Tallahassee International Airport Master Plan
Tallahassee City Commission Briefing
July 13, 2016
Agenda
• Master Plan Process and Objectives of Study
• Public Involvement Program
• Overview of Existing Conditions
• Preliminary Forecast of Aviation Demand
• Facility Requirements
• Schedule
• Discussion
What is a Master Plan?
• Projection of the Airport’s ultimate growth over a 20-year timeframe.
• Plan for the ultimate development of physical facilities.
• Development guide, including timing and costs, that considers adjacent land uses and environmental issues.
• Step-by-step description of the logic used in formulating the plan.
• Display of the plan in graphical and written form.
• Positions the Airport to compete for FAA and FDOT funding.
Master Planning Process
Public Involvement Program
• Technical Advisory Committee Meetings
• Airport Advisory Committee Briefings
• Tallahassee City Commission Briefings
• Public Open House
• Airport Website
Major Objectives• Optimize the operational efficiency,
effectiveness, capability and safety of the airport;
• Enhance the economic and social value of the airport;
• Meet the long-range aviation needs of the community;
• Ensure that current and future airport plans are environmentally compatible and in harmony with local and regional plans and objectives; and
• Provide planning options that are consistent with these project goals.
• Focus on land development, highest and best use, and landside access options.
Inventory of Existing Conditions
• Airport Characteristics and Local Profile• Airport Access, Transportation, Parking• Landside Facilities• Airfield Facilities• Operational Characteristics• Support Facilities • Security and Airspace• Utilities and Infrastructure • Environmental Factors
Existing Facilities
Passenger Terminal Area Facilities
General Aviation Facilities
Importance of Forecasts
• To develop a realistic assessment of market conditions and market performance.
• To address unique local conditions not fully considered in national, macro level forecast efforts.
• To provide a benchmark for comparing current facilities against a reasonable estimate of future demand to define potential future facility needs.
Historical Enplanement Comparison
0
100,000
200,000
300,000
400,000
500,000
600,000
700,0001
99
0
19
91
19
92
19
93
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
ECP TLH
Load Factor Comparison
y = 0.0028x + 0.727
60.00%
65.00%
70.00%
75.00%
80.00%
85.00%
90.00%
95.00%
2011 2012 2013 2014 2015
U.S. TLH ECP DAB GNV MLB PGD Linear (TLH)
Passenger Enplanements Forecast
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
20
15
20
16
20
17
20
18
20
19
20
20
20
21
20
22
20
23
20
24
20
25
20
26
20
27
20
28
20
29
20
30
20
35
Scenario 1 Scenario 2
Airline Operations ForecastYear
Total
Passengers
Scheduled Operations Unscheduled OperationsTotal
OperationsTurboprop Jet Total
% Total
OperationsJet
% Total
Operations
Airline Scenario 1
2015 670,144 2,292 10,936 13,228 99.36% 85 0.64% 13,313
2020 728,803 2,411 11,638 14,049 99.33% 95 0.67% 14,145
2025 794,295 2,569 12,401 14,970 99.31% 103 0.69% 15,073
2030 865,617 2,738 13,213 15,951 99.30% 112 0.70% 16,063
2035 943,295 2,917 14,079 16,996 99.30% 120 0.70% 17,116
AAGR
2015-20351.72% 1.21% 1.27% 1.26% 0.00% 1.74% 0.47% 1.26%
Airline Scenario 2
2015 670,144 2,292 10,936 13,228 99.36% 85 0.64% 13,313
2020 834,787 2,411 13,481 15,892 99.41% 95 0.59% 15,987
2025 1,011,109 2,569 16,086 18,655 99.45% 103 0.55% 18,759
2030 1,087,388 2,738 16,898 19,636 99.43% 112 0.57% 19,748
2035 1,170,136 2,917 17,764 20,681 99.42% 120 0.58% 20,801
AAGR
2015-20352.83% 1.21% 2.46% 2.26% 0.00% 1.74% -0.51% 2.26%
GA Based Aircraft Forecast
YearSingle-Engine
Piston (SEP)
Multi-Engine
Piston (MEP)Turboprop Jet Helicopter
Total GA Based
Aircraft
2015 84 10 6 4 15 119
2020 88 10 6 5 16 125
2025 92 10 7 5 16 131
2030 96 10 8 6 17 138
2035 101 10 8 7 18 145
AAGR 2015-2035 0.92% 0.00% 1.60% 3.10% 0.92% 0.98%
Combined Operations
Combined Operations Forecast
Year
Airline Cargo Military General AviationTotal
OperationsOperations % Total Operations % Total Operations % Total Operations % Total
2015 13,313 22.98% 1,370 2.37% 13,065 22.56% 30,173 52.09% 57,921
2020 14,145 23.48% 1,440 2.39% 13,065 21.69% 31,593 52.44% 60,243
2025 15,073 24.03% 1,513 2.41% 13,065 20.83% 33,081 52.73% 62,733
2030 16,063 24.58% 1,591 2.43% 13,065 19.99% 34,638 53.00% 65,356
2035 17,116 25.13% 1,672 2.45% 13,065 19.18% 36,269 53.24% 68,122
AAGR
2015-20351.26% 0.45% 1.00% 0.18% 0.00% -0.81% 0.92% 0.11% 0.81%
Facility Requirements• Airfield Capacity• Design Aircraft Identification• Runway Length Analysis• Runway Strength Analysis• Instrument Approaches• Airfield Design Standards• Airfield Lighting, Markings and Signage, & Navigational Aids• Terminal Area Facilities• Transient Apron and Based Aircraft Storage• Airport Support Facilities• Land Use Considerations
Schedule
• Inventory/Forecast – March 2016
– FAA/FDOT review of Forecast
• Public Information Meetings – May/October 2016
• Facility Requirements – July/August 2016
• Airport Alternatives – October 2016
• Alternatives Refinement, ALP, Financial Analysis/CIP – February 2017
• Final Deliverables – May 2017
Discussion