TARIFF REFORMS AND THE AFFORDABILITY ISSUE
Achievement of Albania regarding increasing collections, reduction of losses, electricity tariffs, protection of family in needs and reforming power
sector in line with Athens Process.
Mr. Bujar LEKA
Ministry of Industry and Energy
Director of Foreign Relation and Project Directorate
2
At the and of 2000, electricity situation in Albania was dramatic.
It was characterized by:
Very high level of demand
Technical and economical difficulties to meet the demand.
Heavy energy rationalizing through load shedding.
Very high level of technical and non technical losses.
Very low level of collections.
For each 100 kwh injected in the network only 55 kwh were billed and 36 kwh were collected.
In some areas in north of Albania, for 100 kwh injected only 50 kwh were billed and 26 kwh collected.
1. Background The starting point
Inability of Albanian Power Corporation (KESH) to manage more than 50 territorial units or filials;
Huge number of underpaid and under motivated of KESH personnel;
Very high level of KESH personnel;
Tariffs well below the operating costs;
Dramatic financial situation of KESH;
Very low level of electricity production;
Very high level of needs to import electricity.
KESH requests for GoA subsidies on imports.
Suspension on investments funds be donors community (WB, EBRD, EIB. Etc).
Donors urgent request for avoiding the power system collapse to its physical and structural inadequacy.
1. Background The starting point 3
Based on Power Sector Situation of 2000 and 2001 the GoA and KESH prepared their objectives to face the electricity crisis, which were:
a. Restructuring of KESH organization.– Improve the company’s effectiveness, in co-management with ENEL
(Italian utility)– Transform KESH from a vertical integrated into a unbundled company.– Abolish the direct control of the parent Ministry on KESH operations;– Keeping only steering and control power on the KESH’s policy, target to
the planning and developments program, by parent Ministry.– Provide the general Director with full powers and autonomy in the
company’s operations.
b. The GoA obligations and contributions.– Electricity imports to be subsidized.– Electricity payments of budgetary and non budgetary institutions to be a
executive title.– The establishment of a new police structure specialized on unlegal
electricity links connections.– Reorganization of KESH Supervisory Council, composed by the
representants of the Ministry of Economy, Ministry of Industry and Energy and Ministry of Finance.
42. The GoA and KESH objectives
- Preparing a Action Plan in order to meet policies and targets established by GoA.
- Establishing a interministerial Task Force dealing on the Action Plan chaired by the Ministry of Industry and Energy.
- The need to prepare e Power Policy Document for the development of the Power Sector, with short and medium terms objectives to be transformed later in a National Strategy of Energy.
c. Presentation of the GoA and KESH objectives in a Donors Meeting, which was organized in Tirana, April 2001.
d. Donors technical assistance for the implementation of the GoA and KESH targets.
e. Donors approval of the power Sector Policy Document and their support on drafting..
f. Preparation of the Power Sector Policy Document with support of Donors community.
52. The GoA and KESH objectives
Since the beginning the biggest efforts was considered KESH restructuring and organization.
• The key issues for achieving fundamental objectives were:
Company effectiveness and efficiency improvement ;
To meet the Action Plan Targets; To transform KESH into a market
oriented company;
• KESH transforming from a vertical integrated company into an unbundled company with perspective of;
Local Market Opening; Integration of Albania into regional and
European market; Implementation of privatization process.
63. KESH Restructuring
New Statute 7
Abolish the direct control of the parent Ministries on KESH operations, by keeping all the steering and control power on the company’s policies and targets
Provide the General Director with full powers and autonomy in the company’s operations in order to meet policies and targets established by the parent Ministry
Overcome the decision making previous processes and make clear and unambiguous the responsibilities of the managerial decisions
In April 2001 a new Statute was approved with the following main objectives
3. KESH Restructuring
New Reorganization 8
GENERAL DIRECTOR
CENTRAL STAFF
PRODUCTIONDIVISION
TRANSMISSIONDIVISION
DISTRIBUTIONDIVISION
RMUSouth of Albania
SHAREHOLDERS ASSEMBLY
SUPERVISORY COUNCIL
Secretariat Personnel &
Organization * Economics &
Finance Planning &
Engineering Legal Audit
In April 2001, in the prospective of KESH restructuring and unbundling, a new structure of KESH was approved .
This structure provided for 3 main business area, Generation, Transmission, and Distribution, in the organization form of Divisions.
