table of contents section 10 - steven...

6
10-1 © 2007 Schneider Electric All Rights Reserved 10 INTEGRATED POWER AND CONTROL SOLUTIONS (IPACS) EQUIPMENT Download Section 10 PDF Table of Contents Section 10 Integrated Power and Control Solutions (IPaCS) Equipment MPS, see page 10-3 IPC, see page 10-3 IPC2, see page 10-4 IPaCSEquipment Overview 10-2 Modular Panelboard System (MPS) 10-3 Integrated Power Center (IPC) 10-3 Integrated Power Center 2 (IPC2) 10-4 IPC2 10-4 IPC2 Transformer Combo 10-4 Standard Transformer Combo Merchandise Configurations 10-5 Integrated Equipment Sample Lineups 10-6 New! New! Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Upload: hoangtu

Post on 07-Mar-2018

219 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

10-1© 2007 Schneider ElectricAll Rights Reserved

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IP

AC

S)

EQ

UIP

ME

NT

Download Section 10 PDF Table of Contents

Section 10Integrated Power and Control Solutions

(IPaCS) Equipment

MPS, see page 10-3

IPC, see page 10-3

IPC2, see page 10-4

IPaCS™ Equipment Overview 10-2

Modular Panelboard System (MPS) 10-3

Integrated Power Center (IPC) 10-3

Integrated Power Center 2 (IPC2™) 10-4

IPC2 10-4

IPC2 Transformer Combo 10-4

Standard Transformer Combo Merchandise Configurations 10-5

Integrated Equipment Sample Lineups 10-6

New!

New!

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Page 2: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

www.us.schneider-electric.comFOR CURRENT INFORMATION

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IPA

CS

) E

QU

IPM

EN

T

10-2 © 2007 Schneider ElectricAll Rights Reserved

IPaCS Equipment OverviewClass 2200 / Refer to Documents 2230DB0601, 2010CT0001 and 2735CT0001

Integrated Power and Control Solutions (IPaCSTM) Equipment Overview

The Square D® family of integrated equipment combines electrical distribution equipment, building controls and automation into a single factory-assembled and pre-wired enclosure. Our innovative, cost-effective, integrated solutions save valuable floor space, shorten construction cycle times and reduce installation and material handling costs.

Integrated lineups are tailored to customer specifications and can be customized to include third party components, such as building management automation and controls.

Modular Panelboard System (MPS)Pre-Engineered Solution

The Modular Panelboard System is tailored to customer specifications and may include panels, transformers and lighting control. An MPS is applicable when third-party building control systems are not required. Special interiors are available such as column width and Powerlink®. Options may include power and control cable wiring, contactors, terminal blocks, TVSS and equipment space. MPS sections are 86 in. (2184 mm) high x 9.5 in. (241 mm) deep. Widths vary depending upon customer specifications.

Integrated Power Center (IPC)Custom-Designed Solution

For more complex designs, the Integrated Power Center allows for the integration of a variety of controls, including electrical distribution equipment, HVAC controls, lighting controls, power quality and power conditioning products, surge suppression and building management systems. As with all integrated solutions, they meet applicable codes and standards and are shipped to the site fully-assembled, completely pre-tested and ready to install. IPC sections are 84 in. (2134 mm) high x 10.25 in. (260 mm) deep. Widths vary depending upon customer specifications.

Integrated Power Center 2 (IPC2™)The newest addition to the family of integrated solutions, the Integrated Power Center 2 (IPC2™) provides maximum flexibility to meet customers’ specifications. Features include those found in the IPC and are provided in a free-standing enclosure that can be front and rear aligned when transformers are included. Enclosure options include NEMA 1, NEMA 1 with driphood and NEMA 3R.

IPC2 Transformer ComboIdeally suited for projects having both 480Y/277 V and 208Y/120 V requirements. Available as a standalone solution or can be incorporated into an MPS, IPC or IPC2 line-up. The 42 in. (1067 mm) wide x 24 in. (610 mm) deep footprint will decrease space requirements by 40% or more.

