltimeter

10/3/1766

ResponsibleFor:• AltitudeDeterminationwithMSP430FR

HardwareTests:• AltimeterCorrectlyMounted

• VerifyAltimeterAccuracyviacomparisontoknownstandardbarometer

SoftwareTests:• VerifyI2CInterface

• VerifyAltitudeCalculation(MSP430FR)

• FlightTest

Off-ramps:• Hardware:COTSDev.Board

• Software:RaspberryPi2EGSE

Page 67: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARGPS-IridiumInterface

10/3/1767

ResponsibleFor:• DeterminingandTransmittingLocation

HardwareTests:• CorrectElectricalConnections

• Internal3V3RegulatorTesting

SoftwareTests:• VerifyUARTCommunicationtoeach

• VerifyParsingCode

• FlightTest

Off-ramps:• Hardware/Software:RaspberryPi2EGSE

Page 68: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARBlackPowderTrigger

10/3/1768

ResponsibleFor:• ParachuteDeployment

HardwareTests:• PowerSensorVerificationviaknown

Standard

• TriggerLogicVerification

• 12VRegulatorPowerVerification

SoftwareTests:• TriggerlogicVerification

Off-ramps:• RaspberryPi3EGSE

Page 69: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARKanthal CoilTriggers

10/3/1769

ResponsibleFor:• SideandBottomPanelDeployment

CriticalHardwareTests:• PowerSensorVerificationviaknownStandard

• TriggerLogicVerification

• 3V3RegulatorPowerVerification

CriticalSoftwareTests:• TriggerlogicVerification

Off-ramps:• RaspberryPi3EGSE

Page 70: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAvionicsDesignChanges

• TrimmeddowncomplexityofMainBoardRevisionA

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR70

Page 71: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARAvionicsDevelopmentApproach

• SeparateHardwareandSoftwareTesting

• Makealltestablecomponentsindependentlytestable

• Provideasmanyprovenofframps asreasonablypossible

• EGSEcaninterfacetheRaspberryPi2toallComponents

• RaspberryPi3isfirststepforsoftwaretestingalways

• ExtensiveDesignworkonMainboardtoseparatetestableelements

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR71

Page 72: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARManufacturingSummary

WorkCompleted:• RevisionAdesignedand

(ordered/received/notordered)

10/3/17CUAESSeniorProjects2016-2017:REPTARMSR72

FutureWork:• (Solderanyadditional

components?)

• ValidateRevisionAanddecideifaRevisionBisnecessary

• ContinuedownTestPathsforsubsystemvalidation

• IntegrateMainBoardinREPTARstructure

Page 73: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

73

DescentKeyItemsBought Price

Parachutex2 $388

BlackPowder $30

EjectionCanisters $108

FiberglassTube $77

FiberglassCloth $44

FiberglassSheets $59

Epoxy $112

Other $134

KeyNumbers

EstimatedCost $897.00

TotalCost $951.90

Under/Over -$54.90

LandingKeyItemsBought Price

SidePanels $293

AluminumLegs $606

Springs $34

Pins $92

AluminumFoam $92

Epoxy $94

Aluminum $166

Other $67.15

KeyNumbers

EstimatedCost $1,444.15

TotalCost $1,418.93

Under/Over $25.22

AvionicsKeyItemsBought Price

RevA $76

AltimeterBreak $39

Battery Recharger $123

IridiumAntenna $33

RaspberryPi3 $40

VenusGPSSMA $50

RockBlock $294

Other $951.45

KeyNumbers

EstimatedCost $1,087.90

TotalCost $1,606.45

Under/Over -$518.55

Estimated Cost TotalCost DropTest Under/Over Margin

$3,429.05 $3,977.38 $400.00 -$948.23 $622.62

Page 74: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARIn-planemeasurements

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR74

Quantity How WhyCoordinatesandtimeofthepointREPTARisdropped

Dropapinusingamapapp

Tocalculatefinaldrift,assistrecovery

Indicatedairspeed Planeinstruments

Tovalidatewindaloftmodelandpredictdrift

OutsideAirTemperature

OATGauge TocalculateTrueAirspeed

PressureAltitude Planealtimeter TocalculateTrueAirspeed

Groundspeed GPS ComparewithTrueAirspeedforWindsVectorCalculation

Groundtrackvsheading

Magneticcompass

Tovalidatewindaloftmodelandpredictdrift

Page 75: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARExpectedDriftModel

10/3/17CUAESSeniorProjects2016-2017:REPTARTRR75

Page 76: Test Readiness Review REPTAR1 CU AES Senior Projects 2016-2017 : REPTAR TRR 10/3/17 Team: Calvin Buechler, Kevin Faggiano, Dustin Fishelman, CodyGondek, Lee Huynh, Aaron McCusker,

REPTARDriftZoneandRecovery