Team Hotel: Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala Advisors: Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering April 5, 2011. Syngas Production from Petroleum Coke Gasification . Project Purpose . What we are doing? - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Syngas Production from Petroleum Coke Gasification

Syngas Production from Petroleum Coke Gasification

Team Hotel:Russell Cabral, Tomi Damo, Ryan Kosak, Vijeta Patel, Lipi Vahanwala

Advisors:Bill Keesom – Jacobs Consultancy Jeffery Perl, PhD – UIC Dept. Of Chemical Engineering

April 5, 2011 1

Page 2: Syngas Production from Petroleum Coke Gasification

Project Purpose What we are doing?

Producing syngas from petcoke Using entrained flow gasifier Implementing a rigorous syngas

cleaning

Why we are doing this? Making syngas for acetic acid

production Chemical production team specs▪ CO to H2 molar ratio of 0.409▪ CO2 and N2 mixed in

2

http://coalgasificationnews.com/tag/petcoke-gasification/

4/5/2011

Page 3: Syngas Production from Petroleum Coke Gasification

Overall Block Flow

3

4/5/2011

Page 4: Syngas Production from Petroleum Coke Gasification

Recap Discussed Our Aspen Simulation

Gasifier Sulfur Removal Water Gas Shift CO2 Removal Claus Process

Heat Loads Optimization

Equipment Costs and Sizes Individual Economics

Sensitivity Analysis Location

44/5/2011

Page 5: Syngas Production from Petroleum Coke Gasification

Agenda

PFD

Initial Control Scheme

Plant Layout (General Arrangement)

Calculations

Refined Economics54/5/2011

Page 6: Syngas Production from Petroleum Coke Gasification

PFD: Overall Process

64/5/2011

Page 7: Syngas Production from Petroleum Coke Gasification

PFD: Gasification

74/5/2011

Page 8: Syngas Production from Petroleum Coke Gasification

PFD: Hydrogen Sulfide Removal

84/5/2011

Page 9: Syngas Production from Petroleum Coke Gasification

PFD: Water Gas Shift

94/5/2011

Page 10: Syngas Production from Petroleum Coke Gasification

PFD: CO2 Absorption

104/5/2011

Page 11: Syngas Production from Petroleum Coke Gasification

PFD: CO2 Sequestration

114/5/2011

Page 12: Syngas Production from Petroleum Coke Gasification

PFD: Claus Process

4/5/2011 12

Page 13: Syngas Production from Petroleum Coke Gasification

Control Scheme: H2S Removal

4/5/2011 13

Page 14: Syngas Production from Petroleum Coke Gasification

144/5/2011

Page 15: Syngas Production from Petroleum Coke Gasification

4/5/2011 15

Page 16: Syngas Production from Petroleum Coke Gasification

Control Scheme: Water Gas Shift

164/5/2011

Page 17: Syngas Production from Petroleum Coke Gasification

Plant Layout: Overall

4/5/2011 17

Page 18: Syngas Production from Petroleum Coke Gasification

Plant Layout: Gasification Island

4/5/2011 18

Page 19: Syngas Production from Petroleum Coke Gasification

Plant Layout: H2S Removal

4/5/2011 19

Page 20: Syngas Production from Petroleum Coke Gasification

Calculations

4/5/2011 20

Page 21: Syngas Production from Petroleum Coke Gasification

Refined Economics:Raw Material Cost

Raw Materials

Quantity (lbm/day) Price ($/lbm)

Total Cost (day)

Cost ($)/(year)

Petcoke (T/D) 4,409,200 0.034 $ 150,000 $ 52,500,000 Zinc Oxide (lbm/day) 392.73 55.00 $21,600 $ 7,560,053

Selexol 6,200,000 3.20 $19,840,000 $ 19,840,000

Ferro-chrome 53,001 1.33 $ 70,492 $ 24,672,215 Aluminium Oxide 450 23.17 $ 10,416 $ 3,645,468

Oxygen 4,232,832 0.028 $ 117,120 $ 40,992,000

Total     $

149,209,735

21

Page 22: Syngas Production from Petroleum Coke Gasification

4/5/2011 22

Annual Operating Cost

Raw Ma-

terial Cost14984%

Labor0.91%

CW+NG+E

lec21.512%

Maintenance7

4%

Annual Operating Cost

Raw Material costLaborCW+NG+ElecMaintenance

Page 23: Syngas Production from Petroleum Coke Gasification

Capital Cost Analysis

Gasifier, 74%$135 mm

Sulfur Removal, 9%

$17 mm

CO2 Sequa-tration, 17%

$31 mm

4/5/2011 23

Page 24: Syngas Production from Petroleum Coke Gasification

Economics Summary  1st year 2nd Year 3Rd year 4th year 19th Year

Revenue $ - $ - $ - $ 129,570,000 $ 240,352,994

Cap. Cost $ 25,546,569 $ 104,011,033 $ 72,990,199 $ 20,072,305 $ -

Op. Cost $ - $ - $ - $ 111,070,226 $ 242,943,820

Total Expense $ 25,546,569 $ 104,011,033 $ 72,990,199 $ 151,307,886 $ 281,203,980