Additional savings are realized on installation, material costs and material handling, shown in the table below.

The IPC2 Transformer Combo has been recognized by the electrical industry by winning the following awards:

• 2006 INNOVATION Award given by the Electrical Contracting Products magazine.• 2006 Product of the Year Gold Medal Award given by the Consulting/Specifying Engineer magazine.

Table 10.1: IPC2 Transformer Combo—Savings Realized Stick-Built Transformer Combo Savings Realized

Estimated Installation Hours 26–32 3–6 23–26

Materials Saved Associated pipe, wire and fittings — Associated pipe, wire and fittings

No. of Pieces Handled 20–30 1 19–29

New!

New!

New!

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Page 3: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

www.us.schneider-electric.comFOR CURRENT INFORMATION

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IP

AC

S)

EQ

UIP

ME

NT

© 2007 Schneider ElectricAll Rights Reserved

10-3

IPaCS Equipment Modular Panelboard System and Integrated Power CenterClass 2210 and Class 2220 / Refer to Documents 2010CT0001 and 2735CT0001

Modular Panelboard System (MPS)The pre-engineered MPS consists of a mix of NQOD, NF and I-Line® interiors, transformers and lighting control. It is applicable when third-party building control systems are not required. Special interiors are available such as column width and Powerlink®. Options include power and control cable wiring, contactors, terminal blocks, TVSS and equipment space.

Equipment space options include factory-installed lighting contactors in three configurations:

1. Unwired: Mounted in cell only2. Line side wired: Line side of each pole is wired to a branch circuit breaker3. Fully wired: Line side of each pole is wired to a branch circuit breaker, load side of each

pole wired to a terminal block

Built on a panelboard platform, MPS sections are NEMA 1 rated and meet the requirements of UL 67. Individual sections are 86 in. (2184 mm) high x 9.5 in. (241 mm) deep; widths vary from 10 in. (254 mm) to 44 in. (1118 mm).

Layout/Lead Time/Pricing:Contact your nearest field sales office.

Shipping:Integrated equipment line-ups are shipped as a factory-assembled, pre-wired system. Customers may specify single or multiple section shipping splits (some limitations apply). In addition, lineups may be ordered with or without factory-installed power cables.

Integrated Power Center (IPC)

The custom-designed Integrated Power Center allows for greater design flexibility with the integration of a variety of controls, including:• Electrical distribution• Power quality• Building automation• Surge suppression• Lighting controls• HVAC controls

Integrated Power Centers are NEMA 1 rated and meet the requirements of UL 891. As with all integrated solutions, IPCs are shipped to the site fully-assembled, completely pre-tested and ready to install. IPC sections are 84 in. (2134 mm) high x 10.25 in. (260 mm) deep; widths vary depending upon customer specifications.

Individual IPC configurations include NF, NQOD or I-Line panel sections in full height, stacked or side-by-side arrangements. In addition, combination sections combine electrical distribution panels with equipment space for building controls.

Equipment space options include factory-installed lighting contactors in three configurations:

1. Unwired: Mounted in cell only2. Line side wired: Line side of each pole is wired to a branch circuit breaker3. Fully wired: Line side of each pole is wired to a branch circuit breaker, load side of each

pole wired to a terminal block

Layout/Lead Time/Pricing:Contact your nearest field sales office.

Shipping:Integrated equipment line-ups are shipped as a factory-assembled, pre-wired system. Customers may specify single or multiple section shipping splits (some limitations apply). In addition, lineups may be ordered with or without factory-installed power cables.

Modular Panelboard System

MPS Interior

New!