For each new organization unit, it was stated: The mission The main processes The internal structure * Including an information
systems unit
3. KESH Restructuring
Relationships with Political Bodies 9
The new Statute and the New Organization Structure of KESH ask for the observance of new rules in the relationships between the parent Ministries (Ministry of Economy and Ministry of Energy and Industry) and the operating structure of KESH.
The parent Ministries can act on the operating structure of KESH only through the Supervisory Council;
They have the right or duty to; State the mission of KESH Define the yearly targets (Action Plan ) to be achieved by KESH Monitor the results achieved by KESH
The General Director of KESH, as sole responsible of the company’s operation, has the duty/right to
Act in full autonomy for the achievement of the entrusted targets, Divert any political issue to the Supervisory Council
3. KESH Restructuring
Territorial Units 10
In July 2001, the new structure of the Divisions that was approved, implied a dramatic cut of the Territorial Units in order to ensure the effective control on their operation.
8 “Distribution” Zones
6 “ Transmission” Regions
6 “Production” Power Plants
New territorial units had the power for recruitment and dismissal of personnel and kept the responsibilities of running their core activities (operation, maintenance and sales of electricity)
A more drastic reduction of territorial units was not suggested because of some hindering factors, such as (i) poor infrastructures (i.e.: road conditions, telecommunication) and operating resources (i.e.: vehicles, operating tools, peripheral offices, information systems)
3. KESH Restructuring
Central Staff
DIRECTOR
Territorial Units
About 50 former “Filials” were reduced (*)
to
Structure of new Territorial Units 11
DIRECTOR
OPERATIONOFFICE
MAINTENANCE
OFFICE
ACCOUNTINGUNIT
PERSONNELUNIT
DIRECTOR
OPERATIONOFFICE
MAINTENANCE
OFFICE
ACCOUNTINGUNIT
PERSONNELUNIT
SUBSTATIONS
STAFF STAFF
TERRITORIAL STAFF
Production Power Plants
Transmission Regions
3. KESH restructuring
Structure of new Territorial Units 12
Distribution Zones DIRECTOR
TECHNICALOFFICE
COMMERCIALOFFICE
ACCOUNTINGOFFICE
PERSONNELOFFICE
LEGALUNIT
AGENCY
STAFF
TERRITORIAL CASH
OPERATIVE GROUP
STAFF
3. KESH Restructuring
Transmission System Operator 13
The Transmission Division was established since April 2001.
Starting from the second half of 2003, organizational efforts have been focused on the
establishment of the Albanian Transmission Operator.
That required:
a. The reallocation of technical assets.
b. The transfer of 110 and 35 kV substation and 35 kV lines from Transmission to Distribution;
c. The evaluation of the above-mentioned assets;
d. The identification of personnel to be transferred from transmission and distribution division;
From January 1, 2004 the above changes have been effected, opening the way to the other steps to be completed by the end of 2004 and mid-2005.
3. KESH Restructuring
General Structure of the TSO 14
DIRECTOR
CENTRAL STAFF
Secretariat & Legal
Personnel & Organization Administration & Finance
Procurement *
For each new organization unit, it was stated:
The mission The main processes The internal structure
* Procurement staff will be implemented in a successive step
OPERATING MANAGEMENT
OF TRANSMISSION
SYSTEM
OPERATION & MAINTENANCE
OF TRANSMISSION INSTALLATIONS
BUSINESS UNITS
3. KESH Restructuring
TSO Business Units’ Structure 15
OPERATION & MAINTENANCE
OF TRANSMISSION INSTALLATIONS
OPERATING MANAGEMENT
OF TRANSMISSION
SYSTEM
DIRECTOR
DISPATCHING
MARKETING
PLANNING
ENGiNEERING
TERITORIAL UNITS
DIRECTOR
ENGINEERING
OPERATION
MAINTENANCE
TELECOMMUNICATION
METERING
TERITORIAL UNITS
3. KESH Restructuring
2.12 New Structure of Distribution 16
Operation, maintenance and development of the HV assets, transferred from the former Transmission Division, called for a drastic revision of the Distribution Division structure.
The structure of the Distribution Staff Units, shown in the diagram above, has been totally reviewed in terms of both job processes and personnel requirements
DIRECTOR
Staff
Tirana
District
Elbasan
District
Fier
District
Burrel
District
Tirana
Zone
Durres
Zone
Elbasan
Zone
Korce
Zone
Fier
Zone
Berat
Zone
Shkoder
Zone
Burrel
Zone
3. KESH Restructuring
Tariff policy objectives 17
The Main objectives behind tariff reform were to:
Allow KESH to become a financially autonoms company;
Allow KESh to be able on covering operating and capital costs be revenues;
Allow GoA not to subsidize any longer the Power Sector ( up to the end of 2004);
Promote consumers to make a rational use of electricity;
Attract foreign investors to invest and upgrade of the generation capacity;
Create the appropriate environment in view of the future privatization process.