Income tax 40%

$ - $ - $ - $ 13,144,845 $ 83,909,549

Income After Tax

$ - $ - $ - $ 19,717,268 $125,864,323

Cumulative Cash Flow

$ 25,546,569 $129,557,602 $202,547,801 $ 168,810,442 $1,540,424,893

NPV $89,282,710IRR N/AInterest 8%

24

Page 25: Syngas Production from Petroleum Coke Gasification

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

-$250

-$50

$150

$350

$550

$750

$950

$1,150

$1,350

$1,550Cumulative Cash Flow ($MM/year)

Years

($M

M/Y

R)

4/5/2011 25

Page 26: Syngas Production from Petroleum Coke Gasification

Sensitivity Analysis

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00 $270.00 $290.00 $310.00 $330.00

-$100.00

$0.00

$100.00

$200.00

$300.00

$400.00

$500.00

$600.00

NPV Vs. Syngas Prices

NPV

Syngas($/ton)

Net

Pre

sent

val

ue (

$mill

ion)

4/5/2011 26

Page 27: Syngas Production from Petroleum Coke Gasification

Sensitivity Analysis

$150.00 $170.00 $190.00 $210.00 $230.00 $250.00 $270.00 $290.00 $310.00 $330.00

-15.00%

-10.00%

-5.00%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

IRR vs. Syngas Price

IRR

Syngas ($/ton)

Inte

rnal

Rat

e of

ret

urn

4/5/2011 27

Page 28: Syngas Production from Petroleum Coke Gasification

Sensitivity Analysis

60 70 80 90 100 110 120 130 140 150 1600

100

200

300

400

500

600

NPV Vs. Petcoke Prices

NPV

Petcoke($/ton)

Net

Pre

sent

val

ue (

$mill

ion)

4/5/2011 28

Page 29: Syngas Production from Petroleum Coke Gasification

Sensitivity Analysis

50 70 90 110 130 150 1700.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

IRR vs. Petcoke Price

IRR

Petcoke ($/ton)

Inte

rnal

Rat

e of

ret

urn

4/5/2011 29

Page 30: Syngas Production from Petroleum Coke Gasification

Conclusion

PFD

Control Schemes

Plant Layout

Calculations

Refined Economics

4/5/2011 30

Page 31: Syngas Production from Petroleum Coke Gasification

Next Steps

Revise report

4/5/2011 31

Page 32: Syngas Production from Petroleum Coke Gasification

Questions?

4/5/2011 32

Page 33: Syngas Production from Petroleum Coke Gasification

References

Richard Parkinson.  “Where Does It Go? An Introduction to the Placement of Process Equipment.”  UOP  PowerPoint.  2009.  2 April 2011.

4/5/2011 33

Page 34: Syngas Production from Petroleum Coke Gasification

Report Outline

Final Report: Executive Summary IP Discussion IP Recommendations IP

Appendices Design Basis: Done Block Flow Diagram: Done Process Flow Showing Major Equip.: Done

344/5/2011

Page 35: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Material and Energy Balances: Done Calculations: IP Annotated Equip. List: Done Econ. Eval. Factored from Equip. Costs:

Done Utilities: IP Conceptual Control Scheme: Done Major Equipment Layout: Done

354/5/2011

Page 36: Syngas Production from Petroleum Coke Gasification

Report Outline

Appendices (Continued) Distribution and End-use Issues:

IP Constraints Review: IP Applicable Standards: IP Project Communications File: IP Information Sources and References:

IP

364/5/2011

Page 37: Syngas Production from Petroleum Coke Gasification

37

Control Scheme: CO2 Absorption

4/5/2011

Page 38: Syngas Production from Petroleum Coke Gasification

38

Control Scheme: CO2 Sequestration

4/5/2011

Page 39: Syngas Production from Petroleum Coke Gasification

39

Control Scheme: Gasifier

4/5/2011

Page 40: Syngas Production from Petroleum Coke Gasification

40

Control Scheme: Claus Process

4/5/2011

Page 41: Syngas Production from Petroleum Coke Gasification

41

Energy Balance Around WGS Reactor

4/5/2011

Page 42: Syngas Production from Petroleum Coke Gasification

Energy BalanceAround WGS ReactorInlet Fraction Clean Syngas Component

Flow for WGS Reactor (lbmoles/hr) for WGS Cp (btu/lbmole* F)

Outlet Syngas Comp (lbmole/hr) from

(WGS)

CO 4946.233 7.118 123.395

H2O 6424.688 15.367 1601.850

N2 199.954 7.158 199.954

H2* 2960.168 6.948 7783.006

CO2 469.211 10.559 5292.049

CH4* 0.255

12.432 0.255

H2S 0.000 0.000 0.000

COS 0.000 0.000 0.000

Total 15000.509 15000.509

424/5/2011

Page 43: Syngas Production from Petroleum Coke Gasification

Heat LoadsGasifier Equipment Heat Load (MMBtu/hr)

Gasifier -34.7 HP Steam Heat Exchanger 139.0 MP Steam Heat Exchanger 281

Cooler -106.8 Flash 2.99

Sulfur Clean Up Equipment Heat Load (MMBtu/hr)Sulfur Stripper Reboiler 57.0Sulfur Stripper Cooler -200.0

Selexol Cooler -40.7 Rich / Lean Heat Exchanger 274.9

4/5/2011 43

Page 44: Syngas Production from Petroleum Coke Gasification

44

CO2 Sequestration

CO2 in our syngas is absorbed on Selexol to be selectively removed

Delete only one CO2 slide.

4/5/2011