Integrated Power Center

IPC Interior

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Page 4: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

www.us.schneider-electric.comFOR CURRENT INFORMATION

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IPA

CS

) E

QU

IPM

EN

T

10-4 © 2007 Schneider ElectricAll Rights Reserved

IPaCS Equipment Integrated Power Center 2 (IPC2™)Class 2230 / Refer to Documents 2230HO0601 and 2230DB0601

Integrated Power Center 2 (IPC2™)The IPC2 provides maximum design flexibility. In addition to the features found in the Integrated Power Center, IPC2 lineups are free-standing enclosures that can be front- and rear-aligned when transformers are included.

• NEMA 1, NEMA 1 with driphood and NEMA 3R enclosure options• Free-standing sections that can be close-coupled to QED switchboards• UL 891 – Deadfront switchboard construction• Seismically qualified to meet IBC and ASCE 7Equipment space options include factory-installed lighting contactors in three configurations:

1. Unwired: Mounted in cell only2. Line side wired: Line side of each pole is wired to a branch circuit breaker3. Fully wired: Line side of each pole is wired to a branch circuit breaker, load side of each

pole wired to a terminal block

Layout/Lead Time/Pricing:Contact your nearest field sales office.

Shipping:Integrated equipment line-ups are shipped as a factory-assembled, pre-wired system. Customers may specify single or multiple section shipping splits (some limitations apply). In addition, lineups may be ordered with or without factory-installed power cables.

IPC2 Transformer Combo

A member of the IPC2 family, the Transformer Combo has been recognized wide for its innovative design. It integrates panelboards, individually-mounted circuit breakers or lighting contactors with a dry-type transformer into one factory-assembled and pre-wired solution. All are housed in a space-saving 42 in. (1067 mm) wide x 91.5 in. (2324 mm) high x 24 in. (610 mm) deep enclosure.

The Transformer Combo is ideally suited for projects having both 480Y/277 V and 208Y/120 V requirements and is applicable where panels and a transformer are in close proximity. As a standalone solution, the Transformer Combo provides the flexibility to enter and/or exit the section from either the top or bottom. It can also be incorporated into an MPS, IPC or IPC2 lineup.

New!

Integrated Power Center 2

New!

Transformer Combo

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Page 5: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

www.us.schneider-electric.comFOR CURRENT INFORMATION

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IP

AC

S)

EQ

UIP

ME

NT

© 2007 Schneider ElectricAll Rights Reserved

10-5

IPaCS Equipment Integrated Power Center 2 (IPC2™)Class 2230 / Refer to Documents 2230HO0601 and 2230DB0601

Standard Transformer Combo Merchandise ConfigurationsThe IPC2 Transformer Combo is available in four standard merchandise configurations, as shown below (additional configurations are available; contact your nearest field sales office).

Table 10.2: Standard Transformer Combo Configuration SpecificationsCatalog No. IPC2TC-1EE

NF Panel NQOD Panel Transformer

480Y/277 3Ø4W 208Y/120 V 3Ø4W 480 V–208Y/120 V 3Ø225/3 MB 18k AIC 225/3 MB 10k AIC 75 kVA

1–125/3 (Transformer) 20–20/1 Branch Breakers Energy Efficient transformers in compliance with the 2005 Energy Act.

20–20/1 Branch Breakers 22–1PSO 150 °C Temp Rise19–1PSO Copper Bus/Ground Bus Aluminum WindingsCopper Bus/Ground Bus 6–2.5% Taps; 2+ 4-SUSE

Catalog No. IPC2TC-2EE

NF Panel NQOD Panel Transformer

480Y/277 3Ø4W 208Y/120 V 3Ø4W 480 V–208Y/120 V 3Ø400 A MLO 18k AIC 225/3 MB 10k AIC 75 kVA

1–125/3 (Transformer) 20–20/1 Branch Breakers Energy Efficient transformers in compliance with the 2005 Energy Act.