4. Tariff reform
The reference tariff rates identified by Regulatory Body (ERE) for 2001 and 2002,
were;
For customers fed at high voltage level, 5.6 Lek kwh 2001 6.8 Lek kwh 2002
For customers fed at medium voltage level, 9.6 Lek kwh 2001 10.1 Lek kwh 2002
For customers fed at low voltage level, 12 Lek kwh 2001 14.5 Lek kwh 2002
For household customers the tariff was 4 lek/kwh. In 2002 to protect low income customers was put in place a two system tariff.
under 300 kw per month Over 300 kw per month.
4. Tariff reform New Tariffs 18
Trend of Tariff Increase 19
0
2
4
6
8
10
12
HV MV LV Domestic 1st Tier
Domestic2nd Tier
2000
20012002
20032004
8.9
4.5
12
10.4
8.3
Lek/kWh
Since January 1, 2004, the border between 1st and 2nd tier was reduced from 300 to 220 kWh per month
FULL TARIFFS
4. Tariff reform
AVERAGE KESH SELLING PRICE
3.413.87
4.595.65
6.70
+ ~100%
Data source: Third & Fourth Power Sector Action Plan
Low income customers protection 20
In addition to the protecting of the families in need (vulnerable customers), the GoA has adopted a social scheme to protect them from electricity tariff increase, since January 1, 2004.
The GoA is supporting directly the vulnerable customers for their the most needed electricity consumption (lighting, cooking, radio-TV and washing machine);
The GoA social support cost for year 2004 is about 2.8 Million USD, and for year 2005 will be about 3.5 Million USD.
4. Tariff reform
Starting point 21
In 2001, it was started the implementation of a computerised Billing System in order to replace the manual procedure.
The following were the major issues:
1. Use of the project hardware, financed by Swiss Government;
2. System Assignment of software development responsibility to the established “Information System Unit”;
3. Implementation of a large facilities, such as:
i. daily meter reading schedule,
ii. issue of computerised monthly bills,
iii. bills’ payment check with the subsequent identification of bad payers to be disconnected
iv. rich set of output reports aimed at monitoring the effectiveness of the billing process
5. Billing System
Installation of metering apparatus.
• For many reasons in 2001 were identified a very high level of needs in metering apparatus in all distribution units, about 300.000 meters.
• In cooperation with donors community active in Albania (World Bank, EIB, Italian Cooperation) and using KESH financial sources, was prepared a supplying program of meters, for 2003 and 2004.
• After 2004 no more flat tariffs for household customers.
• To address all issues in extension of higher level of collection, KESH is preparing a program of pre-payment meters installation in some very particular areas of the country.
5. Billing System Meters 22
23
6. Main Results
Reduction of Losses 24
50.0%44.8%
41.5%39.2%
36.7%
2000 2001 2002 2003 2004
6. Main Results
Increase of Collections 25
53.4%
76.3%
88.3%92.4% 94.6%
2000 2001 2002 2003 2004
6. Main Results
Reduction of Personnel 26
10,433 10,2029,240
7,8657,400
2000 2001 2002 2003 2004
6. Main Results
Trend of operating Revenues and Costs 27
12,09814,033
16,183
20,492
26,047
14,672
17,56918,640
15,140
21,942
2000 2001 2002 2003 2004
Revenues
Costs
Revenues < costs Revenues > costs
6. Main Results
Lek million
Improvement of Gross Operating Margin 28
-2,574-3,536
-2,453
4,1055,352
2000 2001 2002 2003 2004
GOM < 0 GOM > 0
6. Main Results
Lek million
7. In form of Conclusions 29
After the implementation of a four year Action Plan, when a lot of major interventions , measures, activities, and solutions were implemented, we can state that:
A new organizational culture customer-oriented has progressively been taking place;
Our achievements have been used to open the way towards further future improvements.
7. In form of Conclusions 30
The most critical issues to be addressed starting from 2005, are:
Further improvements of the financial management, especially as for investments and loan agreements.
Finalization of the KESH unbundling and the establishment of an independent TSO, generation and Distribution;
The implementation of Standard Model Market Design based on clear and clean market rules.
The establishment of the open energy market in Albania and its integration in regional and european market;
Preparing a transparent and open process for the privatization of Distribution and after Generation companies.