×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [leak tests]
Pipeline Safety Trust – Getting to ZERO (incidents) Gas Pipeline Safety Issues San Bruno Lessons Learned Randy Knepper Director of Safety New Hampshire
216 views
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004
219 views
1 SYSTEM LEAK CHECKING AND VACUATION HVACR318 – Advanced Refrigeration
219 views
AMS tracker hardware status (mechanics and cabling) Divic RAPIN, UniGe AMS splinter tracker, Septidi 7 Brumaire 217 (october 28, 2008) off-line operations
219 views
Commissioning
106 views
27/Aug./2015 KAGRA f2f meeting N. KIMURA High Energy Accelerator Research Organization, KEK Progress status of Cryogenic System at KAGRA site
215 views
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
219 views
QRL kick-off meeting Presentation of the cryogenic extensions for the QRL project
49 views
Next European Dipole (NED) Status Report
21 views
LHCb Project Review Jim Libby 3 rd October 2005 LHC and LHCb status LHCb in Oxford Producing the hardware Preparing for data I: software Preparing for
216 views
Service channels between Tracker and PP1 TK-PP1 Cable Channel Review 14 September 2007, Antti Onnela, CERN Installation order and Component status Mock-up
216 views
IBL - LAPP Cooling lines
53 views
< Prev
Next >