20–20/1 Branch Breakers 22–1PSO 150 °C Temp Rise19–1PSO Copper Bus/Ground Bus Aluminum WindingsCopper Bus/Ground Bus 6–2.5% Taps; 2+ 4-SUSE

Catalog No. IPC2TC-3EE

(X) Transformer Primary Breaker (P) Panel Main Breaker NQOD Panel Transformer

175 A 3P 480 V 35k AIC 400 A 3P 240 V 10k AIC 208Y/120 V 3Ø4W 480 V–208Y/120 V 3ØSUSE 400 A MLO 10k AIC 112.5 kVA

20–20/1 Branch Breakers Energy Efficient transformers in compliance with the 2005 Energy Act.

22–1PSO 150 °C Temp RiseCopper Bus/Ground Bus Aluminum Windings

6–2.5% Taps; 2+ 4-

Catalog No. IPC2TC-4EE

NQOD Panel NQOD Panel Transformer

208Y/120 V 3Ø4W 208Y/120 V 3Ø4W 480 V–208Y/120 V 3Ø225/3 MB 10k AIC 225 A MLO 10k AIC 75 kVA

20–20/1 Branch Breakers 20–20/1 Branch Breakers Energy Efficient transformers in compliance with the 2005 Energy Act.

22–1PSO 22–1PSO 150 °C Temp RiseCopper Bus/Ground Bus Copper Bus/Ground Bus 6–2.5% Taps; 2+ 4-FT Lugs

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

43114-553-01

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

43114-553-01

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

43114-553-01

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

43114-553-01

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

IPC2TC-1EE IPC2TC-2EE IPC2TC-3EE IPC2TC-4EE

NOTE: All sections can be fed from the top or bottom.

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com

Page 6: Table of Contents Section 10 - Steven Engineeringstevenengineering.com/Tech_Support/PDFs/45174-10.pdf · Download Section 10 PDF Table of Contents Section 10 ... automation into a

10-6 © 2007 Schneider ElectricAll Rights Reserved

10IN

TE

GR

AT

ED

PO

WE

R A

ND

C

ON

TR

OL

SO

LU

TIO

NS

(IPA

CS

) E

QU

IPM

EN

T

www.us.schneider-electric.comFOR CURRENT INFORMATION

IPaCS Equipment Sample LineupsClass 2200 / Refer to Documents 2230DB0601 and 2010CT0001

Integrated Equipment Sample Lineups

NQOD NQOD

NQOD NQOD

NF

NQOD

NF

NQOD

I-LINE

75 kVA

I-Line

-----

-----

-----

-----

-----

--------

NQOD

NQOD

NQOD

NQOD

1200 Amp I-Line

NQOD

Equip.Space

--------

NQOD NQOD

75 kVA-----

-----

-----

-----

NF

NF

NF

NF

1200 Amp I-Line

Equipment Space

Equipment Space

-----

-----

--------

NF

NF

1200 Amp I-Line

-

-

-

-

-

-

800 AmpI-Line Stacked

Transformer Assembly

225 kVA -----

-----

-----

-----

NQOD NQOD

NQOD NQOD

--------

NF NQOD

75 kVA

I-Line

NFNQOD

75 kVA

Main Circuit Breaker

I-Line I-Line

NF NQOD NF NQOD

75 kVA 75 kVA

Modular Panelboard System208Y/120 V

Modular Panelboard System with IPC2 Transformer Combo480Y/277 V System and 208Y/120 V System

Integrated Power Center 208Y/120 V

Integrated Power Center with IPC2 Transformer Combo80Y/227 V System and 208Y/120 V System

Integrated Power Center with Stacked Transformer480Y/277 V System and 208Y/120 V System

IPC2 Transformer Combo and Integrated Power Center480Y/277 V System and 208Y/120 V System

Switchboard and IPC2 Transformer Combo480Y/277 V System and 208Y/120 V System

I-Line

Courtesy of Steven Engineering, Inc.-230 Ryan Way, South San Francisco, CA 94080-6370-Main Office: (650) 588-9200-Outside Local Area: (800) 258-9200-www.stevenengineering.com